This Statement of Work from the Michigan Department of Natural Resources (DNR) outlines requirements for aggregate delivery to Silver Lake State Park in Mears, Michigan. The project requires delivery of 7,600 tons of 23A road gravel specifications to the Silver Lake State Park Welcome Center at 8505 W. Fox Rd. Work must commence after purchase order issuance and be completed by May 10th, 2019, with specific delivery coordination required with Park Manager Jody Johnston.

All deliveries must include scale slips documenting load volume/weight, and contractors must avoid delivering water-saturated gravel that could affect weight accuracy. The work schedule may be impacted by weather conditions and spring roadway weight restrictions. DNR staff will direct specific unloading locations on-site during delivery.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Park Name: Silver Lake State Park

Park Location:9679 W. State Park Road
Mears, MI 49436

Contact Name: Mr. Jody Johnston Phone: (231) 873-3083

Timeframe for work to be accomplished: Delivery shall commence after the issuance of a purchase order. Start date to be communicated between Park Manager and contractor. End date by May 10th, 2019.

Delivery Address: Silver Lake State Park Welcome Center, 8505 W. Fox Rd., Mears, MI 49436

Park Specifications for Delivery:

· All gravel delivery will begin after coordination with the Park Manager. Delivery shall be completed by May 10, 2019.

· All deliveries will be directed as to specific unloading location by on site DNR staff.

· All deliveries will include a scale slip stating the volume or weight included in the load.

· Contractor effort shall be made to deliver gravel that is not saturated with water leading to inaccurate product weight.

· Product to be delivered shall meet 23A road gravel specifications.

· Gravel amount to be delivered is 7,600 tons.

Additional Notes: Weather conditions and spring roadway weight restrictions may lead to a break in delivery time frames.