DRAFT 2021 BASIC SOW.pdf
PDF 681 KB Posted
- Attached to
- WPAFB Construction: Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA8601-21-R-XXXX
About this file
This document outlines requirements for a potential firm-fixed-price construction contract for simplified acquisition of base engineering requirements at Wright-Patterson Air Force Base in Ohio. Services include general contracting, design, construction, and maintenance for over 100 concurrent projects across various facilities totaling over 8,000 acres. The estimated value is $1 million to $115 million over five years. The primary NAICS code is 236220 with a $39.5 million size standard. Responses are requested by July 30th for sources interested in potential future solicitations, including business information, socioeconomic categories, and ability to provide the specified services.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
STATEMENT OF WORK
FOR
SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS
SABER
ZHTV XX-XXXX
30 JUN 2020
88th CIVIL ENGINEER GROUP
5151 WRIGHT AVENUE
WRIGHT-PATTERSON AFB, OH
- 2 -
TABLE OF CONTENTS
SECTION DESCRIPTION
1.0 Project Description
2.0 Work by the Government
3.0 Performance Capabilities
4.0 Technical Design Support
5.0 Management Plan
6.0 Design and Construction Requirements
7.0 Quality Control
8.0 Site Office
9.0 Protection of Contractor’s Equipment and Government Property
10.0 Provisions on Contracting Officer’s Authority
11.0 Task Order Pricing
12.0 Computer Requirements
13.0 Communication
14.0 Construction Start-Up Period
15.0 Pre-Performance Conferences
16.0 Ordering Procedures
17.0 Task Order Proposal Evaluation
18.0 Commencement, Prosecution, Completion and Payment for Work
19.0 Weather Days
20.0 Hours of Work
21.0 Jobsite Verification / Government-Furnished Record Drawings
22.0 Material Submittals / Shop Drawings
23.0 Burn Permits
24.0 Excavation Permits and Digging
25.0 Testing of Materials
26.0 Pre-Final and Final Inspections
27.0 Warranty
28.0 Contractor’s As-Built Drawings
29.0 Government Furnished Equipment / Materials
30.0 Scheduling Work
31.0 Work in Occupied Areas
32.0 Coordinating with Government Activities
33.0 Noise Control
34.0 Construction Site Maintenance
35.0 Contractor Parking
36.0 Transportation of Construction Equipment
37.0 Base Fire Regulations
38.0 Security Requirements
39.0 Airfield Requirements
- 3 -
40.0 Work in Special Security Areas
41.0 Safety and Health
42.0 Explosive Operated Hand tools
43.0 Contractor’s Use of Electromagnetic Emission Devices
44.0 Recording and Preserving Historical and Archeological Finds
45.0 Paving and Roadwork
46.0 Use of Tobacco
47.0 Inappropriate Worker Behavior
48.0 Completion of Contract
49.0 Partnering
Abbreviations
Appendix D
- 4 -
ZHTV XX-XXXX
SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER)
1.0 PROJECT DESCRIPTION
1.1 The Contractor shall provide all management, labor, material, equipment, (unless furnished by the Government), transportation, supervision and design capabilities to accomplish over one hundred (100+) simultaneous projects for a broad range of maintenance, repair and minor construction work on real property at Wright Patterson AFB, OH. The base encompasses over 120 tenant and host organizations on four areas of land totaling 8,145 acres, and 850 facilities containing 16.4 million SF, with missions varying tremendously in complexity and nature. In addition, over 20 General Officers reside or work at WPAFB. The size and diversity of WPAFB necessitates expeditious response and efficient management of the heavy volume of task orders (TO) placed against the SABER contract. Facilities include, but are not limited to, research and development, hospital, secure areas, airfields, flight line, infrastructure, administrative, residential, pavements, industrial, etc. Prompt response and execution of all task orders is required. The Contracting Officer (CO) will issue a request for proposal (RFP) describing basic requirements for each individual task order. Following review of the Contractor’s proposal, the CO will negotiate with the Contractor if elevated, and award an individual TO. The Contractor shall be required to maintain a local office to facilitate services as described in Section 3.0 – PERFORMANCE CAPABILITIES.
1.2 The contractor shall be required to actively execute the normal workload of up to one hundred plus (100+) concurrent projects and shall be required to manage up to one hundred and fifty plus (150+) concurrent projects.The contractor may on occasion be required to provide for large unexpected fluctuations in the workload. It is estimated that less than five percent (5%) of all work shall be required during other than normal working hours.
2.0 WORK BY THE GOVERNMENT:
The Government is not obligated to issue any particular type of work under this contract and reserves the right to accomplish work using Government workforces or by other contracts, as the Government deems necessary or desirable, and to do so shall not breach or otherwise violate this contract.
3.0 PERFORMANCE CAPABILITIES
3.1 Contractor Personnel - The Contractor shall furnish sufficient technical, supervisory, and administrative personnel to insure satisfactory accomplishment of the work specified in each individual contract including accomplishment of work by agreed milestone dates and progress schedule.
- 5 -
3.1.1 Contractor’s Contract Manager (CM): The contract manager shall be responsible for the overall performance of this contract. The contract manager shall be capable of managing the development of renovation and minor new construction designs and estimates, as well as acting as the single point of contact capable of communicating and interfacing with Government officials in all aspects of contract execution. The contract manager shall have a minimum of a bachelor’s degree in engineering or a bachelor’s degree in architecture.
This individual shall be directly employed by the contract holder and shall reside on site or in the local office. The name of this person and alternates, who shall act for the contractor when the CM is absent, shall be designated in writing to the Contracting Officer.
The CM shall receive each RFP. The Contractor shall provide quality, cost effective design for multiple TOs simultaneously within the time constraints stated in Section 16 – ORDERING PROCEDURES. The Contractor shall complete the design and drawings to a point where the architectural, civil, structural, mechanical, and electrical drawings clearly indicate the proposed method of accomplishing the work, and annotate the description, size, and location of each item listed in the detailed cost proposal including coordination with subcontractor. The Contractor’s design and drawings must comply with the Government’s concept design requirements as well as all governing codes (see Section 6.0 – DESIGN AND CONSTRUCTION REQUIREMENTS). The Contractor shall use recognized industry standard practice in determining their proposed design materials and methods, unless the Government specifies otherwise.
3.1.2 Contractor’s Quality Control Manager (QCM): Provide a single point of contact on site capable of managing the implementation of the contractor’s approved Quality Control Plan and Accident Prevention Plan, as well as the most current version of the 29 CFR 1926 OSHA Standards for the Construction Industry. The QCM shall visit each active project site daily to ensure full compliance with all safety requirements, and verify that the materials and workmanship are in accordance with the approved construction drawings, shop drawings, material submittals and technical specifications. The QCM or representative shall prepare and coordinate material submittal sheets and shop drawing submittal. The QCM shall prepare QC reports, schedule and coordinate testing procedures and attend all project status meetings, site visits, and pre-final/final inspections. This individual shall be directly employed by the contract holder and shall not have other duties.
3.1.3 Contractor’s Project Superintendent (PS): Provide a single point of contact on site for each Task Order capable of supervising and coordinating the timely and safe execution of construction tasks in accordance with quality standards and approved design. The PS or representative designated by the PS shall directly superintend the work or assign and have on the worksite a
- 6 -competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. The PS shall visit each active project site daily, submit detailed bi-weekly progress reports (AF Form 3065) for each TO, schedule and coordinate subcontractors and material suppliers, attend all project status meetings and pre-final/final inspections. The PS shall be capable of communicating and interfacing with Government officials in all aspects of Task Order execution. The PS cannot be the QCM.
3.1.4 Contractor’s Environmental Manager (EM): Provide a single point of contact on site capable of managing the implementation of the contractor’s approved Environmental Control Plan as well as WPAFB Specifications United Facilities Guide.
3.1.5 The Contractor shall also provide and maintain the following capabilities, at a local or remote office, to support the WPAFB SABER contract.
3.1.5.1 Design/Drafting: Provide technical design and computer aided design and drafting (CADD) support capable of producing accurate design and drawings for each individual TO within the time constraints specified in Section 16.0 – ORDERING PROCEDURES.
3.1.5.2 Cost Estimating/Negotiating -- Provide estimating/negotiating support capable of producing accurate quantity take-offs and cost proposals, using the contractor’s automated estimating system (AES), within the time constraints specified.
3.2 Contractor Employee Requirements: The prime contractor level is limited to US owned/operated contractors/companies only; foreign contractors are prohibited to participate at this particular level. The contractor shall ensure that employees and subcontractor employees have current, valid licenses and certifications necessary to perform their functions. Any cost or time associated with obtaining licenses or certifications shall be at the contractor’s expense.
3.3 The contractor shall not employ any person who is or was an employee of the US Government, if the employment of that person would create a conflict of interest.
3.4 SUBCONTRACTORS: All work shall be performed by commercial contractors that are licensed by The Ohio Construction Industry Licensing Board (OCILB) for the Electrical, HVAC, Hydronics, Plumbing, and Refrigeration trades. For all other commercial contractor trades a minimum of two (2) years of experience is required in projects of similar size and scope.
3.5 Throughout the life of this contract, the CM shall be readily available. The CO must be able to contact the CM by phone at all times. The CM shall provide overall contract management, including full authority to develop TO proposals, negotiate
- 7 -and sign TOs, provide subcontract purchasing and administration, review material submittals and shop drawings, and shall attend all recurring status meetings, site visits and pre-final/final inspections. Contractor should be able to remobilize within 24 hours.
4.0 TECHNICAL DESIGN SUPPORT:
The Contractor’s staff shall have multidiscipline design experience. Provide technical design capabilities to achieve the required design (as defined in SECTION 6.0) within the prescribed delivery period. Required technical design capabilities include, but are not limited to communications, architectural, structural, civil, mechanical, and electrical.
5.0 MANAGEMENT PLAN: Included in the Contractor’s response to the initial RFP must be a management plan detailed as follows:
5.1 Describe the organization, responsibilities and lines of authority established for the contract. Describe the plan for managing execution and administration.
Describe the material purchasing system and delivery plan. Contractor must have resources readily available and be capable to support multiple task orders concurrently with other on-going or new work. Describe the proposed resources and capabilities to manage and execute multiple concurrent task orders. Include an organizational chart detailing the organization described in the proposal. Include names of assigned personnel and proposed subcontractors and their areas of responsibility for each portion. Clearly delineate on-site from off-site personnel, Quality Control and Safety representatives.
5.2 Contractor shall describe how they plan to support an on-site management team, including a sole source of responsibility for both design and construction for all task orders. Describe the plan to manage, supervise, and coordinate the subcontractor’s work and who in the organization shall be responsible for this management and coordination. Describe the role of the design team in response to a TO. Describe how warranty support shall be handled by your organization on each TO.
6.0 DESIGN AND CONSTRUCTION REQUIREMENTS
6.1 The Government shall provide a Statement of Objectives (SOO) for each Request For Proposal (RFP). The Contractor shall provide a 35% design based on the SOO in response to the RFP. The Contractor’s design and drawings must comply with the Government’s SOO and concept design requirements as well as all governing codes. Following Government acceptance of the Contractor’s proposal and award, the contractor shall complete the design over the course of the TO demonstrating 100% design. The Contractor shall submit for Government review 100% design drawings and specifications for all engineered systems, fire protection (life safety, fire suppression, fire alarm, fire barrier/egress plan, etc.),
- 8 -communications plans as well as any other designs requested in the SOO; and such work shall not commence until the 100% design submission has been approved. When professional engineering services, such as a Fire Protection Engineer (FPE) are requested in the SOO, a professional engineer (PE) must review the 100% design submission of plans and specifications and certify in writing that the design is in compliance with the relevant UFC, the BFS and all other applicable criteria. This certification letter must be submitted with the 100% submission. Full, comprehensive 100% design drawings and specifications in their entirety are not required to be submitted all at once for approval; rather, individual 100% designs may be submitted to the Government for review as required and as they become necessary over the course of the TO. As-Built drawings shall be required upon completion of each TO before final acceptance can be achieved. As- Built drawings shall include redlined drawings and any stamped engineering/architecture drawings as applicable to the TO.
6.1.1 A 35% design represents a clear interim design. 35% design submissions shall be of sufficient detail to show how the users’ functional and technical requirements shall be met, indicate the designer’s approach to the solution of technical problems and show compliance with design criteria. 35% design drawings shall clearly establish scope of work for the overall project.
6.1.2 A 100% design represents a complete design. This may include but is not limited to final drawings of Government-issued modifications, field changes, structural details, mechanical, plumbing, electrical, fire protection and communications (data) layouts, etc.
6.2 All design and construction accomplished pursuant to this contract shall comply with the latest edition of the following codes, unless the CO directs the Contractor otherwise. Any exception must be approved in writing by the CO prior to construction start-up.
1. International Building Code
2. International Mechanical Code
3. International Plumbing Code
4. National Electrical Code
5. National Fire Protection Association (NFPA) codes and standards
6. Uniform Federal Accessibility Standards
7. Installation Facilities Standards (IFS) Design Guide and all associated WPAFB specifications, shall be the design guide used for submitting project drawings and as-built drawings to the Government. Updates to the IFS and associated WPAFB specifications shall be provided to the Contractor in a timely manner.
- 9 -
8. Unified Facilities Guide Specifications (UFGS), including Appendix B. The specifications can be accessed and downloaded on line at http://specsintact.ksc.nasa.gov
9. United Facilities Criteria (UFC) applicable to the respective specialized facility that is being designed.
10. All record drawings, (ie all contracting drawings at WPAFB) shall follow the A/E/C CAD Standard (latest release) US Army Corps of Engineers, DOD Industry Standards.
6.3 If there is a conflict between these codes the most stringent requirements shall apply unless specifically requested in writing by the Government.
6.4 The contractor shall perform all activities of this contract in accordance with all applicable Federal, State, Local and WPAFB specifications.
6.5 Mandatory Use
6.5.1 HVAC. Requirements to be fulfilled by TRANE in regards to HVAC Chiller Replacement Standardization. The United States Air Force (USAF) has a brand name requirement to procure Heating, Ventilation, & Air Conditioning (HVAC) chillers to support new chiller purchases through 30 Sep 2024. TRANE is the supplier for Wright-Patterson AFB.
6.5.2 Carpet. Carpet shall meet the technical and aesthetic criteria listed below.
Carpet, carpet cushion (if used), and flooring adhesives shall be certified as CRI “Green Label” or “Green Label Plus.”
6.5.2.1. Manufacturer shall provide patterned carpet tile that is tufted or woven.
6.5.2.1.1. Manufacturer shall provide patterned carpet tile with level loop, multi-level textured loop, cut and loop, and/or tip sheared.
6.5.2.1.2. Manufacturer shall provide patterned carpet fiber that is 100% bulk continuous filament.
6.5.2.1.3 Manufacturer shall provide patterned carpet with 100% nylon type 6, 6 or nylon type 6 fiber
6.5.2.1.4. Manufacturer shall provide patterned carpet with face fiber that is solution dyed or bleach resistant.
6.5.2.1.5. Manufacturer shall provide patterned carpet that has a minimum http://specsintact.ksc.nasa.gov/
- 10 -density of 5000 calculated using the following formula: (Average pile yarn density = 36 x pile weight (oz. /yd. sq.) / pile thickness in inches).
6.5.2.2 One of the following sources must be utilized when purchasing carpet:
6.5.2.3 Waiver to required sources: If a waiver is received from AFICA, which allows for the purchase from other sources than the four listed above, Carpet shall meet the technical and aesthetic criteria listed below. Carpet, carpet cushion (if used), and flooring adhesives shall be certified as CRI “Green Label” or “Green Label Plus.”
Shaw
Contract #: FA8057-17-C-0002
Web: www.shawcontractgroup.com
POC: Farrah Finley
Phone: (888) 393-2830 pin 2273 (BASE)
Email: airforce.customer@shawinc.com
Website: http://airforce.shawinc.com/ Password: Airforce1
Mohawk
Contract #: FA8057-17-C-0004
Web: www.mohawkgroup.com
POC: Stacey Ridley
Phone: (706) 879-6582
Email: Stacey_ridley@mohawkind.com
Website: https://www.mohawkgroup.com/sitefiles/microsites/mg/airforce/
CMA-Milliken
Contract #: FA8057-17-C-0005
Web: www.cma-gsa.com
POC: Paul Snyder; Betty King
Phone: (888) 669-9772
Email: AirForceCarpetBPA@cma-purchasing.com
Website: http://www.cma-purchasing.com/wp-content/uploads/2018/05/AirForceProgramProductPortfolio.pdf J+J Flooring Group
Contract #: FA8057-17-C-0003
Web: jjflooringgroup.com
POC: Kay Henderson
Phone: (800) 241-4586 x8389
Email: usaf@jjflooringgroup.com
Website: http://www.jjflooringgroup.com/usaf/ http://airforce.shawinc.com/ https://www.mohawkgroup.com/sitefiles/microsites/mg/airforce/ http://www.cma-purchasing.com/wp-content/uploads/2018/05/AirForceProgramProductPortfolio.pdf http://www.cma-purchasing.com/wp-content/uploads/2018/05/AirForceProgramProductPortfolio.pdf http://www.jjflooringgroup.com/usaf/
- 11 -
6.5.2.3.1. Construction of broadloom carpet and carpet tile shall be tufted, woven, needle bonded or fusion bonded.
6.5.2.3.1.1. Fibers shall be continuous filament nylon 6.6 or nylon 6 with a cross-section modification ratio no greater than 2.5.
6.5.2.3.1.2. Pile height shall comply with Americans with Disabilities Act Accessibility Guidelines (ADAAG), Section 4.5.3 Carpet.
6.5.2.3.1.3 Carpet shall meet the following Pile weight density stated in appendix D.
6.5.2.3.1.4. The minimum acceptable gage is 3.175 millimeters (0.125).
6.5.2.3.1.5. The minimum acceptable tuft bind is listed below, as tested by ASTM D1335, Standard Test Method for Tuft Bind of Pile Yarn Floor Coverings:
10 pounds for loop pile broadloom
3 pounds for cut pile broadloom
8 pounds for modular carpet tile
6.5.2.3.1.6. Both primary and secondary backings must be a
synthetic material. Jute back is not acceptable.
6.5.2.3.1.7. Attached open-cell urethane cushion or closed cell vinyl backing is acceptable.
6.5.2.3.1.8. Color fastness to light (fading) must comply with American Association of Textile Chemists and Colorists (AATCC) Test Method (TM) 16E, Color fastness to Light, and have a minimum of 4 after 40AATCC fading units using the AATCC gray scale for color change.
6.5.2.3.1.9. The maximum Electrostatic Propensity is 3.5 Kilovolts (kV) or less.
6.5.2.3.1.10. Carpet must meet ASTM E648-00, Standard Test
Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source, and ASTM D662 and meet the following criteria: Minimum average critical radiant flux of 0.45 watt per square centimeter (Class1) or greater within fire egress routes in unaccompanied personnel housing, child development centers, detention and correctional facilities, lodging facilities and hospitals. If protected by a sprinkler system, Class II may be installed. Minimum
- 12 -average critical radiant flux of 0.22 watt per square centimeter (Class II) in all other facilities. Smoke Density, when necessary to meet specific application, shall be tested in accordance with ASTM E662 and shall have a maximum specific optical density not exceeding 450 (flaming mode exposure).
6.5.2.3.1.11. Carpet submitted for use in medical and child
development facilities must feature antimicrobial effectiveness and electrostatic propensity guaranteed for the life of the carpet. These carpets must also be solution dyed or bleach resistant. The carpet must have a soft non-abrasive texture.
6.5.2.3.1.12. Stain Resistance. Carpet shall meet a minimum rating of 8 using the AATCC red 40 stain scale after 2 HWE (hot water extraction) using the AATCC 171, Carpets: Cleaning of; Hot Water Extraction Method, test method followed by the AATCC 175, Stain Resistance: Pile Floor Coverings, stain test.
6.5.2.3.2. Carpet must be patterned, or a bold tweed. (Solid colors are acceptable for border carpet only.) Tone-on-tone coloration does not meet the criteria as a multi-colored carpet. Random multi-color patterns are preferred.
6.5.2.3.2.1. Light colors and high contrast bold geometric patterns are not acceptable.
6.5.2.3.2.2. Linear patterns and/or patterns which appear to be linear are not acceptable.
6.5.2.3.2.3. A bold tweed must contain a minimum of three (3) distinctively different colors.
6.5.2.3.3. All carpet shall have a 15-year wear warranty against 10 percent loss of face fiber, edge raveling, snags, picks, runs, and delamination.
6.5.2.3.4 All carpet must have an Appearance Retention Rating (ARR) of Heavy or Severe. (See Appendix D)
7.0 QUALITY CONTROL: It is the Contractor’s responsibility to provide, inspect, and document the level of quality that has been established by the standards of this Statement of Work (SOW). The QCM shall direct the execution of the Contractor’s QC Plan.
- 13 -
7.1 A finalized version of the quality control plan submitted with the technical proposal shall be submitted to the Contracting Officer within thirty (30) days of award. Any changes to the plan shall be submitted to the Government. The QC plan shall include, but not limited to the following:
7.1.1 Inspection System: Details of the contractors inspection system which monitors the execution of any task completed under this contract must specify the areas to be inspected on a scheduled or unscheduled basis, how often inspections shall be accomplished, and titles of the individuals who shall perform the inspections.
7.1.2 Deficiency Prevention: A method for identifying and preventing quality deficiencies and their causes.
7.1.3 Response Times: Routine warranty calls shall be no later than forty eight (48) hours after the initial notification by the government. Emergency calls shall be no later than two (2) hours after initial notification by the government. Punch list items on individual task orders shall be resolved within ten (10) working days of notification by the government unless more timely completion is noted elsewhere in the contract requirements.
7.1.4 Inspection Files: The contractor shall maintain on site records of all the inspections conducted by the contractor and the necessary corrective actions taken. This documentation shall be made available to the Government throughout the performance period of this contract.
8.0 SITE OFFICE: The site office shall be manned continuously during standard working hours and include the following functions: contract manager, task order managers, estimating, negotiating, scheduling, communications, and construction quality control. The facility requirements for the on-base site are as follows:
8.1 The contractor shall be required to locate and make connections to nearby electric, water and sewer services. The contractor shall supply and furnish their office facility.
8.2 The Government may provide to the Contractor use of such utilities as are available at the site. However, determination of the existence and location of such utilities is the responsibility of the Contractor and the Base is under no obligation to provide utilities if none are available on site. The Government may make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the task order. Unless otherwise provided in the task order specifications, when utilities are available they shall be furnished without charge. The Contractor, at its expense and in a professional manner satisfactory to the Government, may install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used. Prior to final acceptance of the work by the Government, the
- 14 -
Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.
8.3 The facility shall be of temporary office quality and used only for office functions. It shall not be used for storage of materials and equipment. It shall be painted according to WPAFB standards.
8.4 If desired by the C.O, in lieu of an on base office site, the contractor may locate a site office off base within 15 miles of BLDG 30011, Area A. Contractor shall be responsible for all utilities if using an off-base site.
9.0 PROTECTION OF CONTRACTOR’S EQUIPMENT AND GOVERNMENT
PROPERTY
9.1 All Contractor supplied equipment is the sole responsibility of the Contractor.
The Government is not liable for the theft, vandalism, or damage of any Contractor supplies, equipment or property. The Contractor shall secure his materials and protect all equipment from damage.
9.2 Any equipment/material the Contractor removes and which requires reinstallation as part of the job requirements shall be the responsibility of the Contractor. All damaged material shall be replaced with equipment/material of equal quality and function by the Contractor at his own expense.
10.0 PROVISIONS ON CONTRACTING OFFICER’S AUTHORITY: Only the CO is authorized to make changes to the contract or any TO issued thereunder. No other Government or non-Government official may alter this contract or any TO issued in accordance with the basic contract terms and conditions. The Contractor is to report any attempts to alter this contract or any TO to the CO. In the event the Contractor effects any such changes at the direction of any person other than the CO, the change shall be considered to have been made without authority and no adjustment shall be made in the contract price to cover any increase in costs incurred as a result thereof.
11.0 TASK ORDER PRICING: Contractor task order pricing shall be accomplished as described below and based on the most economical standard construction practices.
Cost effective practices and products and a design review shall be used in project design and scope development. Unreasonable methods and or estimates to accomplish task orders shall not be accepted.
11.1 Terms Explained:
11.1.1 Line Item Costs: The cost of a line item shall be the item’s total bare cost based on a national average as defined by RS Means Pricing Book, a non pre-priced item at bare cost, or a service/permit/fee/certification as defined by the lowest price from competitive bids. Line items may not be altered or modified.
- 15 -
11.1.2 RS Means Pricing Book (MPB): Includes all items of work from a current year RS Means Facilities Cost Data Guide, RS Means Assemblies and RS Means Master Composite Cost Data. The line items are priced primarily using contractor furnished RS Means electronic data bases. The MPB costs is defined as the bare costs unit pricing for the purpose of this contract. The RS Means labor costs are included as line items of work. They are non-negotiable.
11.1.3 Non Pre-Priced Items (NPP): Defined as items of work not included in the MPB but required for execution of a TO and within the scope and general intent of the contract. These items must be submitted, approved and or negotiated if necessary. If no comparable line item exists in RS Means for unique equipment and materials then a NPP item may be developed.
11.1.4 Specialized Services: Defined as services such as Architecture and Engineering (AE) designs, stamped drawings, certifications, permits and specialized fees either not included in RS Means or not allowed as an RS Means line item but within the general scope of work for the TO.
11.1.5 Local Area Adjustment Factor: The RS Means total weighted average city cost index for the city of Dayton Ohio, or the nearest city.
11.1.6 Coefficient: Respective coefficients are multiplied against the standard unit prices at bare cost in the MPB, non pre-priced items and specialized services to calculate task order prices. A coefficient is defined as a numerical factor that compensates the Contractor for any and all costs (generally indirect costs) and profit not included in the MPB bare costs unit pricing or not allowed (such as Division 1 – General Requirements). The coefficients shall include but are not limited to additional costs for overhead, profit, labor burden for the prime Contractor and subcontractors, bond premiums, insurance, taxes, any adjustment factors for average TO size, proposal preparation costs for withdrawn TOs, costs associated with procurement of required tools, equipment, software, specifications, computers and compliance with environmental laws. Coefficients should also include cost for design, daily cleanup, protection or incidental moving of Government property including furniture, portable toilets, and administrative and technical support. No allowance shall be considered later for these costs. There shall be four separate coefficients to serve as adjustments to compensate the contractor:
Coefficients A, B, C & D.
11.1.6.1 Coefficient A: The bare costs unit prices as established by the MPB are multiplied against Coefficient A to arrive at the actual price for a unit of work. Labor line items from Division 01 of the RS Means Pricing book shall not be used when preparing an estimate. The costs of items associated with DIV 01 labor shall be included in the contractor’s
- 16 -adjustment factor for normal working hours prevailing wage, unless otherwise stated in Sections 11.1.6.3 – 11.1.6.6. Coefficient A shall be for work performed during standard working hours; defined as 40 hours per week between the hours of 0700 – 1700 from Monday through Friday with the exception of Federal Holidays (see Section 20.1).
11.1.6.2 Coefficient B: The bare costs unit prices as established by the MPB are multiplied against Coefficient B to arrive at the actual price for a unit of work. Labor line items from Division 01 of the RS Means Pricing book shall not be used when preparing an estimate. The costs of items associated with DIV 01 labor shall be included in the contractor’s adjustment factor for normal working hours prevailing wage, unless otherwise stated in Sections 11.1.6.3 – 11.1.6.6. Coefficient B shall be for work performed during non-standard working hours; defined as work performed anytime outside the hours of 0700 – 1700 from Monday through Friday, and work during the week surpassing 40 hours. This also includes weekends and Federal Holidays (see Section 20.1). It is anticipated that 5 percent of projects over the course of the contract shall utilize Coefficient B.
11.1.6.3 Coefficient C: The non pre-priced items such as specialized equipment and material not available in the RS Means but within the general scope of the work for the TO are multiplied against Coefficient C to arrive at the actual price for a unit of work. The Government may adjust the general scope of work to match RS Means line item descriptions which would eliminate the need of the non pre-priced item.
The Contractor shall provide proof of payment of the same when the work is complete. Reference Section 11.4.1.3 for applying to TO estimate.
The maximum range for Coefficient C shall be 1.15.
11.1.6.4 Coefficient D: Specialized services such as architecture and engineer (AE) services, certifications, permits and fees not included in RS Means but within the general scope of work for the TO shall be multiplied by Coefficient D to arrive at the actual price for a unit of work. Proof of cost shall be provided by submitting the associated AE proposal or permit fee schedule with the estimate. The Contractor shall provide proof of payment of the same when work is complete. The maximum range for Coefficient D shall be 1.15.
11.1.6.5 Contingencies such as changes to labor wages and inflation shall be adjusted annually by the annual economic price adjustment to the MPB. Any change in the applicable minimum hourly rates of wages during the contract period shall not affect the unit prices to be paid by the Government for work performed under the contract.
- 17 -
11.1.6.6 The Contractor shall consider the following factors that affect the calculation of the coefficients:
1. The coefficients are fixed for the term of the contract.
2. The MPB prices are for “in-place” quantities. There shall be no allowances added for waste, compaction, storage, shipping, staging, handling, etc.
3. The MPB prices are limited to Bare Cost unit pricing only. Contractor should carefully consider all costs not included in RS Means Bare Costs unit pricing in order to diligently determine numeric factors for Coefficients A & B.
4. MPB usage limitations apply (reference Section 11.4) which may impact all coefficients.
5. Daily clean up shall be performed at all active project sites. It shall not be a direct TO cost but shall be paid from the coefficients.
6. The coefficients shall cover all the items typically designated as general conditions, bonding, profit and overhead including administrative/technical support and labor burden for the prime Contractor’s office staff and workforce.
7. All vehicles, office supplies/setup, administrative requirements, and equipment/tools which are customary to the trade shall be part of overhead, and therefore included in the coefficients.
8. Common trade tools and equipment shall be included in the coefficients; they shall not be allowed as a direct cost to any TO except under special circumstances. Only heavy equipment such as large scaffolding, dumpsters, generators, cranes, lifts, excavators and earthmoving equipment may be allowed as a direct cost to the TO. If any specialty equipment rental is necessary, the contractor may request Government approval to add the specified equipment as a direct cost to the TO. Common hand tools, ladders, power tools, laser levels, flatbed trailers, pick-up trucks or vans, cleaning equipment and other common equipment to the trade shall not be used as a direct cost to any TO. The cost of maintaining, fueling, operating, mobilizing, demobilizing and transporting the Contractor’s equipment shall be included in the coefficients and shall not be used as a direct cost to any TO.
9. RS Means unit prices are based on projects ranging from $10,000 to
$1,000,000. An average SABER TO shall range from $5,000 to
- 18 -
$1,000,000. Any cost adjustment for the lower average SABER TO size shall be included in the Contractor’s coefficient. No adjustment for TO size shall be allowed as a direct TO cost.
11.2 How To Calculate a Task Order Price:
11.2.1 Total MPB Costs Normal Hours: The sum of all MPB line item costs at normal working hours.
11.2.2 Total MPB Costs After Hours: The sum of all MPB line item costs to be performed after normal duty hours or more than 40 hours in the week.
11.2.3 Total NPP Costs: The sum of all NPP line item costs.
11.2.4 Total AE Service Costs: The sum of all specialized AE permit, certification and fee line item costs.
11.2.5 Government Furnished Material and Equipment: The Government may provide materials and/or equipment for installation. When furnished, the respective RS Means material/equipment shall be deleted from the RS Means line item cost, and the remaining line item cost shall be treated as MPB line item. If an item does not exist in the MPB, the cost for that line item shall be calculated exactly as an NPP item or AE service item.
11.2.6 Project Total Bare Costs: The sum of the total MPB costs. The sum of the total NPP costs. The sum of the total AE services costs.
11.2.7 Localized Total Bare Costs: The MPB total costs multiplied by the local adjustment factor.
11.2.8 Task Order Costs: The total sum of the localized total cost of RS Means line items multiplied by the contractor’s Coefficient A, RS Means line items to be performed after hours multiplied by the contractor’s Coefficient B, the NPP cost multiplied by the contractor’s Coefficient C, and the AE services and certification cost multiplied by the contractor’s Coefficient D.
11.3 Keeping Prices Current:
11.3.1 The RS Means Construction Data Books: The list and price information for all pre-priced items covered in this contract. The current year RS Means Facilities Cost Data Guide, RS Means Assemblies and the RS Means Master Composite Cost Data Guides shall be updated each calendar year. (Example: The contract is awarded on 30 June, the 2020 MPB shall remain in effect through December 31, and be updated by 15 January 2021).
- 19 -
11.3.1.1 Upon updated pricing, all projects that were previously estimated, but not yet awarded, shall be updated to the current year costs. If the new RS Means Price Book covers a line item listed as NPP, the line item in the new RS Means price book shall be used and the existing NPP line item shall be discarded.
11.3.1.2 RS Means national average historical cost figures shall be used to calculate the percentage of change from last year. Each year on 01 January, RS Means provides a new construction cost data. (Ex. 2009 RS Means Facilities Book p. 1273 Actual costs: July 2008=180.4, July 2007=169.4, Percent of Change = (180.4/169.4 = +11.0% national average localized to Dayton Ohio)
11.4 RS Means Instructions for Application to Task Order Estimates:
11.4.1 Unless otherwise specified below, only Division 01 through Division 48 MPB Line Items are allowable in the development of Task Oder Estimates and unless otherwise noted the final price paid by the Government for a MPB Line Item shall be the RS Means Total Bare Cost for that Line Item multiplied by the City Cost Index for Dayton Ohio and then multiplied by Coefficient A or B.
11.4.1.1 RS MEANS Facilities Construction Cost Data, Division 01 specific use instructions are as follows:
A. Section 01.11.31.10 Architectural Fees. Not Used in MPB (Firm Price
Quote adjusted by Coefficient D, if required by Government in individual Task Orders)
B. Section 01.11.31.20 Construction Management Fees. Not Used in
MPB (Calculated in Coefficients A & B as applied to MPB allowable line items)
C. Section 01.11.31.30 Engineering Fees. Not Used in MPB (Firm Price
Quote adjusted by Coefficient D, if required by Government in individual Task Orders)
D. Section 01.11.31.50 Models. Not Used in MPB (Firm Price Quote adjusted by Coefficient D, if required by Government in individual
Task Orders)
E. Section 01.11.31.75 Renderings. Not Used in MPB (Firm Price Quote adjusted by Coefficient D, if required by Government in individual
Task Orders)
F. Section 01.21.16 Contingency Allowances. Not Used in MPB
(Calculated in Coefficients A & B as applied to MPB allowable line items)
G. Section 01.21.53 Factors Allowances. Not Used in MPB (Calculated in Coefficients A & B as applied to MPB allowable line items)
- 20 -
H. Section 01.21.55 Job Conditions Allowance. Not Used in MPB
(Calculated in Coefficients A & B as applied to MPB allowable line items)
I. Section 01.21.57 Overtime Allowance. Not Used in MPB (Calculated in Coefficient B as applied to MPB allowable line items)
J. Section 01.21.63 Taxes. Not Used in MPB (Calculated in Coefficients
A & B as applied to MPB allowable line items)
K. Section 01.31.13.20 Field Personnel. Not Used in MPB (Calculated in
Coefficients A & B as applied to MPB allowable line items)
L. Section 01.31.13.30 Insurance. Not Used in MPB (Calculated in
Coefficients A & B as applied to MPB allowable line items)
M. Section 01.31.13.40 Main Office Expense. Not Used in MPB
(Calculated in Coefficients A & B as applied to MPB allowable line items)
N. Section 01.31.13.50 General Contractor’s Mark-Up. Not Used in MPB
(Calculated in Coefficients A & B as applied to MPB allowable line items)
O. Section 01.31.13.70 Overhead. Not Used in MPB (Calculated in
Coefficients A & B as applied to MPB allowable line items)
P. Section 01.31.13.90 Performance Bond. Not Used in MPB (Calculated in Coefficients A & B as applied to MPB allowable line items)
Q. Section 01.32.13.50 Scheduling. Not Used in MPB (Calculated in
Coefficients A & B as applied to MPB allowable line items)
R. Section 01.32.33 Photographic Documentation. Not Used in MPB
(Calculated in Coefficients A & B as applied to MPB allowable line items)
S. Section 01.41 Regulatory Requirements. Not Used in MPB (Firm
Price Quote adjusted by Coefficient D, if required by Government in individual Task Orders)
T. Section 01.45.23.50-0010 through 01.45.23.50-0150 Testing and
Inspection Services. Not Used in MPB (Firm Price Quote adjusted by
Coefficient D, if required by Government in individual Task Orders)
U. Section 01.51.13.80 Temporary Utilities. Not Used in MPB
(Calculated in Coefficients A & B as applied to MPB allowable line items)
V. Section 01.52.13 Field Offices and Sheds. Not Used in MPB
(Calculated in Coefficients A & B as applied to MPB allowable line items)
- 21 -
W. Section 01.91.13.50 Building Commissioning. Not Used in MPB
(Calculated in Coefficients A & B as applied to MPB allowable line items)
11.4.1.2 RS Means Facilities Construction Cost Data, Division 01 (unless otherwise stated above) through Division 48 specific use instructions.
A. Final price paid by the Government for a MPB Line Item shall be the
RS Means Total Bare Cost for that Line Item multiplied by the City
Cost Index for Dayton Ohio and then multiplied by Coefficient A or B.
B. The following are the only adjustments allowable to RS Means
Facilities Construction Cost Data MPB Line Items. No adjustments are allowable as a result of inferences, references and/or direction contained on pages i through xii of the RS Means Facilities
Construction Cost Data MPB. The adjusted line item final price paid by the Government shall be the RS Means Total Bare Cost for that
Line Item multiplied by the City Cost Index and then multiplied by
Coefficient A or B.
1) The derivation of demolition line item from MPB line item by changing the material unit cost to $0.00 and multiplying the labor unit cost by 0.5.
2) The derivation of remove and reset line item from MPB line item by changing the material unit cost to $0.00 and multiplying the labor unit cost by 1.5.
3) The derivation of Government Furnished Material line item from
MPB line item by changing the material unit cost to $0.00.
11.4.1.3 When the Government issues a RFP for a Task Order
containing work not included in RS Means Facilities Construction Cost Data, the contractor shall develop a Non-Pre-Priced (NPP) Line Item using the following NPP process development. Final price paid by the Government for a NPP Line Item shall be the lowest competitive price for that Line Item multiplied by Coefficient C. NOTE: The allowable use for a NPP Line Item shall be limited to material and equipment only. The Labor associated with the work shall be estimated using the MPB Trade Labor Lines in the MPB. In the event that a NPP Line Item is required, the contractor shall have an additional 10 working days to prepare and submit the Task Order Proposal.
A. Develop a specification for the NPP material or equipment Line Item.
B. Provide the specification to the Government for review and approval.
- 22 -
C. Solicit quotes - a minimum of (2) quotes from venders/supplies/subcontractors.
D. Determine final price paid by the Government for a NPP Line Item by multiplying the lowest competitive price by Coefficient C.
12.0 COMPUTER REQUIREMENTS
12.1 Each TO proposal shall be prepared using e4Clicks Project Estimator and/or the RS Means Facilities master file AES to produce a clear and organized line-item estimate. Each line item in the MPB includes appropriate material, equipment and labor costs indexed to the Dayton area. The RS Means prices shall be updated annually per agreement, using the Means referenced local percentage (in the section titled City Cost Index) for materials and labor for the Dayton area. The contractor shall provide the e4Clicks estimating software, licenses, training requirements and all current updates for eighteen (18) Government users. The software shall be required to be installed on two (2) servers and be operational within twenty-one (21) days after contract award.
12.2 The e4Clicks software estimating package shall have the capability to include yearly RS Means price updates by 15 January each year including the current year local adjustment factor for Dayton, OH. The software estimating package shall have the capability to adjust for different coefficients.
12.3 The contractor shall provide and maintain the current year RS Means (MPB) (electronic database of pre-priced items).
12.4 The contractor shall provide the Government with seven (7) hard copies of the applicable RS Means Cost Data books annually. Failure to deliver and install the updated price books may result in awarded costs of negotiated proposals with the previous year’s MPB costs. These books shall be delivered to the SABER Contract Managers office no later than 15 January each year.
12.5 The Contractor shall provide, install, and maintain the Contractor’s computer hardware and software. As a minimum, the Contractor shall maintain equipment and software throughout the term of this contract to operate the specified AES, web-based document share site and AutoCAD.
12.6 Any Contractor furnished hardware not operating properly shall be promptly repaired by the Contractor so as to maintain all schedules and deliver all documents to the Government within the timeframes specified.
12.7 The Contractor shall at a minimum furnish and install the RS Means annual unit price updates on the Contractor’s PC each year throughout the term of this contract.
12.8 All drawings submitted by the Contractor shall be created from Computer- Aided Design and Drafting (CADD) software. Drawing files shall be compatible with
- 23 -the most current version of AutoCAD being used by the Government, without any need for translation or modification by the Government. The version of AutoCAD 2020 (or most current AutoCAD) shall be acceptable at the point of contract award and for the first year of the contract.
12.9 The Contractor shall submit all CADD drawings on a compact disk (CD).
12.9.1 All design work to be provided under this contract shall be accomplished and developed using computer-aided design and drafting (CADD) software and procedures conforming to the following criteria.
12.9.2 The “Installation Facilities Standard” Appendix- A, WPAFB, CADD Standards, is the applicable specification for developing design drawings and submitting as-built drawings.
12.9.3 The contractor shall submit As-Built drawings, in the form of CADD files, to the Government, for review and approval, for each individual task order prior to submitting a 100% invoice for the project.
13.0 COMMUNICATION: The Contractor shall provide and maintain a cellular telephone for the CM throughout the period of this contract.
13.1 The contractor shall be required to provide and service eighteen (18) mobile Smart telephones to the Government Project Managers (GPM) for the life of the contract. Provide the most current Iphone available at point of award capable of receiving and processing Government automated information. Provide cases (Otter Box case or equivalent), holders and insurance plan for each phone. Phones and cases shall be replaced with new, most current model available every 2 years from point of purchase for the duration of the contract. These Contractor provided phones and cases shall be sole property of the Government.
13.2 The minimum requirements for the telephones are: An unlimited data plan with unlimited two way communication capabilities, five-hundred (500) monthly minutes talk time, unlimited texting, picture and group messaging. The contractor shall provide service for all 18 telephones for the life of the contract.
14.0 CONSTRUCTION START-UP PERIOD: The first thirty (30) calendar days following contract award shall be designated as a start-up period, after which the Contractor shall have all equipment, facilities and personnel in place to fully execute the
- 24 -requirements of this contract. The Contractor shall have 30 days from the time of award for mobilization activities associated with this contract to fully execute the requirements of the contract.
15.0 PRE-PERFORMANCE CONFERENCES: Prior to issuance of a NTP for any TO, the CO may elect to host a Pre-Performance Conference. The Contractor shall be represented at the scheduled conference and be prepared to discuss potential difficulties and obstacles.
16.0 ORDERING PROCEDURES
16.1 Job Walk
16.1.1 The job walk shall be scheduled within 2 working days from the…