DNR Muskegon SP Sand Relocation 2023 SOW.docx
DOCX document 772 KB Posted
- Attached to
- Muskegon State Park 2023 Sand Relocation
- Solicitation number
- RFP - 751 - 230000001429
- Issued by
- Muskegon County, Muskegon City, Michigan
About this file
The document is a Statement of Work (SOW) for the 2023 Sand Relocation Projects at Muskegon State Park in Muskegon, Michigan. The project requires the removal of sand from various areas of the park, including the parking lots, roadways, and around the beach house. The sand must be deposited on the beach or in low areas in the parking lot medians or the building. The project has a timeframe of April 1, 2023, to May 4, 2023. A mandatory pre-bid meeting is scheduled for Tuesday, March 14, 2023, at 2:00 p.m. at the park headquarters, and bids are due on Wednesday, March 22, 2023, at 3:00 p.m. local time.
The SOW provides detailed specifications for the removal and relocation of the sand, including the specific areas to be cleared, the required grade and slope of the beach, and the prohibition of depositing sand into the water. The contractor is also required to remove and stack the snow fence in a manner that minimizes damage to the fence and posts. Any damage to park property must be reported to the park supervisor immediately. Tracked vehicles are not allowed on paved surfaces without prior approval and protection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard Contract Terms W Insurance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2023 SAND RELOCATION PROJECTS
Muskegon State Park
RFP 230000001429
Statement of Work
Bids due: Wednesday, March 22, 2023 at 3:00 p.m., Local Time
Park Name: Muskegon State Park
| Park Location: | 3560 Memorial Drive | |
| North Muskegon, MI 49445 |
Contact Name: Greg Sherburn , Park Manager, Phone: (231) 744-3480
Mandatory Pre-Bid Meeting Date: Tuesday, March 14, 2023 at 2:00 p.m. At the Park Headquarters
Timeframe for work to be accomplished: April 1, 2023 – May 4, 2023
The Park roadway from the intersection of Memorial Drive/Scenic Drive south to the turn around in the road (see map A) must be cleared of sand first to allow traffic access to the campground.
Maps attached: YES
Park Specification for Snow Fence removal:
1. Snow fence must be removed in a manner that will minimize damage to the fence and posts to preserve it for future use.
1. All fence material is to be rolled in tight rolls not to exceed 50 feet in length.
1. Fence posts must be removed in such a manner to prevent bending and distorting.
1. All materials used to attach fence to posts and fence to fence are to be removed from the beach by the contractor.
1. Fence and posts are to be stacked in a central location or on a trailer provided by the park in the proximity of the job site as designated by the Park Supervisor or his representative.
Park Specifications for Sand Removal:
1. Remove all sand accumulations from between the parking lots, from paved roadways, from paved parking lots, from around the beach building and sidewalks, from the east shoulder of the park road, and from both sides of the park road north and south of the parking lot a distance to be established by the Park Supervisor.
1. The shoulders of the park road and the north and south ends of the parking lots are to be cleared a minimum of 12 feet but not more than 15 feet from the paved edge on a level grade even with the road surface.
1. Sand areas located between concrete surfaces or roads and parking lots must be excavated and finished to a grade no higher than the surrounding paved surfaces.
1. Sand must be removed from around all steps and sidewalks associated with the beach house. Final grades in the proximity of the bathhouse are to be determined by the Park Supervisor or his representative and are to be semi-finish grade.
1. All sand that has been removed shall be deposited and rough graded on the beach or low areas in the parking lot medians or the building.
1. Grading on the beach is to be a gradual slope from the parking lot edge to the water’s edge of Lake Michigan as determined by the Park Supervisor or his representative.
1. A grade of 5% or less, 12’ width by 250’ length, shall be rough graded on the west side of the beach building for installation of an ADA decking down to the beach.
1. Tracked vehicles are not allowed on any paced surfaces without prior approval of Park Supervisor. Protection for these surfaces will be required if tracked vehicles need to pass over them.
1. Under no circumstances will sand be deposited into the water.
1. Any damage to park property shall be reported to the Park Supervisor immediately.
1. Contractor to coordinate date and time of sand removal around fence with Park Manager/Supervisor.
Muskegon SP – Sand Relocation, page 1 of 3 image1.png image2.png
File details come from the government source that posted it. Updated .