Dolly Lashing Straps - PWS_Redacted.pdf
PDF 179 KB Posted
- Attached to
- FY26 MPL DOLLY LASHING STRAPS
- Solicitation number
- N42158-26-SIMACQ-NNSY-1200N-0009
About this file
This Performance Work Statement (PWS) details the refurbishment of 96 Dolly Lashing Straps for the Norfolk Naval Shipyard (NNSY). The contractor is required to pick up the straps, overhaul and restore them according to specific NAVSEA drawing requirements, including discarding and replacing software and material items, repairing damaged components, and providing plating and plastisol coating. Additional responsibilities include performing operational tests, weight test certification, and delivering the straps with complete documentation.
The project has a Period of Performance from 12/15/2025 through 7/8/2026, with equipment to be returned to NNSY no later than 8/5/2026 to support Combat Systems Testing. Contractor employees must be U.S. citizens with a confidential security clearance to obtain a Shipyard badge and Common Access Card. The work will be performed at the contractor's facility, with the straps being picked up and returned to NNSY. The applicable documents include multiple NAVSEA drawings related to weapons handling equipment, test loads, methods, and inspection procedures for SSN-688 Class Submarines.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section A: Scope
1. Objective:
Inspect, disassemble, restore, reassemble and weight test Dolly Lashing Straps. Refurbished Dolly Lashing
2. Background/Introduction
Dolly Lashing Straps require refurbishment to meet the inspection requirements of NAVSEA Drawing 709-
5549373 REV M Weapons Handling Test Loads and Methods and Inspection Procedure. The current certification is expired. The Dolly Lashing Straps require refurbishment before they are able to be placed under load for their use in weapons handling evolutions.
3. Limitations of Work
None.
Section B: Applicable Documents
4. Documentation:
4.1. NAVSEA DWG 709-5549373 Rev M, SSN-688 Weapons Handling Equipment Test Loads/Methods and Inspection Procedures
4.2. NAVSEA DWG 709-5200393 Rev C, SSN-688 Class Submarine Weapons Stowage and Handling
Torpedo Lashing Strap Assembly & Details
4.3. NAVSEA DWG 709-6250296 Rev E, SSN-688 Class Submarine Weapon Handling and Stowage
Equipment Repair Notes
4.4. TM SG420-BU-MMA-010 Rev 02 Weapons Shipping, Handling, and Stowage Equipment
6. Contractor Responsibilities:
6.1. Contractor shall pick up (QTY 96) Dolly Lashing Straps from NNSY.
6.2. Contractor shall overhaul and restore (QTY 96) Dolly Lashing Straps IAW requirements of references
4.1 through 4.4.
6.2.1. Contractor shall discard and replace all software and mandatory material items IAW requirements of references 4.1 through 4.4.
6.2.2. Contractor shall repair/replace damaged components as required for satisfactory operation IAW references 4.1 through 4.4.
6.2.3. Contractor shall provide plating and plastisol coat to components as required by references 4.2 and 4.3.
6.3. Contractor shall perform operational test of all moving parts.
6.4. Contractor shall perform weight test certification of (QTY 96) Dolly Lashing Straps IAW reference 4.1.
6.5. Contractor shall deliver (QTY 96) Dolly Lashing Straps with all Weight Test Certification documentation
7. NNSY Responsibilities:
NNSY will be responsible to supply Dolly Lashing Straps (QTY 96) and assist in coordinating delivery to ship when completed.
8. Government Furnished Property:
(QTY 96) Dolly Lashing Straps
9. Security Requirements:
All Documents listed in Section 4 of this Statement of Work and deliverable items associated with this task are confidential or below. Contractor employees must be U.S. citizens and shall have a confidential clearance to obtain a Shipyard badge and Common Access Card (CAC) for unescorted entry to the Norfolk
Naval Shipyard Controlled Industrial Area. Security Clearance information shall be submitted with the contractor’s proposal.
10. Delivery Terms/Shipping/Transportation
Contractor to pick up GFE and deliver upon completion.
11. Place of Performance/Delivery Location:
Work shall be performed at the Contractors Facility. The Dolly Lashing Straps (QTY 96) shall be picked up and returned to NNSY
12. Period of Performance (PoP)/ Completion Date/ Delivery Date:
The POP is 12/15/2025 through 7/8/2026. Equipment will need to be returned to NNSY no later than
8/5/2026 to support project schedule for Combat Systems Testing. The Contractor will check in with the
NNSY POC prior to and upon completion of work.