Navy_26BZ_R4.pdf

PDF 298 KB Posted

Attached to
Domestic Production of Plant-based Carbon Fiber Precursors in Support of Hypersonic Applications
Solicitation number
DON26BZ04-NV066
Issued by

About this file

This document is the Department of the Navy (DON) Small Business Innovation Research (SBIR) Broad Agency Announcement (BAA) for DoW 2026 Release 4, Phase I Proposal Submission Instructions, applicable to topics DON26BZ04-NV066 and DON26BZ04-NV067.

The BAA solicits Phase I research and development proposals from small business concerns through the DoW SBIR/STTR Innovation Portal (DSIP). Proposals must be submitted electronically via DSIP by the BAA close date, with no alternative submission methods accepted. Phase I Base awards are limited to $200,000, with Phase I Option amounts not exceeding $115,000, for a maximum total of $315,000 including Technical and Business Assistance (TABA) funding. Work must be proposed for exactly six months in the Base period and six months in the Option period. The minimum two-thirds of work requirement must be performed by the proposing small business concern in both Base and Option costs, calculated using direct and indirect costs. Cost sharing is not accepted. Phase I proposals require seven volumes: Proposal Cover Sheet (Volume 1), Technical Proposal not exceeding ten pages (Volume 2), Cost Volume with detailed subcontractor and material breakdowns (Volume 3), Company Commercialization Report (Volume 4), Supporting Documents including optional administrative materials (Volume 5), Fraud, Waste and Abuse Training Certificate (Volume 6), and Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7). The DON will evaluate proposals based on technical merit as the most important criterion, followed by qualifications of key personnel and commercialization potential of equal importance; cost is not an evaluation factor. Payments are structured at 50 percent at day 15, 35 percent at day 90, and 15 percent at day 180 from the start of the Base or Option period. Awards may be made using Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other Transaction (OT) contract vehicles. Phase II awardees may transition to Cost Plus Fixed Fee (CPFF), FFP, BOA, or Prototype OT contracts with maximum funding of $2,000,000 including all options.

The two Phase I topics address hypersonic applications: DON26BZ04-NV066 concerns domestic production of plant-based carbon fiber precursors for thermal protection systems through environmentally friendly processing of cellulose or lignin, requiring proof of concept, fiber precursor carbonization, and Environmental Protection Agency compliance; DON26BZ04-NV067 addresses specialized waveguides for extreme temperature RF signal transmission in X, Ku, K, and Ka frequency bands, requiring feasibility demonstration and custom manufacturing capability descriptions. Both topics are restricted under ITAR and EAR regulations, have a Projected CMMC Level 2 (Self) requirement, may result in classified work in Phase II, and require U.S. ownership with no foreign influence or acceptable mitigating procedures approved by the Defense Counterintelligence and Security Agency, including acquisition and maintenance of secret-level facility clearances. Contact information for program and administrative questions is provided through the Navy SBIR/STTR Program Management Office and appropriate SYSCOM managers.

View the file

Other files

File Type Posted
DON26BZ04-NV066.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navy - 1

DEPARTMENT OF THE NAVY (DON)

Small Business Innovation Research (SBIR)

DoW 2026 SBIR BAA Release 4 Phase I

Proposal Submission Instructions

IMPORTANT

• The following instructions apply to topics:

o DON26BZ04-NV066 through DON26BZ04-NV067

• Submitting small business concerns (SBCs) are encouraged to thoroughly review the DoW SBIR/STTR Program Broad Agency Announcement (BAA) and register for the DSIP Listserv to remain apprised of important programmatic changes.

o The DoW Program BAA is located at: https://www.dodsbirsttr.mil/submissions/login.

Select the tab for the appropriate BAA cycle.

o Register for the DSIP Listserv at: https://www.dodsbirsttr.mil/submissions/login.

• The information provided in the DON Proposal Submission Instructions takes precedence over the DoW Instructions posted for this BAA.

• DON Phase I Technical Volume (Volume 2) page limit is not to exceed 10 pages.

• Proposing SBCs that are more than 50% owned by multiple venture capital operating companies (VCOC), hedge funds (HF), private equity firms (PEF) or any combination of these are eligible to submit proposals in response to DON topics advertised in this BAA. Information on Majority Ownership in Part and certification requirements at time of submission for these proposing SBCs are detailed in the section titled ADDITIONAL SUBMISSION

CONSIDERATIONS.

• Phase I Technical Volume (Volume 2) and Supporting Documents (Volume 5) templates, specific to DON topics, are available at https://www.navysbir.com/links_forms.htm.

• The DON may consider the following FAR and Non-FAR contract strategies when issuing Phase I awards: Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other Transaction (OT). The DON may consider the following FAR and Non-FAR contracting strategies when issuing Phase II awards: Cost Plus Fixed Fee (CPFF), FFP, BOA, or Prototype

OT.

• This BAA is issued under regulations set forth in Federal Acquisition Regulation (FAR) 35.016 and awards will be made under “other competitive procedures”. The policies and procedures of FAR Subpart 15.3 shall not apply to this BAA, except as specifically referenced in it. All procedures are at the sole discretion of the Government as set forth in this BAA. Submission of a proposal in response to this BAA constitutes the express acknowledgement to that effect by the proposing SBC.

https://www.dodsbirsttr.mil/submissions/login https://www.dodsbirsttr.mil/submissions/login https://www.navysbir.com/links_forms.htm

Navy - 2

INTRODUCTION

The DON SBIR/STTR Programs are mission-oriented programs that integrate the needs and requirements of the DON’s Fleet through research and development (R&D) topics that have dual-use potential, but primarily address the needs of the DON. More information on the programs can be found on the DON SBIR/STTR website at www.navysbir.com. Additional information on DON’s mission can be found on the DON website at www.navy.mil.

For questions regarding this BAA, use the information in Table 1 to determine who to contact for what types of questions.

TABLE 1: POINTS OF CONTACT FOR QUESTIONS REGARDING THIS BAA

Type of Question When Contact Information Program and administrative Always Navy SBIR/STTR Program Management Office usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil or appropriate Program Manager listed in Table 2 (below)

Topic-specific technical questions

BAA Pre-release Technical Point of Contact (TPOC) listed in each topic on the DoW SBIR/STTR Innovation Portal (DSIP). Refer to the Proposal Submission section of the DoW SBIR/STTR Program BAA for details.

BAA Open DoW SBIR/STTR Topic Q&A platform (https://www.dodsbirsttr.mil/submissions) Refer to the Proposal Submission section of the DoW SBIR/STTR Program BAA for details.

Electronic submission to the DoW SBIR/STTR Innovation Portal (DSIP)

Always DSIP Support via email at dodsbirsupport@reisystems.com

Navy-specific BAA instructions and forms

Always DON SBIR/STTR Program Management Office usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil

TABLE 2: DON SYSTEMS COMMANDS (SYSCOM) SBIR PROGRAM MANAGERS

Topic Numbers

Point of Contact SYSCOM Email

DON26BZ04-

NV066 to

DON26BZ04-

NV067

Mr. Scott Steward Strategic Systems

Programs

(SSP)

ssp.sbir@ssp.navy.mil http://www.navysbir.com/ http://www.navy.mil/ mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil https://www.dodsbirsttr.mil/submissions mailto:dodsbirsupport@reisystems.com mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil

Navy - 3

PHASE I SUBMISSION INSTRUCTIONS

The following section details requirements for submitting a compliant Phase I proposal to the DoW SBIR/STTR Programs.

(NOTE: Proposing SBCs are advised that support contract personnel will be used to carry out administrative functions and may have access to proposals, contract award documents, contract deliverables, and reports. All support contract personnel are bound by appropriate non-disclosure agreements.)

DoW SBIR/STTR Innovation Portal (DSIP). Proposing SBCs are required to submit proposals via the DoW SBIR/STTR Innovation Portal (DSIP); and follow proposal submission instructions in the DoW SBIR/STTR Program BAA on the DSIP at https://www.dodsbirsttr.mil/submissions. Proposals submitted by any other means will be disregarded. Proposing SBCs submitting through DSIP for the first time will be asked to register. It is recommended that SBCs register as soon as possible upon identification of a proposal opportunity to avoid delays in the proposal submission process. Proposals that are not successfully certified electronically in DSIP by the Corporate Official prior to BAA Close will NOT be considered submitted and will not be evaluated by DON. Proposals that are encrypted, password protected, or otherwise locked in any portion of the submission will be REJECTED unless specifically directed within the text of the topic to which you are submitting. Please refer to the DoW SBIR/STTR Program BAA for further information.

Proposal Volumes. The following seven volumes are required.

• Proposal Cover Sheet (Volume 1). As specified in DoW SBIR/STTR Program BAA.

• Technical Proposal (Volume 2) o Technical Proposal (Volume 2) must meet the following requirements or the proposal will be

REJECTED:

Not to exceed ten (10) pages, regardless of page content Single column format, single-spaced typed lines Standard 8 ½” x 11” paper Page margins one inch on all sides. A header and footer may be included in the one-inch margin.

No font size smaller than 10-point Include, within the ten-page limit of Volume 2, an Option that furthers the effort in preparation for Phase II and will bridge the funding gap between the end of Phase I and the start of Phase II. Tasks for both the Phase I Base and the Phase I Option must be clearly identified. Phase I Options are exercised upon selection for Phase II.

Work proposed for the Phase I Base must be exactly six (6) months.

Work proposed for the Phase I Option must be exactly six (6) months.

o Additional information:

A Phase I proposal template specific to DON to meet Phase I requirements is available at https://navysbir.com/links_forms.htm

A font size smaller than 10-point is allowable for headers, footers, imbedded tables, figures, images, or graphics that include text. However, proposing SBCs are cautioned that if the text is too small to be legible it will not be evaluated.

https://www.dodsbirsttr.mil/submissions https://navysbir.com/links_forms.htm

Navy - 4

• Cost Volume (Volume 3).

o Cost Volume (Volume 3) must meet the following requirements or the proposal will be

REJECTED:

The Phase I Base amount must not exceed $200,000.

Phase I Option amount must not exceed $115,000.

Costs for the Base and Option must be separated and clearly identified in Volume 3.

For Phase I, a minimum of two-thirds of the work is performed by the proposing SBC. The two-thirds percentage of work requirement must be met in the Base costs as well as in the Option costs. DON will not accept deviations from the minimum percentage of work requirements for Phase I. The percentage of work is measured by both direct and indirect costs. To calculate the minimum percentage of work for the proposing SBC the sum of all direct and indirect costs attributable to the proposing SBC represent the numerator and the total cost of the proposal (i.e., Total Cost before Profit Rate is applied) is the denominator.

The subcontractor percentage is calculated by taking the sum of all costs attributable to the subcontractor (Total Subcontractor Costs (TSC)) as the numerator and the total cost of the proposal (i.e., Total Cost before Profit Rate is applied) as the denominator.

⧠ Proposing SBC Costs (included in numerator for calculation of the SBC):

Total Direct Labor (TDL) Total Direct Material Costs (TDM) Total Direct Supplies Costs (TDS) Total Direct Equipment Costs (TDE) Total Direct Travel Costs (TDT) Total Other Direct Costs (TODC) General & Administrative Cost (G&A)

NOTE: G&A, if proposed, will only be attributed to the proposing SBC.

⧠ Subcontractor Costs (numerator for subcontractor calculation):

Total Subcontractor Costs (TSC) ⧠ Total Cost (i.e., Total Cost before Profit Rate is applied, denominator for either calculation) Cost Sharing: Cost sharing is not accepted on DON Phase I proposals. A value above or below $0.00 entered in the Cost Sharing field will not be considered in the Phase I contract award.

Provide sufficient detail for subcontractor, material, and travel costs. Subcontractor costs must be detailed to the same level as the prime contractor. Material costs must include a listing of items and cost per item. Travel costs must include the purpose of the trip, number of trips, location, length of trip, and number of personnel.

Inclusion of cost estimates for travel to the sponsoring SYSCOM’s facility for one day of meetings is recommended for all proposals.

The “Additional Cost Information” of Supporting Documents (Volume 5) may be used to provide supporting cost details for Volume 3. When a proposal is selected for award, be prepared to submit further documentation to the SYSCOM Contracting Officer to substantiate costs (e.g., an explanation of cost estimates for equipment, materials, and consultants or subcontractors).

• Company Commercialization Report (Volume 4). DoW collects and uses Volume 4 and DSIP requires Volume 4 for proposal submission. Please refer to the Proposal Preparation Instructions and Requirements section of the DoW SBIR/STTR Program BAA for details to ensure compliance with DSIP Volume 4 requirements.

Navy - 5

• Supporting Documents (Volume 5). Volume 5 is for the submission of administrative material that

DON may or will require to process a proposal, if selected, for contract award.

o Proposing SBCs must review and submit the following items, as applicable:

Majority Ownership in Part. Proposing SBCs that are more than 50% owned by multiple venture capital operating companies (VCOC), hedge funds (HF), private equity firms (PEF), or any combination of these as set forth in 13 C.F.R. § 121.702, are eligible to submit proposals in response to DON topics advertised within this BAA. Complete the certification as detailed under ADDITIONAL SUBMISSION CONSIDERATIONS.

Proposing SBCs may include the following administrative materials in Supporting Documents (Volume 5); a template is available at https://navysbir.com/links_forms.htm to provide guidance on optional material the proposing SBC may want to include in Volume 5:

o Additional Cost Information to support the Cost Volume (Volume 3) o SBIR/STTR Funding Agreement Certification o Data Rights Assertion o Disclosure of Information (DFARS 252.204-7000) o Prior, Current, or Pending Support of Similar Proposals or Awards o Foreign Citizens

Details of Request for Discretionary Technical and Business Assistance (TABA), if proposed, is to be included under the Additional Cost Information section if using the DON Supporting Documents template.

Do not include documents or information to substantiate the Technical Volume (Volume 2) in Volume 5 (e.g., resumes, test data, technical reports, or publications). Such documents or information will not be considered.

A font size smaller than 10-point is allowable for documents in Volume 5; however, proposing SBCs are cautioned that the text may be unreadable.

Fraud, Waste and Abuse Training (Volume 6). DoW requires Volume 6 for submission. Please refer to the Proposal Preparation Instructions and Requirements section of the DoW SBIR/STTR Program BAA for details.

• Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7). In accordance with Section 4 of the SBIR and STTR Extension Act of 2022 and the SBA SBIR/STTR Policy Directive, the DoW will review all proposals submitted in response to this BAA to assess security risks presented by SBCs seeking a Federally funded award. SBCs must complete the Disclosures of Foreign Affiliations or Relationships to Foreign Countries webform in Volume 7 of the DSIP proposal submission. Please refer to the Proposal Preparation Instructions and Requirements section of the DoW SBIR/STTR Program BAA for details.

PHASE I EVALUATION AND SELECTION

The following section details how the DON SBIR/STTR Programs will evaluate Phase I proposals.

Proposals meeting DSIP submission requirements will be forwarded to the DON SBIR/STTR Programs.

Prior to evaluation, all proposals will undergo a compliance review to verify compliance with DoW and DON SBIR/STTR proposal eligibility requirements. Proposals not meeting submission requirements will be REJECTED and not evaluated.

Navy - 6

• Proposal Cover Sheet (Volume 1). The Proposal Cover Sheet (Volume 1) will undergo a compliance review to verify the proposing SBC has met eligibility requirements and followed the instructions for the Proposal Cover Sheet as specified in the DoW SBIR/STTR Program BAA.

• Technical Volume (Volume 2). The DON will evaluate and select Phase I proposals using the evaluation criteria specified in the Method of Selection and Evaluation Criteria section of the DoW SBIR/STTR Program BAA, with technical merit being most important, followed by qualifications of key personnel and commercialization potential of equal importance. The information considered for this decision will come from Volume 2. This is not a FAR Part 15 evaluation and proposals will not be compared to one another. Cost is not an evaluation criterion and will not be considered during the evaluation process; the DON will only do a compliance review of Volume 3. Due to limited funding, the DON reserves the right to limit the number of awards under any topic.

The Technical Volume (Volume 2) will undergo a compliance review (prior to evaluation) to verify the proposing SBC has met the following requirements or the proposal will be REJECTED:

Not to exceed ten (10) pages, regardless of page content Single column format, single-spaced typed lines Standard 8 ½” x 11” paper Page margins one inch on all sides. A header and footer may be included in the one-inch margin.

No font size smaller than 10-point, except as permitted in the instructions above.

Include, within the 10-page limit of Volume 2, an Option that furthers the effort in preparation for Phase II and will bridge the funding gap between the end of Phase I and the start of Phase II. Tasks for both the Phase I Base and the Phase I Option must be clearly identified.

Work proposed for the Phase I Base must be exactly six (6) months.

Work proposed for the Phase I Option must be exactly six (6) months.

• Cost Volume (Volume 3). The Cost Volume (Volume 3) will not be considered in the selection process and will only undergo a compliance review to verify the proposing SBC has met the following requirements or the proposal will be REJECTED:

Must not exceed values for the Base ($200,000) and Option ($115,000).

Must meet minimum percentage of work; a minimum of two-thirds of the work is performed by the proposing SBC. The two-thirds percentage of work requirement must be met in the Base costs as well as in the Option costs. DON will not accept deviations from the minimum percentage of work requirements for Phase I.

Cost Sharing: Cost sharing is not accepted on DON Phase I proposals. A value above or below $0.00 entered in the Cost Sharing field will not be considered in the Phase I contract award.

• Company Commercialization Report (CCR) (Volume 4). The CCR (Volume 4) will not be evaluated by the DON nor will it be considered in the award decision. However, all proposing SBCs must refer to the DoW SBIR/STTR Program BAA to ensure compliance with DSIP Volume 4 requirements.

• Supporting Documents (Volume 5). Supporting Documents (Volume 5) will not be considered in the selection process and will only undergo a compliance review to ensure the proposing SBC has included items in accordance with the PHASE I SUBMISSION INSTRUCTIONS section above.

Navy - 7

• Fraud, Waste, and Abuse Training Certificate (Volume 6). Not evaluated.

• Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7).

Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7) will be assessed as part of the Due Diligence Program to Assess Security Risks. Refer to the DoW SBIR/STTR Program BAA to ensure compliance with Volume 7 requirements.

ADDITIONAL SUBMISSION CONSIDERATIONS

This section details additional items for proposing SBCs to consider during proposal preparation and submission process.

Due Diligence Program to Assess Security Risks. The SBIR and STTR Extension Act of 2022 (Pub. L.

117-183) requires the Department of War, in coordination with the Small Business Administration, to establish and implement a due diligence program to assess security risks presented by SBCs seeking a Federally-funded award. Please review the Certifications and Registrations section of the DoW SBIR/STTR Program BAA for details on how DoW will assess security risks presented by SBCs. The Due Diligence Program to Assess Security Risks will be implemented for all Phases.

Discretionary Technical and Business Assistance (TABA). The Small Business Innovation and Economic Security Act Section 7 mandates agencies offer TABA. The purpose of TABA is to assist awardees in making better technical decisions on SBIR/STTR projects; solving technical problems that arise during SBIR/STTR projects; minimizing technical risks associated with SBIR/STTR projects;

commercializing the SBIR/STTR product or process, including intellectual property protections and cybersecurity assistance; and screening for potential foreign involvement in technology development or commercialization activities. TABA services can be provided through vendor(s) selected by the SBC or the SBC may propose use of TABA funding to hire new staff, augment staff, or direct staff to conduct or participate in training activities consistent with the purpose of TABA as detailed above. The Phase I TABA amount, if proposed, cannot include any profit/fee by the proposing SBC and must be inclusive of all applicable indirect costs. TABA cannot be used in the calculation of general and administrative expenses (G&A) for the SBIR proposing SBC. An SBC receiving TABA will be required to submit a report detailing the results and benefits of the service received. This TABA report will be due at the time of submission of the final report.

Request for TABA funding will be reviewed by the DON SBIR/STTR Program Management Office.

If proposing a TABA Provider, the following MUST be included in the request or be subject to denial.

• Provider(s)

• Provider(s) point of contact, email address, and phone number

• An explanation of the provider’s unique qualifications to provide the TABA service

• Tasks that will be performed by the provider (to include the purpose and objective of the assistance)

• Total provider(s) cost, number of hours, and labor rates (average/blended rate is acceptable)

If proposing TABA funding to hire new staff, augment staff, or direct staff to conduct or participate in training activities consistent with the purpose of TABA, the following MUST be included or be subject to denial.

• Name(s), position(s), business need to be filled, and/or training to be provided

• Number of employees to be hired, augmented, or directed to participate in training activities

• Qualifications of employees hired or augmented, or detailed need for training

• Tasks that will be performed (to include the purpose and objective of the assistance)

• Total staff/training cost, number of hours, and labor rates (average/blended rate is acceptable)

Navy - 8

TABA requests must be included in the proposal as follows:

• Phase I:

Online DoW Cost Volume (Volume 3) – the value of the TABA request.

Supporting Documents (Volume 5) – a detailed request for TABA (as specified above) specifically identified as “TABA” in the section titled Additional Cost Information when using the DON Supporting Documents template.

• Phase II:

DON Phase II Cost Volume (provided by the DON SYSCOM) - the value of the TABA request.

Supporting Documents (Volume 5) – a detailed request for TABA (as specified above) specifically identified as “TABA” in the section titled Additional Cost Information when using the DON Supporting Documents template.

Proposed values for TABA must NOT exceed:

• Phase I: A total of $6,500, in addition to the Phase I award amount.

• Phase II: A total of $25,000 per award, not to exceed $50,000 per Phase II project, included in the

Phase II award amount.

Disclosure of Information (DFARS 252.204-7000). In order to eliminate the requirements for prior approval of public disclosure of information (in accordance with DFARS 252.204-7000) under this award, the proposing SBC shall identify and describe all fundamental research to be performed under its proposal, including subcontracted work, with sufficient specificity to demonstrate that the work qualifies as fundamental research. Fundamental research means basic and applied research in science and engineering, the results of which ordinarily are published and shared broadly within the scientific community, as distinguished from proprietary research and from industrial development, design, production, and product utilization, the results of which ordinarily are restricted for proprietary or national security reasons (defined by National Security Decision Directive 189). An SBC whose proposed work will include fundamental research and requests to eliminate the requirement for prior approval of public disclosure of information must complete the DON Fundamental Research Disclosure and upload as a separate PDF file to the Supporting Documents (Volume 5) in DSIP as part of their proposal submission.

The DON Fundamental Research Disclosure is available on https://navysbir.com/links_forms.htm and includes instructions on how to complete and upload the completed Disclosure. Simply identifying fundamental research in the Disclosure does NOT constitute acceptance of the exclusion. All exclusions will be reviewed and, if approved by the Government Contracting Officer, noted in the contract.

Majority Ownership in Part. Proposing SBCs that are more than 50% owned by multiple venture capital operating companies (VCOC), hedge funds (HF), private equity firms (PEF), or any combination of these as set forth in 13 C.F.R. § 121.702, are eligible to submit proposals in response to DON topics advertised within this BAA.

For proposing SBCs that are a member of this ownership class the following must be satisfied for proposals to be accepted and evaluated:

a. Prior to submitting a proposal, SBCs must register with the SBA Company Registry Database.

b. The proposing SBC within its submission must submit the Majority-Owned VCOC, HF, and PEF

Certification. A copy of the SBIR VC Certification can be found on https://navysbir.com/links_forms.htm. Include the SBIR VC Certification in the Supporting Documents (Volume 5).

c. Should a proposing SBC become a member of this ownership class after submitting its proposal and prior to any receipt of a funding agreement, the proposing SBC must immediately notify the Contracting Officer, register in the appropriate SBA database, and submit the required

Navy - 9 certification, which can be found on https://navysbir.com/links_forms.htm.

System for Award Management (SAM). It is strongly encouraged that proposing SBCs register in SAM, https://sam.gov, by the Close date of this BAA, or verify their registrations are still active and will not expire within 60 days of BAA Close. Additionally, proposing SBCs should confirm that they are registered to receive contracts (not just grants) and the address in SAM matches the address on the proposal. An SBC selected for an award MUST have an active SAM registration at the time of award or they will be considered ineligible.

Cybersecurity Maturity Model Certification (CMMC) Program. DoW has established the CMMC Program to verify that awardees have implemented required security measures necessary to safeguard Federal Contract Information (FCI) and Controlled Unclassified Information (CUI). CMMC Level requirements are identified within each topic and must be met prior to award. Proposing SBCs should anticipate that a Projected CMMC Level for Phase II award may be higher than the Projected CMMC Level advertised in the Phase I topic. Proposing SBCs should carefully review and consider the CMMC requirements as compliance may impact proposed costs and technical approach. Please review the DoW SBIR/STTR Program BAA for additional information on the CMMC Program.

Notice of NIST SP 800-171 Assessment Database Requirement. The purpose of the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 is to protect Controlled Unclassified Information (CUI) in Nonfederal Systems and Organizations. As prescribed by DFARS 252.240-7997, in order to be considered for award, an SBC is required to implement NIST SP 800-171 and shall have a current assessment uploaded to the Supplier Performance Risk System (SPRS) which provides storage and retrieval capabilities for this assessment. The platform Procurement Integrated Enterprise Environment (PIEE) will be used for secure login and verification to access SPRS. For brief instructions on NIST SP 800-171 assessment, SPRS, and PIEE, please visit https://www.sprs.csd.disa.mil/nistsp.htm. For in-depth tutorials on these items, please visit https://www.sprs.csd.disa.mil/webtrain.htm.

Human Subjects, Animal Testing, and Recombinant DNA. Due to the short timeframe associated with Phase I of the SBIR/STTR process, the DON does not recommend the submission of Phase I proposals that require the use of Human Subjects, Animal Testing, or Recombinant DNA. For example, the ability to obtain Institutional Review Board (IRB) approval for proposals that involve human subjects can take 6-12 months, and that lengthy process can be at odds with the Phase I goal for time-to-award.

Before the DON makes any award that involves an IRB or similar approval requirement, the proposing SBC must demonstrate compliance with relevant regulatory approval requirements that pertain to proposals involving human, animal, or recombinant DNA protocols. It will not impact the DON’s evaluation, but requiring IRB approval may delay the start time of the Phase I award and if approvals are not obtained within two months of notification of selection, the decision to award may be terminated. If the use of human, animal, and recombinant DNA is included under a Phase I or Phase II proposal, please carefully review the requirements at: https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections. This webpage provides guidance and lists approvals that may be required before contract/work can begin.

Government Furnished Equipment (GFE). Due to the typical lengthy time for approval to obtain GFE, it is recommended that GFE is not proposed as part of the Phase I proposal. If GFE is proposed, and it is determined during the proposal evaluation process to be unavailable, proposed GFE may be considered a weakness in the technical merit of the proposal.

International Traffic in Arms Regulation (ITAR). For topics indicating ITAR restrictions or the potential for classified work, limitations are generally placed on disclosure of information involving https://navysbir.com/links_forms.htm https://sam.gov/ https://www.sprs.csd.disa.mil/nistsp.htm https://www.sprs.csd.disa.mil/webtrain.htm https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections

Navy - 10 topics of a classified nature or those involving export control restrictions, which may curtail or preclude the involvement of universities and certain non-profit institutions beyond the basic research level. Small businesses must structure their proposals to clearly identify the work that will be performed that is of a basic research nature and how it can be segregated from work that falls under the classification and export control restrictions. As a result, information must also be provided on how efforts can be performed in later phases if the university/research institution is the source of critical knowledge, effort, or infrastructure (facilities and equipment).

SELECTION, AWARD, AND POST-AWARD INFORMATION

Notifications. Email notifications for proposal receipt (approximately one week after the Phase I BAA Close) and selection are sent based on the information received on the proposal Cover Sheet (Volume 1).

Consequently, the e-mail address on the proposal Cover Sheet must be correct.

Debriefs. Requests for a debrief must be made within 15 calendar days of select/non-select notification via email as specified in the select/non-select notification. Please note debriefs are typically provided in writing via email to the Corporate Official identified in the proposal of the proposing SBC within 60 days of receipt of the request. Requests for oral debriefs may not be accommodated. If contact information for the Corporate Official has changed since proposal submission, a notice of the change on company letterhead signed by the Corporate Official must accompany the debrief request.

Protests. Interested parties have the right to protest in accordance with the procedures in FAR Subpart 33.1.

Pre-award agency protests related to the terms of the BAA must be served to: osd.ncr.ousd-r-e.mbx.SBIR- STTR-Protest@mail.mil. A copy of a pre-award Government Accountability Office (GAO) protest must also be filed with the aforementioned email address within one day of filing with the GAO.

Protests related to a selection or award decision should be filed with the appropriate Contracting Officer for an Agency Level Protest or with the GAO. Contracting Officer contact information for specific DON Topics may be obtained from the DON SYSCOM Program Managers listed in Table 2 above. For protests filed with the GAO, a copy of the protest must be submitted to the appropriate DON SYSCOM Program Manager and the appropriate Contracting Officer within one day of filing with the GAO.

Awards. Due to limited funding, the DON reserves the right to limit the number of awards under any topic. Any notification received from the DON that indicates the proposal has been selected does not ultimately guarantee an award will be made. This notification indicates that the proposal has been selected in accordance with the evaluation criteria and has been sent to the Contracting Officer to conduct compliance review of Volume 3 to confirm eligibility of the proposing SBC, and to take other relevant steps necessary prior to making an award.

Contract Types. A Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other Transaction (OT) may be used for Phase I awards.

Funding Limitations. In accordance with the SBIR and STTR Policy Directive section 4(b)(5), there is a limit of one sequential Phase II award per SBC per topic. The maximum Phase I proposal/award amount including all options (including TABA) is $315,000. The Phase I Base amount must not exceed $200,000 and the Phase I Option amount must not exceed $115,000. The maximum Phase II proposal/award amount including all options (including TABA) is $2,000,000 (unless non-SBIR/STTR funding is being added). Individual SYSCOMs may award amounts, including Base and all Options, of less than $2,000,000 based on available funding. The structure of the Phase II proposal/award, including maximum amounts as well as breakdown between Base and Option amounts will be provided to all Phase I

Navy - 11 awardees either in their Phase I award or a minimum of 30 days prior to the due date for submission of their Initial Phase II proposal.

Contract Deliverables. Contract deliverables for Phase I are typically a kick-off brief, progress reports, and a final report. Required contract deliverables (as stated in the contract) must be uploaded to https://www.navysbirprogram.com/navydeliverables/.

Payments. The DON makes three payments from the start of the Phase I Base period, and from the start of the Phase I Option period, if exercised. Payment amounts represent a set percentage of the Base or Option value as follows:

Days from Start of Base Award or Option Payment Amount 15 Days 50% of Total Base or Option 90 Days 35% of Total Base or Option 180 Days 15% of Total Base or Option

Transfer Between SBIR and STTR Programs. Section 4(b)(1)(i) of the SBIR and STTR Policy Directive provides that, at the agency’s discretion, projects awarded a Phase I under a BAA for SBIR may transition in Phase II to STTR and vice versa.

PHASE II GUIDELINES

Evaluation and Selection. All Phase I awardees may submit an Initial Phase II proposal for evaluation and selection. The evaluation criteria for Phase II is the same as Phase I (as stated in this BAA). The Phase I Final Report and Initial Phase II Proposal will be used to evaluate the SBC’s potential to progress to a workable prototype in Phase II and transition the technology to Phase III. Details on the due date, content, and submission requirements of the Initial Phase II Proposal will be provided by the awarding SYSCOM either in the Phase I contract or by subsequent notification.

Awards. The DON will consider the following for Phase II award: Cost Plus Fixed Fee (CPFF), Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other Transaction (OT). Phase II awards can be structured in a way that allows for increased funding levels based on the project’s transition potential. To accelerate the transition of SBIR/STTR-funded technologies to Phase III, especially those that lead to Programs of Record and fielded systems, the Commercialization Readiness Program was authorized and created as part of section 5122 of the National Defense Authorization Act of Fiscal Year 2012. The statute set-aside is 1% of the available SBIR/STTR funding to be used for administrative support to accelerate transition of SBIR/STTR-developed technologies and provide non-financial resources for the SBCs (e.g., the Navy SBIR Transition Program, STP).

Navy SBIR Transition Program (STP). Phase II awardees have the opportunity to participate in the virtual Navy STP Kickoff during the first or second year of the Phase II contract. While there are no travel costs associated with this virtual event, Phase II awardees should budget time of up to a full day to participate. STP information can be obtained at: https://navystp.com. Phase II awardees will be contacted separately regarding this program.

PHASE III GUIDELINES

A Phase III SBIR/STTR award is any work that derives from, extends, or completes effort(s) performed under prior SBIR/STTR funding agreements, but is funded by sources other than the SBIR/STTR programs. This covers any contract, grant, or agreement issued as a follow-on Phase III award or any contract, grant, or agreement award issued as a result of a competitive process where the awardee was an SBIR/STTR firm that developed the technology as a result of a Phase I or Phase II award. The DON will https://navystp.com/

Navy - 12 give Phase III status to any award that falls within the above-mentioned description. Consequently, DON will assign SBIR/STTR Data Rights to any noncommercial technical data and noncommercial computer software delivered in Phase III that were developed under SBIR/STTR Phase I/II effort(s). Government prime contractors and their subcontractors must follow the same guidelines as above and ensure that companies operating on behalf of the DON protect the rights of the SBIR/STTR firm.

Navy - 13

Navy SBIR DoW 2026 BAA Topic Index

Release 4

DON26BZ04-NV066 Domestic Production of Plant-based Carbon Fiber Precursors in Support of

Hypersonic Applications

DON26BZ04-NV067 High Precision Specialized Waveguides for Extreme Temperatures

Navy - 14

DON26BZ04-NV066 TITLE: Domestic Production of Plant-based Carbon Fiber Precursors in Support of Hypersonic Applications

OUSW (R&E) CRITICAL TECHNOLOGY AREA(S): Scaled Hypersonics (SHY)

COMPONENT TECHNOLOGY PRIORITY AREA(S): Advanced Materials;Hypersonics;Sustainment

PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)

The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement.

Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.

OBJECTIVE: Develop an environmentally friendly processing method to produce a plant-based carbon fiber precursor for high-temperature applications.

DESCRIPTION: Rayon-based carbon fibers remain the choice of material as reinforcement in carbon phenolic composites used as thermal protection systems for hypersonics. Currently, rayon fiber precursors used to make rayon-based carbon fibers are not produced in the United States and are subject to the volatile global market for rayon fibers. Moreover, rayon fibers are vital to other Department of Defense programs, NASA, and commercial space companies due to their proven superior thermal performance over polyacrylonitrile (PAN) and pitch-based carbon fibers [Ref 1]. The production of rayon fibers ceased in the United States in 1997 due to the increased cost associated with environmental concerns from the traditional viscose process to produce rayon fibers. Since then, rayon fiber precursors have been sourced from European textile companies that primarily produce rayon for applications other than as a precursor for carbon fiber. Among the 6.5 million metric tons of rayon fibers produced per year, approximately 1.6-

3.2 metric kilotons are rayon fiber precursors used to make carbon fiber [Ref 2]. The global market for rayon is shifting toward a non-toxic process to produce rayon fibers; however, new rayon fibers and other plant-based (cellulose or lignin) fibers have yet to be proven as adequate precursors to produce carbon fibers for thermal protection systems. Therefore, research on environmentally friendly processes to produce a rayon fiber precursor or another plant-based fiber is needed to establish a domestic source of carbon fiber precursor suitable for thermal protection systems. The fiber precursor must be able to be carbonized into a carbon fiber and characterized for structure and properties.

Work produced in Phase II may become classified. Note: The prospective contractor(s) must be U.S.

owned and operated with no foreign influence as defined by 32 U.S.C. § 2004.20 et seq., National Industrial Security Program Executive Agent and Operating Manual, unless acceptable mitigating procedures can and have been implemented and approved by the Defense Counterintelligence and Security Agency (DCSA) formerly Defense Security Service (DSS). The selected contractor must be able to acquire and maintain a secret level facility and Personnel Security Clearances. This will allow contractor personnel to perform on advanced phases of this project as set forth by DCSA and NAVSEA in order to gain access to classified information pertaining to the national defense of the United States and its allies; this will be an inherent requirement. The selected company will be required to safeguard classified material during the advanced phases of this contract IAW the National Industrial Security Program Operating Manual (NISPOM), which can be found at Title 32, Part 2004.20 of the Code of Federal Regulations.

Navy - 15

PHASE I: Develop a proof of concept for the processing of cellulose or lignin to produce a fiber precursor for the production of carbon fibers. (Note: The fiber precursor is expected to be carbonized into a carbon fiber. The subsequent carbon fiber is expected to be characterized for break strength and carbon content.)

Ensure that the process meets Environmental Protection Agency standards for effluent from fiber processing in accordance with pertinent environmental regulations for the production of fibers.

The Phase I Option, if exercised, will include the initial design specifications and capabilities description to build a prototype solution in Phase II.

PHASE II: Build upon the process identified during Phase I by weaving and carbonizing the fiber precursor to create a carbon fabric prototype. (Note: For applicability into thermal protection systems, the fiber precursor can be woven into fabric prior to or after carbonization.) Provide, at a minimum, the following characterization analysis of the prototype: (1) electrical conductivity, (2) density, (3) char yield,

(4) break strength, and (5) alkali metal impurities content of the carbonized fabric.

It is probable that the work under this effort will be classified under Phase II (see Description for details).

PHASE III DUAL USE APPLICATIONS: Scale the process in order to produce fiber precursors that can be woven, carbonized, and integrated into applicable polymer matrices to deliver a polymer matrix composite component for a thermal protection system. Transition the composite to the Navy based on its thermal and ablative performance in an arc jet test. Provide additional characterization such as the composite’s density, thermal conductivity, char yield, spectral emissivity, tensile strength, and shear strength.

Support the government in transitioning the technology for government use. The transitioned product is expected to be able to support current and future weapon and space systems, as well as a wide range of other air-, land-, and sea-based systems. The development of a domestic course of rayon-based carbon fibers would be of interest to the Army, Navy, Air Force, NASA, and commercial space programs for rocket nozzles and thermal protection systems.

REFERENCES:

1. Milbrandt, A. B. “Carbon Fiber from Biomass.” Golden: Clean Energy Manufacturing Analysis Center, 2016. https://www.nrel.gov/docs/fy16osti/66386.pdf

2. Peijs, T. K.“Chapter 5: A critical review of carbon fiber and related products from an industrial perspective.” Advanced Industrial and Engineering Polymer Research, 2022, pp. 90-106.

https://doi.org/10.1016/j.aiepr.2022.03.008

3. National Industrial Security Program Executive Agent and Operating Manual (NISP), 32 U.S.C. §

2004.20 et seq. (1993). https://www.ecfr.gov/current/title-32/subtitle-B/chapter-XX/part-2004

KEYWORDS: Carbon fiber; rayon; carbonization; cellulose; lignin; thermal protection system;

hypersonics; ultra high temperature material

NAVY - 16

DON26BZ04-NV067 TITLE: High Precision Specialized Waveguides for Extreme Temperatures

OUSW (R&E) CRITICAL TECHNOLOGY AREA(S): Scaled Hypersonics (SHY)

COMPONENT TECHNOLOGY PRIORITY AREA(S): Advanced Materials;Hypersonics;Sustainment

PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)

The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement.

Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.

OBJECTIVE: Provide specialized waveguides capable of high temperature, high power, low loss, robust, and agile transmission of radio frequency (RF) signals within a hypersonic vehicle.

DESCRIPTION: The use of RF cables has difficulty meeting environmental conditions while maintaining signal integrity and power requirements. Hypersonic surface temperatures can exceed over 1,000-degree C. Waveguides provide high power transmission and might be easier to manage under extreme hypersonic conditions.

The Navy seeks RF transmission that focuses on high frequency, is consistent performance across a vast range of extreme thermal temperatures, and provides long durations of high thermal loads. The ability to produce complex and unique shapes while maintaining signal performance is required. The development of these waveguides should address extreme hypersonic conditions. The RF frequencies are across a large spectrum for different antennas/capabilities, but waveguides become too large at lower frequencies. To be successful, the waveguides should target frequency bands of X, Ku, K, and Ka. Any dielectric medium may be used within the waveguide. A successful dielectric material would have a permittivity near that of a vacuum, such as air, to ensure low-loss transmission, specifically at extreme temperatures.

Work produced in Phase II may become classified. Note: The prospective contractor(s) must be U.S.

owned and operated with no foreign influence as defined by 32 U.S.C. § 2004.20 et seq., National Industrial Security Program Executive Agent and Operating Manual, unless acceptable mitigating procedures can and have been implemented and approved by the Defense Counterintelligence and Security Agency (DCSA) formerly Defense Security Service (DSS). The selected contractor must be able to acquire and maintain at least a secret-level facility and Personnel Security Clearances. This will allow contractor personnel to perform on advanced phases of this project as set forth by DCSA and SSP in order to gain access to classified information pertaining to the national defense of the United States and its allies; this will be an inherent requirement. The selected company will be required to safeguard classified material during the advanced phases of this contract IAW the National Industrial Security Program Operating Manual (NISPOM), which can be found at Title 32, Part 2004.20 of the Code of Federal Regulations.

PHASE I: Provide feasibility of producing X through Ka band waveguides out of a material robust enough to withstand the extreme environmental conditions of a hypersonic vehicle. During this stage of the development, a prototype of any band is desired to demonstrate operation, but not required to transition to Phase II. Tolerances, bends, and refined connections/adapters will be implemented in the Phase II. Describe how this manufacturing capability can make custom waveguides that will meet all

NAVY - 17

hypersonic conditions. Define the limitations, improvements over other materials, improvements over other manufacturing methods, and description on high volume production (including any limitations or areas of future investment opportunities).

The Phase I Option, if exercised, will include the initial design specifications and capabilities description to build a prototype solution in Phase II.

PHASE II: Develop a custom part that meets extreme environmental condition tests that must assess the transmission of X, Ku, K, or Ka band RF signals. Do extensive machining and testing to provide tolerances, bending limits, and custom connections/adapters concepts that could be adopted and implemented quickly. (Note: The design may be an iterative process to improve performance of the waveguide and to specific requirements.) Demonstrate the prototype’s ability to meet the requirements presented at the beginning of Phase II.

It is probable that the work under this effort will be classified under Phase II (see Description for details).

PHASE III DUAL USE APPLICATIONS: Support the Government in transitioning the technology for Government use. The transitioned product is expected to support current and future hypersonic and space systems, as well as a wide range of other air, land, and sea-based systems.

REFERENCES:

1. Ponchak, G. E.; Jordan, J. L. and Scardelletti, M. C. "High Temperature Characteristics of Coplanar Waveguide on R-Plane Sapphire and Alumina." IEEE Transactions on Advanced Packaging, vol. 32, no. 1, pp. 146-151, Feb. 2009. doi: 10.1109/TADVP.2008.2009123 https://ieeexplore.ieee.org/document/4785306

2. Shen, J. et al. "Rapid prototyping of low loss 3D printed waveguides for millimeter-wave applications." 2017 IEEE MTT-S International Microwave Symposium (IMS), Honololu, HI, USA, 2017, pp. 41-44. doi: 10.1109/MWSYM.2017.8058593 https://ieeexplore.ieee.org/abstract/document/8058593

3. National Industrial Security Program Executive Agent and Operating Manual (NISP), 32 U.S.C. §

2004.20 et seq. (1993).…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .