This document is an addendum to a Request for Proposal (RFP) issued by the Michigan Department of Natural Resources (DNR) for sealcoating and striping work at the Bewabic State Park parking lot in Iron County, Michigan. The scope of work includes clearing the parking lot and road of debris, sealing all cracks, edging the sides of the parking lot and road, sealcoating the entire asphalt surface of approximately 0.62 acres, and restriping as per the existing layout. The contractor is responsible for protecting the work and adjacent materials. The work is scheduled to take place between September 15 and September 27, 2024, with Monday through Friday work hours from 7 a.m. to 8 p.m. Prevailing wages are required.

The RFP addendum clarifies the scope of work and due date, which is Friday, March 15, 2024, at 3:00 p.m. Eastern Time. On-site visits are available by appointment. The contract will be awarded to a qualified bidder, and the successful contractor must comply with all applicable laws and regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bewabic State Park- 2024

ADDENDUM #1

RFP 240000001374

Issued: Thursday, March 7, 2024 Bids Due: Friday, March 15, 2024 at 3:00 p.m. Eastern Time.

Statement of work: Supply all tools, materials and employees to complete all work identified in the plans, specifications and scope of work including:

· Clear parking lot and road of all debris, moss, sand/soil, leaf matter, etc., for surface preparation prior to crack sealing and applying new sealcoating.

· Thoroughly clean out, remove weeds/grass, and seal all cracks

· Edge sides of parking lot and road for proper sealcoat finish

· Sealcoat entire asphalt surface. Approximately 0.62 acre minus grass islands. See aerial map. The entrance drive/roadway is not included in this scope of work.

· Apply sealcoat with brush squeegee and sprayer for proper finish.

· Striping as per existing layout.

· Protecting work and adjacent materials:

· The Contractor is responsible for protecting their work from the visiting public and from the elements of weather. The contractor shall supply the necessary tools and equipment to protect the work from the public or other elements until cure is established.

· The Contractor is responsible for protecting all adjacent materials and building infrastructure from damage resulting from their work.

· Schedule/work hours

· On-site visit by appointment

· Start Date – Mutually agreed upon.

· Completion – September 15th- September 27, 2024

· Work days/hours – Monday – Friday 7am – 8pm

· Additional Items:

· Prevailing wages are required.