NAVY_STTR_27TZ_PH I_R2.pdf
PDF 542 KB Posted
- Attached to
- Membranes for Separation, Purification, Compression, and Storage of Carbon Resources from Alkaline Water
- Solicitation number
- DON27TZ02-NV008
About this file
This document is a Proposal Submission Instructions guide for the Department of the Navy's 2027 Broad Agency Announcement (BAA) for Small Business Technology Transfer (STTR) programs, Release 2, covering 15 research and development topics (DON27TZ02-NV001 through DON27TZ02-NV015).
The BAA addresses critical naval technology areas across quantum systems, artificial intelligence, advanced materials, autonomous systems, renewable energy, and directed energy weapons. Phase I proposals are limited to $200,000 base funding plus a $115,000 optional extension (six months each), with a 10-page technical volume maximum. Phase II awards can reach $2,000,000 total, with options for Cost Plus Fixed Fee, Firm Fixed Price, Basic Ordering Agreement, or Prototype Other Transaction contract vehicles. All proposals must be submitted electronically through the DoW SBIR/STTR Innovation Portal (DSIP) and comply with seven required volumes: cover sheet, technical proposal, cost volume, commercialization report, supporting documents, fraud/waste/abuse certification, and foreign affiliations disclosures. STTR proposers must include an Allocation of Rights agreement. For Phase I, the small business concern must perform minimum 40% of work and a single research institution minimum 30%, calculated by direct and indirect costs. Cost sharing is not accepted. Proposals undergo compliance review first; technical merit evaluation emphasizes performance over cost considerations. The Office of Naval Research (ONR) serves as the participating command point of contact. Phase I options are exercised upon Phase II selection. Cybersecurity Maturity Model Certification Level 2 (Self) is projected for all topics. Proposers should anticipate potential Phase II CMMC requirements higher than Phase I projections and carefully consider compliance impacts on proposed costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DON27TZ02-NV008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVY - 1
DEPARTMENT OF THE NAVY (DON)
2027 DoW Small Business Technology Transfer (STTR) BAA
Release 2
Proposal Submission Instructions
IMPORTANT
• Effective October 1, 2026, the Department of the Navy transformed from a Systems
Command-centric model to a centralized development pipeline, directly integrated with the Portfolio Acquisition Executive (PAE) framework to ensure alignment to naval priorities.
• The following instructions apply to STTR topics only:
o DON27TZ02-NV001 through DON27TZ02-NV015
• Submitting small business concerns (SBCs) are encouraged to thoroughly review the DoW
SBIR/STTR Program Broad Agency Announcement (BAA) and register for the DSIP Listserv to remain apprised of important programmatic changes.
o The DoW Program BAA is located at: https://www.defensesbirsttr.mil/SBIR-
STTR/Opportunities/#announcements. Select the tab for the appropriate BAA cycle.
o Register for the DSIP Listserv at: https://www.dodsbirsttr.mil/submissions/login.
• The information provided in the DON Proposal Submission Instructions takes precedence over the DoW Instructions posted for this BAA.
• DoW has established proposal limitations on a per-topic basis. SBCs may submit only one
(1) proposal in response to a single topic. Please review the DoW SBIR/STTR Program
BAA for further information.
• DON Phase I Technical Volume (Volume 2) page limit is not to exceed 10 pages.
• Phase I Technical Volume (Volume 2) and Supporting Documents (Volume 5) templates, specific to DON topics, are available at https://www.navysbir.com/links_forms.htm.
• The DON may consider the following FAR and Non-FAR contract strategies when issuing
Phase I awards: Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype
Other Transaction (OT). The DON may consider the following FAR and Non-FAR contracting strategies when issuing Phase II awards: Cost Plus Fixed Fee (CPFF), FFP, BOA, or Prototype OT.
• This BAA is issued under regulations set forth in Federal Acquisition Regulation (FAR) 35.016 and awards will be made under “other competitive procedures”. The policies and procedures of
FAR Subpart 15.3 shall not apply to this BAA, except as specifically referenced in it. All procedures are at the sole discretion of the Government as set forth in this BAA. Submission of a proposal in response to this BAA constitutes the express acknowledgement to that effect by the proposing SBC.
https://www.defensesbirsttr.mil/SBIR-STTR/Opportunities/%23announcements https://www.defensesbirsttr.mil/SBIR-STTR/Opportunities/%23announcements https://www.dodsbirsttr.mil/submissions/login https://www.navysbir.com/links_forms.htm
NAVY - 2
INTRODUCTION
The DON SBIR/STTR Programs are mission-oriented programs that integrate the needs and requirements of the DON’s Fleet through research and development (R&D) topics that have dual-use potential, but primarily address the needs of the DON. More information on the programs can be found on the DON
SBIR/STTR website at www.navysbir.com. Additional information on DON’s mission can be found on the DON website at www.navy.mil.
For questions regarding this BAA, use the information in Table 1 to determine who to contact for what types of questions.
TABLE 1: POINTS OF CONTACT FOR QUESTIONS REGARDING THIS BAA
Type of Question When Contact Information
Program and administrative Always Navy SBIR/STTR Program Management Office
DON_SBIR_STTR@us.navy.mil or appropriate participating Command listed in Table 2 (below)
Topic-specific technical questions
BAA Pre-release Technical Point of Contact (TPOC) listed in each topic on the DoW SBIR/STTR Innovation Portal
(DSIP). Refer to the Proposal Submission section of the DoW SBIR/STTR Program BAA for details.
BAA Open DoW SBIR/STTR Topic Q&A platform
(https://www.dodsbirsttr.mil/submissions)
Refer to the Proposal Submission section of the
DoW SBIR/STTR Program BAA for details.
Electronic submission to the
DoW SBIR/STTR
Innovation Portal (DSIP)
Always DSIP Support via email at dodsbirsupport@reisystems.com
Navy-specific BAA instructions and forms
Always DON SBIR/STTR Program Management Office DON_SBIR_STTR @us.navy.mil
TABLE 2: DON SBIR PARTICIPATING COMMANDS
Topic
Numbers
Point of Contact Participating
Command
DON27TZ02-
NV001 to
DON27TZ02-
NV015
Mr. Steve Sullivan
Office of Naval
Research
(ONR)
ONR_SBIR_STTR@us.navy.
mil
PHASE I SUBMISSION INSTRUCTIONS
The following section details requirements for submitting a compliant Phase I Proposal to the DoW
SBIR/STTR Programs.
(NOTE: Proposing SBCs are advised that support contract personnel will be used to carry out administrative functions and may have access to proposals, contract award documents, contract deliverables, and reports. All support contract personnel are bound by appropriate non-disclosure agreements.)
http://www.navysbir.com/ http://www.navy.mil/ mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil https://www.dodsbirsttr.mil/submissions mailto:dodsbirsupport@reisystems.com mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil mailto:ONR_SBIR_STTR@us.navy.mil mailto:ONR_SBIR_STTR@us.navy.mil
NAVY - 3
DoW SBIR/STTR Innovation Portal (DSIP). Proposing SBCs are required to submit proposals via the
DoW SBIR/STTR Innovation Portal (DSIP); and follow proposal submission instructions in the DoW
SBIR/STTR Program BAA on the DSIP at https://www.dodsbirsttr.mil/submissions. Proposals submitted by any other means will be disregarded. Proposing SBCs submitting through DSIP for the first time will be asked to register. It is recommended that SBCs register as soon as possible upon identification of a proposal opportunity to avoid delays in the proposal submission process. Proposals that are not successfully certified electronically in DSIP by the Corporate Official prior to BAA Close will NOT be considered submitted and will not be evaluated by DON. Proposals that are encrypted, password protected, or otherwise locked in any portion of the submission will be REJECTED unless specifically directed within the text of the topic to which you are submitting. Please refer to the DoW SBIR/STTR
Program BAA for further information.
Proposal Volumes. The following seven volumes are required.
• Proposal Cover Sheet (Volume 1). As specified in DoW SBIR/STTR Program BAA.
• Technical Proposal (Volume 2) o Technical Proposal (Volume 2) must meet the following requirements or the proposal will be
REJECTED:
⎯ Not to exceed 10 pages, regardless of page content
⎯ Single column format, single-spaced typed lines
⎯ Standard 8 ½” x 11” paper
⎯ Page margins one inch on all sides. A header and footer may be included in the one-inch margin.
⎯ No font size smaller than 10-point
⎯ Include, within the 10-page limit of Volume 2, an Option that furthers the effort in preparation for Phase II and will bridge the funding gap between the end of Phase I and the start of Phase II. Tasks for both the Phase I Base and the Phase I Option must be clearly identified. Phase I Options are exercised upon selection for Phase II.
⎯ Work proposed for the Phase I Base must be exactly six (6) months.
⎯ Work proposed for the Phase I Option must be exactly six (6) months.
o Additional information:
⎯ A Phase I proposal template specific to DON to meet Phase I requirements is available at https://navysbir.com/links_forms.htm.
⎯ A font size smaller than 10-point is allowable for headers, footers, imbedded tables, figures, images, or graphics that include text. However, proposing SBCs are cautioned that if the text is too small to be legible it will not be evaluated.
• Cost Volume (Volume 3).
o Cost Volume (Volume 3) must meet the following requirements or the proposal will be
REJECTED:
⎯ The Phase I Base amount must not exceed $200,000.
⎯ Phase I Option amount must not exceed $115,000.
⎯ Costs for the Base and Option must be separated and clearly identified in Volume 3.
⎯ For Phase I a minimum of 40% of the work is performed by the proposing SBC, and a minimum of 30% of the work is performed by the single research institution. The percentage of work requirement must be met in the Base costs as well as in the Option costs. The percentage of work is measured by both direct and indirect costs. To calculate the minimum https://www.dodsbirsttr.mil/submissions https://navysbir.com/links_forms.htm
NAVY - 4
percentage of effort for the proposing SBC the sum of all direct and indirect costs attributable to the proposing SBC represent the numerator and the total cost of the proposal (i.e., Total
Cost before Profit Rate is applied) is the denominator. The single research institution percentage is calculated by taking the sum of all costs attributable to the single research institution (identified as Total Subcontractor Costs (TSC) 1 in DSIP Cost Volume) as the numerator and the total cost of the proposal (i.e., Total Cost before Profit Rate is applied) as the denominator.
⧠ Proposing SBC Costs (included in numerator for calculation of the SBC):
⎯ Total Direct Labor (TDL)
⎯ Total Direct Material Costs (TDM)
⎯ Total Direct Supplies Costs (TDS)
⎯ Total Direct Equipment Costs (TDE)
⎯ Total Direct Travel Costs (TDT)
⎯ Total Other Direct Costs (TODC)
⎯ General & Administrative Cost (G&A)
NOTE: G&A, if proposed, will only be attributed to the proposing SBC.
⧠ Research Institution (numerator for Research Institution calculation):
⎯ Total Subcontractor Costs (TSC) 1
⧠ Total Cost (i.e., Total Cost before Profit Rate is applied, denominator for either calculation)
⎯ Cost Sharing: Cost sharing is not accepted on DON Phase I proposals. A value above or below $0.00 entered in the Cost Sharing field will not be considered in the Phase I contract award.
o Additional information:
⎯ Provide sufficient detail for subcontractor, material, and travel costs. Subcontractor costs must be detailed to the same level as the prime contractor. Material costs must include a listing of items and cost per item. Travel costs must include the purpose of the trip, number of trips, location, length of trip, and number of personnel.
⎯ Inclusion of cost estimates for travel to the sponsoring participating Command’s facility for one day of meetings is recommended for all proposals.
⎯ The “Additional Cost Information” of Supporting Documents (Volume 5) may be used to provide supporting cost details for Volume 3. When a proposal is selected for award, be prepared to submit further documentation to the Contracting Officer to substantiate costs
(e.g., an explanation of cost estimates for equipment, materials, and consultants or subcontractors).
• Company Commercialization Report (Volume 4). DoW collects and uses Volume 4 and DSIP requires Volume 4 for proposal submission. Please refer to the Proposal Preparation Instructions and
Requirements section of the DoW SBIR/STTR Program BAA for details to ensure compliance with
DSIP Volume 4 requirements.
• Supporting Documents (Volume 5). Volume 5 is for the submission of administrative material that
DON may or will require to process a proposal, if selected, for contract award.
All proposing SBCs must review and submit the following items, as applicable:
⎯ Allocation of Rights. Required for all SBCs proposing to STTR. In accordance with the
SBIR and STTR Policy Directive section 8(b) and DFARS 252.227-7040, the proposing SBC must submit this agreement as an upload as a separate PDF file in Volume 5, Supporting
NAVY - 5
Documents. The STTR Allocation of Rights template must be used and is available on https://navysbir.com/links_forms.htm. Please refer to the Proposal Preparation Instructions and Requirements section of the DoW STTR Program BAA for information on this requirement.
⎯ Proposing SBCs may include the following administrative materials in Supporting
Documents (Volume 5); a template is available at https://navysbir.com/links_forms.htm to provide guidance on optional material the proposing SBC may want to include in Volume 5:
o Additional Cost Information to support the Cost Volume (Volume 3) o SBIR/STTR Funding Agreement Certification o Data Rights Assertion o Disclosure of Information (DFARS 252.204-7000) o Prior, Current, or Pending Support of Similar Proposals or Awards o Foreign Citizens
⎯ Details of Request for Discretionary Technical and Business Assistance (TABA), if proposed, is to be included under the Additional Cost Information section if using the DON Supporting
Documents template.
⎯ Do not include documents or information to substantiate the Technical Volume (Volume 2)
(e.g., resumes, test data, technical reports, or publications). Such documents or information will not be considered.
⎯ A font size smaller than 10-point is allowable for documents in Volume 5; however, proposing SBCs are cautioned that the text may be unreadable.
• Fraud, Waste and Abuse Training Certification (Volume 6). DoW requires Volume 6 for submission. Please refer to the Proposal Preparation Instructions and Requirements section of the
DoW SBIR/STTR Program BAA for details.
• Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7). In accordance with 15 U.S.C. §638(vv) and the SBA SBIR/STTR Policy Directive, the DoW will review all proposals submitted in response to this BAA to assess security risks presented by SBCs seeking a
Federally funded award. SBCs must complete the Disclosures of Foreign Affiliations or Relationships to Foreign Countries webform in Volume 7 of the DSIP proposal submission. Please refer to the
Proposal Preparation Instructions and Requirements section of the DoW SBIR/STTR Program BAA for details.
PHASE I EVALUATION AND SELECTION
The following section details how the DON SBIR/STTR Programs will evaluate Phase I proposals.
Proposals meeting DSIP submission requirements will be forwarded to the DON SBIR/STTR Programs.
Prior to evaluation, all proposals will undergo a compliance review to verify compliance with DoW and
DON SBIR/STTR proposal eligibility requirements. Proposals not meeting submission requirements will be REJECTED and not evaluated.
• Proposal Cover Sheet (Volume 1). The Proposal Cover Sheet (Volume 1) will undergo a compliance review to verify the proposing SBC has met eligibility requirements and followed the instructions for the Proposal Cover Sheet as specified in the DoW SBIR/STTR Program BAA.
• Technical Volume (Volume 2). The DON will evaluate and select Phase I proposals using the evaluation criteria specified in the Method of Selection and Evaluation Criteria section of the DoW
SBIR/STTR Program BAA, with technical merit being most important, followed by qualifications of
NAVY - 6
key personnel and commercialization potential of equal importance. The information considered for this decision will come from Volume 2. This is not a FAR Part 15 evaluation and proposals will not be compared to one another. Cost is not an evaluation criterion and will not be considered during the evaluation process; the DON will only do a compliance review of Volume 3. Due to limited funding, the DON reserves the right to limit the number of awards under any topic.
The Technical Volume (Volume 2) will undergo a compliance review (prior to evaluation) to verify the proposing SBC has met the following requirements or the proposal will be REJECTED:
⎯ Not to exceed 10 pages, regardless of page content
⎯ Single column format, single-spaced typed lines
⎯ Standard 8 ½” x 11” paper
⎯ Page margins one inch on all sides. A header and footer may be included in the one-inch margin.
⎯ No font size smaller than 10-point, except as permitted in the instructions above.
⎯ Include, within the 10-page limit of Volume 2, an Option that furthers the effort in preparation for Phase II and will bridge the funding gap between the end of Phase I and the start of Phase II. Tasks for both the Phase I Base and the Phase I Option must be clearly identified.
⎯ Work proposed for the Phase I Base must be exactly six (6) months.
⎯ Work proposed for the Phase I Option must be exactly six (6) months.
• Cost Volume (Volume 3). The Cost Volume (Volume 3) will not be considered in the selection process and will only undergo a compliance review to verify the proposing SBC has met the following requirements or the proposal will be REJECTED:
⎯ Must not exceed values for the Base ($200,000) and Option ($115,000).
⎯ Must meet minimum percentage of work; 40% of the work is performed by the proposing
SBC, and a minimum of 30% of the work is performed by the single research institution. The percentage of work requirement must be met in the Base costs as well as in the Option costs.
⎯ Cost Sharing: Cost sharing is not accepted on DON Phase I proposals. A value above or below $0.00 is entered in the Cost Sharing field will not be considered in the Phase I contract award.
• Company Commercialization Report (Volume 4). The CCR (Volume 4) will not be evaluated by the DON nor will it be considered in the award decision. However, all proposing SBCs must refer to the DoW SBIR/STTR Program BAA to ensure compliance with DSIP Volume 4 requirements.
• Supporting Documents (Volume 5). Supporting Documents (Volume 5) will not be considered in the selection process and will only undergo a compliance review to ensure the proposing SBC has included items in accordance with the PHASE I SUBMISSION INSTRUCTIONS section above.
• Fraud, Waste, and Abuse Training Certificate (Volume 6). Not evaluated.
• Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7).
Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7) will be assessed as part of the Foreign Risk Evaluation (FRE) Program to Assess Security Risks. Refer to the DoW
SBIR/STTR Program BAA to ensure compliance with Volume 7 requirements.
ADDITIONAL SUBMISSION CONSIDERATIONS
This section details additional items for proposing SBCs to consider during proposal preparation and submission process.
NAVY - 7
Foreign Risk Evaluation (FRE) Program to Assess Security Risks. 15 U.S.C. §638(vv) requires the
Department of War, in coordination with the Small Business Administration, to establish and implement a due diligence program, known as Foreign Risk Evaluation (FRE) Program, to assess and, when possible, mitigate security risks presented by SBCs seeking a Federally funded award. Please review the
Certifications and Registrations section of the DoW SBIR/STTR Program BAA for details on how DoW will assess security risks presented by SBCs. The FRE Program to Assess Security Risks will be implemented for all Phases.
Discretionary Technical and Business Assistance (TABA). The Small Business Innovation and
Economic Security Act Section 7 mandates agencies offer TABA. The purpose of TABA is to assist awardees in making better technical decisions on SBIR/STTR projects; solving technical problems that arise during SBIR/STTR projects; minimizing technical risks associated with SBIR/STTR projects;
commercializing the SBIR/STTR product or process, including intellectual property protections and cybersecurity assistance; and screening for potential foreign involvement in technology development or commercialization activities. TABA services can be provided through vendor(s) selected by the SBC or the SBC may propose use of TABA funding to hire new staff, augment staff, or direct staff to conduct or participate in training activities consistent with the purpose of TABA as detailed above. The Phase I
TABA amount, if proposed, cannot include any profit/fee by the proposing SBC and must be inclusive of all applicable indirect costs. TABA cannot be used in the calculation of general and administrative expenses (G&A) for the SBIR proposing SBC. An SBC receiving TABA will be required to submit a report detailing the results and benefits of the service received. This TABA report will be due at the time of submission of the final report.
Request for TABA funding will be reviewed by the DON SBIR/STTR Program Management Office.
If proposing a TABA Provider, the following MUST be included in the request or be subject to denial.
• Provider(s)
• Provider(s) point of contact, email address, and phone number
• An explanation of the provider’s unique qualifications to provide the TABA service
• Tasks that will be performed by the provider (to include the purpose and objective of the assistance)
• Total provider(s) cost, number of hours, and labor rates (average/blended rate is acceptable)
If proposing TABA funding to hire new staff, augment staff, or direct staff to conduct or participate in training activities consistent with the purpose of TABA, the following MUST be included or be subject to denial.
• Name(s), position(s), business need to be filled, and/or training to be provided
• Number of employees to be hired, augmented, or directed to participate in training activities
• Qualifications of employees hired or augmented, or detailed need for training
• Tasks that will be performed (to include the purpose and objective of the assistance)
• Total staff/training cost, number of hours, and labor rates (average/blended rate is acceptable)
TABA requests must be included in the proposal as follows:
• Phase I:
⎯ Online DoW Cost Volume (Volume 3) – the value of the TABA request.
⎯ Supporting Documents (Volume 5) – a detailed request for TABA (as specified above) specifically identified as “TABA” in the section titled Additional Cost Information when using the DON Supporting Documents template.
• Phase II:
⎯ DON Phase II Cost Volume (provided by the DON) - the value of the TABA request.
NAVY - 8
⎯ Supporting Documents (Volume 5) – a detailed request for TABA (as specified above) specifically identified as “TABA” in the section titled Additional Cost Information when using the DON Supporting Documents template.
Proposed values for TABA must NOT exceed:
• Phase I: A total of $6,500, in addition to the Phase I award amount.
• Phase II: A total of $25,000 per award, not to exceed $50,000 per Phase II project, included in the
Phase II award amount.
Disclosure of Information (DFARS 252.204-7000). In order to eliminate the requirements for prior approval of public disclosure of information (in accordance with DFARS 252.204-7000) under this award, the proposing SBC shall identify and describe all fundamental research to be performed under its proposal, including subcontracted work, with sufficient specificity to demonstrate that the work qualifies as fundamental research. Fundamental research means basic and applied research in science and engineering, the results of which ordinarily are published and shared broadly within the scientific community, as distinguished from proprietary research and from industrial development, design, production, and product utilization, the results of which ordinarily are restricted for proprietary or national security reasons (defined by National Security Decision Directive 189). An SBC whose proposed work will include fundamental research and requests to eliminate the requirement for prior approval of public disclosure of information must complete the DON Fundamental Research Disclosure and upload as a separate PDF file to the Supporting Documents (Volume 5) in DSIP as part of their proposal submission.
The DON Fundamental Research Disclosure is available on https://navysbir.com/links_forms.htm and includes instructions on how to complete and upload the completed Disclosure. Simply identifying fundamental research in the Disclosure does NOT constitute acceptance of the exclusion. All exclusions will be reviewed and, if approved by the Government Contracting Officer, noted in the contract.
Partnering Research Institutions. The Naval Academy, the Naval Postgraduate School, and other military academies are Government organizations but qualify as partnering research institutions.
However, DON laboratories DO NOT qualify as research partners. DON laboratories may be proposed only IN ADDITION TO the partnering research institution.
System for Award Management (SAM). It is strongly encouraged that proposing SBCs register in
SAM, https://sam.gov, by the Close date of this BAA, or verify their registrations are still active and will not expire within 60 days of BAA Close. Additionally, proposing SBCs should confirm that they are registered to receive contracts (not just grants) and the address in SAM matches the address on the proposal. An SBC selected for an award MUST have an active SAM registration at the time of award or they will be considered ineligible.
Cybersecurity Maturity Model Certification (CMMC) Program. DoW has established the CMMC
Program to verify that awardees have implemented required security measures necessary to safeguard
Federal Contract Information (FCI) and Controlled Unclassified Information (CUI). CMMC Level requirements are identified within each topic and must be met prior to award. Proposing SBCs should anticipate that a Projected CMMC Level for Phase II award may be higher than the Projected CMMC
Level advertised in the Phase I topic. Proposing SBCs should carefully review and consider the CMMC requirements as compliance may impact proposed costs and technical approach. Please review the DoW
SBIR/STTR Program BAA for additional information on the CMMC Program.
Notice of NIST SP 800-171 Assessment Database Requirement. The purpose of the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 is to protect Controlled
Unclassified Information (CUI) in Nonfederal Systems and Organizations. As prescribed by DFARS https://sam.gov/
NAVY - 9
252.240-7997, in order to be considered for award, an SBC is required to implement NIST SP 800-171 and shall have a current assessment uploaded to the Supplier Performance Risk System (SPRS) which provides storage and retrieval capabilities for this assessment. The platform Procurement Integrated
Enterprise Environment (PIEE) will be used for secure login and verification to access SPRS. For brief instructions on NIST SP 800-171 assessment, SPRS, and PIEE, please visit https://www.sprs.csd.disa.mil/nistsp.htm. For in-depth tutorials on these items please visit https://www.sprs.csd.disa.mil/webtrain.htm.
Human Subjects, Animal Testing, and Recombinant DNA. Due to the short timeframe associated with Phase I of the SBIR/STTR process, the DON does not recommend the submission of Phase I proposals that require the use of Human Subjects, Animal Testing, or Recombinant DNA. For example, the ability to obtain Institutional Review Board (IRB) approval for proposals that involve human subjects can take 6-12 months, and that lengthy process can be at odds with the Phase I goal for time-to-award.
Before the DON makes any award that involves an IRB or similar approval requirement, the proposing
SBCs must demonstrate compliance with relevant regulatory approval requirements that pertain to proposals involving human, animal, or recombinant DNA protocols. It will not impact the DON’s evaluation, but requiring IRB approval may delay the start time of the Phase I award and if approvals are not obtained within two months of notification of selection, the decision to award may be terminated. If the use of human, animal, and recombinant DNA is included under a Phase I or Phase II proposal, please carefully review the requirements at: https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections. This webpage provides guidance and lists approvals that may be required before contract/work can begin.
Government Furnished Equipment (GFE). Due to the typical lengthy time for approval to obtain GFE, it is recommended that GFE is not proposed as part of the Phase I proposal. If GFE is proposed, and it is determined during the proposal evaluation process to be unavailable, proposed GFE may be considered a weakness in the technical merit of the proposal.
International Traffic in Arms Regulation (ITAR). For topics indicating ITAR restrictions or the potential for classified work, limitations are generally placed on disclosure of information involving topics of a classified nature or those involving export control restrictions, which may curtail or preclude the involvement of universities and certain non-profit institutions beyond the basic research level. Small businesses must structure their proposals to clearly identify the work that will be performed that is of a basic research nature and how it can be segregated from work that falls under the classification and export control restrictions. As a result, information must also be provided on how efforts can be performed in later phases if the university/research institution is the source of critical knowledge, effort, or infrastructure (facilities and equipment).
SELECTION, AWARD, AND POST-AWARD INFORMATION
Notifications. Email notifications for proposal receipt (approximately one week after the Phase I BAA
Close) and selection are sent based on the information received on the proposal Cover Sheet (Volume 1).
Consequently, the e-mail address on the proposal Cover Sheet must be correct.
Debriefs. Requests for a debrief must be made within 15 calendar days of select/non-select notification via email as specified in the select/non-select notification. Please note debriefs are typically provided in writing via email to the Corporate Official identified in the proposal of the proposing SBC within 60 days of receipt of the request. Requests for oral debriefs may not be accommodated. If contact information for the Corporate Official has changed since proposal submission, a notice of the change on company letterhead signed by the Corporate Official must accompany the debrief request.
https://www.sprs.csd.disa.mil/nistsp.htm https://www.sprs.csd.disa.mil/webtrain.htm https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections
NAVY - 10
Protests. Interested parties have the right to protest in accordance with the procedures in FAR Subpart
33.1.
Pre-award agency protests related to the terms of the BAA must be served to: osd.ncr.ousd-r-e.mbx.SBIR-
STTR-Protest@mail.mil. A copy of a pre-award Government Accountability Office (GAO) protest must also be filed with the aforementioned email address within one day of filing with the GAO.
Protests related to a selection or award decision should be filed with the appropriate Contracting Officer for an Agency Level Protest or with the GAO. Contracting Officer contact information for specific DON
Topics may be obtained from the Point of Contact for the participating Command listed in Table 2 above.
For protests filed with the GAO, a copy of the protest must be submitted to the appropriate Point of
Contact for the participating Command and the appropriate Contracting Officer within one day of filing with the GAO.
Awards. Due to limited funding, the DON reserves the right to limit the number of awards under any topic. Any notification received from the DON that indicates the proposal has been selected does not ultimately guarantee an award will be made. This notification indicates that the proposal has been selected in accordance with the evaluation criteria and has been sent to the Contracting Officer to conduct compliance review of Volume 3, to confirm eligibility of the proposing SBC, and to take other relevant steps necessary prior to making an award.
Contract Types. A Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other
Transaction (OT) may be used for Phase I awards.
Funding Limitations. In accordance with the SBIR and STTR Policy Directive section 4(b)(5), there is a limit of one sequential Phase II award per SBC per topic. Additionally, to adjust for inflation DON has raised Phase I and Phase II award amounts. The maximum Phase I proposal/award amount including all options (less TABA) is $315,000. The Phase I Base amount must not exceed $200,000 and the Phase I
Option amount must not exceed $115,000. The maximum Phase II proposal/award amount including all options (including TABA) is $2,000,000 (unless non-SBIR/STTR funding is being added). Individual
Commands may award amounts, including Base and all Options, of less than $2,000,000 based on available funding. The structure of the Phase II proposal/award, including maximum amounts as well as breakdown between Base and Option amounts will be provided to all Phase I awardees either in their
Phase I award or a minimum of 30 days prior to the due date for submission of their Initial Phase II proposal.
Contract Deliverables. Contract deliverables for Phase I are typically a kick-off brief, progress reports, and a final report. Required contract deliverables (as stated in the contract) must be uploaded to https://www.navysbirprogram.com/navydeliverables/.
Payments. The DON makes three payments from the start of the Phase I Base period, and from the start of the Phase I Option period, if exercised. Payment amounts represent a set percentage of the Base or
Option value as follows:
Days from Start of Base Award or Option Payment Amount
15 Days 50% of Total Base or Option
90 Days 35% of Total Base or Option
180 Days 15% of Total Base or Option https://www.navysbirprogram.com/navydeliverables/
NAVY - 11
Transfer Between SBIR and STTR Programs. Section 4(b)(1)(i) of the SBIR and STTR Policy
Directive provides that, at the agency’s discretion, projects awarded a Phase I under a BAA for SBIR may transition in Phase II to STTR and vice versa.
PHASE II GUIDELINES
Evaluation and Selection. All Phase I awardees may submit an Initial Phase II proposal for evaluation and selection. The evaluation criteria for Phase II is the same as Phase I (as stated in the BAA). The
Phase I Final Report and Initial Phase II Proposal will be used to evaluate the SBC’s potential to progress to a workable prototype in Phase II and transition the technology to Phase III. Details on the due date, content, and submission requirements of the Initial Phase II Proposal will be provided by the awarding
Command either in the Phase I contract or by subsequent notification.
Awards. The DON will consider the following for Phase II award: Cost Plus Fixed Fee (CPFF), Firm
Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other Transaction (OT). Phase II awards can be structured in a way that allows for increased funding levels based on the project’s transition potential. To accelerate the transition of SBIR/STTR-funded technologies to Phase III, especially those that lead to Programs of Record and fielded systems, the Commercialization Readiness
Program was authorized and created as part of section 5122 of the National Defense Authorization Act of
Fiscal Year 2012. The statute set-aside is 1% of the available SBIR/STTR funding to be used for administrative support to accelerate transition of SBIR/STTR-developed technologies and provide non-financial resources for the SBCs (e.g., the Navy SBIR Transition Program, STP).
Navy SBIR Transition Program (STP). Phase II awardees have the opportunity to participate in the virtual Navy STP Kickoff during the first or second year of the Phase II contract. While there are no travel costs associated with this virtual event, Phase II awardees should budget time of up to a full day to participate. STP information can be obtained at: https://navystp.com. Phase II awardees will be contacted separately regarding this program.
PHASE III GUIDELINES
A Phase III SBIR/STTR award is any work that derives from, extends, or completes effort(s) performed under prior SBIR/STTR funding agreements, but is funded by sources other than the SBIR/STTR programs. This covers any contract, grant, or agreement issued as a follow-on Phase III award or any contract, grant, or agreement award issued as a result of a competitive process where the awardee was an
SBIR/STTR firm that developed the technology as a result of a Phase I or Phase II award. The DON will give Phase III status to any award that falls within the above-mentioned description. Consequently, DON will assign SBIR/STTR Data Rights to any noncommercial technical data and noncommercial computer software delivered in Phase III that were developed under SBIR/STTR Phase I/II effort(s). Government prime contractors and their subcontractors must follow the same guidelines as above and ensure that companies operating on behalf of the DON protect the rights of the SBIR/STTR firm.
https://navystp.com/
NAVY - 12
NAVY STTR DOW 2027 BAA
Topic Index
Release 2
DON27TZ02-NV001 Co-Packaged Optics (CPO) for Advanced Cryocooled Electro-Optical/Infrared
(EO/IR) Sensors
DON27TZ02-NV002 Field-Friendly Super Intelligence and Machine Learning Systems
DON27TZ02-NV003 Growth and Production of As2S3 Waveguides
DON27TZ02-NV004 Validated Modular Autonomy for Undersea Multi-Vehicle Coordination
DON27TZ02-NV005 Self-Sustaining Wave Energy Capture for Persistent Autonomous Ocean-Going
Systems
DON27TZ02-NV006 Compact Unmanned Aerial System for Marine Species Monitoring
DON27TZ02-NV007 Multi-Modal Luminescent Paint Systems for Underwater Surface Diagnostics
DON27TZ02-NV008 Membranes for Separation, Purification, Compression, and Storage of Carbon
Resources from Alkaline Water
DON27TZ02-NV009 Domestic Manufacturing of Large Area Raman Laser Materials
DON27TZ02-NV010 Persistent, Geochemically-Driven Low-Temperature Power Systems for Subsea
Intelligence, Surveillance, and Reconnaissance
DON27TZ02-NV011 Heterogenous Swarm Control through Super Intelligence-embodied Architecture
DON27TZ02-NV012 Mission-Specialized Large Language Models for Operational Training and
Knowledge Integration
DON27TZ02-NV013 Computational Frameworks for the Development and Qualification of Additive
Manufacturing-Tailored Wire Feedstock for Naval Directed Energy Deposition
DON27TZ02-NV014 Conformal Printed Antennas for Missile and Weapon Composite Airframes
DON27TZ02-NV015 Photonic-Crystal Surface Emitting Lasers (PCSELS) in the Near-Infrared (NIR)
NAVY - 13
DON27TZ02-NV001 TITLE: Co-Packaged Optics (CPO) for Advanced Cryocooled Electro-
Optical/Infrared (EO/IR) Sensors
OUSW (R&E) CRITICAL TECHNOLOGY AREA(S): Quantum and Battlefield Information Dominance
(Q-BID)
COMPONENT TECHNOLOGY PRIORITY AREA(S): Integrated Sensing and Cyber;Microelectronics
PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)
OBJECTIVE: Develop and demonstrate innovative Co-Packaged Optics (CPO) architectures and integration techniques for advanced cryocooled Electro-Optical/Infrared (EO/IR) sensor systems that significantly reduce the number of electrical wirebonds, increase bandwidth density, and withstand rugged maritime environments for deployment in advanced sensing and tactical edge computing platforms.
DESCRIPTION: Current Department of the Navy (DON) platforms are generating unprecedented volumes of data via advanced radar, SIGINT, and high-resolution imaging sensors. Processing of this data at the tactical edge requires extreme bandwidth but can consume excessive powers, creating significant thermal and signal integrity bottlenecks [Ref 1]. Specifically, for advanced EO/IR sensors that operate in cryocooled temperatures (e.g., 70-140K), the excessive power required to electrically read out the data, i.e., transmit from cold space and receive in warm space, presents a challenging limitation on the size, weight, and power (SWaP) of an integrated dewar cooler assembly. Fiber optics and photonic integrated circuits (PICs) are key optical readout technologies that can offer extreme bandwidth, low power consumption, and mature fabrication but require integrated packaging solutions for next generation DON systems [Ref 2].
CPO offers an integrated solution that considers both optical and electrical elements in EO/IR sensor design, optimizing performance, reliability, and manufacturability. CPO brings the optical transceiver components directly into the same package as the readout integrated circuit (ROIC). This minimizes the electrical channel length or completely eliminates it with photonic interconnects, fundamentally lowering power consumption (energy per bit) and enabling massive bandwidth scaling [Refs 1-4]. To date, commercial CPO solutions are primarily designed for room temperature, climate-controlled hyperscale SI data centers.
This STTR topic seeks to adapt and innovate current CPO technologies for the stringent Size, Weight, Power, and Cost (SWaP-C) and packaging (cryogenically cooled) constraints of advanced Navy EO/IR sensing platforms. The focus of the topic is on the design and development of a CPO architecture that integrates with the ROIC layer of a typical EO/IR sensor chip assembly, enables high-bandwidth cold to warm readout, and operates in cryocooled temperatures.
Proposals must address critical challenges, including:
1. ROIC compatibility: PIC interconnect architecture that is compatible with conventional analog and mixed-signal digital ROICs designed in <180 nm node foundries, optimal number of fiber outputs to meet total ROIC bandwidth.
2. Thermal Management: Dissipating heat effectively when dense photonics and ROICs are co-located in a cryocooled integrated dewar assembly. Minimize PIC power consumption to less than 20 mW.
3. Power Efficiency: Choice of electrical-optical conversion scheme and minimizing power consumption (e.g., half-wave voltage for EO modulators, Vpi), PIC waveguide propagation loss, PIC to fiber input/output coupling losses, and stray light scatter.
NAVY - 14
4. Integration & Packaging: Complementary metal–oxide–semiconductor (CMOS)-compatible substrate materials, 2.5D/3D integration techniques, and cost-effective scalable manufacturing processes.
PHASE I: Conduct a feasibility study for a conceptual design of a CPO architecture with full transceiver functionality that addresses the four critical challenges and is tailored for a SWaP-constrained Navy maritime EO/IR sensor system.
• Deliverables: Perform architectural modeling, signal integrity simulations, and thermal/mechanical modeling.
• Metrics: Define target performance metrics, such as energy efficiency (e.g., < 10 fJ/bit), bandwidth (e.g., > 1 Tbps), coupling loss (e.g., < 0.5 dB/fiber connection) and estimated mean time between failures (MTBF) under standard military environmental conditions (e.g., MIL-STD-
810H). Prepare a
• Outcome: A comprehensive Phase II development plan that identifies the PIC foundry and packaging facility, including preliminary packaging designs and a proof-of-concept simulation report.
PHASE II: Develop, fabricate, and demonstrate a working CPO prototype based on the Phase I design.
Ensure that the
• Deliverables: The prototype shows compatibility with a notional sensor ROIC (i.e., greater than or equal to 640 x 480 Video Graphics Array (VGA) format and less than or equal to 10 um pitch).
(Note: The ROIC digital signals can be emulated using a pseudo-random number generator
(PRNG).) Demonstrate that the prototype is capable of cryocooled operation with full transceiver functionality, i.e., efficient electrical-optical conversion and transmission from cold space, data transfer through optical fiber, and optical-electrical conversion in warm space.
• Testing: Conduct laboratory testing in a relevant cryogenic environment (70-140K) to validate bandwidth, power/energy efficiency, coupling loss, and bit-error-rate (BER) for the entire transceiver operation. Perform preliminary environmental testing (thermal cycling, vibration) to prove the viability of the optical attachment and packaging under stress.
• Outcome: Deliver the prototype device, test reports, and a Phase III transition plan for integrating the technology into a specific DON system or sensor suite.
PHASE III DUAL USE APPLICATIONS: Transition to Navy maritime sensing program of record and commercial sensing applications.
• DON/DoW Application: Transition the ruggedized CPO technology to military Prime Contractors for integration into maritime Infrared Search and Track (IRST) and airborne Intelligence, Surveillance, and Reconnaissance (ISR) platforms, and mobile command centers requiring high-performance computing (HPC) at the edge.
• Commercial Application: Transition the technology to commercial markets, specifically targeting telecom infrastructure, hyperscale data centers, and Super Intelligence/Machine Learning
(SI/ML) compute clusters where thermal efficiency and bandwidth density are highly valued.
REFERENCES:
1. Yi, Y. and Yu, B. "3D Optoelectronics and Co-Packaged Optics: Innovations, Challenges, and
Future Trends." IEEE Journal of Selected Topics in Quantum Electronics, vol. 32, no. 2: 3-D
Horizons in Photonics: Integrated Circuits, March-April 2026, Art no. 3700515, pp. 1-15.
https://doi.org/10.1109/JSTQE.2025.3641790
2. Estrella, S. B. et al. "Cryogenic optical interconnects for infrared sensing applications." 2022
IEEE Research and Applications of Photonics in Defense Conference (RAPID), 2022.
https://doi.org/10.1109/RAPID56086.2022.9911270
NAVY - 15
3. Chen, G.; Wang, G.; Wang, Z. and Wang, L. “Electronic Chip Package and Co-Packaged Optics
(CPO) Technology for Modern AI Era: A Review.” Micromachines 2025, 16, 431.
https://doi.org/10.3390/mi16040431
4. Tian, W.; Hou, H.; Dang, H.; Cao, X.; Li, D.; Chen, S. and Ma, B. “Progress in Research on Co-
Packaged Optics.” Micromachines 2024, 15, 1211. https://doi.org/10.3390/mi15101211
KEYWORDS: Co-packaged optics; CPO; silicon photonics; interconnects; read out integrated circuit;
ROIC; sensors; Electro-Optical/Infrared; EO/IR
NAVY - 16
DON27TZ02-NV002 TITLE: Field-Friendly Super Intelligence and Machine Learning Systems
OUSW (R&E) CRITICAL TECHNOLOGY AREA(S): Applied Super Intelligence (ASI)
COMPONENT TECHNOLOGY PRIORITY AREA(S): Trusted AI and Autonomy
OBJECTIVE: Develop an Super Intelligence/Machine Learning (SI/ML) method that achieves the high-performance accuracy of modern Deep Neural Networks (DNNs) while mitigating their limitations.
DESCRIPTION: Current DNN architectures suffer from inherent "Black Box" vulnerabilities, demanding massive computational scaling and offering no clear link between parameter count and performance. The proposed model must address these shortfalls:
- Optimized Resource Utilization: Unlike DNNs that heuristically overparameterize to boost accuracy, the proposed model must quantitatively map parameter count to expected performance and enable users to identify the minimum configuration required for mission success, significantly reducing computational overhead, complexity, and deployment costs.
- Transparency: The model must replace opaque, distributed neural layers with novel methods for interpretability and trust that go beyond the current post-hoc techniques. By making input-output logic similar to standard programming code, the model should ensure decisions are easily explainable, verifiable, and compliant with auditing standards.
- Reliability: The model must recognize whether it can provide a reliable output for a given problem instance, which will address another well-known criticism of DNNs wherein performance is typically measured as an average, e.g., average accuracy, over many instances of a problem and will help build user trust and acceptability of the model vs DNNs, particularly in sensitive areas like person identification in a crowd video and identifying the source of a cyber-security violation.
The model must deliver DNN-level performance with superior speed and a reduced memory footprint, optimized for lean, secure processing on low-cost CPU and embedded edge hardware. By eliminating cloud-dependence, the model will maximize data privacy and operational security while substantially reducing power consumption compared to GPU-reliant models. It must operate flexibly across mixed
CPU-GPU environments, allowing operators to dynamically balance throughput against computational cost. Beyond standard convolutional neural networks (CNNs), the model’s architecture must be extensible to transformer-based and multimodal models handling text, image, and video.
The metrics below establish outer-edge targets specifically for CNN-based image classification. While satisfying every metric is not mandatory, the model will be evaluated on the number of targets achieved and the viability of the engineering trade-offs.
1. Comparison with Base Architecture of ResNet-18 and larger
2. Comparison of the Number of Classes 10 and 100 using 3 datasets: MNIST, CIFAR-10 and
CIFAR-100, having different combinations of numbers of classes and total number of image pixels (number of channels*number of pixels per image)
3. Mean Average Accuracy of Classification: Same as DNNs or higher
4. Number of Parameters (Fraction of Base Architecture): 50% of DNNs or less
5. Training MFLOPs/Image (Fraction of Base Architecture): 50% of DNNs or less
6. Training Memory Size (Fraction of Base Architecture): 50% of DNNs or less
7. Inference MFLOPs/Image: 50% of DNNs or less
8. Rate of Growth of Metrics (5), (6), and (7): Sublinear
NAVY - 17
In Phase II, similar metrics and their extensibility and relevance to transformers and multimodality scenarios (images and videos as well as their combinations with text to form LLMs and VLMs) will need to be provided and their implementation explained.
This STTR topic requires combinations of research and development, and proposers must demonstrate a strong partnership between the small business and a research institution.
The proposed solution should eliminate the dependency on complex computing infrastructure (e.g., GPUs) by delivering comparable performance on standard off-the-shelf hardware (CPUs, edge devices).
It should optimize the cost-to-performance ratio, balancing accuracy with reductions in time, storage, and computational cost. Furthermore, the architecture should ensure robust explainability—like conventional software programs—and provide reliable confidence metrics to establish user trust. At a minimum, the method should result in the development of an alternative to existing CNN-based architectures for image classification.
The many problems with the modern SI/ML architectures and models mentioned earlier are well recognized and reported. Many researchers and companies are currently attempting to address these shortcomings, including a number of startups.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .