This Statement of Work and Invitation for Bids is issued by the Maryland Department of Transportation State Highway Administration for the replacement of sectional overhead doors at the Prince Frederick Maintenance Shop located at 100 Hallowing Point Road, Prince Frederick, Maryland 20678. The project involves the installation and replacement of two 14'x14' overhead sectional insulated doors, including motors, weatherproof switches, weatherproof covers, tracks, rollers, safety edge weatherstrips, and associated hardware. The contractor must furnish all supervision, labor, tools, transportation, and equipment necessary to complete the work in accordance with industry best practices and applicable OSHA, MOSH, and Maryland licensing requirements. A pre-bid conference and scheduled site visit are both set for May 7, 2026, at 10:00 AM local time, with RSVP and site visit attendance required by May 6, 2026, at 3:00 PM. Questions from bidders are due by May 8, 2026, at 1:00 PM, with sealed bids due on May 11, 2026, at 8:00 AM. The public bid opening will occur on May 11, 2026, at 10:00 AM via Microsoft Teams. Bidders must submit bids through emma.maryland.gov under Solicitation Number 55WBD26SB, and advance registration on the platform is recommended.
The solicitation is issued as a lump sum bid for door replacement services. Approved door manufacturers include Cookson, Cornell, Overhead, and Raynor, or State Highway Administration-approved equivalents. The project requires the installation of stainless steel rollers and panel hinges, 20,000 cycle shaft and torsion springs, two NEMA 4x motors, bottom electric safety edge, and comprehensive weatherstripping including lintel brush seal, guide brush seals, and neoprene bottom seal. Vision lites measuring approximately 60 inches from the bottom of the door with four lites wide by five lites high are also specified. The doors must be mounted on the interior of the building and match the existing brown or bronze color. An overall Minority Business Enterprise or Disadvantaged Business Enterprise subcontracting goal of zero percent has been established. The procurement officer is William McGinty, and the contract manager is Lona Drake at ldrake@mdot.maryland.gov or 410-535-1748. Technical questions regarding the project may be directed to Anthony Rhodes at (410)-906-2584 or ARhodes1@mdot.maryland.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment-B.-Price-Form_55WBD26SB.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR DOOR WASH BAY SECTIONAL DOOR REPLACEMENT
MARYLAND DEPARTMENT OF TRANSPORTAION
STATE HIGHWAY ADMINISTRATION
Prince Frederick Maintenance Shop
100 Hallowing Point Road
Prince Frederick, Maryland 20678
I.Scope of Work:
The Maryland State Highway Administration’s Annapolis Maintenance Shop is soliciting a lump sum bid for the installation/replacement of: Two (2) sectional overhead doors The work consists of replacing two (2) 14’x14’ overhead sectional doors, motors, two weatherproof switches, weather-proof covers, tracks, rollers, safety edge weatherstrips, and all associated hardware. The contractor shall furnish all supervision, labor, tools, transportation and equipment necessary to perform all work. This work shall be completed in accordance with this specification and scope of work in the manner called for, and to the satisfaction of the State Highway Administration Office of Mainte-nance (OOM). Vendor should use best practices established in the construction industry to perform this work. All work to be done in a safe manner, adhering to OSHA, MOSH, codes/regulations and standards. Vendor shall be licensed to perform work in the State of Maryland.
II. Specifications for Overhead Sectional insulated Doors are as follows:
a. Install (2) 14’x 14’ Thermacore Overhead Insulated Sectional Doors or Approved Equal.
b. Two (2) weatherproof control switches and weatherproof covers
c. Door to be mounted on the Interior of building.
d. Install 2” inch Steel continuous Lift Track Wash Bay
e. Sectional Panels (to match existing brown/bronze color)
f. Install stainless steel rollers / panel hinges.
g. Install 20,000 cycle Shaft and Torsion spring.
h. Install (2) NEMA 4x motors, or Approved Equal.
i. Provide bottom electric safety edge.
j. Weather-stripping
i. Provide Lintel Brush Seal at top of opening.
ii. Provide Guide Brush Seals
iii. Provide Neoprene Bottom Seal
k. Provide vision lites as follows: Located approximately 60” from bottom of door four
(4) lites wide X five (5) lites high.
Approved Manufacturers: Cookson, Cornell, Overhead, Raynor (or SHA approved equivalent)
For questions please contact Anthony Rhodes, OOM/FMD Cell: (410)-906-2584
Email: ARhodes1@mdot.maryland.gov
END OF STATEMENT OF WORK