NAVY_SBIR_27BZ_PH I_R1_v2.pdf
PDF 313 KB Posted
- Solicitation number
- DON27BZ01-NV004
About this file
This document is the Department of the Navy's Phase I Proposal Submission Instructions for the DoW 2027 Small Business Innovation Research (SBIR) Broad Agency Announcement (BAA), Release 1, applicable to three Navy topics: DON27BZ01-NV001, DON27BZ01-NV002, and DON27BZ01-NV004. The instructions establish detailed requirements for small business concerns (SBCs) submitting Phase I proposals through the DoW SBIR/STTR Innovation Portal (DSIP), with proposals evaluated on technical merit (most important), key personnel qualifications, and commercialization potential. Phase I awards are limited to a base amount not exceeding $200,000 and an option amount not exceeding $115,000, with both the base and option requiring exactly six months of work. SBCs must perform a minimum of two-thirds of the work (measured by direct and indirect costs) in both the base and option phases, with cost sharing not accepted. Proposals must include seven volumes: a cover sheet, a technical proposal (maximum 10 pages in single-column format with 10-point minimum font), a cost volume with separated base and option costs, a company commercialization report, supporting documents, fraud/waste/abuse training certification, and foreign affiliations disclosures. Proposing SBCs may request discretionary technical and business assistance (TABA) funding up to $6,500 in Phase I, and those more than 50% owned by venture capital operating companies, hedge funds, or private equity firms must register with the SBA and submit required certifications.
The BAA includes three active research topics addressing Navy sustainment and technology priorities: DON27BZ01-NV001 seeks a technology to clean fouled Time Domain Reflectometer tank level indicators in-place aboard DDG 51 class ships without depressurization or defueling (CMMC Level 2 required); DON27BZ01-NV002 seeks development of fire-resistant joiner bulkheads meeting Navy weight, fit, cost, and fire/smoke/toxicity standards per MIL-STD-3020 and MIL-STD-1623 (Advanced Materials and Sustainment priority); and DON27BZ01-NV004, restricted under ITAR/EAR, seeks a dust-protected, water splash-resistant Input-Output Unit (IOU) for secure processing and routing of hull, mechanical, electrical, and navigation signals, with specific enclosure specifications (maximum 188 pounds, 26" width, 27" height, 17" depth), power and cooling requirements per MIL-STD-1399, and networking standards including IPv4/IPv6 and Parallel Redundancy Protocol compliance. Proposal submission closes at the official BAA close date, with notifications sent approximately one week after closing. Phase I awards may be structured as Firm Fixed Price (FFP), Basic Ordering Agreements (BOA), or Prototype Other Transactions (OT), with potential Phase II awards structured as Cost Plus Fixed Fee (CPFF), FFP, BOA, or Prototype OT. All awarded SBCs must maintain active System for Award Management (SAM) registration and comply with NIST SP 800-171 requirements prior to award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DON27BZ01-NV004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 2
NAVY - 1
DEPARTMENT OF THE NAVY (DON)
DoW 2027 Small Business Innovation Research (SBIR) BAA
Release 1
Phase I
Proposal Submission Instructions
IMPORTANT
• The following instructions apply to topics:
o DON27BZ01-NV001, DON27BZ01-NV002, and DON27BZ01-NV004
• Submitting small business concerns (SBCs) are encouraged to thoroughly review the DoW
SBIR/STTR Program Broad Agency Announcement (BAA) and register for the DSIP Listserv to remain apprised of important programmatic changes.
o The DoW Program BAA is located at: https://www.dodsbirsttr.mil/submissions/login.
o Register for the DSIP Listserv at: https://www.dodsbirsttr.mil/submissions/login.
• The information provided in the DON Proposal Submission Instructions takes precedence over the DoW Instructions posted for this BAA.
• DoW has established proposal limitations on a per-topic basis. SBCs may submit only one
(1) proposal in response to a single topic. Please review the DoW SBIR/STTR Program
BAA for further information.
• DON Phase I Technical Volume (Volume 2) page limit is not to exceed 10 pages.
• Proposing SBCs that are more than 50% owned by multiple venture capital operating companies (VCOC), hedge funds (HF), private equity firms (PEF) or any combination of these are eligible to submit proposals in response to DON topics advertised in this BAA. Information on Majority Ownership in Part and certification requirements at time of submission for these proposing SBCs are detailed in the section titled ADDITIONAL SUBMISSION
CONSIDERATIONS.
• Phase I Technical Volume (Volume 2) and Supporting Documents (Volume 5) templates, specific to DON topics, are available at https://www.navysbir.com/links_forms.htm.
• The DON may consider the following FAR and Non-FAR contract strategies when issuing
Phase I awards: Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other
Transaction (OT). The DON may consider the following FAR and Non-FAR contracting strategies when issuing Phase II awards: Cost Plus Fixed Fee (CPFF), FFP, BOA, or Prototype
OT.
• This BAA is issued under regulations set forth in Federal Acquisition Regulation (FAR) 35.016 and awards will be made under “other competitive procedures”. The policies and procedures of
FAR Subpart 15.3 shall not apply to this BAA, except as specifically referenced in it. All procedures are at the sole discretion of the Government as set forth in this BAA. Submission of a proposal in response to this BAA constitutes the express acknowledgement to that effect by the proposing SBC.
https://www.dodsbirsttr.mil/submissions/login https://www.dodsbirsttr.mil/submissions/login https://www.navysbir.com/links_forms.htm
NAVY - 2
INTRODUCTION
The DON SBIR/STTR Programs are mission-oriented programs that integrate the needs and requirements of the DON’s Fleet through research and development (R&D) topics that have dual-use potential, but primarily address the needs of the DON. More information on the programs can be found on the DON
SBIR/STTR website at www.navysbir.com. Additional information on DON’s mission can be found on the DON website at www.navy.mil.
For questions regarding this BAA, use the information in Table 1 to determine who to contact for what types of questions.
TABLE 1: POINTS OF CONTACT FOR QUESTIONS REGARDING THIS BAA
Type of Question When Contact Information
Program and administrative Always Navy SBIR/STTR Program Management Office usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil or appropriate Program
Manager listed in Table 2 (below)
Topic-specific technical questions
BAA Pre-release Technical Point of Contact (TPOC) listed in each topic on the DoW SBIR/STTR Innovation Portal
(DSIP). Refer to the Proposal Submission section of the DoW SBIR/STTR Program BAA for details.
BAA Open DoW SBIR/STTR Topic Q&A platform
(https://www.dodsbirsttr.mil/submissions)
Refer to the Proposal Submission section of the
DoW SBIR/STTR Program BAA for details.
Electronic submission to the
DoW SBIR/STTR
Innovation Portal (DSIP)
Always DSIP Support via email at dodsbirsupport@reisystems.com
Navy-specific BAA instructions and forms
Always DON SBIR/STTR Program Management Office usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil
TABLE 2: DON SYSTEMS COMMANDS (SYSCOM) SBIR PROGRAM MANAGERS
Topic
Numbers
Point of Contact SYSCOM Email
DON27BZ01-
NV001 to
DON27BZ01-
NV004
Mr. Jacob Mcelhaney
Naval Sea Systems
Command
(NAVSEA)
NSSC_SBIR.fct@navy.mil http://www.navysbir.com/ http://www.navy.mil/ mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil https://www.dodsbirsttr.mil/submissions mailto:dodsbirsupport@reisystems.com mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil mailto:NSSC_SBIR.fct@navy.mil
NAVY - 3
PHASE I SUBMISSION INSTRUCTIONS
The following section details requirements for submitting a compliant Phase I proposal to the DoW
SBIR/STTR Programs.
(NOTE: Proposing SBCs are advised that support contract personnel will be used to carry out administrative functions and may have access to proposals, contract award documents, contract deliverables, and reports. All support contract personnel are bound by appropriate non-disclosure agreements.)
DoW SBIR/STTR Innovation Portal (DSIP). Proposing SBCs are required to submit proposals via the
DoW SBIR/STTR Innovation Portal (DSIP); and follow proposal submission instructions in the DoW
SBIR/STTR Program BAA on the DSIP at https://www.dodsbirsttr.mil/submissions. Proposals submitted by any other means will be disregarded. Proposing SBCs submitting through DSIP for the first time will be asked to register. It is recommended that SBCs register as soon as possible upon identification of a proposal opportunity to avoid delays in the proposal submission process. Proposals that are not successfully certified electronically in DSIP by the Corporate Official prior to BAA Close will NOT be considered submitted and will not be evaluated by DON. Proposals that are encrypted, password protected, or otherwise locked in any portion of the submission will be REJECTED unless specifically directed within the text of the topic to which you are submitting. Please refer to the DoW SBIR/STTR
Program BAA for further information.
Proposal Volumes. The following seven volumes are required.
• Proposal Cover Sheet (Volume 1). As specified in DoW SBIR/STTR Program BAA.
• Technical Proposal (Volume 2) o Technical Proposal (Volume 2) must meet the following requirements or the proposal will be
REJECTED:
⎯ Not to exceed ten (10) pages, regardless of page content
⎯ Single column format, single-spaced typed lines
⎯ Standard 8 ½” x 11” paper
⎯ Page margins one inch on all sides. A header and footer may be included in the one-inch margin.
⎯ No font size smaller than 10-point
⎯ Include, within the ten-page limit of Volume 2, an Option that furthers the effort in preparation for Phase II and will bridge the funding gap between the end of Phase I and the start of Phase II. Tasks for both the Phase I Base and the Phase I Option must be clearly identified. Phase I Options are exercised upon selection for Phase II.
⎯ Work proposed for the Phase I Base must be exactly six (6) months.
⎯ Work proposed for the Phase I Option must be exactly six (6) months.
o Additional information:
⎯ A Phase I proposal template specific to DON to meet Phase I requirements is available at https://navysbir.com/links_forms.htm
⎯ A font size smaller than 10-point is allowable for headers, footers, imbedded tables, figures, images, or graphics that include text. However, proposing SBCs are cautioned that if the text is too small to be legible it will not be evaluated.
https://www.dodsbirsttr.mil/submissions https://navysbir.com/links_forms.htm
NAVY - 4
• Cost Volume (Volume 3).
o Cost Volume (Volume 3) must meet the following requirements or the proposal will be
REJECTED:
⎯ The Phase I Base amount must not exceed $200,000.
⎯ Phase I Option amount must not exceed $115,000.
⎯ Costs for the Base and Option must be separated and clearly identified in Volume 3.
⎯ For Phase I, a minimum of two-thirds of the work is performed by the proposing SBC. The two-thirds percentage of work requirement must be met in the Base costs as well as in the
Option costs. DON will not accept deviations from the minimum percentage of work requirements for Phase I. The percentage of work is measured by both direct and indirect costs. To calculate the minimum percentage of work for the proposing SBC the sum of all direct and indirect costs attributable to the proposing SBC represent the numerator and the total cost of the proposal (i.e., Total Cost before Profit Rate is applied) is the denominator.
The subcontractor percentage is calculated by taking the sum of all costs attributable to the subcontractor (Total Subcontractor Costs (TSC)) as the numerator and the total cost of the proposal (i.e., Total Cost before Profit Rate is applied) as the denominator.
⧠ Proposing SBC Costs (included in numerator for calculation of the SBC):
⎯ Total Direct Labor (TDL)
⎯ Total Direct Material Costs (TDM)
⎯ Total Direct Supplies Costs (TDS)
⎯ Total Direct Equipment Costs (TDE)
⎯ Total Direct Travel Costs (TDT)
⎯ Total Other Direct Costs (TODC)
⎯ General & Administrative Cost (G&A)
NOTE: G&A, if proposed, will only be attributed to the proposing SBC.
⧠ Subcontractor Costs (numerator for subcontractor calculation):
⎯ Total Subcontractor Costs (TSC)
⧠ Total Cost (i.e., Total Cost before Profit Rate is applied, denominator for either calculation)
⎯ Cost Sharing: Cost sharing is not accepted on DON Phase I proposals. A value above or below $0.00 entered in the Cost Sharing field will not be considered in the Phase I contract award.
⎯ Provide sufficient detail for subcontractor, material, and travel costs. Subcontractor costs must be detailed to the same level as the prime contractor. Material costs must include a listing of items and cost per item. Travel costs must include the purpose of the trip, number of trips, location, length of trip, and number of personnel.
⎯ Inclusion of cost estimates for travel to the sponsoring SYSCOM’s facility for one day of meetings is recommended for all proposals.
⎯ The “Additional Cost Information” of Supporting Documents (Volume 5) may be used to provide supporting cost details for Volume 3. When a proposal is selected for award, be prepared to submit further documentation to the SYSCOM Contracting Officer to substantiate costs (e.g., an explanation of cost estimates for equipment, materials, and consultants or subcontractors).
• Company Commercialization Report (Volume 4). DoW collects and uses Volume 4 and DSIP requires Volume 4 for proposal submission. Please refer to the Proposal Preparation Instructions and
Requirements section of the DoW SBIR/STTR Program BAA for details to ensure compliance with
DSIP Volume 4 requirements.
NAVY - 5
• Supporting Documents (Volume 5). Volume 5 is for the submission of administrative material that
DON may or will require to process a proposal, if selected, for contract award.
o Proposing SBCs must review and submit the following items, as applicable:
⎯ Majority Ownership in Part. Proposing SBCs that are more than 50% owned by multiple venture capital operating companies (VCOC), hedge funds (HF), private equity firms (PEF), or any combination of these as set forth in 13 C.F.R. § 121.702, are eligible to submit proposals in response to DON topics advertised within this BAA. Complete the certification as detailed under ADDITIONAL SUBMISSION CONSIDERATIONS.
⎯ Proposing SBCs may include the following administrative materials in Supporting
Documents (Volume 5); a template is available at https://navysbir.com/links_forms.htm to provide guidance on optional material the proposing SBC may want to include in Volume 5:
o Additional Cost Information to support the Cost Volume (Volume 3) o SBIR/STTR Funding Agreement Certification o Data Rights Assertion o Disclosure of Information (DFARS 252.204-7000) o Prior, Current, or Pending Support of Similar Proposals or Awards o Foreign Citizens
⎯ Details of Request for Discretionary Technical and Business Assistance (TABA), if proposed, is to be included under the Additional Cost Information section if using the DON Supporting
Documents template.
⎯ Do not include documents or information to substantiate the Technical Volume (Volume 2) in
Volume 5 (e.g., resumes, test data, technical reports, or publications). Such documents or information will not be considered.
⎯ A font size smaller than 10-point is allowable for documents in Volume 5; however, proposing SBCs are cautioned that the text may be unreadable.
• Fraud, Waste and Abuse Training (Volume 6). DoW requires Volume 6 for submission. Please refer to the Proposal Preparation Instructions and Requirements section of the DoW SBIR/STTR
Program BAA for details.
• Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7). In accordance with 15 U.S.C. §638(vv) and the SBA SBIR/STTR Policy Directive, the DoW will review all proposals submitted in response to this BAA to assess security risks presented by SBCs seeking a
Federally funded award. SBCs must complete the Disclosures of Foreign Affiliations or Relationships to Foreign Countries webform in Volume 7 of the DSIP proposal submission. Please refer to the
Proposal Preparation Instructions and Requirements section of the DoW SBIR/STTR Program BAA for details.
PHASE I EVALUATION AND SELECTION
The following section details how the DON SBIR/STTR Programs will evaluate Phase I proposals.
Proposals meeting DSIP submission requirements will be forwarded to the DON SBIR/STTR Programs.
Prior to evaluation, all proposals will undergo a compliance review to verify compliance with DoW and
DON SBIR/STTR proposal eligibility requirements. Proposals not meeting submission requirements will be REJECTED and not evaluated.
NAVY - 6
• Proposal Cover Sheet (Volume 1). The Proposal Cover Sheet (Volume 1) will undergo a compliance review to verify the proposing SBC has met eligibility requirements and followed the instructions for the Proposal Cover Sheet as specified in the DoW SBIR/STTR Program BAA.
• Technical Volume (Volume 2). The DON will evaluate and select Phase I proposals using the evaluation criteria specified in the Method of Selection and Evaluation Criteria section of the DoW
SBIR/STTR Program BAA, with technical merit being most important, followed by qualifications of key personnel and commercialization potential of equal importance. The information considered for this decision will come from Volume 2. This is not a FAR Part 15 evaluation and proposals will not be compared to one another. Cost is not an evaluation criterion and will not be considered during the evaluation process; the DON will only do a compliance review of Volume 3. Due to limited funding, the DON reserves the right to limit the number of awards under any topic.
The Technical Volume (Volume 2) will undergo a compliance review (prior to evaluation) to verify the proposing SBC has met the following requirements or the proposal will be REJECTED:
⎯ Not to exceed ten (10) pages, regardless of page content
⎯ Single column format, single-spaced typed lines
⎯ Standard 8 ½” x 11” paper
⎯ Page margins one inch on all sides. A header and footer may be included in the one-inch margin.
⎯ No font size smaller than 10-point, except as permitted in the instructions above.
⎯ Include, within the 10-page limit of Volume 2, an Option that furthers the effort in preparation for Phase II and will bridge the funding gap between the end of Phase I and the start of Phase II. Tasks for both the Phase I Base and the Phase I Option must be clearly identified.
⎯ Work proposed for the Phase I Base must be exactly six (6) months.
⎯ Work proposed for the Phase I Option must be exactly six (6) months.
• Cost Volume (Volume 3). The Cost Volume (Volume 3) will not be considered in the selection process and will only undergo a compliance review to verify the proposing SBC has met the following requirements or the proposal will be REJECTED:
⎯ Must not exceed values for the Base ($200,000) and Option ($115,000).
⎯ Must meet minimum percentage of work; a minimum of two-thirds of the work is performed by the proposing SBC. The two-thirds percentage of work requirement must be met in the
Base costs as well as in the Option costs. DON will not accept deviations from the minimum percentage of work requirements for Phase I.
⎯ Cost Sharing: Cost sharing is not accepted on DON Phase I proposals. A value above or below $0.00 entered in the Cost Sharing field will not be considered in the Phase I contract award.
• Company Commercialization Report (CCR) (Volume 4). The CCR (Volume 4) will not be evaluated by the DON nor will it be considered in the award decision. However, all proposing SBCs must refer to the DoW SBIR/STTR Program BAA to ensure compliance with DSIP Volume 4 requirements.
• Supporting Documents (Volume 5). Supporting Documents (Volume 5) will not be considered in the selection process and will only undergo a compliance review to ensure the proposing SBC has included items in accordance with the PHASE I SUBMISSION INSTRUCTIONS section above.
NAVY - 7
• Fraud, Waste, and Abuse Training Certificate (Volume 6). Not evaluated.
• Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7).
Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7) will be assessed as part of the Foreign Risk Evaluation Program to Assess Security Risks. Refer to the DoW
SBIR/STTR Program BAA to ensure compliance with Volume 7 requirements.
ADDITIONAL SUBMISSION CONSIDERATIONS
This section details additional items for proposing SBCs to consider during proposal preparation and submission process.
Foreign Risk Evaluation (FRE) Program to Assess Security Risks. 15 U.S.C. §638(vv) requires the
Department of War, in coordination with the Small Business Administration, to establish and implement a due diligence program, known as Foreign Risk Evaluation (FRE) Program, to assess and, when possible, mitigate security risks presented by SBCs seeking a Federally-funded award. Please review the
Certifications and Registrations section of the DoW SBIR/STTR Program BAA for details on how DoW will assess security risks presented by SBCs. The FRE Program to Assess Security Risks will be implemented for all Phases.
Discretionary Technical and Business Assistance (TABA). The Small Business Innovation and
Economic Security Act Section 7 mandates agencies offer TABA. The purpose of TABA is to assist awardees in making better technical decisions on SBIR/STTR projects; solving technical problems that arise during SBIR/STTR projects; minimizing technical risks associated with SBIR/STTR projects;
commercializing the SBIR/STTR product or process, including intellectual property protections and cybersecurity assistance; and screening for potential foreign involvement in technology development or commercialization activities. TABA services can be provided through vendor(s) selected by the SBC or the SBC may propose use of TABA funding to hire new staff, augment staff, or direct staff to conduct or participate in training activities consistent with the purpose of TABA as detailed above. The Phase I
TABA amount, if proposed, cannot include any profit/fee by the proposing SBC and must be inclusive of all applicable indirect costs. TABA cannot be used in the calculation of general and administrative expenses (G&A) for the SBIR proposing SBC. An SBC receiving TABA will be required to submit a report detailing the results and benefits of the service received. This TABA report will be due at the time of submission of the final report.
Request for TABA funding will be reviewed by the DON SBIR/STTR Program Management Office.
If proposing a TABA Provider, the following MUST be included in the request or be subject to denial.
• Provider(s)
• Provider(s) point of contact, email address, and phone number
• An explanation of the provider’s unique qualifications to provide the TABA service
• Tasks that will be performed by the provider (to include the purpose and objective of the assistance)
• Total provider(s) cost, number of hours, and labor rates (average/blended rate is acceptable)
If proposing TABA funding to hire new staff, augment staff, or direct staff to conduct or participate in training activities consistent with the purpose of TABA, the following MUST be included or be subject to denial.
• Name(s), position(s), business need to be filled, and/or training to be provided
• Number of employees to be hired, augmented, or directed to participate in training activities
• Qualifications of employees hired or augmented, or detailed need for training
• Tasks that will be performed (to include the purpose and objective of the assistance)
NAVY - 8
• Total staff/training cost, number of hours, and labor rates (average/blended rate is acceptable)
TABA requests must be included in the proposal as follows:
• Phase I:
⎯ Online DoW Cost Volume (Volume 3) – the value of the TABA request.
⎯ Supporting Documents (Volume 5) – a detailed request for TABA (as specified above) specifically identified as “TABA” in the section titled Additional Cost Information when using the DON Supporting Documents template.
• Phase II:
⎯ DON Phase II Cost Volume (provided by the DON SYSCOM) - the value of the TABA request.
⎯ Supporting Documents (Volume 5) – a detailed request for TABA (as specified above) specifically identified as “TABA” in the section titled Additional Cost Information when using the DON Supporting Documents template.
Proposed values for TABA must NOT exceed:
• Phase I: A total of $6,500, in addition to the Phase I award amount.
• Phase II: A total of $25,000 per award, not to exceed $50,000 per Phase II project, included in the
Phase II award amount.
Disclosure of Information (DFARS 252.204-7000). In order to eliminate the requirements for prior approval of public disclosure of information (in accordance with DFARS 252.204-7000) under this award, the proposing SBC shall identify and describe all fundamental research to be performed under its proposal, including subcontracted work, with sufficient specificity to demonstrate that the work qualifies as fundamental research. Fundamental research means basic and applied research in science and engineering, the results of which ordinarily are published and shared broadly within the scientific community, as distinguished from proprietary research and from industrial development, design, production, and product utilization, the results of which ordinarily are restricted for proprietary or national security reasons (defined by National Security Decision Directive 189). An SBC whose proposed work will include fundamental research and requests to eliminate the requirement for prior approval of public disclosure of information must complete the DON Fundamental Research Disclosure and upload as a separate PDF file to the Supporting Documents (Volume 5) in DSIP as part of their proposal submission.
The DON Fundamental Research Disclosure is available on https://navysbir.com/links_forms.htm and includes instructions on how to complete and upload the completed Disclosure. Simply identifying fundamental research in the Disclosure does NOT constitute acceptance of the exclusion. All exclusions will be reviewed and, if approved by the Government Contracting Officer, noted in the contract.
Majority Ownership in Part. Proposing SBCs that are more than 50% owned by multiple venture capital operating companies (VCOC), hedge funds (HF), private equity firms (PEF), or any combination of these as set forth in 13 C.F.R. § 121.702, are eligible to submit proposals in response to DON topics advertised within this BAA.
For proposing SBCs that are a member of this ownership class the following must be satisfied for proposals to be accepted and evaluated:
a. Prior to submitting a proposal, SBCs must register with the SBA Company Registry Database.
b. The proposing SBC within its submission must submit the Majority-Owned VCOC, HF, and PEF
Certification. A copy of the SBIR VC Certification can be found on https://navysbir.com/links_forms.htm. Include the SBIR VC Certification in the Supporting
Documents (Volume 5).
c. Should a proposing SBC become a member of this ownership class after submitting its proposal and prior to any receipt of a funding agreement, the proposing SBC must immediately notify the
NAVY - 9
Contracting Officer, register in the appropriate SBA database, and submit the required certification, which can be found on https://navysbir.com/links_forms.htm.
System for Award Management (SAM). It is strongly encouraged that proposing SBCs register in
SAM, https://sam.gov, by the Close date of this BAA, or verify their registrations are still active and will not expire within 60 days of BAA Close. Additionally, proposing SBCs should confirm that they are registered to receive contracts (not just grants) and the address in SAM matches the address on the proposal. An SBC selected for an award MUST have an active SAM registration at the time of award or they will be considered ineligible.
Cybersecurity Maturity Model Certification (CMMC) Program. DoW has established the CMMC
Program to verify that awardees have implemented required security measures necessary to safeguard
Federal Contract Information (FCI) and Controlled Unclassified Information (CUI). CMMC Level requirements are identified within each topic and must be met prior to award. Proposing SBCs should anticipate that a Projected CMMC Level for Phase II award may be higher than the Projected CMMC
Level advertised in the Phase I topic. Proposing SBCs should carefully review and consider the CMMC requirements as compliance may impact proposed costs and technical approach. Please review the DoW
SBIR/STTR Program BAA for additional information on the CMMC Program.
Notice of NIST SP 800-171 Assessment Database Requirement. The purpose of the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 is to protect Controlled
Unclassified Information (CUI) in Nonfederal Systems and Organizations. As prescribed by DFARS
252.240-7997, in order to be considered for award, an SBC is required to implement NIST SP 800-171 and shall have a current assessment uploaded to the Supplier Performance Risk System (SPRS) which provides storage and retrieval capabilities for this assessment. The platform Procurement Integrated
Enterprise Environment (PIEE) will be used for secure login and verification to access SPRS. For brief instructions on NIST SP 800-171 assessment, SPRS, and PIEE, please visit https://www.sprs.csd.disa.mil/nistsp.htm. For in-depth tutorials on these items, please visit https://www.sprs.csd.disa.mil/webtrain.htm.
Human Subjects, Animal Testing, and Recombinant DNA. Due to the short timeframe associated with Phase I of the SBIR/STTR process, the DON does not recommend the submission of Phase I proposals that require the use of Human Subjects, Animal Testing, or Recombinant DNA. For example, the ability to obtain Institutional Review Board (IRB) approval for proposals that involve human subjects can take 6-12 months, and that lengthy process can be at odds with the Phase I goal for time-to-award.
Before the DON makes any award that involves an IRB or similar approval requirement, the proposing
SBC must demonstrate compliance with relevant regulatory approval requirements that pertain to proposals involving human, animal, or recombinant DNA protocols. It will not impact the DON’s evaluation, but requiring IRB approval may delay the start time of the Phase I award and if approvals are not obtained within two months of notification of selection, the decision to award may be terminated. If the use of human, animal, and recombinant DNA is included under a Phase I or Phase II proposal, please carefully review the requirements at: https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections. This webpage provides guidance and lists approvals that may be required before contract/work can begin.
Government Furnished Equipment (GFE). Due to the typical lengthy time for approval to obtain GFE, it is recommended that GFE is not proposed as part of the Phase I proposal. If GFE is proposed, and it is determined during the proposal evaluation process to be unavailable, proposed GFE may be considered a weakness in the technical merit of the proposal.
https://sam.gov/ https://www.sprs.csd.disa.mil/nistsp.htm https://www.sprs.csd.disa.mil/webtrain.htm https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections
NAVY - 10
International Traffic in Arms Regulation (ITAR). For topics indicating ITAR restrictions or the potential for classified work, limitations are generally placed on disclosure of information involving topics of a classified nature or those involving export control restrictions, which may curtail or preclude the involvement of universities and certain non-profit institutions beyond the basic research level. Small businesses must structure their proposals to clearly identify the work that will be performed that is of a basic research nature and how it can be segregated from work that falls under the classification and export control restrictions. As a result, information must also be provided on how efforts can be performed in later phases if the university/research institution is the source of critical knowledge, effort, or infrastructure (facilities and equipment).
SELECTION, AWARD, AND POST-AWARD INFORMATION
Notifications. Email notifications for proposal receipt (approximately one week after the Phase I BAA
Close) and selection are sent based on the information received on the proposal Cover Sheet (Volume 1).
Consequently, the e-mail address on the proposal Cover Sheet must be correct.
Debriefs. Requests for a debrief must be made within 15 calendar days of select/non-select notification via email as specified in the select/non-select notification. Please note debriefs are typically provided in writing via email to the Corporate Official identified in the proposal of the proposing SBC within 60 days of receipt of the request. Requests for oral debriefs may not be accommodated. If contact information for the Corporate Official has changed since proposal submission, a notice of the change on company letterhead signed by the Corporate Official must accompany the debrief request.
Protests. Interested parties have the right to protest in accordance with the procedures in FAR Subpart
33.1.
Pre-award agency protests related to the terms of the BAA must be served to: osd.ncr.ousd-r-e.mbx.SBIR-
STTR-Protest@mail.mil. A copy of a pre-award Government Accountability Office (GAO) protest must also be filed with the aforementioned email address within one day of filing with the GAO.
Protests related to a selection or award decision should be filed with the appropriate Contracting Officer for an Agency Level Protest or with the GAO. Contracting Officer contact information for specific DON
Topics may be obtained from the DON SYSCOM Program Managers listed in Table 2 above. For protests filed with the GAO, a copy of the protest must be submitted to the appropriate DON SYSCOM
Program Manager and the appropriate Contracting Officer within one day of filing with the GAO.
Awards. Due to limited funding, the DON reserves the right to limit the number of awards under any topic. Any notification received from the DON that indicates the proposal has been selected does not ultimately guarantee an award will be made. This notification indicates that the proposal has been selected in accordance with the evaluation criteria and has been sent to the Contracting Officer to conduct compliance review of Volume 3 to confirm eligibility of the proposing SBC, and to take other relevant steps necessary prior to making an award.
Contract Types. A Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other
Transaction (OT) may be used for Phase I awards.
Funding Limitations. In accordance with the SBIR and STTR Policy Directive section 4(b)(5), there is a limit of one sequential Phase II award per SBC per topic. The maximum Phase I proposal/award amount including all options (less TABA) is $315,000. The Phase I Base amount must not exceed $200,000 and the Phase I Option amount must not exceed $115,000. The maximum Phase II proposal/award amount including all options (including TABA) is $2,000,000 (unless non-SBIR/STTR funding is being added).
Individual SYSCOMs may award amounts, including Base and all Options, of less than $2,000,000 based
NAVY - 11
on available funding. The structure of the Phase II proposal/award, including maximum amounts as well as breakdown between Base and Option amounts will be provided to all Phase I awardees either in their
Phase I award or a minimum of 30 days prior to the due date for submission of their Initial Phase II proposal.
Contract Deliverables. Contract deliverables for Phase I are typically a kick-off brief, progress reports, and a final report. Required contract deliverables (as stated in the contract) must be uploaded to https://www.navysbirprogram.com/navydeliverables/.
Payments. The DON makes three payments from the start of the Phase I Base period, and from the start of the Phase I Option period, if exercised. Payment amounts represent a set percentage of the Base or
Option value as follows:
Days from Start of Base Award or Option Payment Amount
15 Days 50% of Total Base or Option
90 Days 35% of Total Base or Option
180 Days 15% of Total Base or Option
Transfer Between SBIR and STTR Programs. Section 4(b)(1)(i) of the SBIR and STTR Policy
Directive provides that, at the agency’s discretion, projects awarded a Phase I under a BAA for SBIR may transition in Phase II to STTR and vice versa.
PHASE II GUIDELINES
Evaluation and Selection. All Phase I awardees may submit an Initial Phase II proposal for evaluation and selection. The evaluation criteria for Phase II is the same as Phase I (as stated in this BAA). The
Phase I Final Report and Initial Phase II Proposal will be used to evaluate the SBC’s potential to progress to a workable prototype in Phase II and transition the technology to Phase III. Details on the due date, content, and submission requirements of the Initial Phase II Proposal will be provided by the awarding
SYSCOM either in the Phase I contract or by subsequent notification.
Awards. The DON will consider the following for Phase II award: Cost Plus Fixed Fee (CPFF), Firm
Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other Transaction (OT). Phase II awards can be structured in a way that allows for increased funding levels based on the project’s transition potential. To accelerate the transition of SBIR/STTR-funded technologies to Phase III, especially those that lead to Programs of Record and fielded systems, the Commercialization Readiness
Program was authorized and created as part of section 5122 of the National Defense Authorization Act of
Fiscal Year 2012. The statute set-aside is 1% of the available SBIR/STTR funding to be used for administrative support to accelerate transition of SBIR/STTR-developed technologies and provide non-financial resources for the SBCs (e.g., the Navy SBIR Transition Program, STP).
Navy SBIR Transition Program (STP). Phase II awardees have the opportunity to participate in the virtual Navy STP Kickoff during the first or second year of the Phase II contract. While there are no travel costs associated with this virtual event, Phase II awardees should budget time of up to a full day to participate. STP information can be obtained at: https://navystp.com. Phase II awardees will be contacted separately regarding this program.
PHASE III GUIDELINES
A Phase III SBIR/STTR award is any work that derives from, extends, or completes effort(s) performed under prior SBIR/STTR funding agreements, but is funded by sources other than the SBIR/STTR programs. This covers any contract, grant, or agreement issued as a follow-on Phase III award or any https://navystp.com/
NAVY - 12
contract, grant, or agreement award issued as a result of a competitive process where the awardee was an
SBIR/STTR firm that developed the technology as a result of a Phase I or Phase II award. The DON will give Phase III status to any award that falls within the above-mentioned description. Consequently, DON will assign SBIR/STTR Data Rights to any noncommercial technical data and noncommercial computer software delivered in Phase III that were developed under SBIR/STTR Phase I/II effort(s). Government prime contractors and their subcontractors must follow the same guidelines as above and ensure that companies operating on behalf of the DON protect the rights of the SBIR/STTR firm.
NAVY - 13
NAVY SBIR DOW 2027 BAA
Topic Index
Release 1
DON27BZ01-NV001 Cleaner for the Time Domain Reflectometer Tank Level Indicator
DON27BZ01-NV002 Fire Resistant Joiner Bulkhead
DON27BZ01-NV003 [Topic Removed by Component]
DON27BZ01-NV004 Input-Output Unit (IOU) for Secure Processing and Routing of Hull, Mechanical, & Electrical (HM&E) and Navigation Signals
DON27BZ01-NV005 [Topic Removed by Component]
NAVY - 14
DON27BZ01-NV001 TITLE: Cleaner for the Time Domain Reflectometer Tank Level Indicator
COMPONENT TECHNOLOGY PRIORITY AREA(S): Sustainment
PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)
OBJECTIVE: Develop a technology to clean and potentially reverse fouling on Time Domain
Reflectometer (TDR) Tank Level Indicating (TLI) components in-place. The solution must function within fully compensated fuel tanks aboard DDG 51 class ships without requiring depressurization, defueling, or dewatering.
DESCRIPTION: Fouling on the TDR sensor used for TLI is a persistent problem. The TDR is necessary to provide accurate and precise readings for fuel measurement. Over time, TDRs can experience sensor fouling through a buildup of crystallization and other contaminants on TDR rods and tubes, contributing to false readings or other failures if not properly maintained and cleaned.
The operational readiness of the U.S. Navy's DDG 51 Arleigh Burke-class destroyers is being undermined by a persistent and unsolved equipment failure. The TDR sensors, a TLI technique, which are critical for managing fuel, buoyancy, and stability, are consistently rendered unreliable due to fouling.
Current cleaning methods are operationally untenable; they require taking fuel compensating tanks offline, emptying fuel and/or compensating seawater, and significant follow-on maintenance, which directly reduces the Fleet's readiness and deployability. These efforts are not a permanent solution and often fail to resolve the underlying issue, making this a high-priority challenge for the DDG 51 Program
Office.
The Navy urgently seeks an innovative solution that remedies fouled TDR units without requiring ships to cease operations or undergo costly, invasive maintenance, thereby increasing mission readiness and reducing the risk of fuel spills.
Effective methods for cleaning these sensors in-situ are very limited. The existing approach involves decompensation of fuel tanks (removal of fuel and compensating seawater) and manual removal of TDR sensors for cleaning, which can be costly and time consuming. It is not generally feasible while the ship is underway. Removal of TDR sensors during these manpower-intensive efforts can sometimes lead to TDR sensor miscalibration during re-installation.
The inability to effectively clean TDR sensor fouling is a critical point of failure. The buildup of crystallization and other contaminants on TDR rods and tubes creates false readings and electrical shorts, leading to inaccurate fuel measurement and extensive tracking errors. This directly compromises the precise fuel management necessary for the ship’s stability and mission readiness. Current ships have had fuel spills due to TDR TLI fouling. Additionally, scheduled maintenance periods to remove and clean fouled TDR TLI units inherently cause time delays and ship-wide disruptions affecting other planned work.
The Navy seeks a product that cleans and potentially reverses the fouling buildup throughout the entire
TDR assembly while being compatible with the existing sensor architecture. The technology must return the installed TDR and TLI technique to full operational status upon one execution of the developed technology/technique over an objective period of 36 months, but not less than a threshold period of 8 months of full TDR TLI operability. This effort is required to develop a comprehensive technique that resolves this persistent reliability challenge. A more precise fuel management and reduction in potential failures will result in greater ship stability and increased mission readiness.
NAVY - 15
PHASE I: Develop a concept for a product/technology to clean a fouled TDR TLI in-situ, returning it to full operational status within the challenging environment of a compensated fuel tank. Detail how the cleaning technology would be employed on an in-service ship while underway. Establish feasibility through small-scale testing, analysis, or modeling. If the Phase I Option is exercised, include the initial design specifications and capabilities description to build a prototype solution in a Phase II plan.
PHASE II: Develop, deliver, and demonstrate a prototype of the anti-fouling solution that meets the requirements in the Description. Prove in a demonstration that the technology can return a fouled TDR
TLI to full operability in a simulated confined space without requiring the tank to be emptied or causing fuel spills. Design the solution to minimize or eliminate the need for personnel to access the tank, a key limitation of current procedures. Identify all necessary Navy testing for shipboard certification. Prepare a
Phase III commercialization/transition plan.
PHASE III DUAL USE APPLICATIONS: Support the Navy in transitioning the cleaning technology for
Fleet-wide use, providing the necessary equipment, training, and logistical documentation.
A successful solution to this problem on the DDG 51 class is expected to be highly applicable to other ships facing similar challenges with compensated fuel tanks and TDR TLIs, including the LHD 1 and
LHA 6 classes. The goal is to field a fully qualified and certified solution that resolves this long-standing maintenance and readiness issue across the surface fleet.
Commercial fuel tank farms as well as other industrial operations requiring high level of awareness of tank full status can benefit from development of this technology.
REFERENCES:
1. Dular, Matevz; Bachert, Bernd; Stoffel, Bernd and Sirok, Brane. “Relationship Between
Cavitation Structures and Cavitation Damage.” Sci-Hub,. Elsevier, 2004.
https://www.pismin.com/10.1016/j.wear.2004.08.004
2. Donnelly, Bradley; Sammut, Karl and Tang, Youhong. “Materials Selections for Antifouling
Systems in Marine Structures.” ProQuest, Flinders University, 2022.
https://www.proquest.com/docview/2674371579/fulltext/E04A8683594B4AC3PQ/1?accountid=
34963&sourcetype=Scholarly%20Journals
KEYWORDS: Time Domain Reflectometry; Tank Level Indicator; Fuel Fouling; TDR rods and tubes;
Compensated Fuel Tanks; Crystallization
NAVY - 16
DON27BZ01-NV002 TITLE: Fire Resistant Joiner Bulkhead
COMPONENT TECHNOLOGY PRIORITY AREA(S): Advanced Materials;Sustainment
OBJECTIVE: Develop a material/system to increase the fire-resistance of joiner bulkheads on ships and compartment-level fire containment while meeting Navy requirements for weight, fit, cost, fire, smoke and toxicity.
DESCRIPTION: Fire represents a grave hazard to Navy vessels. Recent fire events have propagated through joiner bulkheads and resulted in significant fire damage, which poses a substantial threat to personnel and equipment. Uncontrolled fires can propagate throughout a ship and cause extensive damage to machinery, equipment, and ship compartments; additionally, fires represent an extreme risk to ship personnel. The Navy has made numerous improvements to make ships more fire-resistant but is seeking improvement for containment of compartment-level fire events seen in recent and historical ship fires
(i.e., USS OSCAR AUSTIN, USS CONYNGHAM, USS STARK, and the cruise ship Star Princess).
More fire-resistant joiner bulkheads would allow damage control teams to contain and extinguish fires more easily before they could grow to threaten the ship. Innovation is needed to meet Navy goals with regard to weight, cost, fit, and performance.
The Navy seeks an improved fire-resistant joiner bulkhead that would reduce the damage ships sustain during fires, as well as improve safety for the crew.
Development of a fire-resistant joiner bulkhead faces several technical challenges. First, any fire-resistant joiner bulkhead must not have a significant weight increase. Given the quantity of joiner bulkheads onboard ships, any weight increase could add significant weight to the ships, which will impair and degrade ship performance. Second, the improved joiner bulkheads must not excessively exceed the width of current joiner bulkheads. Destroyers have confined spaces and for the comfort and operational capability of the crew, any new joiner bulkhead cannot greatly exceed the dimensions of the existing panels. Third, any fire-resistant joiner bulkhead must be a cost-effective solution for the Navy. In particular, the fire-resistant joiner bulkhead must not substantially increase the costs to install at the shipyard. The reason for this concern is that joiner bulkheads sometimes require modification at the shipyards to fit the exact dimensions of the ship. Any solution that requires expensive edge treating or would otherwise be cost-prohibitive to modify at the shipyards will not be considered. Lastly, the improved joiner bulkhead must meet or exceed the requirements to be certified for shock and fire performance as AN-30 class per MIL-STD-3020 and pass Navy Fire, Smoke, Toxicity (FST) testing per
MIL-STD-1623. This is a vital requirement to demonstrate that any new material in the joiner bulkhead will not release dangerous particulates as it burns or fails if there is an impact.
Research into fire-resistant materials has revealed several technology advances in the areas of intumescent coatings, coatings that incorporate nanomaterials to aid in thermal regulation, or advanced high-performance fibers; however, there is no current commercial solution available. The Navy is also open to bio-composites, bio-polymers, or other materials that have the potential to provide superior fire-resistance with reduced toxicity as compared to many commercially available products.
PHASE I: Develop a concept for a fire-resistant joiner bulkhead that meets the requirements above.
Demonstrate the feasibility of the concept in meeting the Navy needs prescribed above and establish that the concept can be developed into a useful product for the Navy. Establish feasibility of a new fire-resistant material/system via small-scale testing. If the Phase I Option is exercised, include the initial design specifications and a capabilities description to build a prototype solution in Phase II.
NAVY - 17
PHASE II: Develop and deliver a prototype fire-resistant joiner bulkhead for evaluation. (Note: The prototype will be evaluated to determine capability in meeting the performance goals defined in the Phase
II SOW.) Demonstrate product performance through prototype evaluation, modeling, and demonstration over the required range of parameters as defined by the Navy. Participate in an extended evaluation in a land-based test environment to refine the prototype into a design that will meet Navy requirements.
Prepare a Phase II manufacturing and development plan, including drawings of connection details, to transition the improved fire-resistant joiner bulkhead to Navy use.
PHASE III DUAL USE APPLICATIONS: Support the Navy in transitioning the fire-resistant joiner bulkhead to Navy use. Develop installation and maintenance manuals for the improved fire-resistant joiner bulkhead to support transition to the Fleet.
Many potential commercial applications for improved fire-resistant joiner bulkheads exist; examples include commercial shipping, construction, aerospace, and automotive industries.
1. Nguyen, Tuan Anh and Nguyen, Quang Tung. “Hybrid Biocomposites Based on Used Coffee
Grounds and Epoxy Resin: Mechanical Properties and Fire Resistance.” Wiley Online Library, June 2021. Hanoi University of Industry, January 26, 2026.
https://onlinelibrary.wiley.com/doi/pdf/10.1155/2021/1919344
2. Liu, Bo-Wen, Zhao, Hai-Bo, and Wang, Yu-Zhong. “Advanced Flame-Retardant Methods for
Polymeric Materials.” Sci-Hub, 2021. Sichuan University, January 26, 2026. https://sci-net.xyz/10.1002/adma.202107905
3. “Report on the Investigation of the Fire Onboard Star Princess off Jamaica.” United Kingdom of
Great Britain and Northern Ireland Assets Publishing Service, 2006. Marine Accident
Investigation Branch, June 2, 2026.
https://assets.publishing.service.gov.uk/media/547c706ae5274a4290000097/Star_Princess.pdf
4. “Fire Resistance of U.S. Naval Surface Ships.” MIL STD 3020. Naval Sea Systems Command
(Ship Systems), 2024. Department of Defense, June 3, 2026.
https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=275893
5. “Fire Performance Requirements and Approved Specifications for Interior Finish Materials and
Furnishings (Naval Shipboard Use).” MIL STD 1623. Naval Sea Systems Command (Ship
Systems), 2015. Department of Defense, June 3, 2026.
https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=37021
KEYWORDS: Fire Safety; Intumescent Coatings; Bio-Composites; Bulkhead Fire Containment; Fire
Protection; High-performance Fibers
NAVY - 18
DON27BZ01-NV004 TITLE: Input-Output Unit (IOU) for Secure Processing and Routing of Hull, Mechanical, & Electrical (HM&E) and Navigation Signals
COMPONENT TECHNOLOGY PRIORITY AREA(S):…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .