Draft Minimum Requirements_Sources Sought Notice.docx.pdf
PDF 309 KB Posted
- Attached to
- Jet Docks Federal contract opportunity
- Solicitation number
- N0018923Q05555
About this file
This document outlines requirements for a federal contract to provide floating docks and related materials to support maritime expeditionary operations. The Navy requires a contractor to supply and install five custom 42-foot performance series floating docks alongside existing docks at piers 37-38 on Joint Expeditionary Base Little Creek in Virginia Beach, Virginia by November 24, 2023. The docks must be capable of lifting and lowering 40-foot patrol boats weighing 40,000 pounds off the water alongside a dock previously purchased from Jet Systems. The contractor must provide all necessary pontoons, adapters, gangways, hardware and equipment, as well as execution of installation, calibration, mooring, and training. The place of performance is piers 37-38 at Joint Expeditionary Base Little Creek in Virginia Beach, Virginia. The related federal contract opportunity is solicitation number N0018923Q05555 for jet docks from the Department of the Navy Naval Supply Systems Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources Sought_JET DOCKS.docx.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Minimum Requirements
Maritime Expeditionary Security Group TWO – MSRON 10 HVU DET
Floating Docks
1. Scope: Maritime Expeditionary Security Group TWO requires a qualified and responsible contractor who can provide the necessary supplies and installation of floating docks to support
40-foot Metal Shark Patrol Boat approximate weight of 40,000lb’s during the winter missions without recovering the boat from the water using the boat trailer.
2. Requirements: Contractor must provide materials/supplies and tools for installation of five
(5) floating docks at Desert Cove Piers 37-38 on board Joint Expeditionary Base Little Creek
Virginia Beach, Virginia. The requirement includes the shipment of the jet docks, complete project execution/installation and calibration of five (5) custom 42ft performance series aqua pads for the 40ft Metal Shark Patrol Boats to go along with the four (4) current existing models on site. Two (2) new docks shall be attached to the single metal 40ft PB dock where wet slips currently reside and additional (3) in the secondary slip. The wet slip/walkways shall be reconfigured as needed. Due to craft weight of 40,000lbs a custom buoyancy package shall be installed. Additional requirements are inverting each side of KDS, 9 MA KDS pipe, 5 MA 8” and 10” outers with riser kits.
The floating dock must be a frame structure with ballast to lift and lower the 40-foot boat off the water. The floating dock is to be installed alongside a previously purchased floating dock purchased from Jet Systems, Inc. The floating dock will be secure to the wood pylon on the pier in a manner that will rise and lower with the inlet water tides and allow for two 40ft boats to be lifted simultaneously. An operational test must be conducted prior to acceptance of the work.
MSRON 10 will have a crane on site as needed for launch.
Contractor shall supply forklift onsite for offload, assembly and launch.
Description Part Number Quantity
UNIVERSAL 42FT PERFORMANCE DOCK – 15’ WIDE X 46’8” – 251MA D0128PD101 5
CUBE – LARGE (BLACK) – TO MAKE DOCKS 18’4” WIDE C000000001 280
CUBE – LARGE (BLACK) – BOW LANES (7MA) FOR FEND OFF AND LATTERAL
GANGWAY LANDINGS (11MA + FLEX LANES)
C000000001 406
CUBE – LARGE (BLACK) – FLEX LANES MODULES (9MA) – QTY 3 C000000001 27
CUBE – LARGE (BLACK) – BOAT DOCK BOW BUOYANCE SUPPLEMENT –
12MA – 5 DOCKS
C000000001 60
11MA – PGB – 7 – 48” PONTOON K0000008895 10
11MA – SSB – 7 – 48” PONTOON K0000008825 30
NS – PONTOON – 48” DIAMETER X 20’ LONG C000000765 10
PSAP – PONTOON STRAPS & HARDWARE (48”) A000000963 5
MI7 POWERHEAD – 110V – 30AMP K000000690 5
SEE KP – DBLE ARM ADAPTER SYSTEM – 4 ANCHR PNTS (PAINTED) A0000002547 19
CUSTOM – 20” HOOP – (FOR 18” DIAMETER PILING OR LESS) TMP0000002 19
PONTOON – 36” DIAMETER X 20’ LONG- REMOVED FROM ABOVE 42’ DOCKS C000000751 -10
PSAP – PONTOON STRAPS & HARDWARE – LIFTING EYES (36”) – REMOVED
FROM ABOVE 42’ DOCKS
A0000009611 -5
PREMIUM 6 STEP W/HANDRAIL & MNTG HDWR – 67”L x 24”W x 48”H A0000000191 5
NS – GANGWAY – ALUMINUM (30’ LONG x 36” WIDE) – SEE RIDER A000000054 2
SEE KP – WEAR PLATE – 60” x 60” x 0.50” HDPE C000000792 2
PSAP – ICS – 53 ¼” (3 MODULES) – SURFACE T-STOCK FOR GANGWAY K000000895 6
PROJECT EXECUTION –
OFFLOAD/ASSEMBLY/LAUNCH/CALIBRATION/MOOR/TRAINING/ADMIN
A0000OH560 1
FORKLIFT - RENTAL TMP00000041 1
3.0 Place of Performance: Repairs to the floating dock system will be at piers 37-38 onboard
Joint Expeditionary Base Little Creek Virginia Beach, Virginia.
4.0 Required Delivery Date: 24 November 2023
File details come from the government source that posted it. Updated .