DMA-ITB-332 - QA and Addendum 1.pdf
PDF 191 KB Posted
- Attached to
- DMA-ITB-332 - RTSM Bathroom Remodel
- Solicitation number
- ITB-12359
- Issued by
- Broward County, Florida
About this file
This document is an Addendum No. 1 and Questions and Answers document for Invitation to Bid (ITB) DMA-ITB-332, issued by the Florida Department of Military Affairs for a bathroom remodel project at the Camp Blanding Joint Training Center. The solicitation covers a comprehensive renovation of RTS-M bathrooms in Building 3150, with key details including the removal of ceramic tiles, installation of new LED lighting, updates to plumbing fixtures, and epoxy flooring using Dura-A-Flex or PlexiQuartz materials. The bid opening date has been changed to Thursday, June 19, 2025, at 4:00 PM EST, with the posting of bid tab and intent to award scheduled for Friday, June 20, 2025. Specific fixture specifications are provided, including American Standard toilets, Sloan flushometers, and Delta sink faucets, with contractors required to remove all construction debris and measure floor areas during a pre-bid site visit.
The document indicates that contractors must contact Mitch Poole at 904-682-2200 to schedule a site visit and measure floors, and no full project plans will be provided. The solicitation requires LED fixtures suitable for damp locations, with lumen output equal to or greater than existing fixtures, and shower heads will be updated. Contractors are responsible for trash removal and must confirm sewer line clearance from each fixture to the exterior cleanout. The addendum provides detailed specifications for toilets, urinals, sinks, and faucets, with an emphasis on specific manufacturer models and requirements. The document does not specify a set-aside for disadvantaged businesses or mention an incumbent vendor, focusing instead on the technical details and procedural requirements for the bathroom remodel project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DMA-ITB-332
12223105 Camp Blanding Joint Training Center
RTS-M BATHROOM REMODEL
Questions and Answers and
Addendum No. 1
Questions and Answers
The Department has received the following questions and the Department’s answers are provided in the table listed below:
No. Question Answer
1 Are the ceramic tiles being removed? The ceramic tiles will need to be removed so the floor can be prepped. You should include this service in your bid.
2 Are there any specifications on the epoxy to be used?
Yes. Dura-A-Flex and PlexiQuartz are acceptable.
3 Will you send the square footage of each bathroom floor?
No. Vendors who attended a Pre-Bid Stie Visit may come out and measure the floors. Please contact Mitch Poole to plan – 904-682-2200.
4 Is there a certain size for the ceiling lights, and how many are required? Is there a certain lumen required?
The new fixtures are to be LED, suitable for damp locations and the lumen output is to be the same or greater than the existing fixtures.
5 How far into the sewer line is required? Will inspection be from the closeouts, or each toilet?
From each fixture to the closest cleanout on the exterior of the building.
We want to confirm that all lines are clear of any obstructions before the new fixtures are installed.
6 Are there any specification of the new toilets, such as height?
Basis of Design Toilets – American Standard #2234.001.020 with Regal manual water closet flushometer Sloan #3080053 Seat – American Standard #5901-100 – Urinal manual flushometer Sloan #3082653 Sinks – Vitreous China-American Standard, Gerber or Equal Sink Faucets – Delta #501-DST Mixing Valve – Leonard #170A-LF
7 Will a trash dumpster be provided, or are we responsible for trash removal?
Contractor is responsible for removing all construction debris from work site and dispose of properly.
8 Are there any specifications available that say what model numbers are to be used for the fixtures and plumbing? As well as the specifications for the LED fixtures and painting?
See answer to question #6 See answer to question #4 See file attached to ITB for the paint specifications.
9 Are the full plans available for the project? No.
10 Will the shower heads be updated? Yes.
11 Will it be possible to add automatic flushers to urinals without replacing them?
Unsure. This is a question for the plumber.
12 What type of epoxy will be used for the flooring? Dura-A-Flex and PlexiQuartz are acceptable.
13 May we get a floor plan to measure area and epoxy floor specification for add alternate?
Floor Plan - see answer to question #3 Epoxy – see answer to question #12
No other questions received.
Addendum No. #1
The Department hereby amends DMA-ITB-332 as noted within this Addendum. For revisions, underlines represent additions and strikethroughs represent deletions. In the event of a conflict between previously posted information and the information contained herein, the information herein shall control. The information included in this addendum is hereby made part of this solicitation.
Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. Any protest concerning this agency decision must be timely filed with the DMA Purchasing Director. Protests may be filed by courier, hand delivery, or U.S. mail at Florida Department of Military Affairs, State Quartermaster, Attention: John Connor, 82 Marine Street, St. Augustine, FL. 32084. Protests may also be filed by email at john.d.connor2.nfg@army.mil . It is the filing party’s responsibility to meet all filing deadlines.
The Contract Administrator/Contract Manager, Jennifer Adams, should be copied in such filings by email at jennifer.c.adams16.nfg@army.mil .
Please note: This addendum does not need to be returned with the bid.
1. The Calendar of Events page is hereby amended as follows:
- The Bid Opening Date was changed to Thursday, June 19, 2025, at 4:00 PM EST.
- The Posting of the Bid Tab and Intent to Award was changed to Friday, June 20, 2025, no later than 4:00 PM EST
- Last sentence is amended to read; “Bid received after 4:00 PM EST on Thursday, June 19, 2025, will not be considered.”
2. Section 4.10 Bid Submission is hereby amended as follows:
- (Section 4.10.1) The Bid Opening Date was changed to Thursday, June 19, 2025.
- (Section 4.11) The Bid Opening Date was changed to Thursday, June 19, 2025.
3. Section 4.13.1 is hereby amended as follows:
- (Section 4.13.1) The posting of DMA’s decision on the Vendor Information Portal was changed to Friday, June 20, 2025, by 4:00 PM
4. Attachment “F” Vendor Checklist is hereby amended as follows:
- (Note) The Bid Opening Date was changed to Thursday, June 19, 2025, at 4:00 PM EST.