Aberdeen Test Center Small Arms Systems Division HVACR M&R Support Performance Work Statement

I. Background

Aberdeen Test Center (ATC) provides various simulated environment testing in support of a diverse test arena for the Department of the Army. Most of these test services rely on the use of complex environmental test chambers that include custom-built Heating, Ventilating, Air Conditioning and Refrigeration (HVACR) systems. These HVACR systems are not fully comparable to other residential and/or industrial HVACR systems, and generally require specialized components, systems and/or a variety of refrigerants to properly function. Further, many of these systems were manufactured over 25 years ago, potentially limiting the availability of technical documentation and/or replacement parts.

These systems are crucial in the testing of weapons, ammunition, body armor and other soldier systems that ultimately impact the Warfighter’s ability to complete his/her mission. Therefore, it is critical that these systems always remain operable, 24 hours per day, 7 days per week, 365 days per year, and fully comply with the strict testing standards set forth by the Department of Defense (MIL-STD-810G: Environmental Engineering Considerations and Laboratory Tests).

II. Scope of Work

The Contractor will be tasked with maintenance and repair for all HVACR and ancillary (e.g. associated electronics, electrical components, controls, etc.) equipment. Work efforts will be concentrated at the Michaelsville Range Complex (MRC) on Aberdeen Proving Ground, MD and include but are not limited to the following:

Signature Range – Closed Range 4 Indoor Firing Gallery – Position 16/17 Sand and Dust Chamber and Rain Chamber – Position 18/19 Extreme Temperature Chamber (ETC) -Position 19A, Small Arms Environmental Chamber (SAEC) – Position 19B

The MRC consists of 12 small and medium caliber firing positions in total. Each position is an Army laboratory facility where air supply, negative-pressure differentials, temperature and humidity are controlled and managed by HVACR equipment. The Contractor, however, may be tasked to perform service on additional ATC HVACR assets as requested by the ATC Contracting Officer Representative (COR).

The following outlines service requirements for the three elements of this M&R contract: 1) Scheduled Maintenance, 2) Unscheduled Maintenance and 3) Replacement Parts.

1) Scheduled Maintenance

The Contractor shall provide 128 hours of technician (journeymen-level) labor towards scheduled maintenance efforts. For initial cost estimating purposes the contractor shall assume that 104 hours are at standard labor rate and that 24 hours are to be at a premium hour rates. These hours will be utilized at the discretion of the ATC COR to support tasks listed below. The ATC COR will coordinate scheduled maintenance efforts through a designated Contractor representative. At the completion of each service visit, a service ticket shall be provided to the ATC COR detailing personnel on site, nature of the service, duration of visit, status of relevant equipment, any replacement parts utilized, and any other information relevant to the service performed.

ATC has identified the following maintenance tasks to be completed as scheduled maintenance. Note that this list is NOT all inclusive and other tasks reasonably considered basic or routine may be requested by the ATC COR as scheduled maintenance.

1. Perform system safety checks on all equipment

2. Perform visual inspection on all mechanical, electrical, refrigeration components to identify any areas of degradation; recommend repair/replacement of any components as necessary

3. Perform refrigerant leak checks on all relevant equipment

4. Perform system calibration on equipment where necessary (e.g. back pressure regulators, thermal expansion valves, etc.)

5. Perform line-to-ground continuity testing to verify appropriate electrical connections/components are grounded

6. Verify, record, and submit appropriate mechanical readings of all equipment (e.g. pressure, temperature, humidity)

7. Verify, record, and submit appropriate electrical readings (e.g. voltage/current readings on following points: compressor line, fan motor line, main disconnect, dehumidifier units, electrical heater)

8. Inspect, service, replace as needed following mechanical components (not exhaustive list): compressor, compressor oil level, accumulator, liquid line receiver, liquid line sight glass, belt drives and pulleys (grease as needed), air filters (note that some consumed filters may contain lead or other hazardous materials), filter driers, refrigerant metering device, hot gas by-pass valves, condenser and evaporator coils (requires non-corrosive and bio-degradable agent to be rinsed thoroughly with pressurized water), chamber door gaskets, Armstrong humidification units, dehumidification units, rooftop exhaust fans/package units

9. Inspect, service, replace as needed following electrical components (not exhaustive list): magnetic contactors, switching relays, current relays, solenoid coils, pressure switch, capacitors, Silicon-Controlled Rectifier, terminal blocks, printed circuit boards, compressor, blower motor, fan motor

10. Perform software maintenance and provide on-going support for all related software; service may be required up to five (5) times per year

11. For negative-pressure ranges (e.g. CR4), perform air balance testing to ensure proper pressure readings/ventilation; service may be required up to three (3) times per year

12. The Contractor is responsible for recommending additional preventative maintenance for MRC equipment based on manufacturer recommendations and/or other industry standards.

13. Additional tasks that are generally and reasonably considered routine and/or reoccurring may be assigned by the ATC COR. An example of a reoccurring task would be replacing equipment requiring frequent replacement due to a heavy workload, electrical imbalances, etc.

2) Unscheduled Maintenance

For emergency services, efforts exceeding the time capacity of scheduled maintenance as defined above and/or efforts outside of the scope of scheduled maintenance as defined above, the Contractor shall provide necessary M&R support under the following guidelines:

1. The ATC COR may request unscheduled maintenance to complete emergency repair service to support an upcoming or active test event. Following an emergency repair request, the Contractor is required to respond on-site, prepared to work within 24 hours of initial request. Emergency repairs shall be completed within 72 hours to allow for continued testing. If a repair cannot be completed within 72 hour timeframe, the Contractor shall document the problem, estimate timeframe for repair completion, and notify the ATC COR. The Contractor must be available at all times, 24/7/365 (including holidays) in order to support around-the-clock testing.

2. Non-emergency maintenance or repair requests shall be completed within five (5) business days.

3. For an unscheduled maintenance request, the Contractor shall troubleshoot the observed failure/deficiency as directed by the ATC COR. Prior to taking any corrective actions or procuring any replacement parts, the Contractor shall coordinate with the ATC COR to report any findings, identify any repair cost and determine a plan of action.

4. Additional tasks within the general scope of work may be requested to support ATC HVACR equipment other than those pieces listed in Appendix A.

5. The following Contractor personnel rates shall be identified for Unscheduled Maintenance efforts:

a. Technician Regular Hourly Rate

b. Technician Premium Hourly Rate (Federal Holiday, Over-time, Weekend Rate)

3) Replacement Parts and Other Direct Costs

The Contractor shall provide replacement parts for downed equipment as needed. The following outlines the guidelines for procuring/installing replacement parts:

1. Prior to the procurement of any replacement part(s), the Contractor must present planned corrective action and identify parts needed to complete the corrective action along with their associated costs to the ATC COR. The ATC COR will either grant approval to proceed or provide an alternate solution.

2. For Contractor furnished replacement parts, the part must be brand new and original equipment unless the ATC COR provides written authorization prior to acquisition. Contractor shall provide a minimum of a one (1) year warranty on all parts furnished by the Contractor.

3. In the instance a replacement part is unavailable through the Contractor or the Government, the Contractor may be required to fabricate a new part or, in some instances, re-design the system as part of the corrective action.

4. The ATC COR may furnish Government-owned replacement parts if available.

5. A representative list (not exhaustive) of replacement parts include: condensers, compressors, air handling units, humidifiers, heaters, fans, refrigeration coils, air filters, control systems, software packages, gauges, valves, sensors, microprocessors, belts, motors, electrical components, electronics, ductwork, dampers, exhaust fan units, etc.

6. The Contractor shall include Parts, Materials, Lodging, Per Diem, Travel Costs and Freight costs within the proposal aggregated as Other Direct Costs. The Contractor shall include any margin (i.e. mark-up) on replacement parts and all Other Direct Costs in the proposal. For cost estimating purposes the contractor shall assume that the loaded total of Other Direct Costs shall be limited to $16,000 for the base contract award.

III. General Requirements

1. Contractor shall provide a service manager who will be responsible for the overall coordination of the contract and act as the central POC with the Contracting Officer (KO) and ATC COR.

2. All Contractor work efforts shall be approved by the ATC COR or designated ATC SME prior to the commencement of any work.

3. All replacement parts shall be approved by the ATC COR or designated ATC SME prior to procurement of any material, equipment, part, etc.

4. Contractor shall provide the ATC COR with a monthly report summarizing all service visits and replacement part purchases, and include an active balance of scheduled maintenance hours, unscheduled maintenance funding and replacement part funding. Report shall include each service ticket number, date, and total cost of invoice.

5. Contractor shall provide the appropriate fully qualified technician to accomplish a given task from the ATC COR.

6. Contractor may be required to establish a fixed schedule for at least one designated technician (journeyman) to be on-site for eight hours per day up to a maximum of two days per week.

7. Contractor will provide a service ticket (including refrigerant repair log) at the end of the visit describing work accomplished, duration of visit, status of job/relevant equipment and any parts replaced along with origin and cost of replacement part. The service ticket shall be computer generated or neatly written by hand.

8. Contractor shall be responsible to deliver all maintenance services, maintenance reports, service tickets, and any other documentation that results from the work listed under this Performance Work Statement.

9. Contractor shall notify ATC COR when each CLIN’s funding is 75% exhausted.

10. Contractor must be willing to work alongside ATC personnel as requested by ATC COR.

11. Contractor must be able to provide up to 3 technicians at any given time to support a single/multiple repair request(s).

12. Work will be conducted at various locations throughout Aberdeen Proving Ground, MD. Equipment may be housed in large warehouses, indoor test ranges, confined spaces, outdoor test facilities, remote areas or facility rooftops.

13. Work will be conducted primarily during the ATC core working hours of 0700-1630 Monday- Friday, except for biweekly RDO Fridays. However, Contractor must be able to provide emergency support 24/7/365, including holidays, without exception.

14. For emergency service requests, Contractor must be able to provide required technicians on- site and prepared to perform troubleshooting/repairs within 24 hours from initial request. This requirement extends to any personnel providing a service sub-tasked by the prime Contractor.

15. Contractor technicians must possess EPA Universal certificate.

16. Contractor must provide appropriate, OSHA approved protective clothing and equipment (PCE)

17. Contractor will perform all tasks in a safe manner (e.g. lock-out/tag-out)

18. Contractor must have a minimum of five (5) years of experience working with a wide variety of low temperature industrial refrigerants.

19. Contractor must have a minimum of five (5) years of experience supporting specialty simulated environmental chambers (with temperature/humidity) to include extreme temperatures to comply with MIL-STD-810G: Environmental Engineering Considerations and Laboratory Tests.

20. Contractor must provide required documentation to ATC COR in accordance with 40 CFR Part 82, Subpart F.

IV. Security Requirements

Security Clause One – The Contractor is responsible for hiring personnel eligible for escorted access to service equipment in the APG Restricted Areas (Ras). All employees working on this contract will be US citizens; non US persons are not authorized to work on this contract.

Security Clause Two – Installation Access. All contractor personnel will comply with the requirements of APG Regulation 190-4, Movement Control Within the Installation, for entry, exit, and internal control of personnel, material and vehicles on APG. All vehicles and personnel are subject to search and seizure of contraband and/or unauthorized Government property in accordance with Army Regulation 190-13, The Army Physical Security Program.

Security Clause Three – Safeguarding Government Information and Property. The contractor shall be responsible for safeguarding all Government information and property provided for contractor use. Government-furnished property will be secured in accordance with AR 190-51, Security of Unclassified Army Property (Sensitive and Nonsensitive).

Security Clause Four – Usage of Privately Owned Personal Electronic Devices (PEDs) Within the Restricted Area (RA). A privately owned personal electronic device (PED) is defined as a civilian multifunction cell phone, iPhone, personal digital assistant, tablet, blackberry, personal wireless fitness devices (PWFD), digital inventory devices and electronic recording/storage devices.

Contractor personnel shall not use the PED’s photographic/recording capability within the ATC RA. The contractor shall not install or connect a privately owned PED to any government-owned computer or network system. Also, a PED that has the capability to store data cannot be connected to a government computer for purposes of charging the device’s battery. Contractor employees must use the appropriate wall adapter to charge a privately owned PED. PEDs are authorized for private, non-work related matters. Under no circumstances will a privately owned PED be used to photograph or record images while in the ATC RA(s).

APPENDIX A

SASD Equipment Schedule

This appendix contains equipment information for MRC environmental test chambers and ranges. The information listed includes major systems and/or major system components and does not limit scope of work to only the listed equipment.

SASD Equipment List

DESCRIPTION
MAKE
MODEL
SERIAL

Michaelsville Range CR4 Building 746

Central HVAC Unit
AAON
RN-020-2-0-EB09-14A
200910-ANEPD2483

Michaelsville Range 16/17 Building 738B

Make Up Air Unit (heated)
Greenheck
MSX-108-H12-HZ
10542072
Make Up Air Unit (heated)
Greenheck
MSX-108-H12-HZ
10542073
Central HVAC
York
N0D7615618
BQ036C00N2AAA1A

Michaelsville Range18/19

Make Up Air Unit (electric heated)
York Solutions
MAU-1
1800 -27kWX2
Central HVAC
Johnson Controls
GCGD18S21S2XC
W1G3920048
Dust Collector
Donaldson
DFO2-8
4082296-1

Michaelsville Range 19A

Environmental Chamber – HVACR System
Cincinnati Sub-Zero
CM-3600B-30-30-S/RRAC
13-CM15649
Make Up Air Preconditioner
Modine
MPR15BD1A0ALQ16D0NNNNNNN
1135214310311718-1078
Make Up Air Unit
Des Champs
PV-W2-WDR
61169

Michaelsville Range 19B Building 737A1

Environmental Chamber – HVACR System
Cincinnati Sub-Zero
WM-3740-MP-(2)30-30-S/RPP/RAC
19-WM16443
Condenser
KeepRite
KCCL0740T4A-M22V-R061
192301929,
Condenser
KeepRite
KCCL0740T4A-M22V-R061
192301928
Make Up Air Unit
Munters
HCD-4500-EA-P-HPX-FPCC/ICA-11
21955082-001