DOT-ITB-26-1359-DN ADDENDUM NO. 1.pdf

PDF 103 KB Posted

Attached to
ADDENDUM NO. 1
Solicitation number
IN-16245
Issued by
Polk County, Florida

About this file

This is Addendum No. 1 to the Florida Department of Transportation (FDOT) Invitation to Bid for DOT-ITB-26-1359-DN, titled "FDOT District One Interstate 75 (I-75) Diverging Diamond Interchanges (DDI) - Generator Deployment." The addendum modifies the Scope of Services regarding construction time requirements. The original bid opening date is scheduled for June 17, 2026, at 10:00 a.m. Bidders and proposers are required to acknowledge receipt of this addendum by completing and returning the acknowledgment form to the Procurement Office by the bid opening date and time. Failure to acknowledge receipt of the addendum may result in disqualification of the bidder or proposer.

The key change specified in this addendum pertains to Section III.b (Construction Time) of Exhibit "A" – Scope of Services, which establishes a maximum work performance duration of 90 calendar days. This 90-day period begins when the vendor commences work and includes all testing activities but excludes material acquisition, procurement, and fabrication time. Bidders must comply with this modified timeline requirement and acknowledge the addendum to remain eligible for consideration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLORIDA DEPARTMENT OF TRANSPORTATION

ADDENDUM NO. 1 DATE: June 11, 2026

RE: BID/RFP #: DOT-ITB-26-1359-DN

BID/RFP TITLE: FDOT District One Interstate 75 (I-75) Diverging Diamond Interchanges (DDI) – Generator Deployment

OPENING DATE: June 17, 2026, 10:00am

Notice is hereby given of the following changes to the above-referenced BID/RFP:

1. CHANGE:

Exhibit “A” – Scope of Services Section III; b. General Requirements

III. GENERAL REQUIREMENTS

b. Construction Time: Work performance duration is a maximum of 90 calendar days.

This begins at the time the Vendor starts work and includes testing. This does not include material acquisition/procurement and fabrication.

Bidders/Proposers must acknowledge receipt of this Addendum by completing and returning to the Procurement Office, by no later than the time and date of the bid/proposal opening. Failure to do so may subject the bidder/proposer to disqualification.

Procurement Agent

_____________________________________Bidder/Proposer

_____________________________________Address

_____________________________________Submitted by (Signature)

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.

2026-06-11T14:45:06+0000
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .