This is an Invitation for Bid (IFB) document for Project No. 33094, Franklin Street Stormwater, issued by the City of Jefferson City, Missouri (Reference #IFB4386-07/26). The project encompasses the furnishing of all material, labor, and equipment to construct an enclosed stormwater system including pipes and inlets, pavement replacement, sidewalk construction, pipe abandonment, fencing, grading, and related ancillary items. The scope includes mobilization, traffic control across five phases, stormwater infrastructure components such as inlet structures, junction boxes, and dual-wall pipes in various diameters, concrete pavement and sidewalk construction of varying thicknesses, pedestrian amenities including detectable warning panels and fencing, and site restoration work including seeding and mulching. The bid opening date is July 5, 2026, at 12:00 AM CDT, with submissions due by July 21, 2026, at 1:30 PM CDT. A mandatory pre-bid conference is scheduled for July 16, 2026, from 11:00 AM to 12:00 PM CDT at the Thomas Jefferson Conference Room, City Hall, 320 E. McCarty Street, Jefferson City, Missouri 65101. The project owner is Megan Stephenson, and questions regarding the opportunity may be submitted on an ongoing basis.

The bid document includes a detailed pricing form requiring unit prices and total costs for approximately 40 line items, ranging from mobilization and traffic control to specific quantities of materials such as 230 linear feet of 15-inch diameter dual-wall pipe, 355 linear feet of 30-inch diameter dual-wall pipe, 718 square yards of compacted stone base, and 1,019 square yards of concrete pavement across varying thicknesses. Bidders must submit signed bid documents and itemized bid forms as required by the solicitation. No specific award date, contract term, set-asides, or funding sources are identified in the provided documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. 33094, Franklin Street Stormwater

Jul 5th 2026, 12:00AM CDT - Jul 21st 2026, 1:30PM CDT

Table of Contents

Contents Page #

Project Details 3

. 4

.. 4

Project Details

Project Project No. 33094, Franklin Street Stormwater

Ref. # IFB4386-07/26

Type IFB

Description The proposed work for the project entitled "Project No.

33094, Franklin Street Stormwater" will include the furnishing of all material, labor, and equipment to construct an enclosed stormwater system including pipes and inlets, pavement replacement, sidewalk construction, pipe abandonment, fencing, grading, and other ancillary items.

Open Date Jul 5th 2026, 12:00AM CDT

Questions Due Date

Close Date Jul 21st 2026, 1:30PM CDT

Project Owner Megan Stephenson

Events

Event Name Duration Description

Open Date Jul 5th 2026, 12:00AM CDT

Posting date for the Opportunity

Project No. 33094, Franklin Street Stormwater Pre- Bid Meeting

Jul 16th 2026, 11:00AM CDT -

Jul 16th 2026, 12:00PM CDT

A pre-bid conference will be held at 11:00 A.M., on Thursday, July 16, 2026 in theThomas Jefferson Confrence Rooom of City Hall, 320 E, McCarty Street,Jefferson City, MO 65101. All prospective bidders are urged to attend.

Close Date Jul 21st 2026, 1:30PM CDT

Deadline for Submissions

Questions Due Date

The Q and A Period for this Opportunity is Ongoing

..0 Pricing Form [Required]

No Basket

Item Name Unit of Measure Approx.

Quantity

Unit Price Total Cost

Mobilization LS 1 Traffic Control Phase 1

LS 1

Traffic Control Phase 2

LS 1

Traffic Control Phase 3

LS 1

Traffic Control Phase 4

LS 1

Traffic Control Phase 5

LS 1

Straw Wattles LF 50 Inlet Protection EA 5 Removals LS 1 Earthwork LS 1 Rock Excavation QY 30 4'x4' Type C Inlet, Structures 3, 4, 7, & 8

EA 4

4'x4' Junction Box, Structures 2, 5, 6, & 10

EA 4

4'x8' Junction Box, Structure 1

EA 1

Grated Inlet, Structure 9

EA 1

Grated Inlet, Structure 14

EA 1

15" CMP Elbow & Pipe Conection to Structure 4

LS 1

15" Dia. N-12 Dual Wall Pipe

LF 230

30" Dia. N-12 Dual Wall Pipe

LF 355

Pipe Abandonment

CY 35

Solid Block Modular Block Wall

SFF 65

Cap Block for Solid Block Wall

LF 40

Sub Grade Stabilization

TON 400

3" Thick Compacted Stone Base

SY 718

Type "A" Curb and Gutter

LF 307

8" Thick PCC Commercal Approach

SY 46

Item Name Unit of Measure Approx.

Quantity

Unit Price Total Cost

9 1/2" Thick Concrete Pavement

SY 195

7" Thick Concrete Pavement

SY 392

6" Thick Concrete Pavement

SY 418

4" Thick Concrete Sidewalk

SY 114

Monolithic Concrete Toe Wall

LF 27

6" Thick Concrete Sidewalk Ramps

SY 13

Detectable Warning Panels

SF 30

Pedestrian Fencing

LF 58

Relocate Street Sign

EA 1

Relocate/Modifiy Irrigation Control Box

LS 1

Seeding and Mulching

LS 1

..1 Signed Bid Documents, Including Signed Itemized Bid Form [Required] [Any]

(Vendor file uploads)

Project No. 33094, Franklin Street Stormwater
Table of Contents
Project Details
Events
.
.
..1 Signed Bid Documents, Including Signed Itemized Bid Form[Required][Any]

File details come from the government source that posted it. Updated .