Mobile Traffic Signal Trailers - Request for Information
Solicitation number
RFI-10383
Issued by
Volusia County, Florida

About this file

This document is a Request for Information (RFI) from the Florida Department of Transportation (FDOT), District Five, Office of Traffic Operations. FDOT is seeking a contractual service to provide on-demand deployment of mobile traffic signal trailers at intersections where the existing traffic signals are malfunctioning or disabled. The vendor would be responsible for furnishing, installing, operating, and maintaining the mobile signal trailers for a minimum of 14 consecutive days per deployment. FDOT is requesting information from vendors to help balance the 4-hour mobilization and deployment timeframe with the quoted cost. The RFI also requests information about the vendors' experience with similar contracts, preferred optional features, and the installation and configuration timelines for standard and multiple connected trailers. The RFI provides a timeline for the procurement process, including the advertisement date, deadlines for questions and responses, and the public meeting date to open the responses.

The RFI states that the responses will be reviewed by the agency for informational purposes and will not be considered as offers to be accepted to form a binding contract. Any subsequent competitive solicitation that may result from this RFI will be posted on the Florida Vendor Information Portal. The RFI does not provide any details on pricing terms, set asides, incumbents, funding requirements or sources, or other financial information.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Shell07/2018

REQUEST FOR INFORMATION (RFI) from the Florida Dept. of Transportation

The Department of Transportation, District Five, Office of Traffic Operations is requesting the following information from prospective vendors about the commodities and/or contractual services described below.

Description of commodities/contractual services:

FDOT is seeking a contractual service to provide on-demand deployment of mobile traffic signal trailers at intersections where the existing traffic signal(s) are malfunctioning or otherwise disabled.

The exact duration of each deployment is unknown but expected to be at least 14 consecutive days per deployment. Vendor would be responsible for furnishing, installing, operating, and maintaining mobile signal trailer for the duration of the deployment. Consistent coordination with FDOT staff is required. The length of time from deployment request to vendor installation of mobile signal trailer is expected to be no more than 4 hours, regardless of time of day. Failure to meet this requirement would result in liquidated damages assessed at $500 per day. Deficiencies in deployed mobile signal trailer(s) shall be corrected within 1 hour, or liquidated damages will be assessed at $200 per hour, up to $500 per day.

The vendor should provide the appropriate mobile signal trailer configurations to facilitate operations at a Two-way, Three-way, or Four-way approach, as needed. At FDOT’s discretion, optional elements or hardware should be available at additional cost, including CCTV, pedestrian signal, cellular modem, and hardwire connection to the existing traffic signal cabinet.

Specific Information Requested:

FDOT is requesting information from vendors of mobile traffic signal trailers to help with balancing timing requirements against quoted cost.

Is 4 hours a reasonable timeframe to mobilize and deploy signal trailers within the District Five footprint? How could this timing constraint be offset?

Do you have experience with similar contracts with other public agencies? What stipulations or parameters within those contracts worked well? What did not work well?

Do you prefer optional add-ons to a deployment, or standardized deployments?

Once on-site, how long does installation and configuration take for a standard mobile signal trailer? How long does the installation and configuration take for multiple, connected signal trailers?

What optional features require additional deployment time?

Are there a maximum number of trailers that can be supported before response time needs to increase?

Timeline Advertisement date – September 24, 2024 Deadline for Questions – September 26, 2024, at 10:00am Deadline for Questions with Answers – September 30, 2024, at 10:00am Responses due – October 3, 2024, by 10:00am Public Meeting to open Responses – October 3, 2024, at 11:00am

Contact for Questions or clarification:

Please submit all questions in writing to D5.ProcurementQuestions@dot.state.fl.us

DOT-RFI-25-5001-MTS

mailto:D5.ProcurementQuestions@dot.state.fl.us

RFI Shell07/2018

The requested information must be received by 10:00 am (EST) on October 3, 2024.

E-mail requested information to: D5.Purch@dot.state.fl.us

NOTE: Responses to this Request for Information (RFI) will be reviewed by the agency for informational purposes and will not be considered as offers to be accepted by the agency to form a binding contract. Advertisement of any subsequent competitive solicitation that may result from this RFI will be posted on the Florida Vendor Information Portal.