DPW-RFI Template.pdf
PDF 2 MB Posted
- Attached to
- Roof Repair B11341
- Solicitation number
- W911SG24B0008
About this file
This document is a Request for Information (RFI) template related to a federal contract opportunity for roof repair at Building 11341.
The RFI seeks information from the contractor regarding a proposed solution to the roof repair work, including potential cost and schedule impacts. The contractor must provide a description of the problem/issue and the proposed solution. The Contracting Officer's Representative (COR) will either accept or reject the proposed solution and provide a response to the contractor's questions. The RFI requires responses from various stakeholders, including Safety, NEC, Fire Department, and Master Planning, to confirm acceptance of the proposed solution.
The related federal contract opportunity is for the roof repair work at Building 11341, which involves removing the existing Thermoplastic Polyolefin (TPO) roofing and replacing it with a new 80 mil TPO roofing system with R-38 insulation and 5/8-inch glass-mat roof board. A hazardous materials survey is required prior to construction. The solicitation number is W911SG24B0008, and the contract is being issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI No.
Date
Contract Title:
Contract No.
RFI Subject:
Prime Contractor: Requested by:
Feature of work
Date
Date
RFI requires answer no later than this date:
Contractor (stakeholder) Signature
COR Signature
Contractor (Stakeholder) Proposed Solution:
REQUEST FOR INFORMATION – REPORT (RFI)
Potentional cost Impact Schedule Impact Other No Cost change
Information Requested by Contractor (Stakeholder):
COR Accepts contractor proposed solution.
COR recommendation below
COR Rejects contractor proposed solution.
COR response to Contractor questions.
______________ Safety accepts proposed solution
______________ NEC accepts proposed solution
______________ Fire Department accepts proposed solution
______________ Master Planning accepts proposed solution
______________ Environmental accepts proposed solution
| Contract Title: |
| RFI No: |
| Contract No 1: |
| Contract No 2: |
| undefined: |
| Feature of work: |
| Date1_af_date: |
| Text3: Describe problem/Issue here |
| Text9: |
| Date10_af_date: |
| Date11_af_date: |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Date19_af_date: |
| Text1: |
| Text4: |
| Button5: |
| Dropdown1: [SOW Paragragh No.] |
| Text2: |
| Check Box2: Off |
| Text12: |
| Text13: Other accepts proposed solution |
| Text8: |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
File details come from the government source that posted it. Updated .