Draft - Drawing Plans 12-16-2021.pdf
PDF 5 MB Posted
- Attached to
- USACE Levee Repair - San Joaquin County
- Solicitation number
- W91238-22-S-0010-01
About this file
This document provides details for a potential federal construction contract opportunity with the U.S. Army Corps of Engineers Sacramento District. The project involves levee repairs along the San Joaquin River in San Joaquin County, California to rehabilitate approximately 3,800 feet damaged in 2016-2017 flooding. The construction is anticipated to include removal of an existing emergency berm and fence, clearing and grubbing, and building a seepage berm with materials like levee fill, geotextiles, filter sand, drain rock, and a replacement steel fence. The contract value is estimated between $5-10 million. The solicitation is anticipated to be issued on February 14, 2022 as a total small business set-aside under NAICS code 237990 and PSC code Y1KB. Bids are tentatively due on March 16, 2022 and work must be completed by November 1, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft - Specifications 12-13-2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
SACRAMENTO DISTRICT
SAN JOAQUIN RIVER RIGHT BANK
SAN JOAQUIN COUNTY, CALIFORNIA
PL 84-99 EMERGENCY REPAIRS
SITE 1151-21
W91238-16-D-0018
XXXXXX-XX-X-XXXX
DECEMBER 2021
US Army Corps of Engineers ®
USACE SACRAMENTO
SIGNATURE BLOCK
PREPARED UNDER THE DIRECTION OF:
JAMES J. HUNDURA
COL. CORPS OF ENGINEERS, SACRAMENTO DISTRICT
APPROVED BY:
RICK POEPPELMAN PE
CHIEF, ENGINEERING DIVISION
APPROVED FUNCTIONAL ADEQUACY:
WILLIAM HALL P.E.
CHIEF, DESIGN BRANCH
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
1-
US Army Corps of Engineers ®
Last saved by: ADAM.FORD(2021-08-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-G-001.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
G -0
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S E
N
C O
V E
R S
H E
E T
G-001
S
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-G-002.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
G -0
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
A B
B R
E V
IA
TI
O N
S A
N D
S H
E E
T
IN
D E
X G
E N
E R
A L
N O
TE
S
, L E
G E
N D
G-002
GENERAL NOTES
SECTION LINE
DETAIL
NORTH ARROW
LEGEND
NORTH
PLAN
X# X-5##
AB
APN
AVE
CO
CY
E
EA
EG
EL
FG
FT
HWY
IN
LS
MAX
MIN
NGS
N
CUBIC YARD
EAST, EASTING
EACH
EXISTING GROUND
ELEVATION
FINISH GRADE
FEET
HIGHWAY
INCH
LANDSIDE
MAXIMUM
MINIMUM
MSWSE
NATIONAL GEODETIC SURVEY
NORTH, NORTHING
AGGREGATE BASE
ASSESSOR PARCEL NUMBER
AVENUE
COUNTY
NAD
RD
S
SF
ST
TYP
W
WS
YD
NORTH AMERICAN DATUM
ROAD
SOUTH
SQUARE FEET
STREET
TYPICAL
WEST
WATERSIDE
YARD
MEAN SUMMER WATER SURFACE ELEVATION
ABBREVIATIONS
FD FOUND
DWR DEPARTMENT OF WATER RESOURCES
IP IRON PIPE
NTS NOT TO SCALE
NAVD NORTH AMERICAN VERTICAL DATUM
PVI POINT OF VERTICAL INTERSECTION
X# X-3##
GS GROUND SURFACE
APPROX APPROXIMATELY
BLVD. BOULEVARD
CP CATCH POINT
(E) EXISTING
ACCESS POINT
1. DIMENSIONS, REPAIR LENGTHS AND QUANTITIES SHOWN ARE APPROXIMATE AND
ONLY INDICATE THE GENERAL SCOPE OF REPAIR.
2. GENERAL NOTES ARE APPLICABLE TO ALL WORK, UNLESS NOTED OTHERWISE.
3. ACCESS TO THE PROJECT IS LIMITED TO THE ACCESS POINTS SHOWN ON THE
DRAWINGS.
4. THE LOCATIONS OF EXISTING UTILITIES, IF ANY, ARE APPROXIMATE AND HAVE
NOT BEEN INDEPENDENTLY VERIFIED BY THE CONTRACTING OFFICER OR THEIR
REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION
AND ELEVATION OF ALL UTILITIES WITHIN THE CONSTRUCTION ZONE, ALONG THE
CONSTRUCTION ACCESS ROUTE AND IN THE STAGING AREAS BEFORE
COMMENCING WORK. THE CONTRACTOR SHALL PROTECT ALL UTILITIES,
INCLUDING PROVIDING AND PLACING STEEL PLATING, AND SHALL BE FULLY
RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE CAUSED BY THE
CONTRACTOR'S FAILURE TO LOCATE AND PRESERVE ANY AND ALL UTILITIES.
CONTRACTOR TO NOTIFY UNDERGROUND SERVICE ALERT TWO DAYS MINIMUM
PRIOR TO ANY EXCAVATION FOR CONSTRUCTION. CONTRACTOR SHALL OBTAIN
ALL PERMITS NECESSARY TO WORK AROUND EXISTING UTILITIES.
5. CONTRACTOR SHALL PROVIDE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) AND IMPLEMENT THE PLAN.
6. CONTRACTOR MUST KEEP ROADWAYS CLEAR OF MUD AND DEBRIS AT ALL TIMES.
7. ANY TEMPORARY EARTHWORK ASSOCIATED WITH CONSTRUCTION MUST BE
APPROVED IN ADVANCE BY THE CONTRACTING OFFICER.
8. UNLESS OTHERWISE NOTED, NO TEMPORARY OR PERMANENT EXCAVATIONS ARE
ALLOWED.
9. LEVEE SLOPES MAY NOT BE CUT TO PROVIDE CONSTRUCTION ACCESS RAMPS.
10. WHEN REMOVING TEMPORARY FILL, CONTRACTOR MUST EXERCISE CAUTION TO
AVOID DISTURBING THE EXISTING GROUND SURFACE BELOW THE TEMPORARY
FILL. UPON COMPLETION OF THE WORK, CONTRACTOR IS TO REMOVE AND
DISPOSE OF TEMPORARY FILL, RESTORE GROUND SURFACE BELOW TO ORIGINAL
CONDITION, AND HYDROSEED DISTURBED AREAS.
11. ALL DIMENSIONS ARE IN FEET UNLESS OTHERWISE NOTED.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING THE DAMAGE CAUSED
TO EXISTING FACILITIES TO PRE-CONSTRUCTION CONDITIONS. ANY ROADS,
CURBS, GUARDRAILS, SIGNS, FENCES, UTILITIES, FLOOD CONTROL STRUCTURES
STAGING AND LAYDOWN AREAS WILL BE REPLACED OR REPAIRED TO APPLICABLE
STANDARDS AT THE CONTRACTORS EXPENSE TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
13. DRAWING SCALES DEPICTED ARE BASED ON UNITED STATES ARMY CORPS OF
ENGINEERS (USACE) PROJECT CAD STANDARDS SUMMARY. PLOTTING AREA FOR
22"X34" (D SIZE). CONFIRM SCALE FOR DRAWINGS PLOTTED AT ALL OTHER
DIMENSIONS.
14. DRAWINGS SHOWN WITH AERIAL PHOTOS ARE PROVIDED FOR REFERENCE ONLY.
ALL FACILITIES MAY NOT BE SHOWN ON PHOTOS. THE CONTRACTOR SHALL
SATISFY THEMSELVES AS TO THE LOCATION OF EXISTING FACILITIES THAT MAY BE
AFFECTED BY CONSTRUCTION.
15. TOPOGRAPHIC SURVEY PROVIDED BY MHM, INC. ON DECEMBER 24, 2018.
FLOW
FLOW LINE
CIP CAST IN PLACE
PVC POLYVINYL CHLORIDE
AGGREGATE SURFACING - PLAN VIEW
SHEET INDEX
SHEET ID DESCRIPTION
G-001 COVER SHEET
G-002 GENERAL NOTES, LEGEND, ABBREVIATIONS, AND SHEET INDEX
G-003 PROJECT VICINITY AND LOCATION MAP
V-001 PROJECT SURVEY CONTROL
G-004 STAGING AREA AND HAUL ROUTE
G-005 KEY MAP AND CONTROL LINE
G-006 CONSTRUCTION LIMITS
CD-101 EXCAVATION PLAN, STA 4876+00 TO 4868+00
CD-102 EXCAVATION PLAN, STA 4868+00 TO 4860+00
C-103 GRADING PLAN - SUBGRADE STA 4876+00 TO 4868+00
C-104 GRADING PLAN - SUBGRADE STA 4868+00 TO 4860+00
C-111 GRADING PLAN - FILL, STA 4876+00 TO 4868+00
C-112 GRADING PLAN - FILL, STA 4868+00 TO 4860+00
C-301 TYPICAL SECTIONS - EXCAVATION
C-302 TYPICAL SECTIONS - CONSTRUCTION
C-310 EXCAVATION CROSS SECTIONS, STA 4861+00 TO 4868+00
C-311 CONSTRUCTION CROSS SECTIONS, STA 4861+00 TO 4868+00
C-312 CONSTRUCTION CROSS SECTIONS STA 4869+00 TO 4875+00
C-501 DETAILS
TYPE II FILL - SECTION VIEW
DRAIN ROCK - SECTION VIEW
FILTER SAND - SECTION VIEW
FL FLOW LINE
OFF OFFSET
BORING SYMBOL
CENTERLINE
PROPERTY LINE
(E) MINOR CONTOURS
(E) MAJOR CONTOURS
PROPOSED MINOR CONTOURS
PROPOSED MAJOR CONTOURS
LIMITS OF CONSTRUCTION
LIMITS OF CLEARING, GRUBBING AND STRIPPING
LIMITS EXCAVATION
MATCHLINE
CENTERLINE
CH CHORD
EXISTING CRUSHED AGGREGATE EMERGENCY
AGGREGATE SURFACING - SECTION VIEW
SEEPAGE BERM TOE MATERIAL - SECTION VIEW
CONCRETE
STA. STATION
+0
4850+00
4855+00
4860+00
4865+00 4870+00
4875+00
4880+00
4884+92
AI
RP
O
RT
W
AY
DURHAM FERRY ROAD
KASSON ROAD
DIVISION ROAD
PERRIN ROAD
WALTHALL SLOUGH
E LINNE ROAD
SA
N
J O
AQ
U
IN
R
IV
ER
KASSON ROAD
IN
TE
RST
AT
E
ROUTE
E MC MULLIN ROADS
H
A Y
S R
O A
D
A
IR
P O
R T
W A
Y
W LORENZEN ROAD
PERRIN ROAD
M C
M U
LLIN
SA
N
J O
AQ
U
IN
R
IV
ER
OCEAN
SACRAMENTO
SAN FRANCISCO
NEVADA
CALIFORNIA
PACIFIC
OREGON
ARIZONA
MEXICO
TRACY
STOCKTON
MODESTO
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ALAN.CAMOU(2021-02-23) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-G-003.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
G -0
FI
LE
N
A M
E
7-
-1
A1 LOCATION MAP
SCALE: 1" = 300' 600'0 300'
NORTH
PLAN
A6 VICINITY MAP
SCALE: 1" = 4000' 8000'0 4000'
CO
CO
NI
NO
D R
KASSON RD
SA
N JO
AQ
UIN
R
IV
ER
AIRPORT WAY
FLO
W
SAN JOAQUIN RIVER
FLOW
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
P R
O
JE
C T
V
IC
IN
IT
Y A
N D
L O
C A
TI
O
N M
A P
G-003
E6 PROJECT LOCATION MAP
NOT TO SCALE
VICINITY MAP A6
LEVEE CONTROL LINE
SITE AREA
A1
+0
4850+00
4855+00
4860+00 4865+00
4870+00
4875+00
4880+00
4884+91.08
AIRPORT WAY
BEGIN PROJECT
STA. 4861+50 (APPROX)
END PROJECT
STA. 4876+00 (APPROX)
CONTROL LISTING
POINT #
ELEV
32.000
43.300
39.879
39.474
39.199
39.400
NORTHING
2089368.84
2072480.73
2068462.10
2068499.11
2068513.62
2069467.06
EASTING
6321453.91
6334356.52
6342244.40
6341911.38
6341491.07
6340535.82
DESCRIPTION
NGS_AA4256-HPGN D CA 10 HG
NGS_HS0679_SJ 7 USE
SA 113 FD PCAP
FD PCAP
SA 112 FD PCAP
SA 114 FD PGE BM 57
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-V-001.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
V -0
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
P
O
JE
C T
S U
R V
E Y
C O
N
TR
O L
V-001
NORTH
PLAN
FLO
W
FLOW
A1 PROJECT SURVEY AND CONTROL POINTS
SCALE: 1" = 300' 600'0 300'
1. SURVEY CONTROL DATA SHOWN HEREON PROVIDED
BY MHM, INC.
2. HORIZONTAL CONTROL STATEMENT: COORDINATE
VALUES AND BEARINGS SHOWN FOR THIS SURVEY ARE
REFERENCED TO THE NORTH AMERICAN DATUM OF
1983 (NAD83) AND ORIGINATE FROM FOUND
MONUMENTS AA4256 "HPGN D CA 10 HG" AND HS0679
"SJ 7" ESTABLISHED BY THE NATIONAL GEODETIC
SURVEY AND ADJUSTED IN JUNE 2012. THE DATUM
REFERENCE FOR THIS SURVEY IS BASED UPON THE
CALIFORNIA COORDINATE SYSTEM, ZONE 2 (NAD83)
2011 EPOCH. ALL MEASURMENTS ARE GRID VALUES IN
U.S. SURVEY FEET. TO OBTAIN GROUND VALUES DIVIDE
DISTANCES BY THE MEAN COMBINATION FACTOR
0.99992225.
3. VERTICAL CONTROL STATEMENT: ELEVATION VALUES
FOR THIS SURVEY ARE REFERENCED TO THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD88) AND
ORIGINATE FROM FOUND AND MEASURED MONUMENTS
AA4256 "HPGN D CA 10 HG" ASSIGNED THE ELEVATION
32.00 FEET, NAVD88 AND HS0679 "SJ 7" ASSIGNED THE
ELEVATION 43.30 FEET NAVD88.
4. CONTRACTOR SHALL PRESERVE AND PROTECT ALL
CONTROL POINTS AND EXISTING MONUMENTS.
MONUMENTS AND SURVEY MARKERS DESTROYED
DURING CONSTRUCTION SHALL BE REPLACED BY A
LICENSED SURVEY AT THE CONTRACTORS EXPENSE.
GENERAL SHEET NOTES
LEGEND
- SURVEY CONTROL POINT '202'202
A6 PROJECT VICINITY SURVEY AND CONTROL POINTS
SCALE: 1" = 4000'
SITE AREA
204 203
SEE SHEET G-005 FOR LEVEE CONTROL LINE CURVE AND LINE TABLES
V
V
V
V
V V
V V
V
V
V
V
V
V
V
V
V
V
V
V V
V
V
V V
V V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V V
V
V
VV
V
V
V
V
V
V
V
VVV
V
V
V
V
V
V
V
V
V
V
V
V
V
V
+0
4850+00
4855+00
4860+00 4865+00 4870+00
4875+00
4880+00
4884+91
V V
V V
V V
V
V
V V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
+0
4850+00
4855+00
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ALAN.CAMOU(2021-02-23) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-G-004.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
G -0
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
TA
G
IN
G A
R E
A A
N D
H A
U L
R O
U
TE
G-004
NORTH
PLAN
COCONIN
O D
R
KASSON RD
SAN JOAQUIN RIVER
AIRPORT WAY
FLOW
SAN JOAQUIN RIVER
FLOW
A1 STAGING AREA AND HAUL ROUTES
SCALE: 1" = 300' 1000'0 500' A6 STAGING AREA
SCALE: 1" = 100' 200'0 100'
STAGING AREA
(APPROX 1.75 ACRES)
ACCESS POINT
A6
1. PROTECT EXISTING TREES WITHIN TEMPORARY WORK
AREAS AND ALONG HAUL ROUTES DURING
CONSTRUCTION IN ACCORDANCE WITH SPECIFICATION
01 50 00.
2. ALL ACCESS POINTS TO PUBLIC ROADS MUST BE
CONTROLLED IN ACCORDANCE WITH SPECIFICATION
01 50 00.
3. CONTRACTOR SHALL PLACE CONSTRUCTION SIGNAGE IN
ACCORDANCE WITH SPECIFICATION 01 50 00.
4. ALL TRUCKS SHALL TRAVEL AT SPEEDS LESS THAN 15
MPH ON HAUL ROADS.
5. ONLY MINIMUM CLEARING, STRIPPING, AND GRUBBING
AS REQUIRED FOR EQUIPMENT SET UP SHALL BE
CONDUCTED IN THE STAGING AREA.
6. STAGING/LAYDOWN AREAS AND SITE OFFICE LOCATION
AREA TO BE RETURNED TO THEIR ORIGINAL CONDITIONS
AT THE END OF THE WORK PRIOR TO DEMOBILIZATION.
7. CONTRACTOR SHALL PROVIDE TEMPORARY SECURITY
FENCING AROUND VULNERABLE PORTIONS OF STAGING
AREA IN ACCORDANCE WITH SPECIFICATION 01 50 00.
8. TEMPORARY ACCESS RAMPS ARE TO BE CONSTRUCTED
OF IMPORT FILL ONLY. NO CUTTING INTO EXISTING
GROUND, INCLUDING FILL, SHALL BE PERMITTED EXCEPT
AS SHOWN ON THE PLANS.
GENERAL SHEET NOTES
STAGING AREA
HAUL ROUTE
ACCESS POINT
LEGEND
VVV
HAUL ROUTE
CONSTRUCTION SIGN
SEE NOTE 3
AIRPORT WAY
2 RIVERS RD
CURVE TABLE: LEVEE CONTROL LINE
CURVE #
C1
C2
C3
C4
C5
C6
C7
C8
LENGTH
105.98'
184.20'
222.49'
444.81'
156.79'
7.04'
193.31'
104.70'
RADIUS
1000.00'
1000.00'
800.00'
600.00'
200.00'
200.00'
1500.00'
200.00'
DELTA
6°04'19"
10°33'14"
15°56'06"
42°28'33"
44°55'05"
2°01'02"
7°23'02"
29°59'38"
CHORD DIRECTION
S42° 00' 53.98"E
S39° 46' 26.40"E
S42° 27' 52.09"E
S71° 40' 11.52"E
S70° 26' 55.40"E
S48° 59' 53.53"E
S46° 18' 53.15"E
S27° 37' 33.16"E
CHORD LENGTH
105.93'
183.94'
221.78'
434.69'
152.81'
7.04'
193.18'
103.51'
BEGIN LEVEE
CONTROL LINE
N:2067367.387 E:6343378.014
END LEVEE
CONTROL LINE
N:2069574.541 E:6340544.078
4847+00
4850+00
4855+00 4860+00
4865+00
4870+004875+00
4880+00
4884+91.08
L8
L7 L6
L3
L2
L1
L9 L5
L4
C7C6C5
C4C3
C2
C1
C8
LINE TABLE: LEVEE CONTROL LINE
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
L9
LENGTH
127.57'
235.15'
64.02'
492.93'
358.11'
387.49'
184.64'
396.84'
125.00'
DIRECTION
S38° 58' 44.32"E
S45° 03' 03.64"E
S34° 29' 49.17"E
S50° 25' 55.01"E
N87° 05' 31.97"E
S47° 59' 22.76"E
S50° 00' 24.30"E
S42° 37' 21.99"E
S12° 37' 44.32"E
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-03-31) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-G-005.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
G -0
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S E
N
K E
Y M
A P
A N
D C
O N
TR
O
L
LI
N E
G-005
NORTH PLAN
SAN JOAQUIN RIVER
FLOW
A1 KEY MAP
SCALE: 1" = 200' 400'0 200'
E1 ALIGNMENT TABLE - LEVEE CONTROL LINE
LEVEE CONTROL LINE
CD-102 & C-112
CD-101 & C-111
CURVE TABLE: CONSTRUCTION LIMITS
CURVE #
C1
C2
C3
C4
C5
LENGTH
16.53'
8.77'
367.94'
110.11'
599.66'
RADIUS
30.00'
30.00'
600.00'
150.00'
831.00'
DELTA
031°33'40"
016°44'51"
035°08'07"
042°03'25"
041°20'43"
CHORD LENGTH
16.32'
8.74'
362.20'
107.65'
586.73'
CHORD BEARING
S34° 38' 22.06"E
S10° 06' 33.09"E
N74° 30' 34.70"W
N71° 02' 55.54"W
S71° 05' 33.81"E
LINE TABLE: CONSTRUCTION LIMITS
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
LENGTH
18.85'
336.43'
9.20'
97.50'
53.70'
56.50'
132.24'
199.41'
119.29'
121.14'
20.92'
404.31'
34.85'
140.10'
321.79'
134.87'
57.67'
171.62'
270.55'
58.24'
63.66'
DIRECTION
S18° 51' 31.88"E
S01° 44' 07.54"E
S56° 00' 06.81"W
N33° 56' 53.10"W
N40° 24' 00.96"W
N44° 49' 06.93"W
N53° 13' 57.72"W
N48° 57' 19.18"W
N49° 08' 15.16"W
N50° 28' 08.84"W
N56° 56' 31.13"W
S87° 55' 21.73"W
N50° 01' 12.80"W
N47° 01' 44.43"W
N48° 35' 32.73"W
N52° 51' 52.53"W
N44° 51' 19.03"W
N42° 44' 17.33"W
N42° 24' 32.16"W
N45° 35' 35.72"W
N53° 04' 09.33"W
LINE TABLE: CONSTRUCTION LIMITS
LINE #
L22
L23
L24
L25
L26
L27
L28
L29
L30
L31
L32
L33
L34
L35
L36
L37
L38
L39
L40
L41
LENGTH
56.91'
129.86'
59.53'
78.46'
186.15'
23.24'
24.82'
92.28'
58.30'
87.09'
302.04'
121.06'
142.00'
136.71'
144.72'
261.26'
23.83'
35.81'
238.23'
490.09'
DIRECTION
N33° 48' 51.56"W
N07° 05' 10.18"W
N66° 54' 15.43"E
S31° 52' 12.49"E
N61° 27' 39.37"E
S13° 51' 09.18"E
S07° 20' 39.59"W
S04° 09' 02.16"W
S16° 40' 28.83"E
S20° 04' 17.15"E
S40° 34' 39.04"E
S47° 59' 56.14"E
S48° 12' 49.20"E
S50° 47' 39.30"E
S46° 19' 55.58"E
N88° 14' 04.63"E
N31° 39' 51.21"E
S58° 01' 46.31"E
N88° 14' 04.63"E
S50° 25' 12.24"E
N:2068248.074 E:6342902.496
4847+00
4850+00
4855+00
4860+00
4865+00
4870+00 4875+00
CONSTRUCTION LIMITS
L37
L3
L39
L40
C5
L41C1 L1
C2
L2
L3 L4 L5 L6 L7 L8 L9 L10 L11
C3
L12
C4 L13 L14 L15 L16 L17
L18
L19 L20 L21 L22
L23
L2
L25
L2
L27
L28
L29
L30
L31
L32
L33L34L35L36
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-G-006.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
G -0
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S E
N
C O
N S
TR
U
C
TI
O N
L
IM
IT
S
G-006
NORTH PLAN
SAN JOAQUIN RIVER
FLOW
A1 CONSTRUCTION LIMITS
SCALE: 1" = 100' 200'0 100'
E1 CONSTRUCTION LIMITS LINE TABLE E6 CONSTRUCTION LIMITS CURVE TABLE
4868+00
4869+00
4870+00
4871+00
4872+00
4873+00
4874+00
4875+00
4876+00
4877+00
3H :1
V
(E) CRUSHED AGGREGATE
EMERGENCY BERM
(SEE NOTE 2)
LIMITS OF CLEARING, GRUBBING, AND STRIPPING
CONSTRUCTION LIMITS
LEVEE CONTROL LINE
SEE NOTE 6
LIMITS OF EXCAVATION
(E) FENCE
REMOVE BETWEEN
NEW CONNECTIONS
APPROX LOCATION OF
NEW FENCE CONNECTION
(SEE SHEET C-111)
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-CD-101.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C D
-1
FI
LE
N A
M E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
X
C A
V A
TI
O
N P
LA
N
, S
TA
6+
T O
8+
CD-101NORTH PLAN
SAN JOAQUIN RIVER
FLOW
A1
EXCAVATION PLAN, STA 4876+00 TO 4868+00
SCALE: 1" = 200' 60'0 30'
1. THE LIMITS OF CLEARING, GRUBBING, AND STRIPPING
INCLUDE THE EXCAVATION AND FILL LIMITS. CLEARING,
GRUBBING AND STRIPPING SHALL BE PERFORMED IN
ACCORDANCE WITH SPECIFICATION 31 11 00.
2. EXISTING EMERGENCY BERM AND ADJACENT TOE
FENCE SHOWN IN THE DRAWING WILL BE REMOVED BY
OTHERS PRIOR TO THE CONSTRUCTION OF THE
SEEPAGE BERM.
3. ALL EXCAVATION SHALL BE PERFORMED IN SUCH A
WAY AS TO ENSURE POSITIVE DRAINAGE AWAY FROM
THE LEVEE TOE.
4. CONTRACTOR SHALL STOCKPILE STRIPPED MATERIALS
FOR RESPREAD ON COMPLETED BERM.
5. CONTRACTOR SHALL PROVIDE HIGH VISIBILITY
TEMPORARY SECURITY FENCE AT THE CONSTRUCTION
LIMIT LINE.
6. CONTRACTOR SHALL PROTECT ALL EXISTING CONTROL
POINTS IN PLACE.
7. REFER TO THE GEOTECHNICAL DATA REPORT (GDR)
FOR AVAILABLE INFORMATION ON SUBSURFACE
EXPLORATION AND SOIL LABORATORY TEST RESULTS.
8. SEE C-301 FOR TYPICAL EXCAVATION SECTIONS.
GENERAL SHEET NOTES
LEGEND
CRUSHED AGGREGATE SURFACING
M
AT
C H
L
IN
E C
D -1
C D
-1
- SURVEY CONTROL POINT '202'
4859+00
4860+00
4861+00
4862+00
4863+00
4864+00
4865+00
4866+00
4867+00
4868+00
(E) FENCE
REMOVE BETWEEN
NEW CONNECTIONS
LIMITS OF CLEARING, GRUBBING, AND STRIPPING
CONSTRUCTION LIMITS
LEVEE CONTROL LINE
SEE NOTE 6
SEE NOTE 6
(E) RAMP
PRESERVE AND PROTECT
(E) CRUSHED AGGREGATE
EMERGENCY BERM
(SEE NOTE 2)
5H:1V
3H :1
V
3H :1
V
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-CD-102.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C D
-1
FI
LE
N A
M E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
C A
V A
TI
O
N P
LA
N
, S
TA
8+
T O
0+
CD-102NORTH PLAN
A1
EXCAVATION PLAN, STA 4868+00 TO 4860+00
SCALE: 1" = 200' 60'0 30'
SAN JOAQUIN RIVER FLOW
M
AT
C H
L
IN
E C
D -1
C D
-1
D1 C-301
1. THE LIMITS OF CLEARING, GRUBBING, AND STRIPPING
INCLUDE THE EXCAVATION AND FILL LIMITS. CLEARING,
GRUBBING AND STRIPPING SHALL BE PERFORMED IN
ACCORDANCE WITH SPECIFICATION 31 11 00.
2. EXISTING EMERGENCY BERM AND ADJACENT TOE
FENCE SHOWN IN THE DRAWING WILL BE REMOVED BY
OTHERS PRIOR TO THE CONSTRUCTION OF THE
SEEPAGE BERM.
3. ALL EXCAVATION SHALL BE PERFORMED IN SUCH A
WAY AS TO ENSURE POSITIVE DRAINAGE AWAY FROM
THE LEVEE TOE.
4. CONTRACTOR SHALL STOCKPILE STRIPPED MATERIALS
FOR RESPREAD ON COMPLETED BERM.
5. CONTRACTOR SHALL PROVIDE HIGH VISIBILITY
TEMPORARY SECURITY FENCE AT THE CONSTRUCTION
LIMIT LINE.
6. CONTRACTOR SHALL PROTECT ALL EXISTING CONTROL
POINTS IN PLACE.
7. REFER TO THE GEOTECHNICAL DATA REPORT (GDR)
FOR AVAILABLE INFORMATION ON SUBSURFACE
EXPLORATION AND SOIL LABORATORY TEST RESULTS.
8. SEE C-301 FOR TYPICAL EXCAVATION SECTIONS.
GENERAL SHEET NOTES
LEGEND
CRUSHED AGGREGATE SURFACING
- SURVEY CONTROL POINT '202'
4868+00
4869+00
4870+00
4871+00
4872+00
4873+00
4874+00
4875+00
4876+00
4877+00
LIMITS OF CLEARING, GRUBBING, AND STRIPPING
CONSTRUCTION LIMITS
LEVEE CONTROL LINE
SEE NOTE 6
TOE OF SEEPAGE BERM
NEW FENCE
(SEE NOTE 8)
SUBGRADE
GRADE BREAK
SLOPE
3H:1V
-0 .7
5%
-0.75%
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-103.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -1
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
G
A D
IN
G
P
LA
N
S U
B G
R A
D E
S
TA
6+
T O
8+
C-103NORTH PLAN
SAN JOAQUIN RIVER
FLOW
A1 GRADING PLAN - SUBGRADE STA 4876+00 TO 4868+00
SCALE: 1" = 200' 60'0 30'
M
AT
C H
L
IN
E C
-1
C -1
1. THE CONTRACTOR SHALL GRADE LANDSIDE TOE OF
SEEPAGE BERM WITHIN CONSTRUCTION LIMITS TO
DRAIN WHILE MAINTAINING CURRENT GRADING OF
ADJACENT FIELDS.
2. SEE C-302 FOR TYPICAL GRADING SECTIONS
3. ALL GRADING SHALL BE PERFORMED IN SUCH A WAY
AS TO ENSURE POSITIVE DRAINAGE AWAY FROM THE
LEVEE TOE.
4. CONTRACTOR SHALL STOCKPILE STRIPPED MATERIALS
FOR RESPREAD ON COMPLETED BERM.
5. CONTRACTOR SHALL PROVIDE HIGH VISIBILITY
TEMPORARY SECURITY FENCE AT THE CONSTRUCTION
LIMIT LINE.
6. CONTRACTOR SHALL PROTECT ALL EXISTING CONTROL
POINTS IN PLACE.
7. FOLLOWING CLEARING, GRUBBING AND STRIPPING,
AREA WILL BE TRACKED WITH A D6 DOZER OR LARGER
AND ANY LOOSE MATERIAL WILL BE REMOVED.
8. INSTALL NEW FENCE 1' MIN AND 2' MAX FROM EDGE OF
PATROL ROAD.
9. ONLY CLEARING, GRUBBING AND STRIPPING SHALL
OCCUR BEYOND LIMITS OF EXISTING EMERGENCY
SEEPAGE BERM WITHIN THE LIMITS OF CLEARING,
GRUBBING AND STRIPPING.
GENERAL SHEET NOTES
LEGEND
- SURVEY CONTROL POINT '202'
C-302
4859+00
4860+00
4861+00
4862+00
4863+00
4864+00
4865+00
4866+00
4867+00
4868+00
LIMITS OF CLEARING, GRUBBING, AND STRIPPING
CONSTRUCTION LIMITS
LEVEE CONTROL LINE
SEE NOTE 6
SEE NOTE 6
(E) RAMP
PRESERVE AND PROTECT
TOE OF SEEPAGE BERM
3H :1V
3H :1V
5H:1V
NEW FENCE
(SEE NOTE 8)
SUBGRADE
GRADE BREAK
SLOPE
3H:1V
-0.75%
-0.75%
5H:1V
24 23
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-104.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -1
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
A D
IN
G
P
LA
N
S U
B G
R A
D E
S
TA
8+
T O
0+
C-104NORTH PLAN
A1 GRADING PLAN - SUBGRADE STA 4868+00 TO 4860+00
SCALE: 1" = 200' 60'0 30'
SAN JOAQUIN RIVER FLOW
M
AT
C H
L
IN
E C
-1
C -1
1. THE CONTRACTOR SHALL GRADE LANDSIDE TOE OF
SEEPAGE BERM WITHIN CONSTRUCTION LIMITS TO
DRAIN WHILE MAINTAINING CURRENT GRADING OF
ADJACENT FIELDS.
2. SEE C-302 FOR TYPICAL EXCAVATION AND GRADING
SECTIONS
3. ALL GRADING SHALL BE PERFORMED IN SUCH A WAY
AS TO ENSURE POSITIVE DRAINAGE AWAY FROM THE
LEVEE TOE.
4. CONTRACTOR SHALL STOCKPILE STRIPPED MATERIALS
FOR RESPREAD ON COMPLETED BERM.
5. CONTRACTOR SHALL PROVIDE HIGH VISIBILITY
TEMPORARY SECURITY FENCE AT THE CONSTRUCTION
LIMIT LINE.
6. CONTRACTOR SHALL PROTECT ALL EXISTING CONTROL
POINTS IN PLACE.
7. FOLLOWING CLEARING, GRUBBING AND STRIPPING,
AREA WILL BE TRACKED WITH A D6 DOZER OR LARGER
AND ANY LOOSE MATERIAL WILL BE REMOVED.
8. INSTALL NEW FENCE 1' MIN AND 2' MAX FROM EDGE OF
PATROL ROAD.
GENERAL SHEET NOTES
LEGEND
- SURVEY CONTROL POINT '202'
TOE OF SEEPAGE BERM
SEEPAGE BERM HINGE POINT
PATROL ROAD
NEW FENCE
(SEE NOTE 7)
MATCH (E) ROADWAY
SEEPAGE BERM
GRADE BREAK
SLOPE
3H:1V
TOP OF
CHIMNEY
DRAIN
BENCH
LEVEE CONTROL LINE
4868+004869+00
4870+00
4871+00
4872+00
4873+00
4874+00
4875+00
4876+00
4877+00
5H:1V
VA
R
IE
S
EXCAVATE SUFFICIENT
ROCK BERM TO INSTALL
NEW FENCE POST
SLOPE
3H:1V
NOTE 6
GATE
NEW FENCE
(SEE NOTE 7)
CONSTRUCTION LIMITS
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-111.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -1
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
A D
IN
G
P
LA
N
FI
LL
, S
TA
6+
T O
8+
C-111NORTH PLAN
SAN JOAQUIN RIVER
FLOW
A1
GRADING PLAN - FILL, STA 4876+00 TO 4868+00
SCALE: 1" = 200' 60'0 30'
1. CONTRACTOR SHALL GRADE LANDSIDE TOE OF
SEEPAGE BERM WITHIN CONSTRUCTION LIMITS TO
DRAIN WHILE MAINTAINING CURRENT GRADING OF
ADJACENT FIELDS.
2. SEE C-302 FOR TYPICAL SECTION.
3. CONTRACTOR SHALL STOCKPILE STRIPPED MATERIALS
FOR RESPREAD ON COMPLETED BERM.
4. CONTRACTOR SHALL PROVIDE HIGH VISIBILITY
TEMPORARY SECURITY FENCE AT THE CONSTRUCTION
LIMIT LINE.
5. CONTRACTOR SHALL PROTECT ALL EXISTING CONTROL
POINTS IN PLACE.
6. BEGIN FENCE REMOVAL 15-FT FROM FURTHEST EDGE
OF THE SEEPAGE BERM. INSTALL NEW POST IN ORDER
TO CONNECT EXISTING FENCE WITH NEW ONE.
7. MIN 1-FT AND MAX 2-FT DISTANCE BETWEEN EDGE OF
PATROL ROAD AND FENCE.
GENERAL SHEET NOTES
M
AT
C H
L
IN
E C
-1
C D
-1
5H:1V
4859+00
4860+00
4861+00
4862+00
4863+00
4864+00
4865+00
4866+00
4867+00
4868+00
VARIES
TOE OF SEEPAGE BERM
SEEPAGE BERM HINGE POINT
PATROL ROAD
CONSTRUCTION LIMITS
MATCH (E) ROADWAY
SEEPAGE BERM
GRADE BREAK
SLOPE
3H:1V
TOP OF
CHIMNEY
DRAIN
BENCH
LEVEE CONTROL LINE
EXCAVATE SUFFICIENT
ROCK BERM TO
INSTALL NEW FENCE
POST
SLOPE
3H:1V
GATE
NOTE 6
NEW FENCE
(SEE NOTE 7)
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-112.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -1
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
A D
IN
G
P
LA
N
FI
LL
, S
TA
8+
T O
0+
C-112NORTH PLAN
A1
GRADING PLAN - FILL, STA 4868+00 TO 4860+00
SCALE: 1" = 200' 60'0 30'
SAN JOAQUIN RIVER FLOW
1. CONTRACTOR SHALL GRADE LANDSIDE TOE OF
SEEPAGE BERM WITHIN CONSTRUCTION LIMITS TO
DRAIN WHILE MAINTAINING CURRENT GRADING OF
ADJACENT FIELDS.
2. SEE C-302 FOR TYPICAL SECTION.
3. CONTRACTOR SHALL STOCKPILE STRIPPED MATERIALS
FOR RESPREAD ON COMPLETED BERM.
4. CONTRACTOR SHALL PROVIDE HIGH VISIBILITY
TEMPORARY SECURITY FENCE AT THE CONSTRUCTION
LIMIT LINE.
5. CONTRACTOR SHALL PROTECT ALL EXISTING CONTROL
POINTS IN PLACE.
6. BEGIN FENCE REMOVAL 15-FT FROM FURTHEST EDGE
OF THE SEEPAGE BERM. INSTALL NEW POST IN ORDER
TO CONNECT EXISTING FENCE WITH NEW ONE.
7. MIN 1-FT AND MAX 2-FT DISTANCE BETWEEN EDGE OF
PATROL ROAD AND FENCE.
GENERAL SHEET NOTES
M
AT
C H
L
IN
E C
-1
C -1
A1 C-302
D1
LEVEE CONTROL LINE
(E) GRADE
APPROXIMATE
LIMITS OF EXCAVATION
POSSIBLE PRESENCE OF (E)
FILTER FABRIC TO BE REMOVED
LIMITS OF
CRUSHED AGGREGATE REMOVAL
VARIES, SEE NOTE 2
WATERSIDELANDSIDE
WATERSIDE TOE
APPROXIMATE
TOE OF LEVEE
APPROXIMATE
LANDSIDE
HINGE POINT
(E) CRUSHED AGGREGATE
EMERGENCY BERM
(SEE NOTE 2)
MATCH EXISTING
BERM TOE ELEVATION
(PROJECTED)
(E) FENCE TO BE REMOVED
EXISTING BERM
TO BE REMOVED
STA. 4861+00 APPROXIMATE LIMITS
OF EXCAVATION
MATCH (E) BERM
TOE ELEVATION
MATCH (E) GRADE
(E) GRADE
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-09-30) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-301.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -3
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
C A
V A
TI
O
N
TY
P
IC
A L
S E
C
TI
O N
S
C-301
A1 TYPICAL CROSS SECTION - EXCAVATION
SCALE: NOT TO SCALE
GENERAL NOTES
1. COMPLETED SLOPES AND ALL AREAS DISTURBED
DURING CONSTRUCTION SHALL BE SEEDED IN
ACCORDANCE WITH SPECIFICATION 32 92 19.
2. EXISTING EMERGENCY BERM AND ADJACENT TOE
FENCE SHOWN IN THE DRAWING WILL BE
REMOVED BY OTHERS PRIOR TO THE
CONSTRUCTION OF THE SEEPAGE BERM.
3. ALL DIMENSIONS SHOWN ARE MINIMUM.
4. FOR THE PURPOSES OF QUANTITY ESTIMATION,
THE APPROXIMATE TOE OF THE LEVEE HAS BEEN
ESTABLISHED BY THE INTERSECTION OF THE
AVERAGE LANDSIDE EMBANKMENT SLOPE AND
THE EXISTING LANDSIDE GROUND SURFACE.
D1 TYPICAL CROSS SECTION - END EXCAVATION TRANSITION
SCALE: NOT TO SCALE
C-501
(PROJECTED)
SLOPE
VARIES
-2.00%
WATERSIDE
LANDSIDE
0.75%
17'
4' M
IN
LIMITS OF
CRUSHED AGGREGATE REMOVAL
VARIES, SEE NOTE 2
CONSTRUCTION LIMITS
LIMITS OF STRIPPING, CLEARING AND GRUBBING
10'
6' M
IN
5'
2'
70'
1.
5'
5' M
IN
1' MIN - 2' MAX
2'
LEVEE CONTROL LINE
APPROXIMATE
TOE OF LEVEE
APPROXIMATE
LANDSIDE
HINGE POINT
CHIMNEY DRAIN
HINGE POINT
PROJECTED TOE OF
SEEPAGE BERM
(E) GRADE
TYPE II FILL
DRAIN BLANKET
FILTER SAND 1'
WATERSIDE TOE
SEEPAGE BERM HINGE POINT
SEEPAGE BERM
TOP OF CHIMNEY
DRAIN MATCH
(E) GRADE
EL. 36.42
PATROL ROAD
FINISHED
GRADE
BEGIN TAPER TO 1.5'
FILTER SAND 0.5'
PREPARED SUBGRADE
TYPE II FILL
(E) GRADE
EL. 34.2
INSTALL NEW FENCE
(SEE NOTE 4) F1
C-302
HYDROSEED
(SEE NOTE 1)
RESTORE LEVEE CROWN SURFACE
TO ORIGINAL CONDITION WITH
AB MATERIAL
1 1
1' M
IN
TYPE II FILL
DRAIN BLANKET
FILTER SAND 1'
SEEPAGE BERM
FILTER SAND 0.5'
PREPARED SUBGRADE
TYPE II FILL
(E) GRADE
MATCH (E) GRADE
(E) GRADE
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-10-01) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-302.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -3
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
C
N S
TR
U
C
TI
O N
TY
P
IC
A
L S
E C
TI
O
N S
C-302
A1 TYPICAL CROSS SECTION
SCALE: NOT TO SCALE
D1 TYPICAL CROSS SECTION - END FILL TRANSITION
SCALE: NOT TO SCALE
GENERAL NOTES
1. COMPLETED SLOPES AND ALL AREAS DISTURBED
DURING CONSTRUCTION SHALL BE SEEDED IN
ACCORDANCE WITH SPECIFICATION 32 92 19.
2. FOLLOWING CLEARING, GRUBBING AND
STRIPPING, AREA WILL BE TRACKED WITH A D6
DOZER OR LARGER AND ANY LOOSE MATERIAL
WILL BE REMOVED.
3. ALL DIMENSIONS SHOWN ARE MINIMUM.
4. INSTALL NEW FENCE 1' MIN AND 2' MAX FROM
EDGE OF PATROL ROAD.
5. THE LIMITS OF CLEARING, GRUBBING, AND
STRIPPING INCLUDE THE EXCAVATION AND FILL
LIMITS. CLEARING, GRUBBING AND STRIPPING
SHALL BE PERFORMED IN ACCORDANCE WITH
SPECIFICATION 31 11 00.
6. SEE SHEETS C-311 AND C-312 FOR STATION
CONTROL AND OFFSET DISTANCES.
7. SUBGRADE SHALL BE PREPARED IN
ACCORDANCE WITH SPECIFICATION 31 00 00.
8. PLACEMENT OF FILTER SAND AND DRAIN
BLANKET MATERIAL UP THE LEVEE SLOPE ALONG
THE CHIMNEY DRAIN SHALL BE IN 12 INCH
HORIZONTAL LOOSE LIFTS LIFTS AS SHOWN IN
DETAIL F1 OR AS PER CONTRACTOR'S APPROVED
MEANS AND METHODS. MINIMUM DIMENSION
THICKNESSES SHALL BE MAINTAINED FOR EACH
MATERIAL.
4861+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4863+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4864+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4865+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4866+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4867+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4868+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4862+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
(E) BERM TO BE REMOVED
APPROXIMATE LANDSLIDE HINGE POINT
MATCH (E) BERM TOE ELEVATION
APPROXIMATE TOE OF LEVEE
(PROJECTED)
(E) BERM TO BE REMOVED
APPROXIMATE LANDSLIDE HINGE POINT
APPROXIMATE TOE OF LEVEE
(PROJECTED)
APPROXIMATE LANDSLIDE HINGE POINT
MATCH (E) BERM TOE ELEVATION
APPROXIMATE TOE OF LEVEE
(PROJECTED)
(E) BERM TO BE REMOVED
APPROXIMATE LANDSLIDE HINGE POINT
MATCH (E) BERM TOE ELEVATION APPROXIMATE TOE OF LEVEE
(PROJECTED)
(E) BERM TO BE REMOVED
APPROXIMATE LANDSLIDE HINGE POINT
MATCH (E) BERM TOE ELEVATION APPROXIMATE TOE OF LEVEE
(PROJECTED)
(E) BERM TO BE REMOVED
APPROXIMATE LANDSLIDE HINGE POINT
MATCH (E) BERM TOE ELEVATION APPROXIMATE TOE OF LEVEE
(PROJECTED)
(E) BERM TO BE REMOVED
APPROXIMATE LANDSLIDE HINGE POINT
MATCH (E) BERM TOE ELEVATION APPROXIMATE TOE OF LEVEE
(PROJECTED)
(E) BERM TO BE REMOVED
APPROXIMATE LANDSLIDE HINGE POINT
MATCH (E) BERM TOE ELEVATION APPROXIMATE TOE OF LEVEE
(PROJECTED)
(E) BERM TO BE REMOVED
APPROXIMATE LANDSLIDE HINGE POINT
MATCH (E) BERM TOE ELEVATION APPROXIMATE TOE OF LEVEE
(PROJECTED)
APPROXIMATE LIMITS OF EXCAVATION
SLOPE 3H:1V (PROJECTED)
APPROXIMATE LIMITS OF EXCAVATION
SLOPE 3H:1V (PROJECTED)
APPROXIMATE LIMITS OF EXCAVATION
SLOPE 3H:1V (PROJECTED)
APPROXIMATE LIMITS OF EXCAVATION
SLOPE 3H:1V (PROJECTED)
APPROXIMATE LIMITS OF EXCAVATION
SLOPE 3H:1V (PROJECTED)
APPROXIMATE LIMITS OF EXCAVATION
SLOPE 3H:1V (PROJECTED)
APPROXIMATE LIMITS OF EXCAVATION
SLOPE 3H:1V (PROJECTED)
APPROXIMATE LIMITS OF EXCAVATION
SLOPE 3H:1V (PROJECTED)
LEVEE CONTROL LINE
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-10-01) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-310.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -3
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
1+
T O
8+
E X
C A
V A
TI
O
N C
R O
S S
S E
C
TI
O N
S
C-310
A1 EXCAVATION CROSS SECTIONS
SCALE: 1" = 20' H
GENERAL NOTES
1. SEE SHEET C-301 FOR TYPICAL CROSS SECTION.
4861+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4862+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4863+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4864+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4865+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4866+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4867+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4868+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
LEVEE
CONTROL LINE
-2.00%
LANDSIDE WATERSIDE
GRADE BREAK
17'
OFF. -48.62
EL. 31.55
CHIMNEY DRAIN HINGE POINT
OFF. -34.90
EL. 36.08SEEPAGE BERM HINGE POINT
OFF. -187.59
EL. 28.77
GRADE BREAK
SEEPAGE BERM HINGE POINT
OFF. -187.82
EL. 28.77 OFF. -54.10
EL. 31.58
CHIMNEY DRAIN HINGE POINT
OFF. -40.61
EL. 36.08
SEEPAGE BERM HINGE POINT
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
OFF. -36.89
EL. 36.08OFF. -188.08
EL. 28.98
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
OFF. -39.01
EL. 36.08
OFF. -51.36
EL. 31.96
OFF. -188.56
EL. 29.16
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
OFF. -40.54
EL. 36.08
OFF. -54.49
EL. 31.43
OFF. -191.01
EL. 27.64
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
OFF. -187.51
EL. 29.02
OFF. -37.95
EL. 36.08
OFF. -50.92
EL. 31.76
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
OFF. -188.31
EL. 29.05
OFF. -37.72
EL. 36.08
OFF. -50.54
EL. 31.81
SEEPAGE BERM HINGE POINT
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
OFF. -36.35
EL. 36.08
OFF. -48.09
EL. 32.17
OFF. -190.99
EL. 28.54
-2.00%
LANDSIDE WATERSIDE
17' LEVEE
CONTROL LINE
SLOPE VARIES
OFF. -49.89
EL. 31.75
PATROL ROAD
PATROL ROAD
PATROL ROAD
PATROL ROAD
PATROL ROAD
PATROL ROAD
PATROL ROAD
PATROL ROAD
SLOPE VARIES
-0.75%
-2.00% 17'
-2.00% 17'
-2.00% 17'
-2.00% 17'
-2.00% 17'
-2.00% 17'
SLOPE VARIES
SLOPE VARIES
SLOPE VARIES
SLOPE VARIES
SLOPE VARIES
SLOPE VARIES
SUBGRADE
SUBGRADE
SUBGRADE
SUBGRADE SUBGRADE
SUBGRADE
SUBGRADE
SUBGRADE
TOP OF CHIMNEY DRAIN
OFF. -17.75
EL. 36.42
-0.75%
-0.75%
-0.75% -0.75%
-0.75%
-0.75%
-0.75%
MATCH (E) GRADE
MATCH (E) GRADE
MATCH (E) GRADE
MATCH (E) GRADE MATCH (E) GRADE
MATCH (E) GRADE
MATCH (E) GRADE
MATCH (E) GRADE
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAINTOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
OFF. -19.89
EL. 36.42
OFF. -22.00
EL. 36.42
OFF. -23.60
EL. 36.42
OFF. -23.54
EL. 36.42
OFF. -20.94
EL. 36.42
OFF. -20.72
EL. 36.42
OFF. -19.34
EL. 36.42
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-10-01) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-311.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -3
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
1+
T O
8+
C O
N S
TR
U
C
TI
O N
C R
O S
S S
E C
TI
O
N S
C-311
A1 CONSTRUCTION CROSS SECTIONS
SCALE: 1" = 20' H
GENERAL NOTES
1. SEE SHEET C-302 FOR TYPICAL CROSS SECTION.
2. SEEPAGE BERM DRAINAGE LAYER SHOWN ON
C-302.
4869+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4870+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4871+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4872+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4873+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4874+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
4875+00
0 10 20 30 40 500-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150-160-170-180-190-200-210-220
LANDSIDE WATERSIDE LANDSIDE WATERSIDE
-2.00% 17'
LEVEE
CONTROL LINE
LEVEE
CONTROL LINE
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
OFF. -188.63
EL. 29.52 OFF. -48.98
EL. 32.31
OFF. -37.68
EL. 36.08
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
SEEPAGE BERM HINGE POINT
SEEPAGE BERM HINGE POINT
GRADE BREAK
CHIMNEY DRAIN HINGE POINT
OFF. -188.88
EL. 29.81
OFF. -35.70
EL. 36.08
OFF. -45.93
EL. 32.67
OFF. -188.71
EL. 30.17
OFF. -35.42
EL. 36.08
OFF. -44.51
EL. 33.05
OFF. -187.89
EL. 30.74
OFF. -36.74
EL. 36.08
OFF. -44.06
EL. 33.64
OFF. -188.86
EL. 29.64
OFF. -35.08
EL. 36.08
OFF. -45.82
EL. 32.50
OFF. -188.73
EL. 30.02 OFF. -45.38
EL. 32.89
OFF. -35.80
EL. 36.08
OFF. -188.36
EL. 30.43 OFF. -44.38
EL. 33.31
OFF. -36.07
EL. 36.08
PATROL ROAD
PATROL ROAD
PATROL ROAD
PATROL ROAD
PATROL ROAD
PATROL ROAD
PATROL ROAD
SLOPE VARIES SLOPE VARIES
-2.00% 17'
-2.00% 17'
-2.00% 17'
-2.00% 17'
-2.00% 17'
-2.00% 17'
SLOPE VARIES
SLOPE VARIES
SLOPE VARIES
SLOPE VARIES
SLOPE VARIES
SUBGRADE
-0.75%
MATCH (E) GRADE
MATCH (E) GRADE
MATCH (E) GRADE
MATCH (E) GRADE
MATCH (E) GRADE
MATCH (E) GRADE
MATCH (E) GRADE
-0.75%
-0.75%
-0.75%
-0.75%
-0.75%
-0.75%
SUBGRADE
SUBGRADE
SUBGRADE
SUBGRADE
SUBGRADE
SUBGRADE
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
TOP OF CHIMNEY DRAIN
OFF. -20.68
EL. 36.42
OFF. -18.69
EL. 36.42
OFF. -18.08
EL. 36.42
OFF. -18.42
EL. 36.42
OFF. -19.74
EL. 36.42
OFF. -19.07
EL. 36.42
OFF. -18.80
EL. 36.42
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-10-01) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-312.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -3
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
9+
T O
5+
C O
N S
TR
U
C
TI
O N
C R
O S
S S
E C
TI
O
N S
C-312
A1 CONSTRUCTION CROSS SECTIONS
SCALE: 1" = 20' H
GENERAL NOTES
1. SEE SHEET C-302 FOR TYPICAL CROSS SECTION.
2. SEEPAGE BERM DRAINAGE LAYER SHOWN ON
C-302.
PROJECTED TOE OF
SEEPAGE BERM
4' M
IN
PATROL ROAD
AGGREGATE SURFACING
15'
0.
5'
(E) GRADE
1.5'
1'
SEEPAGE BERM TOE MATERIAL
FINISHED GRADE
SEEPAGE BERM
DRAIN BLANKET
FILTER SAND
1'
0.5'
PREPARE SUBGRADE IN
ACCORDANCE WITH
SPECIFICATION
0.5'
1' MIN - 2' MAX
INSTALL NEW FENCE
(SEE NOTE 4)
SEEPAGE BERM
HINGE POINT
TYPE II FILL
TYPE II FILL
(E) GRADE
5'
GEOTEXTILE SEPARATOR
S
TA
0+
.8
1 1
TYPE II FILL
DRAIN BLANKET
FILTER SAND 1'
SEEPAGE BERM
FILTER SAND 0.5'
PREPARED SUBGRADE
TYPE II FILL
(E) GRADE
MATCH (E) GRADE
1' M
IN
(E) GRADE1
LONGITUDINAL WIDTH
S
TA
5+
.0
MATCH
(E) GRADE
20'
3.
5'
2.
5'
1.5'
1.5'
10'
CENTER POST TO CENTER POST
3.
5'
3.
1-7/8" GALVANIZED PIPE
GROUND LEVEL
0.
5'
SEE DETAIL A
2-3/4" GALVANIZED PIPE
CONCRETE
GATE LOCKING TABS WITH LOCK
DETAIL A
GROUND LEVEL
CONCRETE
2-3/4" GALVANIZED PIPE
2-3/4" GALVANIZED PIPE
0.
5'
1.
5'
S O
LI
C
IT
A
TI
O
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
M A
R K
S
IZ
E
S U
B M
IT
TE
D B
Y
D A
TE
C O
N
TR
A C
T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
TE
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
S A
C R
A M
E N
TO
D
IS
TR
IC
T
J S
TR
E
E T
S A
C R
A M
E N
TO
, C
A
-2
X X
X X
X X
-X X
-X -X
X X
X
M A
R C
H
D E
S
IG
N F
IL
E
N O
S P
E C
IF
IC
A
TI
O N
N O
A
N S
I D
W
8-
-D
-0
S A
N J
O A
Q U
IN
C
O U
N
TY
, C A
LI
FO
R N
IA
P
L
-9
E M
E R
G E
N C
Y R
E P
A
IR
S S
IT
E
Last saved by: ADAM.FORD(2021-10-01) Last Plotted: 2021-10-01 Filename: C:\USERS\ADAM.FORD\AECOM DIRECTORY\1151-21_SAN JOAQUIN - GENERAL\1151-21_SAN JOAQUIN\1151-21_SAN JOAQUIN\20-SHEETS\1151-21-C-501.DWG
A E
C O
M T
E C
H N
IC
A
L S
E R
V
IC
E S
IN
C
L
S
TR
E E
T, S
U
IT
E
S
A C
R A
M E
N
TO
, C A
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
-2 1-
C -5
FI
LE
N
A M
E
7-
-1
R . M
IL
LE
T
A . F
O R
D
T.
Q
U
IN
TR
A
LL
J.
S
O R
E N
S
D
TA
IL
S
C-501A1 DETAIL
SCALE: NOT TO SCALE
D1 DETAIL - LONGITUDINAL BERM
SCALE: NOT TO SCALE
GENERAL NOTES
1. COMPLETED SLOPES AND ALL AREAS DISTURBED
DURING CONSTRUCTION SHALL BE SEEDED IN
ACCORDANCE WITH SPECIFICATION 32 92 19.
2. FOLLOWING CLEARING, GRUBBING AND
STRIPPING, AREA WILL BE TRACKED WITH A D6
DOZER OR LARGER AND ANY LOOSE MATERIAL
WILL BE REMOVED.
3. ALL DIMENSIONS SHOWN ARE MINIMUM.
4. INSTALL NEW FENCE 1' MIN AND 2' MAX FROM
EDGE OF PATROL ROAD.
5. THE TYPE OF FENCE IS TO MATCH THE EXISTING
STEEL PIPE RAIL FENCING AND PER ASTM A702-13.
6. CONCRETE SHALL HAVE A MINIMUM 28 DAY
COMPRESSIVE STRENGTH OF 2000 PSI AND PER
ASTM C31/C31M AND ASTM C39/C39M.
E1 MANUAL DUAL SWING BARRIER GATE
SCALE: 1"=2' E6 SINGLE RAIL FENCE DETAIL
SCALE: 1"=2'
| Sheets and Views |
| G-001 COVER SHEET |
| G-002 GENERAL NOTES, LEGEND, ABBREVIATIONS, AND SHEET INDEX |
| G-003 PROJECT VICINITY AND LOCATION MAP |
| V-001 PROJECT SURVEY CONTROL |
| G-004 STAGING AREA AND HAUL ROUTE |
| G-005 KEY MAP AND CONTROL LINE |
| G-006 CONSTRUCTION LIMITS |
| CD-101 EXCAVATION PLAN, STA 4876+00 TO 4868+00 |
| CD-102 EXCAVATION PLAN, STA 4868+00 TO 4860+00 |
| C-103 GRADING PLAN - SUBGRADE STA 4876+00 TO 4868+00 |
| C-104 GRADING PLAN - SUBGRADE STA 4868+00 TO 4860+00 |
| C-111 GRADING PLAN - FILL, STA 4876+00 TO 4868+00 |
| C-112 GRADING PLAN - FILL, STA 4868+00 TO 4860+00 |
| C-301 TYPICAL SECTIONS - EXCAVATION |
| C-302 TYPICAL SECTIONS - CONSTRUCTION |
| C-310 EXCAVATION CROSS SECTIONS, STA 4861+00 TO 4868+00 |
| C-311 CONSTRUCTION CROSS SECTIONS, STA 4861+00 TO 4868+00 |
| C-312 CONSTRUCTION CROSS SECTIONS STA 4869+00 TO 4875+00 |
| C-501 DETAILS |
File details come from the government source that posted it. Updated .