This is a Statement of Work (Schedule A) from the Michigan Department of Natural Resources (DNR) for RFP #190000001931 seeking dust control services on state-designated ORV routes in the Western Upper Peninsula. The project requires the application of approved dust control agents on approximately 6.34 miles of trails across multiple locations in Iron, Gogebic, and Houghton counties, with bids due on May 8, 2019, at 3:00 p.m. local time. The contractor must apply dust control treatment at least once per season during spring or early summer, starting in 2019, with additional applications possible during dry periods. The period of performance is from the last full week of May through the first full week of June of each contract year, with a total contract term of three years.

The contractor can choose between three dust control agents: Calcium Chloride (35% solution at 176 gallons per 0.1 mile), Penetrating Emulsion Prime (218 gallons per 0.1 mile), or Magnesium Chloride (30% solution at 293 gallons per 0.1 mile). The total annual treatment quantity ranges from 10,454 to 17,405 gallons depending on the agent selected, with a three-year total ranging from 31,362 to 52,215 gallons. The project is funded through P.A. 451, Part 811, Section 81117, which provides for ORV trail maintenance and natural resource restoration. Award will be based on Best Value to the State of Michigan.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2019 Western U.P. Dust Control

SCHEDULE A – STATEMENT OF WORK

RFP #190000001931

Bids Due: Wednesday, May 8, 2019 at 3:00 p.m. Local Time

1. STATEMENT OF WORK

The contractor shall furnish the necessary personnel, material, equipment, services and facilities to perform the application of an approved dust control agent, as a dust control measure, on state designated ORV routes. the application must be made at a minimum of one time at each location during the beginning of each ORV riding season starting in the spring or early summer of 2019 and continuing each riding season of subsequent years as identified in the contract. Additional applications per season may be requested if conditions warrant during exceptionally dry periods. Upon completion of the project, the Department expects the route surface to be treated with the selected dust control agent at the specified treatment rate per solution for that agent type.

Treatment locations: Iron, Gogebic, and Houghton counties.

2. BACKGROUND/PURPOSE

These dust control measures are done in areas that meet the below criteria to alleviate issues associated by dust generated by ORV use. Excessive dust may be a safety hazard to individuals with allergies or breathing difficulties and may decrease visibility along roadways.

Criteria

· In residential areas where there are at least 6 homes in close proximity and are within 250’ of the route right-of-way.

· Where the route is near high traffic areas, parks, businesses and major road intersections.

· Single resident if resident has medically confirmed respiratory health problems.

· Within city or village limits where necessary

· Consideration may be given to residents not meeting these criteria especially in open areas void of vegetative cover where dust is consistently being carried into or onto the home.

As stated in P.A. 451, Part 811, Section 81117, the fund shall be administered by the department and shall be used for the signing, improvement, maintenance, and construction of ORV trails, routes, or areas; and for the restoration of any of the natural resources of this state on public lands that are damaged due to ORV use in conjunction with the plan.

3. TECHNICAL SPECIFICATIONS

Provide and apply the approved dust control agent from the selection below, at the given application rate (gallons/0.1 mile), as an effective dust control measure on ORV routes at the identified treatment locations. The agent shall be applied across the entire width of the route surface which is approximately 10-12’ (varies).

Dust Control Agents A. Calcium Chloride (CC): Liquid application at 35% solution, 176 gallons per 0.1 mile.

B. Penetrating Emulsion Prime (PEP): Liquid application at product recommended solution, 218 gallons per 0.1 mile.

C. Magnesium Chloride (MC): Liquid application at 30% solution, 293 gallons per 0.1 mile.

D. The Contractor will have the option of applying either Penetrating Emulsion Prime, Calcium Chloride or Magnesium Chloride at the mix ratios and application rates described herein. Award of Contract shall be based upon the Best Value to the State of Michigan. The State of Michigan reserves the right to reject any or all bids, to waive any irregularity in any bid, and to make an award that is in the best interest of the State of Michigan.

Treatment Location
Quantity (Gallons)
Treatment Length (Miles)
A (CC)
B (PEP)
C(MC)
Watersmeet
528
654
879
0.3
Marenisco
1760
2180
2930
1
Twin Lakes
1760
2180
2930
1
Toivola
352
436
586
0.2
Atlantic Mine
176
218
293
0.1
South Range
528
654
879
0.5
Calumet
704
872
1172
0.4
Dollar Bay
1056
1308
1758
0.6
Iron River
1056
1308
1758
0.6
Caspian
528
654
879
0.5
Crystal Falls (3 sites)
598
741
996
0.34
Lake Emily
352
436
586
0.2
Fortune Lakes
440
545
733
0.25
Beachwood (2 sites)
440
545
733
0.25
Scott Lake
176
218
293
0.1
TOTALS FOR ONE (1) YEAR:
10,454
12,949
17,405
6.34
TOTALS FOR THREE (3) YEARS:
31,362
38,847
52,215
19.02

E. NOTE: Treatment sites are located on ORV routes approximately 10-12’ wide that may be difficult to access with large application equipment.

F. Contractor must provide the MSDS sheets, percent solution and application rate of the agent they choose to use with the bid proposal package.

G. The DNR project manager must approve the treatment agent and solution and be notified prior to application.

H. Additional services may be necessary due to extreme dry weather conditions and will be evaluated on a case by case basis.

CONTRACTOR’S RESPONSE:

|_|
Contractor has reviewed the Contract Activities section and will comply with no exception(s).
|_|
Contractor has reviewed the Contract Activities section and will comply with exception(s).

List all exception(s):

E. MICHIGAN CDL DRIVER’S LICENSE: Drivers of the application vehicles shall require Michigan CDL driver’s licenses appropriate for the type of vehicle being driven. Bidder shall provide those drivers’ names and the expiration dates of their licenses.

CONTRACTOR’S RESPONSE:

|_|
Contractor has reviewed the Michigan CDL driver’s license requirement and will comply with no exception(s). Please list the drivers and their license info here:
|_|
Contractor has reviewed the Michigan CDL driver’s license requirement and will comply with exception(s).

List all exception(s):

F. PROJECT PLAN Bidder shall provide a Project Plan describing work activities, equipment used, means of equipment transportation between sites, and any needed phasing, including plans for inclement weather, and second application criteria.

Contractor’ Project Plan:

4. INSPECTION AND ACCEPTANCE

During the performance of the contract, or when specifically requested, the Department reserves the right to make periodic inspections to review all services called for by the contract and to assure the work is progressing satisfactorily. If any of the services do not conform to contract requirements, the Department may require the contractor to perform the services again in conformity with contract requirements. When the defects in services cannot be corrected by reperformance, the Department may require the contractor to take necessary action to ensure that future performance conforms to contract requirements and reduce the contract price to reflect the reduced value of the services performed. If the contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Department may by contract or otherwise, perform the services and charge to the contractor and cost incurred by the Department that is directly related to the performance of such service or terminate the contract for default.

5. PERIOD OF PERFORMANCE

All tasks as specified on the statement of work shall be completed, inspected and accepted during a period from the beginning of the last full week of May through the end of the first full week in June of each contract year.

6. CONTRACTOR PROJECT MANAGER AND HOURS OF AVAILABILITY

Bidder shall provide the name and contact information for his/her Project Manger and hours of availability.

Contractor’s Project Manager Name and Contact Info:
Name:

Office telephone:

Cell Telephone:

Hours of Availability:
Monday through Friday:

Saturday:

Sunday:

7. DNR PROJECT MANAGER

Jeff Kakuk

(906) 753-6317 ext 228, 906-250-5818 cell kakukj@michigan.gov