This is a project-specific construction contract between the City of Daytona Beach, Florida, and an unnamed contractor for the LPGA Boulevard & Jimmy Ann Drive Intersection signalization project (Contract No. 2657). The scope of work involves construction of traffic signal improvements at the specified intersection, with plans dated September 14, 2026, prepared by engineer Matthew Ubben, P.E. The contractor must make necessary equipment purchases upon receipt of a Purchase Notice to Proceed, with equipment anticipated to ship approximately 90 days from the order date. Following equipment delivery, the City will issue a Construction Notice to Proceed, and the contractor must commence work no later than the commencement date specified in that notice. Substantial completion is required within 100 days of the Construction Notice to Proceed, with final completion within 130 days. The contract documents incorporate the City's Invitation to Bid (ITB No. 2657ITB) and addenda, as well as the contractor's responsive offer, with the ITB and addenda governing in cases of conflict.
The contract price is not filled in on the provided draft document. If the contract price exceeds $100,000, the contractor must provide performance and payment bonds equal to 100 percent of the contract price. The contractor is subject to liquidated damages as specified in LAP Division I Specifications, Section 8-10.2, if deadlines are not met. Payments will be made in progress installments and a final payment, subject to retainage. The contract is subject to federal Davis-Bacon prevailing wage requirements, federal contract work hours and safety standards, nondiscrimination and civil rights provisions, and other federal-aid highway construction requirements, including compliance with the Clean Air Act and Federal Water Pollution Control Act. The contractor must maintain workers' compensation insurance with employers' liability coverage of at least $500,000 per accident, commercial general liability insurance with combined single limits of not less than $1,000,000 per occurrence and $2,000,000 general aggregate, and automobile liability coverage with combined single limits of $1,000,000 per occurrence. The contract is governed by Florida law, with venue in Volusia County courts, and disputes are subject to a mandatory negotiation and mediation process before judicial remedies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2657ITB_-_LPGA_Boulevard_&_Jimmy_Ann_Drive_Intersection.pdf | ||
| LPGA_Blvd_at_Jimmy_Ann_Dr_S&S_Submittal_9.14.26.pdf | ||
| 449469-1-58-01_Spec_09192026.pdf | ||
| w57506013_NON-Collusion_Declaration.docx | DOCX document | |
| w37503034_DisclosureOfLobbyingActivities.docx | DOCX document | |
| w52501046_LAP_Cert_of_Current_Capacity.docx | DOCX document | |
| w37503032_v001_CertDebarmentSuspension.docx | DOCX document | |
| w37503033_Lobbying_Certification.docx | DOCX document | |
| w27503011_DBE_Bid_Package_Information.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO. 2657 – LPGA BOULEVARD & JIMMY ANN DRIVE INTERSECTION 1
PROJECT-SPECIFIC CONSTRUCTION CONTRACT NO. 2657
LPGA BOULEVARD & JIMMY ANN DRIVE
INTERSECTION
LAP FPN 449469-1-58-01 & FAN D524-081-B
THE PARTIES TO THIS CONTRACT are the City of Daytona Beach, a Florida municipal corporation, hereinafter the “CITY” or “OWNER,” and <> a <>, hereinafter the “CONTRACTOR.”
WITNESSETH, that the CONTRACTOR and the CITY agree as follows, for the mutual valuable consideration provided herein:
ARTICLE I. SCOPE OF WORK
The CONTRACTOR will, at its sole cost and expense, provide, perform, and complete the construction project commonly known as “LPGA & Jimmy Ann Signalization” as further described in the Contract Documents, hereinafter the “Work”.
ARTICLE II. CONTRACT DOCUMENTS
The Contract Documents are further described in the General Conditions, and if applicable the Supplemental General Conditions and Technical Specifications. In addition, the Plans, dated September 14, 2026 and referenced herein are the plans or drawings prepared by Matthew Ubben, P.E. (the “Engineer/Architect” or “E/A”), provided or made available with the CITY’s Invitation to Bid, as amended by any addenda to the Bid documents, are a part of the Contract Documents. The Plans are not physically attached hereto but are incorporated herein by reference. CONTRACTOR acknowledges receipt of all such Plans. The Contract Documents are intended to include all information necessary for CONTRACTOR’s proper prosecution and timely completion of the Work.
CONTRACTOR will prosecute the Work as necessary to produce the results indicated by the Contract Documents. The Contract Documents are complementary, and what is required by one will be binding as if required by all.
ARTICLE III. COMMENCEMENT AND COMPLETION
The CITY and the CONTRACTOR mutually agree that time is of the essence with respect to the dates and times set forth in the Contract Documents. To that end, the CONTRACTOR will make the necessary purchases upon receipt of a Purchase Notice to Proceed. Once the equipment is shipped (which is anticipated to be approximately 90 days from the order date), the CITY will issue a Construction Notice to Proceed and CONTRACTOR will commence the Work no later than the Commencement Date set forth in the Construction Notice to Proceed and will diligently and continuously prosecute the Work at such a rate, and with sufficient forces as will allow the CONTRACTOR to achieve Substantial Completion within 100 days after the Construction Notice to Proceed, and Final Completion within 130 days after Construction Notice to Proceed, subject only to any adjustments in the Contract Time that may be authorized by Change Orders properly issued in accordance with the Contract Documents. In executing this Contract, CONTRACTOR affirms that the time set for completion is reasonable.
The CITY will suffer financial loss if Final Completion of the Work is not achieved within the Contract Time.
Accordingly, and in lieu of actual damages or proof thereof, if CONTRACTOR fails to meet these deadlines, CONTRACTOR will be liable to the CITY for liquidated damages as follows:
Applicable liquidated damages are the amounts established in the LAP Division I Specifications, Spec. 8-10.2 as included in the Invitation to Bid as Attachment B.
The CITY will have the right to offset such liquidated damages against any remaining portion of the Contract Price due CONTRACTOR but will not be limited to the offset if it is insufficient. If the unpaid balance of the Contract Price is less than the amount of the liquidated damages, the CONTRACTOR or its Surety must pay the deficiency to the CITY upon demand.
CONTRACT NO. 2657 – LPGA BOULEVARD & JIMMY ANN DRIVE INTERSECTION 2
ARTICLE IV. CONTRACT PRICE
Subject to any adjustments that may be authorized pursuant to this Contract, the Contract Price due the CONTRACTOR is $<> for work completed and accepted in accordance with the Contract Documents. The Contract Price represents the CONTRACTOR’s sole compensation from the CITY for prosecution of the Work.
The Contract Price will be paid in a series of Progress Payments and a Final Payment, and is subject to retainage, as further described in the Contract Documents.
ARTICLE V. PERFORMANCE SECURITY
CONTRACTOR must provide a payment bond and a performance bond, or alternate form of Performance Security in an amount equal to 100% of the Contract Price if the contract price exceeds $100,000.00.
Additional requirements associated with the provision of Performance Security, including requirements to increase the amount provided, are set forth in the General Conditions and, if applicable, the Supplemental General Conditions.
ARTICLE VI. PUBLIC RECORDS
A. To the extent applicable, CONTRACTOR will comply with the requirements of Florida Statutes Section 119.0701, which include the following:
(a) Keeping and maintaining public records that the CITY requires for performance of the service provided herein.
(b) Upon the request of the City Clerk of the CITY, (i) providing the City Clerk with a copy of requested public records or (ii) allowing inspection or copying of the records, within a reasonable time after receipt of the City Clerk’s request, at a cost that does not exceed the cost provided in Ch. 119, Florida Statutes, or as otherwise provided by law.
(c) Ensuring that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law until completion of this Contract, and following such completion if CONTRACTOR fails to transfer such records to the CITY.
(d) Upon completion of the work required by a specific work authorization, keep and maintain public records required by the CITY to perform the service. CONTRACTOR will meet all applicable requirements for retaining public records. All records stored electronically must be provided to the CITY upon request from the City Clerk, in a format that is compatible with the CITY’s information technology systems.
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE
CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS
CONTRACT, CONTRACTOR MUST CONTACT THE CITY CLERK, WHOSE
CONTACT INFORMATION IS AS FOLLOWS:
(Phone) 386 671-8023 (Email) clerk@codb.us (Address) 301 S. Ridgewood Avenue Daytona Beach, FL 32114
B. Nothing herein will be deemed to waive CONTRACTOR’s obligation to comply with Section 119.0701(3)(a), Florida Statutes.
CONTRACT NO. 2657 – LPGA BOULEVARD & JIMMY ANN DRIVE INTERSECTION 3
ARTICLE VII. INDEMNIFICATION
To the extent provided by law, Contractor shall indemnify, defend, and hold harmless the City and the State of Florida, Department of Transportation, including the Department’s officers, agents, and employees, against any actions, claims, or damages arising out of, relating to, or resulting from negligent or wrongful act(s) of CONTRACTOR, or any of its officers, agents, or employees, acting within the scope of their office or employment, in connection with the rights granted to or exercised by CONTRACTOR.
The foregoing indemnification shall not constitute a waiver of the Department’s or CITY’s sovereign immunity beyond the limits set forth in Florida Statutes, Section 768.28. Nor shall the same be construed to constitute agreement by CONTRACTOR to indemnify CITY for the negligent acts or omissions of CITY, its officers, agents, or employees, or third parties. Nor shall the same be construed to constitute agreement by CONTRACTOR to indemnify the Department for the negligent acts or omissions of the Department, its officers, agents, or employees, or third parties. This indemnification shall survive the termination of this Agreement.
This indemnification agreement is separate and apart from, and in no way limited by, any insurance provided pursuant to this agreement or otherwise.
ARTICLE VIII. INSURANCE
A. Required Insurance.
CONTRACTOR will provide and maintain at CONTRACTOR’s own expense, insurance of the kinds of coverage and in the amounts set forth in this Section. All such insurance will be primary and non-contributory with the CITY’s own insurance. In the event any request for the performance of services presents exposures to the CITY not covered by the requirements set forth below, the CITY reserves the right to add insurance requirements that will cover such an exposure.
(a) Coverage and Amounts.
(1) Workers Compensation Insurance. As required by Florida Statutes, Chapter 440, Workers’ Compensation Insurance, for all employees of CONTRACTOR employed at the project site or in any way connected with the Work.
The insurance required by this provision will comply fully with the Florida Workers’ Compensation Law and include Employers’ Liability Insurance with limits of not less than $500,000 per accident. Any associated or subsidiary company involved in the service must be named in the Workers’ Compensation coverage.
(2) Liability insurance, Including:
(i) Commercial General Liability coverage for operations, independent contractors, products-completed operations, broad form property damage, collapse and underground, and personal injury on an "occurrence" basis, insuring the CONTRACTOR and any other interests, including but not limited to any associated or subsidiary companies involved in the Work; and
(ii) Automobile Liability coverage insuring claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance, or use of any motor vehicle used by CONTRACTOR at the project site or in any way connected with the Work.
The limit of liability will be a combined single limit for bodily injury and property damage of no less than $1,000,000 per occurrence. If insurance is provided with a general aggregate, the aggregate will be in an amount of no less than $2,000,000. The Risk Manager may authorize lower liability limits for the automobile policy only, at the Risk Manager’s sole discretion.
THE COMMERCIAL GENERAL LIABILITY INSURANCE POLICY WILL NAME THE CITY AND STATE OF FLORIDA, DEPARTMENT OF TRANSPORTATION AS AN ADDITIONAL INSURED. CONTRACTOR's Commercial General Liability insurance policy shall provide coverage to CONTRACTOR and CITY when required
CONTRACT NO. 2657 – LPGA BOULEVARD & JIMMY ANN DRIVE INTERSECTION 4
to be named as an additional insured either by endorsement or pursuant to a blanket additional insured endorsement, for those sources of liability which would be covered by the latest edition of the standard Commercial General Liability Coverage Form (ISO Form CG 00 01) without the attachment of any endorsements excluding or limiting coverage for Products/Completed Operations, Independent Suppliers, Property of City in CONTRACTOR’s Care, Custody or Control or Property of City on which Contracted operations are being performed, Explosion, Collapse or Underground hazards (XCU Coverage, Contractual Liability or Separation of Insureds). When CITY is added as additional insured by endorsement, ISO Endorsements CG 20 10 and CG 20 37 or their equivalent shall be used to provide such Additional Insured status that is at least as broad as ISO form CG 20 10 11 85.
(iii) Builders’ Risk – The CONTRACTOR is required to maintain Builders Risk Insurance on an “all risk” basis, including but not limited to the completed value basis on the insurable portion of the work for the benefit of the CITY, the CONTRACTOR and subcontractors as their interests may appear. The CITY, the CONTRACTOR and any subcontractor insured therein waive all rights against each other for damages caused by fire and other perils to the extent covered by the insurance obtained pursuant to this paragraph.
(b) Subcontractors’ Insurance. Each of CONTRACTOR’s subcontractors will be required to provide insurance in substantially similar form to the insurance required of CONTRACTOR above based on services provided.
(c) Proof of Insurance. CONTRACTOR will furnish proof of insurance acceptable to the CITY prior to or at the time of execution of this Contract. CONTRACTOR will not commence Work until all required insurance has been approved by the CITY. CONTRACTOR will furnish evidence of all required insurance in the form of certificates of insurance which will clearly outline all hazards covered as itemized above, the amounts of insurance applicable to each hazard and the expiration dates.
Upon request of the Risk Manager, CONTRACTOR will also provide the CITY copies of the insurance contracts referenced by the certificates.
(d) Cancellation and Replacement. CONTRACTOR will file replacement certificates 30 days prior to expiration or termination of any required insurance occurring prior to expiration or termination of this Contract. If such insurance terminates without CONTRACTOR’s prior knowledge, immediately upon becoming aware of such termination CONTRACTOR will provide notice to the City’s Risk Manager at P.O. Box 2451, Daytona Beach, Florida 32115-2451.
The CITY reserves the right to suspend any or all of the Work until such insurance has been replaced, or to obtain replacement insurance at CONTRACTOR’s sole cost.
(e) Termination of Insurance. CONTRACTOR will not cancel any required insurance coverage until the work is completed, accepted by the CITY and CONTRACTOR has received written notification from the Risk Manager that CONTRACTOR is authorized to cancel the insurance and the effective date of such authorization.
The Risk Manager will provide such written notification at the request of CONTRACTOR if the request is made no earlier than two weeks before the work is to be completed.
The liabilities of CONTRACTOR under this Contract will survive and not be terminated, reduced, or otherwise limited by any expiration or termination of insurance coverage. Neither approval nor failure to disapprove insurance furnished by the CONTRACTOR will relieve the CONTRACTOR or its sub-contractors from responsibility to provide insurance as required by the contract.
(f) Liabilities Unaffected. CONTRACTOR’s liabilities under this Contract will survive and not be terminated, reduced or otherwise limited by any expiration or termination of insurance coverages. Similarly, CONTRACTOR’s liabilities under this Contract will not be limited by the existence of any exclusions or limitations in insurance coverages, or by CONTRACTOR’s failure to obtain insurance coverage.
CONTRACTOR will not be relieved from responsibility to provide required insurance by any failure of the CITY to demand such coverage, or by CITY’s approval of a policy submitted by CONTRACTOR that does not meet the requirements of this Contract.
CONTRACT NO. 2657 – LPGA BOULEVARD & JIMMY ANN DRIVE INTERSECTION 5
(g) Risk Manager. All references to the Risk Manager will be deemed to include the Risk Manager’s designee.
ARTICLE IX. NOTICES
A. Where the Contract Documents authorize or require the CITY to provide notice to CONTRACTOR, notice may be provided by delivery by hand to CONTRACTOR’s designated Superintendent at the Project Site, or in the absence or unavailability of the Superintendent to any other person on the Project Site who holds himself of herself out as managing the Work on behalf of CONTRACTOR, or in lieu of either of these, by written notice to the address provided below.
B. Where the Contract Documents authorize or require CONTRACTOR to provide notice to the CITY, notice may be provided only by written notice to the address provided below.
C. Written notice is valid only if sent by certified United States mail, return receipt requested, facsimile with confirmation receipt required, or by recognized courier such as Federal Express with confirmation receipt requested.
All such notices will be deemed to have been duly given and provided on (i) the date of receipt, (ii) upon receipt or refusal of delivery if transmitted by registered or certified mail, return receipt requested, or (iii) the first business day after the date of deposit, if transmitted by reputable overnight courier service, whichever occurs first. Written notices will be sent to the following persons:
If to CITY: If to the CONTRACTOR:
Attn: David Waller Attn:
Title: Public Works Director Title:
The City of Daytona Beach Company: _________________________________ 950 Bellevue Rd. Address: ___________________________________ Daytona Beach, FL 32114 City | ST | Zip: _______________________________ Email: wallerdavid@daytonabeach.gov Email: _____________________________________ provided, however, that either Party may by written notice change the address designated for receipt of written and faxed notices.
ARTICLE X. DISPUTE RESOLUTION
If a dispute exists concerning this Contract, the Parties agree to use the following procedure prior to pursuing any judicial remedies.
A. Negotiations Required. A Party will request in writing that a meeting be held between representatives of each Party within 14 days of the request or such later date that the Parties may agree to. Each Party will attend and will include, at a minimum, a senior level decision maker (an owner, officer, or employee of each organization) empowered to negotiate on behalf of their organization. The purpose of this meeting is to negotiate the matters constituting the dispute in good faith. The Parties may mutually agree in writing to waive this step and proceed directly to mediation as described below.
B. Non-Binding Mediation. Mediation is a forum in which an impartial person, the mediator, facilitates communication between parties to promote reconciliation, settlement, or understanding among them. Within 30 days after the procedure described above proves unsuccessful or the Parties mutually waive the procedure, the Parties will submit to a non-binding mediation. The mediation, at a minimum, will provide for (i) conducting an on-site investigation, if appropriate, by the mediator for fact gathering purposes, (ii) a meeting of all Parties for the exchange of points of view and (iii) separate meetings between the mediator and each Party to the dispute for the formulation of resolution alternatives. The Parties will select a mediator trained in mediation skills and certified to mediate by the Florida Bar, to assist with resolution of the dispute. The Parties will act in good faith in the selection of the mediator and give consideration to qualified individuals nominated to act as mediator. Nothing in this Contract prevents the Parties from relying on the skills of a person who also is trained in the subject matter of the dispute or a contract interpretation expert. Each Party will attend and will include, at a minimum, a senior level decision maker mailto:wallerdavid@daytonabeach.gov
CONTRACT NO. 2657 – LPGA BOULEVARD & JIMMY ANN DRIVE INTERSECTION 6
(an owner, officer, or employee of each organization) empowered to negotiate on behalf of their organization. If the Parties fail to reach a resolution of the dispute through mediation, then the Parties are released to pursue any judicial remedies available to them.
ARTICLE XI. GENERAL PROVISIONS
A. This Contract will be governed by the laws of the state of Florida without regard to any choice of law principles that could result in application of the laws of any other jurisdiction. Venue for any legal action or proceeding arising out of this Contract is exclusively in the federal or state courts in and for Volusia County, Florida.
The Parties hereby waive any right to stay or dismiss any action or proceeding brought under or in connection with this Contract that is brought before the above-referenced courts on the basis of forum non-conveniens.
B. In case of litigation arising out of this Contract where the meaning of one or more provisions is at issue, the CITY will not be penalized by virtue of its having drafted this Contract. CONTRACTOR has carefully reviewed and had the opportunity to seek advice of legal counsel prior to executing this Contract.
C. The CITY and CONTRACTOR agree that they have knowingly waived the right to trial by jury and have instead agreed that, in the event of any litigation arising out of or connected to this Contract, to proceed with a trial before the court, unless both parties subsequently agree otherwise in writing.
D. In performing the services provided for herein, CONTRACTOR is an independent contractor and not an employee of the CITY.
E. The waiver of any provision of this Contract will not be deemed to be a waiver of any other provision of this Contract. No waiver of any provision of this Contract will be deemed to constitute a continuing waiver unless expressly provided in writing, nor will a waiver of any default be deemed a waiver of any subsequent defaults of the same type. The failure at any time to enforce this Contract, whether the default is known or not, does not constitute a waiver or estoppel of the right to do so.
F. All terms and conditions of this Contract which contemplate a period of time beyond completion or termination, will survive such completion or termination and not be merged therein or otherwise terminated.
G. If any word, phrase, clause, sentence or provision of the Contract, or the application of same to any person or set of circumstances is for any reason held to be unconstitutional, invalid or unenforceable, that finding will only effect such word, phrase, clause, sentence or provision, and such finding will not affect the remaining portions of this Contract; this being the intent of the Parties in entering into the Contract; and all provisions of the Contract are declared to be severable for this purpose.
H. The undersigned representative of CONTRACTOR affirms that in executing this Contract on behalf of CONTRACTOR, he or she is fully authorized to bind CONTRACTOR to the terms and conditions herein set forth.
I. No CITY officer, employee, or independent CONTRACTOR who is involved in the development, evaluation, or decision-making process of the performance of any Solicitation will have a financial interest, direct or indirect, in the Contract resulting from that Solicitation. Any violation of this provision, with the knowledge, expressed or implied, of CONTRACTOR will render the Contract voidable by the CITY.
J. This Contract represents the entire and integrated agreement between the CITY and CONTRACTOR with respect to the subject matter hereof and supersedes all prior negotiations, representations or agreements, either written or oral.
K. The Parties agree to comply with s.20.055(5), Florida Statutes, and to incorporate in all subcontracts the obligation to comply with s.20.055(5), Florida Statutes.
L. E-Verify. The CONTRACTOR (and its subcontractors) have an obligation to utilize the U.S. Department of Homeland Security’s (DHS) E-Verify system for all newly hired employees. By executing this Contract, the CONTRACTOR certifies that it is registered with, and uses, the E-Verify system for all newly hired employees. The
CONTRACT NO. 2657 – LPGA BOULEVARD & JIMMY ANN DRIVE INTERSECTION 7
CONTRACTOR must obtain an affidavit from its subcontractors in accordance with paragraph (2)(b) of section 448.095, F.S., and maintain a copy of such affidavit for the duration of the Contract.
This section serves as notice to the CONTRACTOR regarding the requirements of section 448.095, F.S., specifically sub-paragraph (2)(c)1, and the CITY’s obligation to terminate the Contract if it has a good faith belief that the CONTRACTOR has knowingly violated section 448.09(1), F.S. If terminated for such reason, the CONTRACTOR will not be eligible for award of a public contract for at least one year after the date of such termination. The CITY reserves the right to order the immediate termination of any contract between the CONTRACTOR and a subcontractor performing work on its behalf should the City develop a good faith belief that the subcontractor has knowingly violated section 448.095(1), F.S.
M. Conflict of Interest: No member, officer, or employee of the City or of the Locality during his tenure or for 2 years thereafter shall have interest, direct or indirect, in this Contract or proceeds thereof.”
N. Inspector General: Contractor understands and will comply with 20.055(5), F.S.; and will also require all subcontractors to comply with 20.055(5), F.S.”
O. The CITY’s Invitation to Bid (ITB) No. 2657ITB, and any Addenda are incorporated herein as Exhibit A. The CONTRACTOR’s Responsive Offer is attached as Exhibit B. In case of conflicts between Exhibit A, Exhibit B;
Exhibit A will govern. In case of conflicts between Exhibit A and other provisions of this Contract, this Contract will govern.
ARTILE XII. REQUIRED CONTRACT PROVISIONS
REMAINDER OF PAGE IS INTENTIONALLY LEFT BLANK.
REQUIRED CONTRACT PROVISION BEGIN ON THE FOLLOWING PAGE.
FHWA-1273 – Revised June 25, 2026
CONTRACT PROVISIONS FOR
FEDERAL-AID CONSTRUCTION CONTRACTS
I. General II. Nondiscrimination III. Davis-Bacon and Related Act Provisions IV. Contract Work Hours and Safety Standards Act
Provisions V. Subletting or Assigning the Contract VI. Safety: Accident Prevention VII. False Statements Concerning Highway Projects VIII. Implementation of Clean Air Act and Federal Water
Pollution Control Act IX. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion X. Certification Regarding Use of Contract Funds for
Lobbying XI. Use of United States-Flag Vessels
ATTACHMENTS
A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only).
I. GENERAL
1. Historically, contracting agencies using Federal-aid highway funds were required to ensure Form FHWA-1273 was physically incorporated into all contracts and subcontracts.
Effective June 10, 2026, this requirement was eliminated [91 FR 25492]. Future use of Form FHWA-1273 is now optional on the part of the contracting agency using Federal-aid highway funds. FHWA continues to make Form FHWA-1273 available as a convenience to contracting agencies. Contracting agencies must continue to ensure compliance with the provisions cited in Form FHWA-1273 in accordance with the provisions regardless of the use of Form FHWA-1273.
Accordingly, the contracting agency retains the authority to determine whether the contractor must use Form FHWA-1273 to physically incorporate required contract provisions in each subcontract and in lower tier contracts. Where permitted by the contracting agency, the contractor may choose other ways to include required contract provisions in each subcontract, besides incorporating Form FHWA-1273. Contract provisions in Form FHWA-1273 are not required to be physically included in subcontracts for design services on Federal-aid design-build contracts, or in purchase orders, rental agreements and other agreements for supplies or services.
The applicable provisions of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor or design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.
Contracting agencies may reference Form FHWA-1273 in solicitation-for-bids or request-for-proposals documents.
2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract.
3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA.
4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. 23 U.S.C. 114(b).
The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors.
23 U.S.C. 101(a).
II. NONDISCRIMINATION
The contractor and all subcontractors must comply with the following policies: 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27, including any amendments thereto.
Note: The U.S. Department of Labor has exclusive authority to determine compliance with 29 CFR Parts 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27, including any amendments thereto.
The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 are incorporated by reference in this contract.
1. Assurances Required:
a. The requirements of 49 CFR Part 26, including any amendments thereto, and the State DOT’s FHWA-approved Disadvantaged Business Enterprise (DBE) program are incorporated by reference.
b. The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26, including any amendments thereto, in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:
(1) Withholding monthly progress payments;
(2) Assessing sanctions;
(3) Liquidated damages; and/or
(4) Disqualifying the contractor from future bidding as non-responsible.
c. The Title VI and nondiscrimination provisions of U.S.
DOT Order 1050.2A at Appendixes A and E, including any amendments thereto, are incorporated by reference. 49 CFR Part 21.
III. DAVIS-BACON AND RELATED ACT PROVISIONS
This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size), in accordance with 29 CFR 5.5. The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal-aid highway. 23 U.S.C. 113.
This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. 23 U.S.C. 101.
Where applicable law requires that projects be treated as a project on a Federal-aid highway, the provisions of this subpart will apply regardless of the location of the project. Examples include: Surface Transportation Block Grant Program projects funded under 23 U.S.C. 133 [excluding recreational trails projects], the Nationally Significant Freight and Highway Projects funded under 23 U.S.C. 117, and National Highway Freight Program projects funded under 23 U.S.C. 167.
The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 “Contract provisions and related matters” with minor revisions to conform to the FHWA- 1273 format and FHWA program requirements.
1. Minimum wages (29 CFR 5.5)
a. Wage rates and fringe benefits. All laborers and mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. As provided in paragraphs (d) and (e) of 29 CFR 5.5, the appropriate wage determinations are effective by operation of law even if they have not been attached to the contract. Contributions made or costs reasonably anticipated for bona fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph 1.e. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe benefits on the wage determination for the classification(s) of work actually performed, without regard to skill, except as provided in paragraph 4. of this section. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classifications and wage rates conformed under paragraph 1.c. of this section) and the Davis-Bacon poster (WH–1321) must be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.
b. Frequently recurring classifications. (1) In addition to wage and fringe benefit rates that have been determined to be prevailing under the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to § 1.3(f), wage and fringe benefit rates for classifications of laborers and mechanics for which conformance requests are regularly submitted pursuant to paragraph 1.c. of this section, provided that:
(i) The work performed by the classification is not performed by a classification in the wage determination for which a prevailing wage rate has been determined;
(ii) The classification is used in the area by the construction industry; and
(iii) The wage rate for the classification bears a reasonable relationship to the prevailing wage rates contained in the wage determination.
(2) The Administrator will establish wage rates for such classifications in accordance with paragraph 1.c.(1)(iii) of this section. Work performed in such a classification must be paid at no less than the wage and fringe benefit rate listed on the wage determination for such classification.
c. Conformance. (1) The contracting officer must require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract be classified in conformance with the wage determination. Conformance of an additional classification and wage rate and fringe benefits is appropriate only when the following criteria have been met:
(i) The work to be performed by the classification requested is not performed by a classification in the wage determination; and
(ii) The classification is used in the area by the construction industry; and
(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
(2) The conformance process may not be used to split, subdivide, or otherwise avoid application of classifications listed in the wage determination.
(3) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the https://www.ecfr.gov/current/title-29/part-3 https://www.govinfo.gov/link/uscode/40/3141 https://www.govinfo.gov/link/uscode/40/3141 https://www.ecfr.gov/current/title-29/part-1 classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken will be sent by the contracting officer by email to DBAconformance@dol.gov. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
(4) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer will, by email to DBAconformance@dol.gov, refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.
(5) The contracting officer must promptly notify the contractor of the action taken by the Wage and Hour Division under paragraphs 1.c.(3) and (4) of this section. The contractor must furnish a written copy of such determination to each affected worker or it must be posted as a part of the wage determination. The wage rate (including fringe benefits where appropriate) determined pursuant to paragraph 1.c.(3) or (4) of this section must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
d. Fringe benefits not expressed as an hourly rate.
Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly cash equivalent thereof.
e. Unfunded plans. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, in accordance with the criteria set forth in § 5.28, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
f. Interest. In the event of a failure to pay all or part of the wages required by the contract, the contractor will be required to pay interest on any underpayment of wages.
2. Withholding (29 CFR 5.5)
a. Withholding requirements. The contracting agency may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount of wages and monetary relief, including interest, required by the clauses set forth in this section for violations of this contract, or to satisfy any such liabilities required by any other Federal contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the same prime contractor (as defined in § 5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld. In the event of a contractor's failure to pay any laborer or mechanic, including any apprentice or helper working on the site of the work all or part of the wages required by the contract, or upon the contractor's failure to submit the required records as discussed in paragraph 3.d. of this section, the contracting agency may on its own initiative and after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
b. Priority to withheld funds. The Department has priority to funds withheld or to be withheld in accordance with paragraph 2.a. of this section or Section IV, paragraph 3.a., or both, over claims to those funds by:
(1) A contractor's surety(ies), including without limitation performance bond sureties and payment bond sureties;
(2) A contracting agency for its reprocurement costs;
(3) A trustee(s) (either a court-appointed trustee or a U.S.
trustee, or both) in bankruptcy of a contractor, or a contractor's bankruptcy estate;
(4) A contractor's assignee(s);
(5) A contractor's successor(s); or
(6) A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901–3907.
3. Records and certified payrolls (29 CFR 5.5)
a. Basic record requirements (1) Length of record retention.
All regular payrolls and other basic records must be maintained by the contractor and any subcontractor during the course of the work and preserved for all laborers and mechanics working at the site of the work (or otherwise working in construction or development of the project under a development statute) for a period of at least 3 years after all the work on the prime contract is completed.
(2) Information required. Such records must contain the name; Social Security number; last known address, telephone number, and email address of each such worker; each worker's correct classification(s) of work actually performed;
hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C.
3141(2)(B) of the Davis-Bacon Act); daily and weekly number mailto:DBAconformance@dol.gov mailto:DBAconformance@dol.gov https://www.govinfo.gov/link/uscode/31/3901 https://www.govinfo.gov/link/uscode/31/3901 of hours actually worked in total and on each covered contract;
deductions made; and actual wages paid.
(3) Additional records relating to fringe benefits. Whenever the Secretary of Labor has found under paragraph 1.e. of this section that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C.
3141(2)(B) of the Davis-Bacon Act, the contractor must maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.
(4) Additional records relating to apprenticeship. Contractors with apprentices working under approved programs must maintain written evidence of the registration of apprenticeship programs, the registration of the apprentices, and the ratios and wage rates prescribed in the applicable programs.
b. Certified payroll requirements (1) Frequency and method of submission. The contractor or subcontractor must submit weekly, for each week in which any DBA- or Related Acts-covered work is performed, certified payrolls to the contracting agency. The prime contractor is responsible for the submission of all certified payrolls by all subcontractors. A contracting agency or prime contractor may permit or require contractors to submit certified payrolls through an electronic system, as long as the electronic system requires a legally valid electronic signature; the system allows the contractor, the contracting agency, and the Department of Labor to access the certified payrolls upon request for at least 3 years after the work on the prime contract has been completed; and the contracting agency or prime contractor permits other methods of submission in situations where the contractor is unable or limited in its ability to use or access the electronic system.
(2) Information required. The certified payrolls submitted must set out accurately and completely all of the information required to be maintained under paragraph 3.a.(2) of this section, except that full Social Security numbers and last known addresses, telephone numbers, and email addresses must not be included on weekly transmittals. Instead, the certified payrolls need only include an individually identifying number for each worker ( e.g., the last four digits of the worker's Social Security number). The required weekly certified payroll information may be submitted using Optional Form WH–347 or in any other format desired. Optional Form WH–347 is available for this purpose from the Wage and Hour Division website at https://www.dol.gov/sites/dolgov/files/WHD/ legacy/files/wh347/.pdf or its successor website. It is not a violation of this section for a prime contractor to require a subcontractor to provide full Social Security numbers and last known addresses, telephone numbers, and email addresses to the prime contractor for its own records, without weekly submission by the subcontractor to the contracting agency.
(3) Statement of Compliance. Each certified payroll submitted must be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor, or the contractor's or subcontractor's agent who pays or supervises the payment of the persons working on the contract, and must certify the following:
(i) That the certified payroll for the payroll period contains the information required to be provided under paragraph 3.b.
of this section, the appropriate information and basic records are being maintained under paragraph 3.a. of this section, and such information and records are correct and complete;
(ii) That each laborer or mechanic (including each helper and apprentice) working on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3; and
(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification(s) of work actually performed, as specified in the applicable wage determination incorporated into the contract.
(4) Use of Optional Form WH–347. The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH–347 will satisfy the requirement for submission of the “Statement of Compliance” required by paragraph 3.b.(3) of this section.
(5) Signature. The signature by the contractor, subcontractor, or the contractor's or subcontractor's agent must be an original handwritten signature or a legally valid electronic signature.
(6) Falsification. The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
(7) Length of certified payroll retention. The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
c. Contracts, subcontracts, and related documents. The contractor or subcontractor must maintain this contract or subcontract and related documents including, without limitation, bids, proposals, amendments, modifications, and extensions. The contractor or subcontractor must preserve these contracts, subcontracts, and related documents during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
d. Required disclosures and access (1) Required record disclosures and access to workers. The contractor or subcontractor must make the records required under paragraphs 3.a. through 3.c. of this section, and any other documents that the contracting agency, the State DOT, the FHWA, or the Department of Labor deems necessary to determine compliance with the labor standards provisions of any of the applicable statutes referenced by § 5.1, available for inspection, copying, or transcription by authorized representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and must permit such representatives to interview workers during working hours on the job.
https://www.govinfo.gov/link/uscode/40/3141 https://www.govinfo.gov/link/uscode/40/3141 https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347/.pdf https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347/.pdf https://www.ecfr.gov/current/title-29/part-3 https://www.govinfo.gov/link/uscode/18/1001 https://www.govinfo.gov/link/uscode/31/3729 https://www.govinfo.gov/link/uscode/31/3729
(2) Sanctions for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .