This document is a set of Questions and Answers related to an Architectural and Engineering Design Professional Services Request for Qualifications (RFQ) issued by the Georgia Department of Natural Resources (DNR). The RFQ seeks to identify qualified architectural, engineering, and landscape design firms to provide miscellaneous professional services for various DNR-managed projects on an as-needed basis. Project types may include cabin renovations, visitor centers, office buildings, bridges, fish hatcheries, comfort stations, residences, maintenance shops, and pre-engineered metal buildings. The RFQ does not specify a maximum number of firms to be selected, and both multi-disciplinary and specialized firms will be considered. The selected firms may be required to use the e-Builder project management software on a case-by-case basis.
The document also provides clarification on the required documentation, such as business licenses and professional licenses, as well as the experience and project types expected in the responses. It indicates that contract fees will be discussed after the selection of firms, and that the selected firms will have the opportunity to negotiate final contract terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum _3 _ A_E.pdf | ||
| RFQ_462_492_992024_AE.pdf | ||
| Short Listed Firms.docx | DOCX document | |
| Addendum _1.pdf | ||
| Awarded Firms.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DNR-462-492-2024 A&E/Landscape DP Step II – Questions & Answers
1. I was looking over the RFP that was just issued task order design services for the GA
DNR and I would like to inquire about the types of projects that you anticipate maybe be assigned as part of the contract to the selected firm(s)? Cabin Renovations, Visitor Centers, Office buildings, Bridges and boardwalks, Fish Hatcheries, Comfort Stations, Residences, maintenance shops and pre-engineered metal buildings, yurts
2. Section A-9 states “Provide copies of relevant licenses (i.e., Registered Architect, Professional Engineer, Etc.)”. Can you please confirm if you are requesting a copy of the business license of the firm to provide A&E services or if you are requesting a copy of each design professionals license who plans to work on the DNR task order?
Please provide business license.
3. Section B-2 states “Provide information of the firm’s experience on projects of similar type, size, and function, and complexity.” All A&E firms can provide some level of the services outlined in the RFP regarding Pre-Design Services, Design Services, Design Review, Construction Contract Administration, Cost Estimating, Commissioning Support Services, and Professional Support Services. Can you help narrow down experience or provide specific examples or expectations, so we showcase similar projects to that extent? Are you wanting to see a variety of several different project types, new or renovations projects, large or small projects, etc.
Please provide a wide variety of project types.
4. Do you intend to award to multiple firms and if so, is there a maximum number of firms to be selected?
Yes – multiple firms will be selected. There is not a maximum number of firms.
Whatever we feel is the best fit.
5. Are you seeking qualifications from only multi-disciplinary firms, or will A/E firms specializing in one or two specific disciplines be considered? A/E firms specializing in one or more specific disciplines will still be considered.
6. Do you have a list of anticipated projects expected to occur during the contract period?
If not, do you have specific categories that these projects might fall under? No.
Potential projects include those referenced above.
7. Should our response include subconsultants or just the staff of the submitting organization? Yes, if your firm feels like subconsultants may be utilized.
8. Will the Georgia Peach certification & commissioning be required for all projects, or will it be used on a case-by-case basis? (how will this work from a fee standpoint?) No
9. Will using e-Builder project management software be required for all projects, or will it be used on a case-by-case basis? Case by Case basis
10. Will the selected firm have the opportunity to negotiate final contract terms? Contract fees will be discussed after selection.