FY21 ROADWAY MARKINGS AND GUARDRAIL
CONCURRENCES
Note: Signatures affixed on this sheet indicate official recommendation and approval of all the drawings in this set as indexed on this sheet
Safety
Security
Department
Environmental
Force Protection
Management
Maintenance
Customer 1
Customer 2
DPW
Information
Anti-Terrorism
Fire
Physical
Garrison
Operations &
W
H
I
T
E
S
A
N
D
S
M I
S
S
I
L
E
R
A
N
G
E
B I
R
T
H
P
L
A
C
E
O
F
A
M
E
R
I
C
A
S
MI
S
S
I
L
E
S
P
A
C
E
A
C
T
I
V
I
T
Y
WS-85210-2021-C-01
AutoCAD SHX Text
WHITE SANDS MISSILE RANGE, NEW MEXICO
AutoCAD SHX Text
DIRECTORATE OF PUBLIC WORKS
AutoCAD SHX Text
ENGINEERING DIVISION
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
CHIEF, ENGINEERING DIVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
RECOMMENDED
AutoCAD SHX Text
BRANCH CHIEF
AutoCAD SHX Text
SUBMITTED
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
WHITE SANDS MISSILE RANGE, N.M.
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DIRECTORATE OF PUBLIC WORKS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
ENGINEERING DIVISION
AutoCAD SHX Text
OF
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text FY21 Roadway markings and Guardrail
AutoCAD SHX Text
DIRECTORATE OF PUBLIC WORKS
AutoCAD SHX Text
REP
AutoCAD SHX Text
REP
AutoCAD SHX Text Rafael Acosta
AutoCAD SHX Text James Stephenson
AutoCAD SHX Text Rafael Acosta
AutoCAD SHX Text Samuel Morris
AutoCAD SHX Text 05/20/2021
AutoCAD SHX Text No Scale
AutoCAD SHX Text
BID SET 100%%% DESIGN
WS-85210-2021-C-G-02
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
FY21 Roadway Markings and Guardrail
GENERAL NOTES
REP
REP
Rafael Acosta
Samuel E. Morris
- NONE
AutoCAD SHX Text
1. Contractor shall coordinate all work with existing conditions and Contractor shall coordinate all work with existing conditions and construction drawings. Provide all equipment, material and labor as required for a complete and functional system. 2. All materials and equipment shall be installed in accordance with All materials and equipment shall be installed in accordance with manufacture's published recommendations, contract documents, industry standards and all federal, state, local codes and amendments as adopted by the government for services intended by the Contracting Officer (KO). The installation of all materials and equipment shall be made by experience and licensed craftsman in a neat workman like manner. All materials, supervision, labor, tool, costs and services necessary to completely install a functional system shall be furnished by the contractor. 3. The term "provide" used in the drawings and scope of work implies that The term "provide" used in the drawings and scope of work implies that the contractor shall furnish, transport, install, connect, warrant, and start-up, inclusively. 4. The drawings are diagrammatic only but are required to be followed as The drawings are diagrammatic only but are required to be followed as closely as actual construction conditions and work of other trades permits. 5. Upon completion of work, contractor shall provide the COR, within 10 days, Upon completion of work, contractor shall provide the COR, within 10 days, manufacture's operating & maintenance manual for all equipment including replacement parts list. 6. Contractor shall report discrepancies between field conditions and new Contractor shall report discrepancies between field conditions and new construction drawings to the KO during the solicitation phase prior to providing their bid. 7. Contractor shall field verify all existing utilities prior to any excavation for Contractor shall field verify all existing utilities prior to any excavation for new sign post/pole foundations per SOW section 5.5. 8. Contractor shall remove and dispose of any existing asphalt pavement or Contractor shall remove and dispose of any existing asphalt pavement or rigid concrete. Contractor may dispose rigid concrete at the WSMR Hughes Reclamation Area (Main Cantonment) located at the intersection of Watertown and Hughes Ave. Rigid concrete shall be free of rebar and/or all debris. 9. Contractor shall apply water for dust control per section 158 of the Contractor shall apply water for dust control per section 158 of the Federal Highway Administration (FP-03). Contractor may utilize water standpipe located near Route 6 and Route 7 (Lat. = 33.1784, Long. = -106.5229). Metering of water usage shall be required and reported to the COR on a weekly basis by the number of truck loads used per day. Approximate distance from project site is 28.5 miles. Alternate water source LAT: 33.8188, LONG: -106.6545 approximately 25 miles north of RR7 SEC 16. 10. A borrow pit is available for use. Borrow pit is located near RR7/RR6 A borrow pit is available for use. Borrow pit is located near RR7/RR6 intersection (Lat. = 33.1936; Long. = -106.5405) COR shall be notified at least 5 working days prior to removing any material. Quantities of material removed shall be reported to the COR on a weekly basis. When finished using borrow pit, contractor shall remove any grubbed vegetation and leave side slopes at a 4H:1V or flatter slope. Approximate distance from project site is 29.5 miles. 11. The contractor shall perform hazardous building materials sampling of all The contractor shall perform hazardous building materials sampling of all building material that may be disturbed during this project. Asbestos sampling shall be performed by an asbestos inspector that meets the requirements of the Environmental Protection Agency (EPA) Asbestos Hazard Emergency Response Act (AHERA).
AutoCAD SHX Text
1. All pavement markings & striping shall be 4" wide, white or yellow as All pavement markings & striping shall be 4" wide, white or yellow as indicated on the details and Plan Sheet 7 and shall conform to the standard highway colors. 2. All pavement markings shall be installed by using Type "H" Extruded All pavement markings shall be installed by using Type "H" Extruded Type "H" Extruded Thermoplastic pavement marking material with glass beads per Section 634.08 of the FP-03 & Plan Sheet 7 of drawings. Application shall be . Application shall be 12# beads per 100 S.F. 3. All specifications for pavement markings are as per the Manual on All specifications for pavement markings are as per the Manual on Uniform Traffic Control Devices (MUTCD) standard manual, 2009 Edition. 4. Edge line striping shall be placed 6 inches from the edge of Edge line striping shall be placed 6 inches from the edge of pavement. Edge line striping is not required in stand-up curb or curb and gutter sections of roadway. 5. Contractor shall prepare road surface prior to applying roadway Contractor shall prepare road surface prior to applying roadway markings per mfg. instructions.
AutoCAD SHX Text General Notes:
AutoCAD SHX Text Pavement Marking Notes::
AutoCAD SHX Text Traffic Control Plan Notes:
AutoCAD SHX Text
1. Contractor shall develop and implement a traffic control plan Contractor shall develop and implement a traffic control plan for all elements of work. Traffic control plan shall be developed, implemented and maintained in accordance with the NMSHTD, Sections 618, 702 and Chapter 6 of the Manual on Uniform Traffic Control Devices. All work shall be performed in a manner that provides 24 hour per day, 7 days a week, vehicular access adjacent to project area.
AutoCAD SHX Text Material Testing Notes:
AutoCAD SHX Text
1. During construction, material testing services shall include During construction, material testing services shall include but not be limited to compaction of sub-grade, sub-base, base course, asphalt and concrete compressive strength. Testing shall be obtained from an independent certified third party material testing laboratory and submitted to the COR.
AutoCAD SHX Text Guardrail Notes:
AutoCAD SHX Text
1. End treatment shown is a general depiction of an SKT-SP End treatment shown is a general depiction of an SKT-SP (Sequential Kinking Terminal-Standard Post System) 50' NMDOT accepted end terminal that is FHWA accepted as crashworthy at Test Level 3 (TL-3) and may be used for all posted speeds. 2. Accepted systems, on the Departments Approved Product Accepted systems, on the Departments Approved Product List, shall be installed according to manufactures' installation instructions. 3. A reflectorized object marker shall be installed. Adhesive A reflectorized object marker shall be installed. Adhesive backed reflective sheeting may be applied directly to guardrail end treatment impact head as per the manufacturer's recommendation. Direct applied sheeting shall provide a smooth surface and have no wrinkles, air bubbles, cuts or tears. Reflective material shall be Type VIII with yellow background and black chevron stripes. Stripes shall be oriented with their tops away from traffic and angles down at 45° toward traffic. 4. These end treatments do not require an offset at the end. These end treatments do not require an offset at the end. End treatments shall be installed ensuring that the end piece is 2' off the shoulder. A maximum flare of 25:1 or flatter over the length of the treatment is allowed. 5. End treatments shall be of the length and test level End treatments shall be of the length and test level specified in these drawings and as specified by the manufacturer for the intended end treatment type and test level. Only end treatments currently on the NMDOT Approved Product List will be accepted for installation. For specific end treatment details, see manufacturers' drawings. 6. Contractor shall warp all grade transitions to create smooth Contractor shall warp all grade transitions to create smooth surface contours.
AutoCAD SHX Text Fog Seal Notes: 1. Application of fog seal shall comply with Section 415 Pavement Surface Restoration of the New Mexico State Highway & Traffic Department (NMSHTD). 2. Contractor shall prepare roadway surface and apply per manufacturers instructions. 3. Contractor shall provide a Master Seal Tire Rubber Modified Surface Sealer (TRMSS) fog seal or Government approved equal on the 2.64 mile stretch of Route 7, Section 16 per manufacturer specifications. Roadway width is 20' with no shoulders. Submittal shall be provided to the COR for material approval/disapproval. 4. Vehicular traffic shall not be permitted on the pavement surface until sufficient curing time has elapsed to eliminate pickup or tracking of the sealant.
Guardrail #1
Proposed Staging
Area LAT:
32.4351 LONG:
-106.4707
Guardrail #2
Guardrail #3
Guardrail #4
Guardrail #6
R
R
Guardrail #7
Contractor shall Remove/Replace Guardrail:
1. Guardrail 1: RR1 LAT: 32.4284, LONG: -106.4722, new construction consist of 75LF of straight rail and 2EA End Treatments each side of roadway, no removals East or West of Roadway.
2. Guardrail 2: RR1 LAT: 32.4255, LONG: -106.4740, new construction consist of 75LF of straight rail
2 End Treatments on the west side and 25LF of straight rail and 2 End Treatments on the East side of roadway, no removals East or West of Roadway.
3. Guardrail 3: RR1 LAT: 32.4239, LONG: -106.4750, new construction consist of 62.5LF of straight rail and 2 End Treatments West of Roadway, no removals no new construction East of Roadway.
4. Guardrail 4: RR1 LAT: 32.4173, LONG: -106.4791, new construction consist of 62.5LF of straight rail and 2 End Treatments on west side of roadway. On West side of roadway remove and dispose of
50LF of straight rail and 2 End Treatments at an off-site location that has been permitted by the jurisdiction having authority to accept and dispose of construction waste and debris. No removals, no new construction East of Roadway.
5. Guardrail 5: RR1 LAT: 32.4133, LONG: -106.4797, new construction consist of 62.5LF of straight rail and 2 End Treatments on west side of roadway, Remove and dispose of 50LF of straight rail and 2
End Treatments at an off-site location that has been permitted by the jurisdiction having authority to accept and dispose of construction waste and debris. No removals, no new construction East of
Roadway.
6. Guardrail 6: RR1 LAT: 32.4031, LONG: -106.4796, new construction consist of 2EA Thrie Beam
Transition Sections, 50LF of straight rail and 2EA End Treatments on West side of roadway. New construction on East side of Roadway consist of 75LF of straight rail, 2EA Thrie Beam Transition
Sections and 2EA End Treatments, per NMDOT STD 606-GR31-17/20. Remove and dispose of 2
Transition Sections, 4 End Treatments and 150LF of straight rail at an off-site location that has been permitted by the jurisdiction having authority to accept and dispose of construction waste and debris.
R
R
R
R
Site Plan 1
Site Plan 2
N
FY21 Roadway Markings and Guardrail
WS-85210-2021-SP-03
Guardrail #5
7. Guardrail 7: RR316 LAT: 33.2760
LONG: -106.3973 New construction consist of 2EA End Treatments and
215LF of straight rail for the North side and 2EA End Treatments and 215LF of straight rail for the South side.
Remove and dispose 130LF of straight rail and 4 End Treatments at an off-site location that has been permitted by the jurisdiction having authority to accept and dispose of construction waste and debris.
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
CHIEF, ENGINEERING DIVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
RECOMMENDED
AutoCAD SHX Text
BRANCH CHIEF
AutoCAD SHX Text
SUBMITTED
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
WHITE SANDS MISSILE RANGE, N.M.
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DIRECTORATE OF PUBLIC WORKS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
ENGINEERING DIVISION
AutoCAD SHX Text
OF
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text Guardrail Site Plan
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DIRECTORATE OF PUBLIC WORKS
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
3"
3"
3"
3"
3"
3"
3"
X"
Y"
STRIPES AT 45 DEGREES
TOWARD TRAVEL WAY.
BACKGROUND: YELLOW
(MUTCD SPECIFICATION,
OBJECT MARKERS) COPY:
BLACK
X AND Y SHALL BE WITHIN
3" OF FACE WIDTH AND
HEIGHT, RESPECTIVELY,
AND FACE SHALL HAVE A
MINIMUM 300 SQUARE
INCHES COPY AREA.
NO BLOCK OUT
CONCRETE CULVERT CROSSING
BEGINNING LAP
INTERMEDIATE LAPEND LAP
SET POST VERTICAL. VARY
POST LENGTH AS REQUIRED
FOR GRADE
GUARDRAIL POST
& BLOCK
6" THICK PROPOSED
AGGREGATE BASE
COURSE
3" THICK PROPOSED
ASPHALT SURFACE
SET POST VERTICAL. VARY
POST LENGTH AS REQUIRED
FOR GRADE
GUARDRAIL POST &
BLOCK
M
I N
M
A X
WS-85210-2021-C-DT-04
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
RR316 GUARDRAIL DETAIL
REP
REP
Rafael Acosta
Samuel E. Morris
- NONE
W6x9 METAL POSTS
NO SCALE
PROPOSED SKT 350 GUARDRAIL SYSTEM ABOVE WATERWAY RR316BOO2 ELEVATION VIEW
NO SCALE
PLAN VIEW
NO SCALE
PROPOSED SKT 350 GUARDRAIL SYSTEM PLAN VIEW
NO SCALE
FY21 Roadway Markings and Guardrail
AutoCAD SHX Text
DIRECTION OF TRAVEL
AutoCAD SHX Text D3
AutoCAD SHX Text D1
AutoCAD SHX Text D2
DRAINAGE
STRUCTURE
2 SPACES @ 6'-3"
DOUBLE NESTED
12 GAGE SINGLE
FACE W-BEAM
GUARDRAIL WITH
W6x9 POSTS
4 SPACES @ 6'-3"
SINGLE NESTED 12 GAGE
SINGLE FACE
W-BEAM GUARDRAIL WITH
W6X9 POSTS
12'-6"
SINGLE FACE
W-BEAM GUARDRAIL
STANDARD SECTION
STEEL POST
ADD 12'-6" MIN. OF
STANDARD RAIL
BEFORE ATTACHING
END TREATMENT
BEGINNING LAPINTERMEDIATE LAP
END LAP
DIRECTION OF TRAVEL
25'
DOUBLE NESTED
12 GAGE W-BEAM
2 SPACES @ 6'-3"
DOUBLE NESTED
12 GAGE SINGLE
FACE W-BEAM
GUARDRAIL WITH
W6x9 POSTS
12'-6"
4 SPACES @ 6'-3"
DOUBLE NESTED 12
GAGE SINGLE FACE
W-BEAM GUARDRAIL
WITH W6X9 POSTS
SINGLE FACE
W-BEAM GUARDRAIL
STANDARD SECTION
STEEL POST
ADD 12'-6" MIN. OF
STANDARD RAIL
BEFORE ATTACHING
END TREATMENT
100'
M
I N
M
A X
SET POST VERTICAL.
VARY POST LENGTH AS
REQUIRED FOR GRADE
GUARDRAIL POST &
POLYMER COMPOSITE
BLOCK
SET POST VERTICAL.
VARY POST LENGTH
AS REQUIRED FOR
GRADE
GUARDRAIL POST &
POLYMER COMPOSITE
BLOCK
W6x9
BOLT MAY BE
PLACED THROUGH
EITHER LEFT OR
RIGHT FLANGE
BOLT HOLE
" x 10" BUTTON HEAD BOLT
WITH OVAL GRIP & HEX NUT
EXISTING SUB BASE
EXISTING 6" THICK
AGGREGATE BASE
COURSE
EXISTING 3" THICK
ASPHALT SURFACE
3"
3"
3"
3"
3"
3"
3"
X"
Y"
STRIPES AT 45 DEGREES
TOWARD TRAVEL WAY.
BACKGROUND: YELLOW
(MUTCD SPECIFICATION,
OBJECT MARKERS) COPY:
BLACK
X AND Y SHALL BE WITHIN
3" OF FACE WIDTH AND
HEIGHT, RESPECTIVELY,
AND FACE SHALL HAVE A
MINIMUM 300 SQUARE
INCHES COPY AREA.
NO BLOCK OUT
WS-85210-2021-C-DT-05
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
OWENS ROAD GUARDRAIL
REP
REP
Rafael Acosta
Samuel E. Morris
- NONE
PROPOSED SKT 350 GUARDRAIL SYSTEM OVER WATERWAY East and West of Roadway. ELEVATION VIEW
NO SCALE
PLAN VIEW
NO SCALE
PROPOSED SKT 350 GUARDRAIL SYSTEM PLAN VIEW
NO SCALE W6x9 METAL POSTS
NO SCALE
FY21 Roadway Markings and Guardrail
AutoCAD SHX Text D4
AutoCAD SHX Text D5
AutoCAD SHX Text D6
10'-0" 10'-0"30'-0"
4"
4"
4"
4"
Passing Line or
Skip Line
Solid No - Passing Line or Shoulder Stripping
Double Yellow
Centerline
PAVEMENT MARKING
TYPICAL SHOULDER/CENTER
STRIPE DIMENSIONS
NTS
4"
WS-85210-2021-C-DT-06
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
FOG SEAL/MARKINGS DETAIL
REP
REP
Rafael Acosta
Samuel E. Morris
- NONE
Roadway Markings/Stripe
Notes:
1. Contractor shall restripe centerline roadway striping on
WSMR, RR7 Section 16 per
Details this Sheet.
2. Contractor shall verify location of no passing zones.
3. All markings shall be a 4" Type
"B" Waterborne Traffic Marking and shall comply with Section
634.05 of the FP-03 and the
Manual on Uniform Traffic
Control Devices. Apply 12# of beads per 100SF. All Traffic
Control devices and markings shall conform with MUTCD.
4. Contractor shall prepare road surface and apply per mfg.
instructions.
5. Contractor shall Fog Seal approximately 30,976SY.
Fog Seal Notes:
1.
Application of fog seal shall comply with Section 415 Pavement Surface
Restoration of the New Mexico State
Highway & Traffic Department
(NMSHTD) and Federal Highway
Standards and Specifications,section
406.
2. Contractor shall prepare roadway surface and apply per manufacturers instructions.
3. Contractor shall provide a Master Seal
Tire Rubber Modified Surface Sealer
(TRMSS) fog seal or Government approved equal on the 2.64 mile stretch of Route 7, Section 16 per manufacturer specifications. Roadway width is 20' with no shoulders, 30,976SY of fog seal. Submittal shall be provided to the Project Engineer for material approval/disapproval.
4. Vehicular traffic shall not be permitted on the pavement surface until sufficient curing time has elapsed to eliminate pickup or tracking of the sealant.
R
RR7 SEC 16 Begin Fog Seal and
New Striping LAT: 33.4934, LONG: -106.403
RR7 SEC 16 End Fog Seal and
New Striping LAT: 33.5272, LONG: -106.421
Site Plan 3
FY21 Roadway Markings and Guardrail
FIRE LANE NO PARKING
FIRE LANE NO PARKING
F I R E
L A N
E
N
O
P A R K I N
G
36"
FIRE
CURB PAINTED RED
3" RED LINES WITH 24" HIGH LETTERS IN
WHITE ON SOLID RED BACKGROUND
"FIRE LANE NO PARKING"
PAINTED ON PAVEMENT
FY21 Roadway Markings and Guardrail
WS-85210-2021-SP-07
AutoCAD SHX Text B-272 PARKING LOT - Pavement Marking NOT TO SCALE
AutoCAD SHX Text Pavement Marking Work:
AutoCAD SHX Text
1. Contractor shall stripe "Fire Lane No Parking" red lines with Extruded Contractor shall stripe "Fire Lane No Parking" red lines with Extruded Thermoplastic pavement marking material and white lettering with Preformed Thermoplastic marking material. Refer to Detail, this sheet, Fire Lane No Parking Detail.
AutoCAD SHX Text Bldg. 272
AutoCAD SHX Text Area not included in the project
AutoCAD SHX Text Picatinny Ave.
AutoCAD SHX Text Aerobee Ave.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Red Stone St.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Standard Fire Lane No Parking Detail
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
CHIEF, ENGINEERING DIVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
RECOMMENDED
AutoCAD SHX Text
BRANCH CHIEF
AutoCAD SHX Text
SUBMITTED
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
WHITE SANDS MISSILE RANGE, N.M.
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DIRECTORATE OF PUBLIC WORKS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
ENGINEERING DIVISION
AutoCAD SHX Text
OF
AutoCAD SHX Text
PLATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text Pavement Marking Details
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DIRECTORATE OF PUBLIC WORKS
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
XX
| Sheets and Views |
| FY21 RDWY MRK Revised-Cover_1 |
| FY21 RDWY MRK Revised-General Notes_2 |
| FY21 RDWY MRK Revised-Site Plan |
| FY21 RDWY MRK Revised-RR316B002 |
| FY21 RDWY MRK Revised-OWEN RD MBGF |
| FY21 RDWY MRK Revised-Traffic Marking_Fog_Seal |
| FY21 RDWY MRK Revised-B272 |
File details come from the government source that posted it. Updated .