DNR_Gwinn_Compartment 33.pdf
PDF 628 KB Posted
- Attached to
- DNR - TSP Gwinn - Comp 33; 191. 8 acres
- Solicitation number
- RFP-751-240000002901-1
- Issued by
- Marquette County, Michigan
About this file
This document is a Timber Sale Prescription from the Michigan Department of Natural Resources - Forest Resources Division for the Gwinn Compartment 33 timber sale. The prescription outlines the contract work for timber harvesting and treatment in specific stands within the compartment, to be completed between October 1, 2024 and July 1, 2025. The work includes marking trees according to management objectives for different cover types, painting boundary and payment unit lines, and GPS data collection. The prescription provides detailed treatment specifications for each stand, including targeted basal area, tree selection, and exclusions. Contractors are responsible for determining final acreage, obtaining landowner permission for private land access, and providing residual basal area data. Paint and GPS data deliverables are required.
The prescription does not include pricing information, set-asides, or funding details. It focuses on the technical requirements and logistics of the timber harvesting and stand management work. Contractors must furnish their own equipment and labor to complete the specified treatments within the defined timeline.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 of 5 R4038 (Rev. 03/16/2022)
Michigan Department of Natural Resources – Forest Resources Division
TIMBER SALE PRESCRIPTION
GENERAL
Forest Resources Division Management Unit
Gwinn
Sale Name (or prescription name)
Compartment 33
Timber Sale Number (if applicable)
LOCAL CONTACT
Name
Matt Yeo
Email Address
YeoM1@michigan.gov
Telephone
906-458-5379
TIMELINE
Contract Work Can Begin:
Immediately Date: 10/01/2024
Contract Work Must Be Completed By This Date:
07/01/2025
LEGAL DESCRIPTION
Town
T45N
Range
R26W
Section(s)
Description
S1/2NW, SE, SW
Year of Entry
Compartment(s)
32033
Stand Number(s)
24, 31, 51, 61, 65
Access
See Map
ACREAGE (Payment will be made based on these estimated acres) Estimated Acres
191.8 Source
Inventory GPS Other:
TREATMENT & OBJECTIVE
STAND # / VDU # / PU # COVER TYPE ACRES INITIAL BA TREATMENT MANAGEMENT OBJECTIVE
S 24 / VDU 24 / PU 1 R9 27.7 171-200 Crown Thinning Red Pine
S 31 / VDU 31 / PU 2 R9 39.5 171-200 Crown Thinning Red Pine
S 51 / VDU 51 / PU 3 R6 44.5 201+ Systematic Thinning Red Pine
S 61 / VDU 61 / PU 6 O9 37.9 81-110 Single Tree Selection Oak
S 65 / VDU 65 / PU’s 4 & 5 R9 42.2 171-200 Crown Thinning Red Pine
2 of 5 R4038 (Rev. 03/16/2022)
PRESCRIPTION
1. Mark all stands according to specifications listed in the Timber Marking Specifications, and specific details obtained at the pre-work meeting.
2. All cutting and payment boundary paint lines are to be painted by the contractor in the approximate locations as shown on the map. The exterior line adjacent to state land will be painted in red. The unit lines are to be painted in yellow paint.
3. Area determination must be done for all units by contractor for the treatment area.
When establishing paint lines:
• Contractors are responsible for obtaining landowner permission before crossing private land.
• Avoid using dead or badly damaged trees – boundary trees must last for the duration of the timber sale (up to 5-6 years).
• Favor the use of reserved species such as hemlock, oak, or lesser occurring species.
• Avoid using small (fast-growing) stems and those exposed to direct sunlight.
• Mark Payment Unit lines so they can be seen from all sides.
Management Objective: Red Pine (Mark to Cut)
When marking, prioritize selection of trees to be cut in the following order:
1. Red and white pine should be considered the featured tree species, so efforts to remove red & white pine trees with obvious disease issues must be a priority.
2. Mark other species as appropriate but preserve healthy examples of all species present.
3. Do not cut any hemlock, cedar or oak, and consider releasing them wherever it is convenient to do so.
4. If cherry or paper birch are marked to cut, provide adequate space to encourage sprouting to maintain these species in the stands.
5. Leave den and nest trees.
6. Further guidance will be discussed at presale meeting.
7. Follow all guidelines set forth in “The Complete Marker”.
Management Objective: Oak (Mark to Cut)
When marking, prioritize selection of trees to be cut in the following order:
1. Mark trees to be cut. Favor the best future crop tree in place, regardless of species.
2. Leave den and nest trees.
3. The objective is an all age stand structure.
4. Further guidance will be discussed at presale meeting.
5. Follow all guidelines set forth in "The Complete Marker".
Prescriptions
• Stand 24 / PU 1; Stand 31 / PU 2: Thin stand down to 100- 120 BA. Leave all white pine and oak if found within the stand.
• Stand 51 / PU 3: Mark every third row in stand or 1/3 of trees if rows are hard to follow. Harvest all jack pine, red maple and aspen if present.
• Stand 61 / PU 6: Thin stand down to 60-80 BA. Harvest all merchantable aspen, maple, fir, and spruce.
Favor leaving large diameter oak while marking for acorn production.
• Stand 65 / PU’s 4 & 5: Thin stand down to 100-120 basal area. Leave underrepresented species in stand such as oak and white pine.
3 of 5 R4038 (Rev. 03/16/2022)
PAINT LINES
This is included in the bid This is not included in the bid
Paint line work to be performed: (See attached map for locations)
TYPE OF LINE WORK TO BE DONE PAINT COLOR
Exterior line against private Blue Other:
Exterior line against state Red Other:
Interior payment unit Yellow Other:
Other: Green Other:
Exclusions to mark and why:
• Paint must be visible from all required angles.
• Changes to linework can be approved by the contract administrator as needed to assist with practical layout.
Standards for marking lines against private land:
• For line against PVT, GPS a point every 5 chains along the line as it is painted.
• Line shall be run straight between department survey monuments and be marked with blue paint.
• Avoid using dead or badly damaged trees – boundary trees must last for the duration of the timber sale (up to 5-6 years)
• Avoid using small (fast-growing) stems and those exposed to direct sunlight.
BOUNDARY GPS
GPS data files will be provided
FEATURE WORK TO BE DONE NOTES
Volume Determination Unit (VDU)
Payment Unit (PU) GPS all sale lines with MobileMap.
Exclusions Special Instructions:
• All painted boundaries must be GPS’d in MobileMap and the tracks delivered to the DNR.
TIMBER MARKING SPECIFICATIONS
This is included in the bid This is not included in the bid
Total Merchantable Residual BA (Basal Area): See Prescription section on pg. 2
TREATMENT NUMBER SIZE
Regeneration Gaps Per Acre: N/A N/A
Girdled Trees Per Acre: N/A N/A
PRODUCT MARKING SYMBOL MINIMUM DBH TOP DOB
Sawlogs
Diagonal slash on 2 opposite sides, 6’ above ground level and stump mark 10.6” 10.0”
Pulpwood
Diagonal slash on 2 opposite sides, 6’ above ground level and stump mark 4.6” 4.0”
TYPE OF WORK WORK TO BE DONE PAINT COLOR
Trees marked to leave Green Other:
Trees marked to cut Orange Other:
Special Marking Instructions:
• Put upper marks on two opposite sides of trees 6' above the ground, all marked trees must have stump marks.
• The contractor must furnish the DNR with plot data showing residual BA/Ac for payment units to be checked (Self
Administration). This is due before the DNR checks the marking.
• The contractor is responsible for checking all workers on the sale.
• Final marking details are to be discussed at the presale meeting.
• Avoid marking in wet weather conditions, or when tree boles are damp.
• Label sale name and unit numbers at all unit and road intersections with red aerosol paint.
4 of 5 R4038 (Rev. 03/16/2022)
TIMBER CRUISING SPECIFICATIONS
Cruise layout file will be provided
TOTAL NUMBER OF CRUISE POINTS ~N/A NOTE: FOR EACH VDU, SELECT A BAF THAT AVERAGES 4-8 TREES PER POINT
CRUISE DESIGN (MobileMap)
N/A N/A
Plots per acre Plots per acre
Management type Management type
District District
FMU FMU
Compartment Compartment
VDU Number VDU Number
FCS Key FCS Key
Contract or State Contract or State
Purpose Purpose
Plot Type Plot Type
BAF or Plot Size BAF or Plot Size
Sample Type Sample Type
Sample Tree Ratios Sample Tree Ratios
Status Status
Residual Plot Density Residual Plot Density
Residual BAF Residual BAF
Stump Height Stump Height
RESTRICTIONS
1. Forest Resources Division must be able to identify who did what on the timber sale.
2. The contractor may not have more than two markers in one cruise unit without prior approval.
3. Each marker should have an assigned area to mark (not strips).
PAINT
4. Call Matt Yeo at (906) 458-5379 to make arrangements for paint.
5. Paint will be supplied from Gwinn.
6. Contractor’s work schedule must coincide with the DNR work schedule for paint supply.
7. The DNR will not be available on weekends or evenings.
DELIVERABLES
8. A list of names that marked or cruised each cruise unit.
9. A summary of paint used (in quarts).
10. All data, cruise and GPS, must be uploaded from MobileMap to InventoryManager.
Additional Information
File details come from the government source that posted it. Updated .