CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TBD |
| A |
| TDP ____ |
| TM _____ |
| OTHER X MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| Key Events Schedule |
| Plan Of Actions & Milestones |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-81791 |
| SOW Section 3.9 & 6.1 |
| Fleet Readiness Center Southwest |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
See Block 16
| 1 TIME |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| See Block 16 |
| 1 |
Block 3: Plan Of Action and Milestones (POA&M) to identify contractor performance dates of all major events from contract award to completion of all contract requirements. The milestones shall be prepared using a recognized project management technique (preferably Microsoft Project). The contractor shall notify the Government prior to making any changes to the POA&M. All changes to the POA&M shall be approved in advance by the Government. The POA&M shall detail such items as engineering, procurement of major hardware, assembly, operational debug, shipment, installation, training, and final acceptance test.
Block 8: The POA&M shall be delivered within thirty (30) calendar days After Contract Award (ACA).
Block 9: “Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only [Controlled Technical Information] [9/23/2024]. Other requests for this document must be referred to Technical Point of Contact (TPOC), Fleet Readiness Center Southwest (FRCSW), San Diego, CA 92135.”
Block 12: Within 30 days of contract award
Block 14: See FTXT.247-9505 Technical Data and Information for distribution information
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Michael Anderson |
| 11/12/2024 |
| William K. Fields |
| 11/12/2024 |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TBD |
| A |
| TDP ____ |
| TM _____ |
| OTHER X DRPR |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| Engineering Drawings |
| Final Design and As-built Drawings |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-DRPR-80651 |
| SOW Section 4.1.1 & 6.2 |
| Fleet Readiness Center Southwest |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
See Block 16
| 1 TIME |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| See Block 16 |
| 1 |
Block 8: Submit draft for approval within 90 days of contract award. Government will review and comment within 14 days of receipt of draft. Submit revisions within 14 days of receipt of Government comments. Distribute within 7 days of authorization to issue final.
Block 9: “Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only [Controlled Technical Information] [9/23/2024]. Other requests for this document must be referred to Technical Point of Contact (TPOC), Fleet Readiness Center Southwest (FRCSW), San Diego, CA 92135.”
Block 12: Within 120 days of contract award
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Michael Anderson |
| 09/23/2024 |
| William K. Fields |
| 09/23/2024 |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TBD |
| A |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| Wire Rope Assemblies: Aircraft, Proof Loading and Prestretching of |
| Proof load certifications for wire ropes |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| MIL-DTL-5688E(3) NOT 2 |
| SOW Section 6.3 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| 1 TIME |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
N/A
| 16. REMARKS |
| See Block 16 |
| 1 |
Block 3: Supplier provided proof load certifications for wire ropes
Block 9: “Distribution Statement A. Approved for public release: distribution is unlimited”
Block 12: Deliver to FRCSW TPOC at any time between contract award and inspection and acceptance.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Michael Anderson |
| 09/23/2024 |
| William K. Fields |
| 09/23/2024 |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TBD
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| Test/Inspection Report |
| Certification of Nondestructive Test of hoist hooks |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-NDTI-80809B |
| SOW Section 6.4 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| 1 TIME |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
N/A
| 16. REMARKS |
| See Block 16 |
| 4 |
Block 3: Certification of Nondestructive Test of hoist hooks will be no older than one (1) year.
Block 9: “Distribution Statement A. Approved for public release: distribution is unlimited”
Block 12: Deliver to FRCSW TPOC at any time between contract award and inspection and acceptance.
Block 14: See FTXT.247-9505 Technical Data and Information for distribution information.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Michael Anderson |
| 09/23/2024 |
| William K. Fields |
| 09/23/2024 |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TBD |
| A |
| TDP ____ |
| TM X_____ |
| OTHER |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A005 |
| Commercial Off-The-Shelf (COTS) Manuals |
| Operator and Maintenance Manuals |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-TMSS-81815 |
| SOW Section 6.5 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| 1 TIME |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
N/A
| 16. REMARKS |
| See Block 16 |
| 3 |
Block 9: “Distribution Statement A. Approved for public release: distribution is unlimited”
Block 12: Two (2) hardcopies and one (1) digital copy of Operator and Maintenance manuals including illustrated parts breakdown to be delivered to FRCSW TPOC at any time between contract award and End Of Contract.
Block 14: See FTXT.247-9505 Technical Data and Information for distribution information. Contractor shall provide the Government Two (2) hardcopies and one (1) digital copy of Operator and Maintenance manuals including illustrated parts breakdown.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Michael Anderson |
| 09/23/2024 |
| William K. Fields |
| 09/23/2024 |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0006 |
| A |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A006 |
| Contract Field Service Report |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MGMT-81238 |
| SOW Section 6.6 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
See Block 16
| 1 TIME |
| See Block 16 |
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
N/A
| 16. REMARKS |
| See Block 16 |
| 1 |
Block 9: “Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only [Controlled Technical Information] [9/23/2024]. Other requests for this document must be referred to Technical Point of Contact, Fleet Readiness Center Southwest, San Diego, CA 92135.”
Block 12: An electronic copy of the Field Service Report is to be provided to FRCSW TPOC within seven (7) days of completing services.
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Michael Anderson |
| 09/23/2024 |
| William K. Fields |
| 09/23/2024 |
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0007 |
| A |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A007 |
| Certificate of Compliance |
| Certificate of Conformance |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-81356A |
| SOW Sections 5.4 and 6.7 |
| FRCSW |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
See Block 16
| 1 TIME |
| EOC |
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| See Block 16 |
| 1 |
Block 8: Contractor will provide the TPOC with a Certificate Of Conformance (COC). Contractor is required to fill out the COC with the Technician’s name, signature and date of service completion. FRCSW TPOC will review and countersign the COC and provide a signed copy of the COC to the Contractor prior to End of Contract.
Block 9: “Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only [Controlled Technical Information] [9/23/2024]. Other requests for this document must be referred to Technical Point of Contact, Fleet Readiness Center Southwest, San Diego, CA 92135.”
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Michael Anderson |
| 09/23/2024 |
| William K. Fields |
| 09/23/2024 |