ENGINEERING DIVISION – INFRASTRUCTURE BRANCH

STATEMENT OF WORK (SOW)

Apply Dust Suppressant

DPW22-027

August 1, 2022

TABLE OF CONTENTS:

1. Summary Description of Work

2. Attachments

1. Summary Description of Work:

1.1. Apply dust suppressant, Magnesium Chloride (MgCl), to aggregate surface roads through Fort Carson. Work will be performed on a task order basis. Specific locations will be on order as provided in the task order documents.

1.2. The Contractor shall adhere to Construction Drawings for all work locations, quantities, dimensions and types.

1.3. The Contractor shall adhere to all of the regulations and information provided in the Construction Drawings General Notes.

1.4. Work Includes:

1.4.1. Administrative preparation and mobilization

1.4.2. Traffic Control per MUTCD

1.4.3. Road surface preparation

1.4.4. Liquid MgCl solution application including compaction

1.4.5. Road surface protection and demobilization

1.5. The Contractor shall adhere to all information provided in the Fort Carson General Forms.

1.6. The Contractor shall provide all submittals as specified in the submittal register.

1.7. The Contractor agrees to comply with federal, state and local public health regulations and also shall comply with DoD and Army public health regulations and guidance.

2. Attachments:

2.1. Construction Drawings

2.2. Submittal Register

2.3. Fort Carson General Forms

2.4. ☒ Project Specific Attachments

Delivery Schedule (per task order)