DNR_Grayling_GNA2 Cooke Dam Red Pine.pdf
PDF 2 MB Posted
- Solicitation number
- RFP-751-250000002626-1
- Issued by
- Michigan
About this file
This is a Timber Sale Prescription document from the Michigan Department of Natural Resources - Forest Resources Division for the GNA2 Cooke Dam Red Pine timber sale located in the Grayling Unit. The contract covers timber harvesting and forest management activities across 248.7 estimated acres in Township T24N, Range R07E, Sections 27 and 28. The project involves multiple treatment types including crown thinning and low thinning across five different stands (Stand Numbers 42, 43, 7, 44, and 33), with management objectives focused on barrens creation and planted red pine management. The contract work is scheduled to begin immediately and must be completed by 12/31/2025.
The timber sale prescription specifies detailed requirements for the timber harvest, including removing approximately 1/3 of red pine stems (3-4 out of 10 trees) using specific priority guidelines. The total merchantable residual basal area is set at 100, with a minimum of 90 and maximum of 110. Paint marking specifications are provided, with trees marked to be cut receiving a blue slash on both sides. The contract includes provisions for GPS boundary marking, paint line work, and specific restrictions on the number of markers per cruise unit. Paint will be supplied by the Mio Field Office, and contractors must coordinate with the DNR for paint pickup with a minimum of 24 hours notice.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 of 6 R4038 (Rev. 03/16/2022)
Michigan Department of Natural Resources – Forest Resources Division
TIMBER SALE PRESCRIPTION
GENERAL
Forest Resources Division Management Unit Sale Name (or prescription name) Timber Sale Number (if applicable)
LOCAL CONTACT
Name Email Address Telephone
TIMELINE
Contract Work Can Begin:
Immediately Date:
Contract Work Must Be Completed By This Date:
LEGAL DESCRIPTION
Town Range Section(s)
Description
Year of Entry Compartment(s) Stand Number(s)
Access
ACREAGE (Payment will be made based on these estimated acres) Estimated Acres Source
Inventory GPS Other:
TREATMENT & OBJECTIVE
STAND # / VDU # COVER TYPE ACRES INITIAL BA TREATMENT MANAGEMENT OBJECTIVE
PRESCRIPTION
2 of 6 R4038 (Rev. 03/16/2022)
PAINT LINES
This is included in the bid This is not included in the bid
Paint line work to be performed: (See attached map for locations)
TYPE OF LINE WORK TO BE DONE PAINT COLOR
Exterior line against private Blue Other:
Exterior line against state Red Other:
Interior payment unit Yellow Other:
Other: Green Other:
Exclusions to mark and why:
Standards for marking lines against private land:
BOUNDARY GPS
This is included in the bid This is not included in the bid
GPS data files will be provided
FEATURE WORK TO BE DONE NOTES
Volume Determination Unit (VDU) Payment Unit (PU) Exclusions Special Instructions:
TIMBER MARKING SPECIFICATIONS
This is included in the bid This is not included in the bid
Total Merchantable Residual BA (Basal Area): _________ (Minimum: _________ to Maximum: _________)
TREATMENT NUMBER SIZE
Regeneration Gaps Per Acre:
Girdled Trees Per Acre:
PRODUCT MARKING SYMBOL MINIMUM DBH TOP DOB
Sawlogs 10.6” 10.0” Pulpwood 4.6” 4.0”
TYPE OF WORK WORK TO BE DONE PAINT COLOR
Trees marked to leave Green Other:
Trees marked to cut Orange Other:
Special Marking Instructions:
3 of 6 R4038 (Rev. 03/16/2022)
This is included in the bid This is not included in the bid Cruise layout file will be provided
TOTAL NUMBER OF CRUISE POINTS ~
CRUISE DESIGN (MobileMap)
Stand ______ / VDU _______ Stand ______ / VDU _______ Plots per acre Plots per acre Management type Management type District District
FMU FMU
Compartment Compartment VDU Number VDU Number FCS Key FCS Key Contract or State Contract or State Purpose Purpose Plot Type Plot Type BAF or Plot Size BAF or Plot Size Sample Type Sample Type
Sample Tree Ratios Sample Tree Ratios
Status Status Residual Plot Density Residual Plot Density Residual BAF Residual BAF Stump Height Stump Height
Stand ______ / VDU _______ Stand ______ / VDU _______ Plots per acre Plots per acre Management type Management type District District
FMU FMU
Compartment Compartment VDU Number VDU Number FCS Key FCS Key Contract or State Contract or State Purpose Purpose Plot Type Plot Type BAF or Plot Size BAF or Plot Size Sample Type Sample Type
Sample Tree Ratios Sample Tree Ratios
Status Status Residual Plot Density Residual Plot Density Residual BAF Residual BAF Stump Height Stump Height
NOTE: FOR EACH VDU, SELECT A BAF THAT AVERAGES 4-8 TREES PER POINT
TIMBER CRUSING SPECIFICATIONS
5 of 6 R4038 (Rev. 03/16/2022)
RESTRICTIONS
1. Forest Resources Division must be able to identify who did what on the timber sale.
2. The contractor may not have more than two markers in one cruise unit without prior approval.
3. Each marker should have an assigned area to mark (not strips).
PAINT
4. To make arrangements for paint contact:
Name:
Telephone:
5. Paint will be supplied from: _____________________________
6. Contractor’s work schedule must coincide with the DNR work schedule for paint supply.
7. The DNR will not be available on weekends or evenings.
DELIVERABLES
8. A list of names that marked or cruised each cruise unit.
9. A summary of paint used (in quarts).
10. All data, cruise and GPS, must be uploaded from MobileMap to InventoryManager.
Additional Information
GNA2 Cooke Dam RP Barrens
Michigan Department of Natural Resources
TownRange
Sections
Township
DNR Roads
Paved Roads
Gravel Roads
Poor Dirt Roads
Trails
Designated ATV Trails
Reference Polygons
Compartments Outline
Good Neighbor Authority
Timber Sales
Payment Units
VDUs
Treatments
Shelter Wood (w/Reserves)
Thinning (Crown, Low, Systematic)
Treatments Outline
Stands Outline
Great Lakes
1/17/2025 0 0.2 0.40.1 mi
0 0.35 0.70.17 km
1:18,056
Cooke Dam Rd
River Road
Barrens
Barrens
Low Thinning
Low Thinning
Low Thinning
This Contract is only for the Stands to the east of Cooke Dam Rd The stands bordered by Cyan are the thinning units requiring CTM The Barrens creation units only need line work completed by contractor
GNA2 Cooke Dam RP Thinning
Michigan Department of Natural Resources
TownRange
Sections
Township
DNR Roads
Paved Roads
Poor Dirt Roads
Trails
Designated Equestrian Trails
Designated ATV Trails
Reference Polygons
Compartments Outline
Good Neighbor Authority
Timber Sales
Payment Units
VDUs
Treatments
Shelter Wood (w/Reserves)
Thinning (Crown, Low, Systematic)
Treatments Outline
Stands Outline
Great Lakes
1/17/2025 0 0.2 0.40.1 mi
0 0.35 0.70.17 km
1:18,056
Low Thinning
Low Thinning
Low Thinning
Barrens
Barrens
River Road
Cooke Dam Rd Nearby Sale
This Contract is only for the Stands to the east of Cooke Dam Rd The stands bordered by Cyan are the thinning units requiring CTM The Barrens creation units only need line work completed by contractor
| Forest Resources Division Management Unit: Grayling Unit |
| Sale Name or prescription name: GNA2 Cooke Dam Red Pine |
| Timber Sale Number if applicable: N/A |
| Contract Work Must Be Completed By This Date: 12/31/2025 |
| Town: T24N |
| Range: R07E |
| Sections: 27 & 28 |
| Description: NE & SE of 28, and SW of 27 |
| Year of Entry: 2025 |
| Compartments: 7926337 & 7926336 |
| Stand Numbers: 7, 33, 42, 43 & 44 |
| Access: Cooke Dam Road and River Road |
| Estimated Acres: 248.7 |
| PRESCRIPTIONRow1: - Stands 7, 33 & 44 (130 acres): Thin From Below |
Remove approximately 1/3 of red pine stems (3-4 out of 10) in the stand using the following priority list for tree removal:
1. Access:
A) Existing skid trails: Remove individuals to ensure existing skid trails are a minimum of 14 feet wide.
1. In stands where 1 row was cut with 2 leave rows between cut rows, and access is not adequate, remove 1 row adjacent to every other cut row.
B) New skid trails: When needed, create new skid trails by removing 2 rows. Leave 3 rows in between cut rows.
Adjust cut rows as needed to account for rows joining or splitting.
2. Thin From Below:
A) Remove individuals that are intermediate or suppressed, have poor form, or low vigor.
3. Spacing:
A) Remove quality individuals to maximize growing space for the highest quality residual trees.
4. Remove any other species only as needed for access.
- Stands 42 & 43 (118.7 acres): These stands only need boundary line work - No marking is required.
| This is included in the bid: On |
| This is not included in the bid: Off |
| Standards for marking lines against private land: N/A - No private boundary work is included in this contract. |
| NOTES: |
| NOTES_2: |
| NOTES_3: |
| MARKING SYMBOLSawlogs: Slash |
| MARKING SYMBOLPulpwood: Slash |
| TOTAL NUMBER OF CRUISE POINTS: N/A |
| Additional Information: A minimum of 24 hours notice is required for paint pick up. The contractor should contact Garret Price well before work begins to ensure there is enough paint on hand. Cole Michaud may be utilized as a secondary contact for paint @ 989-590-1220. |
| Local Contact Name: Garret Price |
| Local Contact Email Address: PriceG2@michigan.gov |
| Local Contact Telephone: 989-590-8541 |
| Contract Work Can Begin Immediately: On |
| Contract Work Can Begin on this Date: Off |
| Date Contract Work Can Begin: |
| Inventory: On |
| GPS: Off |
| Other Type of Source: On |
| Specify other type of source: Forest Service Inventory Shapefiles |
| Stand Number/ VDU Number: |
| 0: 42 |
| 1: 43 |
| 2: 7 |
| 3: 44 |
| 4: 33 |
| 5: |
| 6: |
| COVER TYPERow1: |
| 0: R8 |
| 1: R8 |
| 2: R8 |
| 3: R8 |
| 4: R8 |
| 5: |
| 6: |
| ACRESRow1: |
| 0: 28.7 |
| 1: 90.0 |
| 2: 69.3 |
| 3: 38.1 |
| 4: 22.6 |
| 5: |
| 6: |
| INITIAL BARow1: |
| 0: 111-140 |
| 1: 111-140 |
| 2: 141-170 |
| 3: 141-170 |
| 4: 141-170 |
| 5: |
| 6: |
| TREATMENTRow1: |
| 0: Crown Thinning |
| 1: Crown Thinning |
| 2: Low Thinning |
| 3: Low Thinning |
| 4: Low Thinning |
| 5: |
| 6: |
| MANAGEMENT OBJECTIVERow1: |
| 0: Barrens Creation |
| 1: Barrens Creation |
| 2: Planted RP |
| 3: Planted RP |
| 4: Planted RP |
| 5: |
| 6: |
| Paint Color Blue: Off |
| Paint Color Red: Off |
| Paint Color Yellow: Off |
| Other Paint Color, specify: |
| 0: |
| 1: Orange (2 chevrons) |
| 2: Orange (chevrons both sides) |
| 3: |
| 0: |
| 1: |
| 2: Blue (Slash on both sides of cut tree) |
| Other Paint Color: |
| 0: Off |
| 1: On |
| 2: On |
| 3: Off |
| Other Type of Line: |
| Check for Work to be Done: |
| 0: Off |
| 1: Yes |
| 2: Yes |
| 3: |
| 0: Off |
| 1: Yes |
| 2: Yes |
| 3: |
| 0: Off |
| 1: Off |
| 2: Yes |
| This is included in the bid1: On |
| This is not included in the bid1: Off |
| GPS data files will be provided: On |
| Total Merchantable Residual Basal Area (BA): 100 |
| Minimum Merchantable Residual Basal Area: 90 |
| Maximum Merchantable Residual Basal Area: 110 |
| Number of Regeneration Gaps Per Acre: N/A |
| Number Girdled Trees Per Acre: N/A |
| Size of Regeneration Gaps Per Acre: N/A |
| Size of Girdled Trees Per Acre: N/A |
| Special Instructions: All painted boundaries must be GPS’d in MobileMap and the tracks delivered to the DNR. |
| Paint Color Green: |
| 0: Off |
| 1: Off |
| Exclusions to mark and why: Boundaries are to be marked as indicated above, and on the attached map. No boundaries are needed along River Road and Cooke Dam Road. All painted boundary trees must have an adequate stump mark that extends at least 12 inches from the ground. The letters "P" and "U" Should be written on trees at the start and end of Payment Unit Boundaries. The contract administrator is to be contacted for any clarification needed while performing boundary work, or regarding any significant deviation from the boundary lines provided. |
| Paint Color Other: |
| 2: Off |
| 4: On |
| Paint Color Orange: |
| 3: Off |
| Special Marking Instructions: Only Stands 7, 33 & 44 (130 acres total) are to be Cut Tree Marked (CTM). Cut trees shall be selected according to prescription (100 BA residual). All cut trees must have an adequate stump mark. Do not remove more than 1/3 of the total BA in any given area. Areas of lower density may require little to no marking. Follow prescription for skid trail size and spacing. Do not mark trees exhibiting large diameter (20"+), plate like bark, large lower limb development, or fire scars. A skid trail is to be marked roughly 1 chain to the North along River road; this is to extend the River Road bicycle trail. Contact the contract administer with any questions. |
| This is included in the bid_2: |
| 0: On |
| 1: Off |
| This is not included in the bid_2: |
| 0: Off |
| 1: On |
| Cruise layout file will be provided: Off |
| Stand Number: |
| 0: |
| 0: N/A |
| 1: N/A |
| 1: |
| 0: N/A |
| 1: N/A |
| VDU Number1: |
| 0: |
| 0: N/A |
| 1: N/A |
| 1: |
| 0: N/A |
| 1: N/A |
| Plots per acre: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Management type: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| District: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| FMU: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Compartment: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| VDU Number: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| FCS Key: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Contract or State: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Purpose: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Plot Type: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| BAF or Plot Size: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Sample Type: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Sample Tree Ratios: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Status: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Residual Plot Density: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Residual BAF: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| Contact Name: Garret Price |
| Contact Telephone Number: 989-590-8541 |
| Office Name: Mio Field Office |
| Stump Height: |
| 1: |
| 0: |
| 1: |
| 0: |
| 1: |
| stump Height: |
| 0: |
| 0: |
File details come from the government source that posted it. Updated .