DRAFT JAC WWTP Hauling IDIQ SOW.pdf

PDF 156 KB Posted

Attached to
Wastewater Treatment Hauling Services; Jacobs Creek Job Corps Center; Bristol, TN.
Solicitation number
1282A724Q0034
Issued by

About this file

This document is a Draft Statement of Work (SOW) for an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract to provide wastewater hauling services at the Jacobs Creek Job Corps Center in Bristol, Tennessee. The contractor will be required to provide labor, materials, equipment, and transportation to pump and haul sludge, excess influent, and obtain municipal wastewater for seeding the on-site wastewater treatment plant. Estimated annual pumping volumes range from 100,000 to 2,500,000 gallons, with higher volumes typically occurring during the winter rain/snow season. The contractor must provide documentation of the certified wastewater treatment facilities that will receive the pumped wastewater, as well as copies of disposal manifests. Pricing will be a fixed cost per gallon, inclusive of all associated activities. The contractor must provide samples and notification of gallons hauled per each truck load. A Sources Sought synopsis has been issued to gauge interest and capabilities from small businesses, including 8(a), HUBZone, Service-Disabled Veteran-Owned, and Women-Owned firms, for a potential future Request for Quote solicitation and IDIQ contract award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jacobs Creek Job Corps Center Wastewater Hauling IDIQ

DRAFT Statement of Work

Project Jacobs Creek Job Corps Center Wastewater Hauling IDIQ

General Information

1.0 Scope of Work

The contractor shall provide all labor, material, equipment, and transportation to successfully provide the following services at Jacobs Creek Job Corps Center, as described below:

• Pumping and hauling of sludge

• Pumping and hauling of excess influent to prevent overflow

• Seeding the wastewater treatment plant for improved treatment process. This task includes obtaining wastewater from a municipal wastewater treatment plant and hauling and pumping into the Jacobs Creek plant.

Estimated yearly pumping: 100,000-2,500,000 gallons Minimum yearly pumping: 100,000 gallons

Higher volume of hauling requirements typically occurs during the winter rain/snow season: September – April.

2.0 Background

The wastewater treatment plant is a Titan Membrane Filtration plant. In a typical year, sludge must be periodically removed. During heavy rain events or when the membranes are undergoing routine cleaning, excess influent must be pumping and hauled to a municipal plant. Additionally, municipal waste may need to be hauled into the plant to provide seeding to allow the plant to operate more efficiently.

When the plant is operating normally, there is a need to pump 30,000 gallons of sludge, and 100,000 gallons of excess influent. In the years 2020-2022 pumping volumes ranged from 500,000-720,000 gallons per year due to filtration issues and high rain events. In November 2022, the plant experienced a total membrane failure and was non-operational. The volume hauled during the plant failure was 4.6 million in 2023, and 2.2 million from January-June 2024. The plant was repaired and returned to normal service in June 2024.

Contractor Requirements

3.0 Technical Requirements

Prior to any work being accomplished on this contract, the contractor will provide documentation to the Contracting Officer of the locations and names of the Certified Wastewater Treatment Facilities that will receive the pumped wastewater. The contractor shall provide copies of manifest from the location(s) at which the sludge is disposed at the time of invoicing.

All sludge and wastewater removed from the Center under this contract shall be disposed of by the contractor in accordance with Federal, State of Tennessee, and local regulations. For each truck load pumped, the contractor shall grab and provide a sample to the wastewater treatment operator to submit for State required testing.

The contractor shall consider in their unit pricing that notification for pumping may occur within twenty-four

(24) hours. For routine sludge removal or seeding, the center will give the contractor three business days’ notice. The price per gallon will be the same regardless of the notification time and the type of waste (sludge, excess influent or seeding). The per gallon cost shall be inclusive of all activities necessary to remove waste, including, but not limited to drive time, fuel, vehicle maintenance, Personal Protective Equipment, licensing, safety and spill prevention plan development, and disposal costs. The vendor shall bill for services solely as a cost per gallon, and no other costs will appear on the submitted invoices.

On the day of completion of pumping, the contractor shall provide notification to the Contracting Officer's Representative by email reporting the number of gallons hauled. Designated Points of Contact at the Center will be allowed to schedule the pumping.

4.0 Deliverables

• Samples: For each truck load pumped, the contractor shall grab and provide a sample to the wastewater treatment operator to submit for State required testing.

• Volume reporting: On the day of completion of pumping, the contractor shall provide notification to the Contracting Officer's Representative by email reporting the number of gallons hauled.

• Manifests: The contractor shall provide copies of manifest from the location(s) at which the sludge is disposed at the time of invoicing.

Project
General Information
1.0 Scope of Work
Estimated yearly pumping: 100,000-2,500,000 gallons
Minimum yearly pumping: 100,000 gallons
Higher volume of hauling requirements typically occurs during the winter rain/snow season: September – April.
2.0 Background
Contractor Requirements
3.0 Technical Requirements
Prior to any work being accomplished on this contract, the contractor will provide documentation to the Contracting Officer of the locations and names of the Certified Wastewater Treatment Facilities that will receive the pumped wastewater. The contra...
4.0 Deliverables