About this file

This document is a grant application form for the Leading by Example Solar-Decarbonization Grant Program issued by the Massachusetts Department of Energy Resources (DOER). The program provides funding for state and local entities to implement solar photovoltaic (PV) projects, energy storage systems, and electric vehicle (EV) charging infrastructure. The application form outlines the required project details, including system technology, size, generation estimates, utility information, procurement plans, project timeline, and cost breakdown. Applicants can also request additional funding for decarbonization measures such as heat pumps, building envelope upgrades, and other projects to support facility decarbonization.

The grant program provides incentives of up to $2,500,000 per solar PV system, with additional funding available for energy storage, EV charging, and projects located in Environmental Justice or Low-income Disadvantaged Communities. Applicants must provide detailed cost estimates, financing plans, and projected energy and emissions savings to qualify for the grant. The application deadline is June 30, 2027, and awarded grants will be between the DOER and the selected state entities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Introduction

INSTRUCTIONS
Complete the Solar Application Form tab of this spreadsheet as well as the Decarbonization Form tab if applicable, and submit to DOER via email at LBE-grants@mass.gov.
IMPORTANT TO NOTE
Please refer to the Program Opportunity Notice (PON) for full details on grant eligibility, requirements, and evaluation criteria.
The deadline to submit an application for this PON is June 30, 2027.
All applications and supporting documentation must be submitted via email to LBE-grants@mass.gov.
Awarded grants will be between the DOER and the selected state entity(s).
CONTACT INFORMATION
Please submit any inquiries to LBE-grants@mass.gov with "LBE Solar-Decarbonization Grant" in the subject line
Additional program contacts:
Catie Snyder

Deputy Director Department of Energy Resources LBE Division catie.snyder@mass.gov Sophia Vitello Data & Project Analyst Department of Energy Resources LBE Division sophia.vitello@mass.gov

The Commonwealth of Massachusetts Department of Energy Resources 100 Cambridge Street, 9th Floor Boston, MA 02114 http://www.mass.gov/doer Leading by Example Solar-Decarbonization Grant Program

PON-ENE-2025-004

Issued September 20, 2024

Solar Application Form

1)Applicant Contact InformationNotes
Applicant Name:
Agency/Campus:
Title:
E-mail:
Phone:
New Application or Update to Existing Application:
Date of Submission (whether new or update):
Project Title:
Project Location (include specific lot or building, where applicable):
Will project be located in an Environmental Justice (EJ) community or Low-income Disadvantaged Community (LIDAC)?Please select from dropdown
Search the EEA statewide Environmental Justice Map here to determine if in an EJ communitySearch the federal Climate and Economic Justice Screening Tool here to determine if in a LIDAC
2)Solar PV Project, Metering, and Ownership TypeBTM: behind-the-meter
Please select from dropdown:Please select typeFTM: front-of-meter

3) Project Narrative:

Describe project details, including description of system, system location, project status and whether the project will be purusing SMART qualification or other incentives. In addition, please include any supplemental clean energy measures that will be undertaken onsite as part of this project or that have been implemented in the past. Similarly, for an innovative solar project, please describe what makes this project "innovative".

4)Project Details
A. Technology:Please select from dropdown
B. Size/Capacity (kW AC):
C. Size/Capacity (kW DC):
D. Size/Capacity (watts) (autopopulates):0
E. Projected Generation Year 1 (kWh) (autopopulates):0
i. Projected Generation over 20 Years (kWh) (autopopulates):
F. Percentage of Generation to be Used Onsite:
G. Total Site Electricity Consumption/Year (kWh):
H. Electric utility, service area, and rate class:
I. Utility basic service rate ($/kWh):Basic service = supply, RPS, and admin costs
J. Does this project include energy storage?
If yes, please answer the following questions:Please select from dropdown
i. Nominal rated power capacity (kW)
ii. Nominal useful energy capacity (kWh)
iii. Please describe how the agency intends to use the energy storage system, including

expected cycling per year

iv. Please describe any expected benefits from the energy storage system, such as type and amount of economic impacts, added resiliency, etc.

v. If the energy storage system is being designed to provide energy resiliency benefits, please describe the system components that provide resilience, the loads being served during an outage and how these loads provide value to occupants/visitors/community and/or align with the facility's mission.
K. Please describe plans for any exported electricity, (i.e. net metering, on-bill credits, etc). If no exported electricity is expected, please describe how the system was designed to ensure this.
L. Please describe any expected interconnection challenges that have been identified in the pre-application report or through other measures:
M. Circuit name of the expected interconnection location (identified in pre-application report):
N. Procurement Plans (team, expected timeline, procurement methodology e.g. Chap. 149, Chap. 25a, agency RFR, etc)
O. For ground-mount projects, please describe how the project will meet the requirement for inclusion of pollinator-friendly plantings in the area around the solar PV system
P. Projected Timeline:Please provide target dates for each section below:
i. Planning/Design
ii. Procurement
iii. Construction Start
iv. Construction End
v. Projected Interconnection
5)Project Cost Information
A. Total Project Cost (incl. interconnection if known):
B. Estimated Interconnection Cost (if known):
C. Total Estimated Cost/Watt:
i. Breakdown of Cost/Watt Solar:
ii. Breakdown of Cost/Watt Storage (if applicable):
D. Please describe any measures that have been taken to reduce the final project costs (e.g. minimal system add-ons, standardized design, etc):
E. If applicable, estimated SMART incentive rate (please identify expected SMART block, base incentive rate and type and amounts of any expected adders)
F. PPA Rate or AOBC Credit (before/without LBE Grant), if applicable:
G. PPA Rate or AOBC Credit (with LBE Grant), if applicable:
H. PPA Terms, if applicable (escalator, timeline of contract, lease payments, etc):
I. Has this grant already been factored into the PPA rate? If not, are there plans to use it to reduce the PPA rate?
J. If this project is a lease-only arrangement (i.e. the facility is not an off-taker for any of the electricity produced), please describe the terms of the agreement and benefits to the agency.
K. Other funding sources (please describe the degree to which funding has been secured):
6)EV Charging (for solar canopy projects only)
A. If Level 2 Charging: Number of parking spaces covered by solar canopy

(Level 2 are standard for this grant but can substitute Level 1 at a 3:1 port ratio - see 6B)

B. If substituting Level 1 Charging: Number of parking spaces covered by solar canopy
C. Number of Level 2 charging ports required by this grant0
D. Number of Level 1 charging ports required by this grant0
E. Number of charging ports to be installed as part of this project
F. If fewer ports to be installed than required by grant, please provide justification
G. Number of Level 2 ports for which pre-wiring is required under this grant0
H. Number of Level 1 ports for which pre-wiring is required under this grant (if substituting for Level 2)0
I. Number of ports for which pre-wiring is included in this project
J. If fewer ports to be pre-wired for than required by grant, please provide justification
7)Grant Funding Requested
Incentive ($/watt) ($/kW)
(autocalculates)Total Incentive RequestedMaximum Incentive
Solar PV System Incentive$0$2,500,000
Storage System Incentive$0
EVSE Incentive$0
Eligible Matching Decarbonization Incentive$0
EJ adder (if applicable)$0
Total Solar + Storage + EVSE + EJ Adder
(as applicable)$0
TOTAL$0$0
8)Project Benefits for Site
A. Estimated Energy Savings (kWh)

(same as 4e above if using all electricity onsite):

B. Projected Cost Savings & RevenuePlease provide estimates below:
i. Annual avoided electricity costs from offset consumption:
ii. Annual avoided electrcity costs from net metering or on-bill credits:
iii. Annual demand charge savings:
iv. Annual capacity charge savings:
v. Annual SMART revenue (if applicable):
vi. Other savings or revenue:
Total annual projected benefits:$0
C. Please describe any non-monetary benefits:
D. Please describe any related education & outreach efforts that will be used to highlight the benefits of solar to stakeholders, clients, community, or the general public:
9)REC Retirement: Embodied Carbon of Project
Project type & REC retirement pathwayPlease select from dropdown
# of RECs to Retire (autocalculates):--

New Application Update to Existing Application https://www.mass.gov/info-details/environmental-justice-populations-in-massachusettshttps://screeningtool.geoplatform.gov/ Decarbonization Form

Completion of this tab is required for project proponents who are seeking to request the additional decarbonization funding offered through this Program.

1)Project InformationNotes
Project Title
Project Location
Please confirm decarbonization project will be located at same site as the solar projectPlease select from dropdown
Project CategoryPlease select from dropdown

2) Project Narrative:

Provide project details, including a description of project, its intended results, and how it either supports state facility decarbonization, and whether additional incentives are being sought for the project (e.g., utility funding). In addition, please include any supplemental clean energy measures that will be undertaken onsite as part of this project or that have been implemented in the past. If you have selected "Other projects to facilitate current or future decarbonization" above, please provide as much detail as possible about the scope of the project.

3)Project Details
Project Size (with units)E.g., tons (heat pump), square footage (envelope), etc.
Total Estimated Project Cost

(Project quotes or cost estimates must be secured by the applicant prior to submission of an application to substantiate the funding request)

Maximum Grant Incentive Available (autopopulates)$0.00
Total Grant Incentive RequestedMay not exceed the maximum incentive value in line 29.
4)Annual Project Benefits
Estimated annual energy savings (MMBtus)

(if applicable)

Estimated annual emissions reduction (MTCO2e)
Estimated annual cost savings
Please describe any non-monetary and non-emissions benefits

RECs Source

Inputs
Total MW0.00
Total kW DC0
Year 1 annual generation (kWh) from capacity0
Total RECs in Year 101 REC = 1 MWh
Total RECs in First 2 Years0
Total RECs over 20 Years0
20-Year Solar Generation OutlookYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12Year 13Year 14Year 15Year 16Year 17Year 18Year 19Year 20Total
Solar generation kWh (0.5% annual degradation)- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
MWh equivalent- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
20% of annual MWh- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
8% of annual MWh- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
20-Year Emissions Reduction EstimatesYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12Year 13Year 14Year 15Year 16Year 17Year 18Year 19Year 20Total
CECP projected grid emission factor (starts with FY24) (MTco2e per kwh)

tc={D7E9D707-089E-4F81-AB63-AEAD5BB1946D}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

MTCO20.0002450.0002390.0002250.0002030.0001820.0001600.0001390.0001240.0001160.0001080.0001000.0000920.0000840.0000770.0000700.0000630.0000570.0000510.0000470.000042
Estimated emissions reduction based on generation (MTCO2e)000000000000000000000
Solar CanopyClass I RECsSMART
Purchase upfront00
Retire upfront0--
Retire over time0--
Rooftop & ground-mountClass I RECsSMART
Purchase upfront00
Retire upfront0--
Retire over time0--

EPEAT Rooftop & Ground-mount 0

EPEAT Canopy (25% redux)Class I RECsSMART
Purchase upfront00
Retire upfront0--
Retire over time0--

Solar Source

Solar PV Project TypeDoes this project include storage?RECs
Please select typePlease select from dropdownPlease select from dropdown
Rooftop / State-owned / BTMYesCanopy / Class I / Purchase upfront
Rooftop / State-owned / FTMNoCanopy / Class I / Retire upfront
Rooftop / 3rd party-owned / BTMCanopy / Class I / Retire over time
Rooftop / 3rd party-owned / FTMProject Detail TechnologyCanopy / SMART / Purchase upfront
Ground-mount / State-owned / BTMPlease select from dropdownRooftop or ground-mount / Class I / Purchase upfront
Ground-mount / State-owned / FTMRooftopRooftop or ground-mount / Class I / Retire upfront
Ground-mount / 3rd party-owned / BTMGround-mountRooftop or ground-mount / Class I / Retire over time
Ground-mount / 3rd party-owned / FTMSolar CanopyRooftop or ground-mount / SMART / Purchase upfront
Canopy / State-owned / BTMInnovative SolarEPEAT / Canopy / Class I / Purchase upfront
Canopy / State-owned / FTMEPEAT /Canopy / Class I / Retire upfront
Canopy / 3rd party-owned / BTMEJC?EPEAT / Canopy / Class I / Retire over time
Canopy / 3rd party-owned / FTMPlease select from dropdownEPEAT / Canopy / SMART / Purchase upfront
Innovative Solar / State-owned / BTMYesEPEAT / Roof or ground-mount
Innovative Solar / State-owned / FTMNo
Innovative Solar / 3rd party-owned / BTM
Innovative Solar / 3rd party-owned / FTM

Decarb Source

Project Category
Please select from dropdown
Decarbonization conversion (i.e., heat pumps)
Site electrification preparation
Building envelope improvements
Other projects to facilitate current or future decarbonization
Same Site as Solar
Please select from dropdown
Yes
No

image1.jpg image2.png

File details come from the government source that posted it. Updated .