Frenchburg DOL099RP20799 Solicitation_Amend0001 Page L6_12102009.pdf
PDF 32 KB Posted
- Attached to
- RECOVERY - Frenchburg Civilian Conservation Center Food Service Building Renovation (Mariba, Kentucky)
- Solicitation number
- DOL099RP20799
About this file
Page L-6 Sub-Section L.10 (Changed)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOL099RP20799 SECTION L Amendment 0001
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L-6
(A) The Offeror shall demonstrate prior corporate experience listing only those projects completed within the past five (5) years with any of the following criteria:
(i) Design-Build projects performed in Menifee, Kentucky; and/or
(ii) Projects performed in Kentucky of similar size and scope as this project; and/or
(iii) Projects performed under a Federal Government contract.
(B) Scoring will be more favorable for projects meeting multiple criteria. Include the following information for each project listed. (Items are of equal importance.)
(i) The Offeror’s design experience in the Design-Build process;
(ii) The Offeror’s construction experience in the Design-Build process;
(iii) The Offeror’s recent experience in meeting the completion schedule for similar projects; and
(iv) The Offeror’s awards that have been won for similar projects;
(3) PRELIMINARY DESIGN
As part of its Technical Proposal, the Offeror shall submit sketches for the design and the construction of the project. The proposal shall be based on the requirements set forth within the Specifications.
The design effort shall be sufficiently complete in all parts to ensure the work represented can be accomplished within the construction budget and is sufficient for the Offeror to develop a firm price proposal.
The proposal shall include those items required in Section 7.5.1 of the Job Corps Handbook (JCH) 814, dated September 2006. In addition, the proposal shall:
(i) Provide a design narrative, demo plan, schematic floor plan layout, reflected ceiling plan, and elevation sections for the cafeteria renovation.
(ii) Provide a Life Cycle Cost Analysis in accordance with Section 5.2.11–HVAC Systems, Components and Materials, of the JCH-814, dated September 2006.
(iii) Provide a design narrative which addresses the High Performance and Sustainable Building Design requirements in accordance with Section 1.8–High Performance and Sustainable Building Design, of the JCH-814, dated September 2006. The design narrative shall include both recommendations and cost information associated with each recommendation.
(4) PROJECT SCHEDULE
File details come from the government source that posted it. Updated .