This is a Scope of Work document for a districtwide asphalt repair and sealing project in California. The project encompasses crackfill, sealing, and striping of existing asphalt surfaces across various district locations. Work includes the supply of labor and materials for the installation and sealing of asphalt surfaces, with compensation structured on a unit pricing basis calculated per unit. The document establishes the technical requirements and specifications for contractors to execute these repairs and maintenance activities across multiple district sites.

The project requires contractors to provide comprehensive pricing for labor, materials, equipment, and all associated costs necessary to complete the asphalt repair and sealing work. Bidders must demonstrate capability in crackfill operations, sealing applications, and striping work while maintaining compliance with district standards and specifications. Unit pricing allows for flexible project scaling across the various district locations identified for improvement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Escondido Union High School District Purchasing Department 302 North Midway Drive Escondido, CA 92027

BID DOCUMENTS

for

BID # 2026-27-2 Districtwide Asphalt Repair & Sealing Unit Price Bid

Bid Closes Date & Time: December 8, 2026 at 2:00 PM

To: Prospective Bidders:

* * * ATTENTION: Please review this document as soon as you receive it. * * *

* No Bidder questions will be accepted after the deadline stated in the bid documents *

Please immediately review our “Bid Process Timeline”, Item # 1 in the Information for Bidders - Specific section.

Bidders are required to have a valid California Contractor’s License as follows: A – General Engineering Contractor and C12 - Earthwork and paving

Bidders are to review DIR General Prevailing Wage Determination and associated statutory apprenticeship requirements (if applicable) for the following craft: Parking and Highway Improvement (Striping, Slurry and Seal Coat Operations-Laborer)#

This Project is a public work and subject to prevailing wage requirements as set forth in Labor Code §1720 et seq. The bidder/contractor and all subcontractors of every tier are required to pay laborers performing any portion of work on the Project not less than the prevailing wage rate established for the labor provided.

Pursuant to Labor Code §1771.4(a)(4), prevailing wage rate monitoring and enforcement shall be by the California Department of Industrial Relations (“DIR”). Each bidder must be registered with the DIR pursuant to Labor Code §1725.5 in order to be qualified submit a bid on or to perform work on this Project. Bids submitted by contractors not registered with the DIR will be rejected as non-responsive. All subcontractors listed in the bid also must be registered with the DIR at the time of bid opening. At all times during performance of the Project, the bidder/contractor and all subcontractors, of any tier, must be registered with the DIR.

Any requests for interpretation or corrections must be made in accordance with the Information for Bidders – Specific section, “Item 3. Interpretation of Documents and Addenda” and according to the “Bid Process Timeline.”

The District reserves the right to reject any or all bids, to accept or to reject any one or more items on a bid, or to waive any irregularities or informalities in the bids or in the bidding process.

If you wish to bid, your completed bid must be returned in a sealed envelope no later than the Bid Opening Date and Time as stated in the Notice to Contractors Calling for Bids.

If you have any questions regarding the bid requirements or timeline, please contact Carissa Iwamoto, Director of Purchasing, at ciwamoto@euhsd.org.

Escondido Union High School District 2026-27-2: Districtwide Asphalt Repair & Sealing Unit

Table of Contents

NOTICE TO CONTRACTORS CALLING FOR BIDS

INFORMATION FOR BIDDERS – Specific INFORMATION FOR BIDDERS - General

BID BOND

AGREEMENT

PERFORMANCE BOND

PAYMENT BOND

SPECIFICATIONS - SPECIAL CONDITIONS

SPECIFICATIONS - TECHNICAL SPECIFICATIONS

SPECIFICATIONS – CAMPUS MAPS

SPECIFICATIONS – GENERAL CONDITIONS

BID FORM

REFERENCES

DESIGNATION OF SUBCONTRACTORS

NON-COLLUSION BIDDING DECLARATION

CONTRACTOR’S CERTIFICATION REGARDING WORKERS’ COMPENSATION

VERIFICATION OF CONTRACTOR/SUBCONTRACTORS’ DIR REGISTRATION

CONTRACTOR’S CERTIFICATE REGARDING NON-ASBESTOS CONTAINING MATERIALS

COMPLIANCE WITH CARB CERTIFICATION

NOTICE TO CONTRACTORS CALLING FOR BIDS 3

NOTICE TO CONTRACTORS CALLING FOR BIDS

NOTICE IS HEREBY GIVEN that Escondido Union High School District, acting by and through its Governing Board (“District”), will receive sealed bids for:

2026-27-2 Districtwide Asphalt Repair & Sealing Unit Price Bid

The project generally consists of: Work to include crackfill, sealing and striping of existing asphalt across various district locations. Project involves supply of labor and materials for the installation and sealing of asphalt surfaces with unit pricing on a price per unit basis.

Required state of California Contractor License classification: A – General Engineering Contractor and C12

- Earthwork and paving

Value of contract estimation: $115,000 anticipated Estimated Start Date: December 16, 2026 Completion of Work: Each project shall have a mutually agreed upon completion date. Contract duration will be through December 31, 2027. District retains right to extend contract for subsequent one year or greater terms.

Each bid must conform and be responsive to the bid documents which may be obtained at https://www.euhsd.org/bids

All bids will be received by the District via sealed bid on December 8, 2026, no later than 2:00 PM local time, at 302 North Midway Drive, Escondido, CA 92027, and will be opened and publicly read aloud.

The successful Bidder and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, California, for the type of work performed and the locality in which the work is to be performed, per sections 1770 et seq. Of the CA Labor Code. Prevailing wage rates are on file at the District and available on request or at https://www.dir.ca.gov/OPRL/Statistics_Research.html . Bidders and Bidders’ subcontractors shall comply with the DIR registration and qualifications requirements per sections 1725.5 and 1771.1 of the CA Labor Code.

Each bid must be submitted on the bid form provided in the bid documents and accompanied by a satisfactory Bid Bond executed by the bidder and surety company, or certified check, or cashier’s check in favor the District, or cash, in an amount equal to $3,000. The contract awardee shall be required to furnish a Performance Bond and a Payment Bond for the full estimated annual amount on an annual basis.

The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of Public Contract Code section 22300.

The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding. No bidder may withdraw his bid for a period of sixty days after the date set for the opening of bids. For questions, please contact ciwamoto@euhsd.org The basis of award for this project is total base bid.

BY THE ORDER OF THE GOVERNING BOARD OF THE ESCONDIDO UNION HIGH SCHOOL DISTRICT

David Vincent, Clerk of the Governing Board Publication: Daily Transcript

Escondido Union High School District October 28 and November 4, 2026

San Diego County, California Notice will appear in the Daily Journal and

Associated General Contractors of America, San Diego Chapter

INFORMATION FOR BIDDERS – SPECIFIC 4

INFORMATION FOR BIDDERS – Specific

The following information is specific to this Bid / Contract. Information stated in this “Information for Bidders – Specific” section supersedes any conflicting information which may be contained in the following “Information for Bidders – General” section.

1. BID PROCESS TIMELINE: The following is the timeline for bid submittals and the bid evaluation and selection process:

DATE AND TIME DEADLINE / PROCESS DESCRIPTION

October 28, 2026

1. Legal Notice to Contactors Calling for Bids is sent to all CUPCCAA registered contractors holding an A and C-12 license

2. Published in the Daily Transcript (published a second time on November 4, 2026)

3. Published online at https://www.euhsd.org/bids

4. Posted on the Plan room of the Associated General Contractors of

America, San Diego Chapter

November 18, 2026

10:00 AM

Request for Information / Clarification RFIs are to be sent to:

Carissa Iwamoto, Director of Purchasing ciwamoto@euhsd.org

November 20, 2026

4:00 PM

Final Bid Clarifications will be issued via addendum online at https://www.euhsd.org/bids

December 8, 2026 at

2:00 PM

BID OPENING DATE AND TIME (BID SUBMITTAL DEADLINE). Sealed Bids must be received no later than this date and time at the following address:

Escondido Union High School District Attn: Purchasing Department, Bid # 2026-27-2 302 North Midway Drive Escondido, CA 92027

December 15, 2026

Anticipated award of Bid at EUHSD Governing Board Meeting

2. MANDATORY PRE-BID CONFERENCE/JOB WALK: No job walk will be performed for this bid.

3. INSTRUCTIONS FOR BIDDERS: Bidder and Subcontractors DIR Registered Contractor Status.

Bidder Status. In addition to other requirements in this bid package relating to Bidder qualifications, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, or engage in the performance of any contract for public work unless currently registered and qualified to perform public work pursuant to Labor Code §1725.5. Bidder must be registered with the DIR at the time of bid opening or the bid will be rejected as non-responsive. Bidder may register with DIR at http://www.dir.ca.gov/Public-Works/PublicWorks.html.

INFORMATION FOR BIDDERS – SPECIFIC 5

Listed Subcontractors’ Status. All Subcontractors listed in Bidder’s Bid also must be Registered with the DIR at the time of bid submission. Bidders must include listed subcontractors’ DIR registration number with the bid, or if the listed subcontractor’s DIR registration number is not known at time of bid submittal, then the subcontractor’s DIR registration number may be submitted to District within twenty-four hours (24) of bid opening. Pursuant to Labor Code §1771.1 an inadvertent error in listing a subcontractor who is not registered with DIR in a bid or proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following apply: (1) The subcontractor is registered prior to the bid opening; (2) Within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5; or (3) The subcontractor is replaced by another registered subcontractor pursuant to Section 4107 of the Public Contract Code.

DIR Registration Verification. Each Bidder shall submit the completed DIR Registration Verification Form, included in the Bid Documents, executed by a duly authorized officer or employee of the Bidder with the Bidder’s bid or proposal.

4. INTERPRETATION OF DOCUMENTS AND ADDENDA: If any person contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the plans, specifications, or other proposed contract documents, or finds discrepancies in, or omissions from the specifications, he/she may submit to the Business & Contract Services office of the Escondido Union High School District a written request for an interpretation or correction thereof. It is the sole and exclusive responsibility of the Bidder to submit such request in sufficient time for the District’s response thereto and delivery of such response to all Bidders prior to the scheduled closing for receipt of Bids. Any request of any Bidder, pursuant to the foregoing sentence that is made after the deadline date and time specified in the “Bid Process Timeline” (Item # 1 in the Information for Bidders – Specific section) shall be deemed untimely. Please email requests to ciwamoto@euhsd.org Any interpretation or correction of the proposed documents will be made only by Addendum duly issued by the District No Bidder questions will be accepted after stated deadline in the Bid Process Timeline.

Any addenda or bulletins issued by the Escondido Union High School District during the time of bidding or forming a part of the documents issued to the bidder for the preparation of the bid shall be covered in the bid and shall be made a part of the contract.

All prospective bidders are encouraged to check the District’s bid website https://www.euhsd.org/bids for any addenda for this bid prior to sending and submitting its bid package to the District.

5. DOCUMENTS TO BE INCLUDED IN THE BIDDER’S BID SUBMITTAL PACKAGE: A Bidder’s bid submittal must include the following items, completely filled out and signed by authorized signatory personnel of the Bidder’s company, in order to be considered a responsive bid:

Bid form Bid bond References Designation of Subcontractors Non-Collusive Bidding Declaration Worker’s Compensation Certification Contractor’s Verification of Contractor and Subcontractors’ DIR Registration

Contractor’s Certificate Regarding Non-Asbestos Containing Materials Contractor CARB Compliance form and supporting documentation

Bidders do not need to return the entire set of bid documents back to the District. Only the documents listed above are required to be submitted. Should the Bidder submit pages from the Bid Documents that have not been required by the District to be submitted as part of the Bidder’s Bid Submittal Package, the District will discard that extraneous paperwork.

6. BIDDER’S SAMPLES TO BE SUBMITTED AT TIME OF BID: No samples are required.

Listed Subcontractors’ Status. All Subcontractors listed in Bidder’s Bid also must be Registered with the

DIR at the time of bid submission. Bidders must include listed subcontractors’ DIR registration number with the bid, or if the listed subcontractor’s DIR registration number is not known at time of bid submittal, then the subcontractor’s DIR registration number may be submitted to District within twenty-four hours (24) of bid opening. Pursuant to Labor Code §1771.1 an inadvertent error in listing a subcontractor who is not registered with DIR in a bid or proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following apply: (1) The subcontractor is registered prior to the bid opening; (2) Within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in subparagraph (E) of paragraph (2) of subdivision (a) of

Section 1725.5; or (3) The subcontractor is replaced by another registered subcontractor pursuant to Section

4107 of the Public Contract Code.

DIR Registration Verification. Each Bidder shall submit the completed DIR Registration Verification Form, included in the Bid Documents, executed by a duly authorized officer or employee of the Bidder with the

Bidder's bid or proposal.

INTERPRETATION OF DOCUMENTS AND ADDENDA: If any person contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the plans, specifications, or other proposed contract documents, or finds discrepancies in, or omissions from the specifications, he/she may submit to the Business & Contract Services office of the Escondido Union High School District a written request for an interpretation or correction thereof. It is the sole and exclusive responsibility of the Bidder to submit such request in sufficient time for the District's response thereto and delivery of such response to all

Bidders prior to the scheduled closing for receipt of Bids. Any request of any Bidder, pursuant to the foregoing sentence that is made after the deadline date and time specified in the “Bid Process Timeline” (Item # 1 in the

Information for Bidders — Specific section) shall be deemed untimely. Please email requests to ciwamoto@euhsd.org Any interpretation or correction of the proposed documents will be made only by

Addendum duly issued by the District No Bidder questions will be accepted after stated deadline in the Bid

Process Timeline.

Any addenda or bulletins issued by the Escondido Union High School District during the time of bidding or forming a part of the documents issued to the bidder for the preparation of the bid shall be covered in the bid and shall be made a part of the contract.

All prospective bidders are encouraged to check the District’s bid website https://www.euhsd.org/bids for any addenda for this bid prior to sending and submitting its bid package to the District.

DOCUMENTS TO BE INCLUDED IN THE BIDDER’S BID SUBMITTAL PACKAGE: A Bidder's bid submittal must include the following items, completely filled out and signed by authorized signatory personnel of the

Bidder's company, in order to be considered a responsive bid:

Bid form Bid bond References Designation of Subcontractors

Non-Collusive Bidding Declaration

Worker's Compensation Certification

Contractor's Verification of Contractor and Subcontractors' DIR Registration

Contractor's Certificate Regarding Non-Asbestos Containing Materials

Contractor CARB Compliance form and supporting documentation

Bidders do not need to return the entire set of bid documents back to the District. Only the documents listed above are required to be submitted. Should the Bidder submit pages from the Bid Documents that have not been required by the District to be submitted as part of the Bidder's Bid Submittal Package, the District will discard that extraneous paperwork.

6. BIDDER'S SAMPLES TO BE SUBMITTED AT TIME OF BID: No samples are required.

INFORMATION FOR BIDDERS— SPECIFIC 5

INFORMATION FOR BIDDERS – SPECIFIC 6

7. BID BOND REQUIREMENT: A bid bond is required for this bid in the amount of $3,000. Bond form is included in the Bid Documents.

8. PAYMENT AND/OR PERFORMANCE BONDS TO BE REQUIRED OF AWARDED VENDOR: Refer to the

“Specifications – Special Conditions” section, Item #5.

9. REFERENCES: Bidders are required to complete the “References” sheet as part of their bid submittal. Bidder must be able to present evidence of satisfactory experience providing similar goods and / or services as those specified in this Request for Bid.

10. SUBCONTRACTOR’S LIST: Bidders are required to complete the “Designation of Subcontractors” Form as part of their bid submittal. The Bidder must provide the name, Address, California Contractors License Number, DIR Registration Number, and Portion of work to be performed for all Subcontractor(s).

11. CONTRACTOR’S CERTIFICATION REGARDING WORKERS’ COMPENSATION: In accordance with the provisions of Section 3700 of Labor Code, Contractor shall secure the payment of compensation to his employees. Contractor shall sign and file with the District the following certificate prior to performing the work under this contract. “I am aware of the provisions of Section 37700 of the labor Code which required every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.” The form of such certificate is included as a part of the contract documents. Each bidder shall sign the certificate and submit it with his/her sealed bid.

12. MAILING / DELIVERING THE BID: The Bidder is ultimately responsible for the timely submittal of the Bidder’s sealed Bid Package. All bids must be submitted in sealed envelopes bearing on the outside the name of the bidder, his/her address, and the name of the bid and bid number for which the bid is submitted.

It is the sole responsibility of the bidder to see that his/her bid is received in proper time. All bids received after the scheduled closing time for receipt of bids will be returned to the bidder unopened.

To ensure that the bid package remains sealed until the bid opening date and time, clearly indicate the Bid Number and Bid Name on the outside of the package, or at a minimum, on the sealed envelope that may be placed inside the mailing package or carton.

If the package is sent via U.S. Postal Service, UPS, Fed Ex, etc all packages must be clearly addressed to:

Escondido Union High School District Attn: Purchasing Services, Bid #2026-27-2 302 North Midway Drive Escondido, CA 92027

If the package is hand-delivered prior to or at bid opening, bring Bidder’s sealed Bid Package with the bid number and name clearly indicated on the outside of the package to: The office of Purchasing Department inside of the District Service Center.

13. PIGGYBACK CLAUSE: For the term of the Contract and any mutually agreed extensions pursuant to this request for bids, at the option of the contractor, other public agencies within San Diego county may procure identical items off this bid under the same terms and conditions and at the same unit price, pursuant to sections 20118 (K-12 school districts) and 20652 (Community College) of the Public Contract Code.

The Escondido Union High School District waives its right to require such other districts and offices to draw their warrants in the favor of the District as provided in said Code section. Public agencies within San Diego County shall process their purchase orders and warrants directly to the successful bidder upon agreement by the District and the successful bidder. Acceptance or rejection of this clause will not affect the outcome of this bid.

End of Section

Escondido Union High School District 2026-27-2: Districtwide Asphalt Repair & Sealing Unit Price Bid

INFORMATION FOR BIDDERS – GENERAL 7

INFORMATION FOR BIDDERS - General

1. Preparation of Bid Form

The District invites bids on the attached forms. All blanks in the bid form must be appropriately filled in, and all prices must be state in figures. Unit price shall include the cost of labor and materials.

All bids must be submitted in sealed envelopes bearing on the outside the name of the bidder, his/her address, and the name of the project and bid number for which the bid is submitted. It is the sole responsibility of the bidder to see that his/her bid is received in proper time. All bids received after the scheduled closing time for receipt of bids will be returned to the bidder unopened.

2. Faxed and Electronic Mail Bids All bids must be under sealed cover. District will not accept any bids or bid modifications submitted by facsimile or electronic mail transmission.

3. Signature The bid must be signed in the name of the bidder and must bear the signature in longhand of the person or persons duly authorized to sign the bid.

4. Modifications Changes in or additions to the bid form, recapitulations of the work bid upon, alternate proposals, or any other modification of the bid form which is not specifically called for in the contract documents may result in the District’s rejection of the bid as not being responsive to the invitation to bid. No oral or telephonic modification of any bid submitted will be considered.

5. Examination of Site and Contract Documents Each bidder may visit the site of the proposed work and fully acquaint himself/herself with the conditions relating to the construction and labor so that he may fully understand the facilities, difficulties, and restrictions attending the execution of the work under the contract. Bidders shall thoroughly examine and be familiar with the bid documents and specifications. The failure or omission of any bidder to receive or examine any documents, form, instrument, addendum, or other document or to visit the site and acquaint himself with conditions there existing shall in no way relieve any bidder from obligations with respect to his/her bid or to the contract.

Each bidder, by making his/her bid represents that the/she has read and understands the Contract and Bid Documents and any and all related reports and information. After executing the Agreement, no consideration will be given to any claim of misunderstanding of the documents.

Each bidder, by making his/her bid, represents that he/she has visited the site, inspected the area of the work, and familiarized himself/herself with the local conditions under which the work is to be performed, including sub-surface conditions. Such inspection shall specifically consider requirements for accessing the site and determining the work can be completed as required.

6. Withdrawal of Bids Any bidder may withdraw his/her bid either personally or by written request at any time prior to the scheduled closing time for receipt of bids.

7. Agreements and Bonds The Agreement from which the successful bidder, as Contractor, will be required to execute, and the forms and amounts of surety bonds which he/she will be required to furnish at the time of execution of the Agreement, are included in the contract documents and shall be carefully examined by the bidder.

Based on the Unit Price nature of a contract resulting from this bid process, bond documents shall be required for the full annual estimated amount of the contract in annual increments.

INFORMATION FOR BIDDERS – GENERAL 8

The Performance Bond must be executed by an admitted Surety approved to conduct business in the State of California which meets the highest standards the District is legally permitted to establish and which it has established.

The Payment Bond must be executed by an admitted Surety approved to conduct business in the State of California which meets the highest standards the District is legally permitted to establish.

Bonds shall be in the form set forth in the contract documents.

8. Interpretation of Plans and Documents If any person contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the drawings, specifications, or other information pertaining to the site (including any available soils or geotechnical report) or finds discrepancies in, or omissions from the drawings and specifications, he is hereby required in accordance with Public Contract Code section 1104 to submit to the bid administrator a written request for an interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery according to deadlines set in the bid documents. Any interpretation or correction of the bid documents or other available information will be made only by addendum duly issued by the District. At the option of the District, all addenda may be mailed, published online, made available for pick-up or sent via electronic mail. No oral interpretation of any provision in the documents will be made to any bidder. Numbers spelled out in words will take precedence over numerals/figures.

9. Bidders Interested in More than One Bid and Bidders Not Qualified to Bid No person, firm, or corporation shall be allowed to make, or file, or be interested in more than one bid for the same work unless alternate bids are specifically called for. A person, firm, or corporation that has submitted a sub-proposal to a bidder, or that has quoted prices of materials to a bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other bidders or making a prime proposal.

No person, firm, or corporation shall be allowed to bid who has participated in the preparation of contract specifications; a bid by such a person, firm or corporation shall be determined to be non-responsive.

10. Anti-Discrimination It is the policy of the District that in connection with all work performed under contracts, there be no discrimination against any prospective or active employees engaged in the work because of race, color, ancestry, national origin, religious creed, sex, age or marital status. The successful bidder agrees to comply with all applicable Federal and California laws including, but not limited to, the California Fair Employment Practice Act, beginning with Government Code Section 12900, and Labor Code Section 1735. In addition, the successful bidder agrees to require like compliance by any subcontractors employed on the work by the bidder.

11. Award of Contract

The District reserves the right to reject any or all bids, or to waive any irregularities or informalities in any bids or in the bidding. Award, if made by the District, will be to the lowest price responsive and responsible bidder based on anticipated usage.

The District has provided a hypothetical distribution of anticipated projects by project size for the purpose of determining the lowest bidder. In no case shall the District be bound by the amounts listed in the hypothetical conditions outlined in bid form. This is not a fixed quantity bid.

12. Additive and Deductive Items: Method of Determining Lowest Bid Pursuant to Public Contract Code section 20103.8, should this bid solicitation include additive and/or deductive items, the checked [X] method shall be used to determine the lowest bid:

__X__ (a) The lowest bid shall be the lowest bid price based on the base bid only without consideration of the prices on the additive or deductive items.

INFORMATION FOR BIDDERS – GENERAL 9

_____ (b) The lowest bid shall be the lowest total of the bid prices on the base contract and those additive or deductive items taken in the numerical order set forth in the bid form and specifically identified as being used for the purpose of determining lowest bid price.

_____ (c) The lowest bid shall be the lowest total of the bid prices on the base contract and those additive or deductive items that when taken in order from a specifically identified list of those items in the bid form and added to, or subtracted from, the base contract, are less than, or equal to, a funding amount publicly disclosed by the District before the first bid is opened.

_____ (d) The lowest bid shall be determined in a manner that prevents any information that would identify any of the bidders from being revealed to the public entity before the ranking of all bidders from lowest to highest has been determined.

The lowest bid shall be determined as described in the Bid Documents generally and specifically in paragraph 1 of the Bid Form.

Notwithstanding the method used by the District to determine the lowest responsible bidder, the District retains the right to add to or deduct from the contract any of the additive or deductive items included in the bid solicitation after the lowest responsible bidder has been determined.

13. Evidence of Responsibility Upon the request of the District, a bidder whose bid is under consideration for the award of the contract shall submit promptly to the District satisfactory evidence showing the bidder's financial resources, his/her construction experience in the type of work being required by the District, and his/her organization available for the performance of the contract and any other required evidence of the bidder's qualifications to perform the proposed contract. The District may consider such evidence before making its decision awarding the proposed contract. Failure to submit requested evidence of a bidder's responsibility to perform the proposed contract may result in rejection of the bid.

14. Listing Subcontractors Each bidder shall submit with his/her sealed bid a list of the proposed subcontractors on this project as required by the Subletting and Subcontracting Fair Practices Act (Public Contract Code section 4100 and following). Forms for this purpose are furnished with the contract documents. All listed subcontractors must be registered with the DIR pursuant to Labor Code §1725.5. Bidder must include in the bid the DIR registration number for each listed subcontractor. If the DIR registration number for a listed subcontractor is not known at the time of bid submittal, the Bidder may submit the subcontractor’s DIR registration number to the District within twenty-four (24) hours of bid opening. Pursuant to Labor Code §1771.1, an inadvertent error in listing a subcontractor who is not registered with DIR in a bid or proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following apply: (1) The subcontractor is registered prior to the bid opening; (2) Within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5; or (3) The subcontractor is replaced by another registered subcontractor pursuant to Section 4107 of the Public Contract Code. In addition to these requirements, within one business day after the bid opening, Contractor shall provide the address, phone number, and license number of each listed subcontractor. If the bidder fails to provide information within one business day, District may in its discretion, reject the bid as non-responsive.

15. Workers’ Compensation In accordance with the provisions of section 3700 of the Labor Code, Contractor shall secure the payment of compensation to his/her employees. Contractor shall sign and file with District the following certificate prior to performing the work under this contract:

I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. The form of such certificate is included as part of the contract.

16. Substitution of Security

INFORMATION FOR BIDDERS – GENERAL 10

Monies withheld by the District to ensure performance under the contract may be released in accordance with Public Contract Code section 22300 and the contract documents.

17. Contractor’s License If, at the time the bids are opened, bidder is not licensed to perform the project in accordance with division 3, chapter 9 of the Business and Professions Code of the State of California (Section 7028.15) and the Notice of Contractors Calling for Bids, the bid will not be considered.

18. Bid Protest In the event a bidder objects to the District’s intent to award the contract based on the apparent lowest responsive and responsible bidder, protest will be subject to District Board Policy 3311. A protest must be filed in writing (email is not acceptable) with the Bid Administrator before 4:00 PM of the fifth business days after opening of the bids and shall include all documents supporting or justifying the protest. A bidder's failure to file the protest documents in a timely manner shall constitute a waiver of his/her right to protest the award of the contract.

19. Ethics in Bidding The District expects the bidders to maintain high ethical standards in engaging in the competitive bidding process. The bid amount of one bidder should not be divulged to another before the award of the subcontract or order, nor should it be used by Contractor to secure a lower proposal from another bidder on that project (bid shopping). Subcontractors or Suppliers should not request information for the Contractor regarding any sub-bid in order to submit a lower proposal on that project (bid peddling). District will consider any bidder found to be engaging in such practices to be a non-responsible bidder and may reject its bid on that ground.

20. Substitutions and Special Brand Names In accordance with Public Contract Code section 3400 “prior to or after the award of the contract” district must provide for “submissions of data substantiating a request for a substitution of ‘an equal’ item.”

Therefore, no later than thirty-five (35) days after award of the contract, if the bidder is requesting substitution of "an equal" item or product or work, the make and grade of the item, product or work which is to be substituted shall be provided to the District representative. The documentation submitted must include any and all illustrations, specifications, and other relevant data including catalogue information which describes the substituted item or product or work and substantiates that it is an "or equal" to the specified item or product or work. In addition, the submittal documentation must also include a statement of the cost implications of the substitution being requested stating whether and why the substitution will reduce or increase the contract price. The documentation submitted must also include information regarding the durability and life cycle cost of the substituted item, product or work. Substantiating data shall include a signed affidavit from the Contractor stating that the substituted item or product or work is equivalent to the specified item or product or work in every way except as listed on the affidavit. Whenever possible, the same substitution information is to be included in the sealed bid submittal package. Failure to submit all the needed substantiating data, including the signed affidavit, may result in a determination that the bid is non-responsive. Bidders are specifically notified that the submission of his/her documentation in no way obligates the District or it’s representative to review such documentation prior to contract award.

Furthermore, after award of a contract, if a proposed substitution is rejected, bidder shall be responsible to provide the item or product or work as originally specified at no additional cost to the District. District has the complete and sole discretion to determine if an item or article is an equal item.

21. Labor Compliance Program This contract will be monitored by the California Department of Industrial Relations to ensure compliance with prevailing wage requirements. All contractors, subcontractors, bidders and laborers performing work on the Project are required to comply with the applicable Labor Code requirements (Labor Code §1725.5 and §1771.4, respectively.

Escondido Union High School District Bid 2026-27-2 Districtwide Asphalt Repair & Sealing

BID BOND

KNOW ALL MEN BY THESE PRESENT: that we, _____________________________________________________________, as Principal, and ___________________________________________________________________________ , as Surety, are held and firmly bound unto the ESCONDIDO UNION HIGH SCHOOL DISTRICT, hereinafter called the District, in the penal sum of three thousand dollars and zero cents ($3,000.00) to the said District for the work described below for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated _______________, 20____ for:

BID NO. 2026-27-2

NOW, THEREFORE, if the Principal shall not withdraw said bid within the period specified therein after the opening of the same, or, if no period be specified, within sixty (60) days after said opening; and, if the Principal be awarded the Contract, and shall within the period specified therefore, or, if no period be specified, within five (5) days after the prescribed forms are presented to him for signature, enter into a written contract with the District, in accordance with the bid as accepted and give bond with good and sufficient surety or sureties, as may be required, for the faithful performance and proper fulfillment of such contract and for the payment for labor and materials used for the performance of the Contract, or in the event of the withdrawal of said bid within the period specified or the failure to enter into such contract and give such bonds within the time specified, if the Principal shall pay the District the difference between the amount specified in said bid and the amount for which the District may procure the required work and/or supplies, if the latter amount be in excess of the former, together with all costs incurred by the District in again calling for bids, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue.

Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract on the call for bids, or to the work to be performed thereunder, or the specifications accompanying the same, shall in anywise affect its obligation under this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of said contract or the call for bids, or to the work, or to the specifications.

In the event suit is brought upon this bond by the District and judgment is recovered, the Surety shall pay all litigation expenses incurred by the District in such suit, including reasonable attorneys' fees, court costs, expert witness fees and investigation expenses.

IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this _____ day of _________________, 20____, the name and corporate seal of each corporate party being hereto affixed and these presents duly assigned by its undersigned representative, pursuant to authority of its governing body.

Escondido Union High School District Bid 2026-27-2 Districtwide Asphalt Repair & Sealing

(Corporate Seal)

PRINCIPAL: ______________________________________________

By: ______________________________________________

Title: ______________________________________________

SURETY: ______________________________________________

By: ______________________________________________

Attorney-in-Fact

(Attach Attorney-in-Fact Certificate)

Escondido Union High School District Bid 2026-27-2 Districtwide Asphalt Repair & Sealing

AGREEMENT

[To be executed between the District and the selected/awarded contractor]

THIS AGREEMENT, made this day of , 20__ in the County of San Diego, State of California, by and between the Escondido Union High School District, hereinafter called the District, and

____________________________________________, hereinafter called the Contractor, WITNESSETH that the District and the Contractor for the considerations stated herein agree as follows:

ARTICLE 1 - SCOPE OF WORK. Within the time agreed to the Contract herein, Contractor shall perform and provide all labor, materials, apparatus, utility services, facilities, transportation, tools and equipment and perform all the work required to construct and complete the following titled project in a good and workmanlike manner and in strict accordance with the Contract Documents (the "Work"):

BID NO. 2026-27-2: Districtwide Asphalt Repair & Sealing Unit Price Bid ("Project").

ARTICLE 2 - TIME FOR COMPLETION. (a) The work shall be commenced on the date stated in the District's Notice to Proceed, as provided in Item # 1 of the Specifications - Special Conditions.

ARTICLE 3 – CONTRACT PRICE. The District shall pay to the Contractor as full consideration for the faithful performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including any applicable sales, use or other taxes or costs, the "Contract Amount” based on price per unit of measurement, said sum being the total amount of the following amounts on a per project basis.

Section I: Remove and Replace Existing 3” Asphalt

Unit of Measurement Price Per Unit of Measurement

(Column 2)

Minimum Charge Per Project

0 - 30,000 Square Feet

30,001 - 100,000

100,0001+

Section II: Install New 3” Asphalt over brushed grade

Unit of Measurement

Price Per Unit of Measurement (Column 2)

Minimum Charge Per Project

0 - 30,000

30,001 - 100,000

100,001 +

**Said Unit BID PRICES include all applicable taxes and costs.

Payment shall be made as set forth in the General Conditions.

Escondido Union High School District Bid 2026-27-2 Districtwide Asphalt Repair & Sealing

ARTICLE 4 – COMPONENT PARTS OF THE CONTRACT. The contract entered into by this Agreement consists of the following Contract Documents (referred to herein as the "Contract" or the "Contract Documents"), all of which are component parts of the Contract as if herein set out in full or attached hereto:

Notice to Contractors Calling for Bids Information for Bidders – Specific and General Specifications General Conditions Bid, as accepted including all required documents Addenda Nos. _____, _____, _____ as issued

Payment Bond Performance Bond Insurance Documents

All of the above-named Contract Documents are intended to be complementary. Work required by one of the above-named Contract Documents and not by others shall be done as if required by all. This agreement shall supersede any prior agreement of the parties.

IN WITNESS WHEREOF, this Agreement has been duly executed by the above-named parties, on the day and year first above written.

ESCONDIDO UNION HIGH SCHOOL DISTRICT

San Diego County, California Contractor (SAMPLE ONLY. Do not submit with Bid) By: By:

Amanda Phillips, Signature of Authorized Agent/Officer Assistant Superintendent, Business Services Print Name:

Title:

Date: Date:

Award by Governing Board on ______________________, 20 .

Contractors are required by law to be licensed and regulated by the Contractors’ State License Board. Any questions concerning a contractor may be referred to the registrar of the board whose address is:

Contractors State License Board 9821 Business Park Drive

Sacramento, CA 95827 Phone: (800) 321-CLSB http://www.cslb.ca.gov

PERFORMANCE BOND (SAMPLE) 15

PERFORMANCE BOND

[Sample only]

KNOW ALL MEN BY THESE PRESENTS: That

WHEREAS, the Escondido Union High School District (hereinafter designated as “Public Entity” or “District”), by action taken or a resolution passed on __________________, has approved the award to ______________________________, hereinafter designated as the "Principal," a contract for the work described as follows:

(“Project” or “Contract”) which Contract dated __________, and all of the Contract Documents attached to or forming a part of the Contract, are hereby referred to and made a part hereof, and

WHEREAS, the Principal is required under the terms of the Contract to furnish a bond for the faithful performance of the Contract;

NOW, THEREFORE, we, the Principal, and _______________________________________________ (“Surety”) are held and firmly bound unto the District in the penal sum of:

$ _____________________________________________________________ DOLLARS ($ _________), lawful money of the United States of America, for payment to the District and will and truly be made pursuant to the provisions herein. Principal and Surety, each of us, bind ourselves, our heirs, executors, administrators, successors, and assigns jointly and severally to:

- Perform all the work required to complete the Project; and

- Pay to the District all damages the District incurs as a result of the Principal’s failure to perform all the Work required to complete the Project.

In the event the Principal is declared by the District to be in breach or default in the performance of the Contract, then, after written notice from the District to the Surety, as provided for herein, the Surety shall either remedy the default or breach of the Principal or shall take charge of the Work of the Contract and complete the Contract with a Contractor other than the Principal at its own expense; provided, however, that the procedure by which the Surety undertakes to discharge its obligations under this Bond shall be subject to the advance written approval of the District.

The condition of the obligation is such that, if the above bounden Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions, and agreements in the Contract and any alteration thereof made as therein provided, on his or its part to be kept and performed at the time and in the intent and meaning, including all contractual guarantees and warrantees of materials and workmanship, and shall indemnify and save harmless the District, its trustees, officers and agents, as therein stipulated, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract, the above obligation shall hold good for a period equal to the warranty and/or guarantee period of the Contract, during which time Surety’s obligation shall continue if Contractor shall fail to make full, complete, and satisfactory repair, replace, and totally protect the District from loss or damage resulting from or caused by defective materials or faulty workmanship. The

PERFORMANCE BOND

[Sample only]

KNOW ALL MEN BY THESE PRESENTS: That

WHEREAS, the Escondido Union High School District (hereinafter designated as “Public Entity” or “District”), by action taken or a resolution passed on , has approved the award to

, hereinafter designated as the "Principal," a contract for the work described as follows:

2026-27-2 Districtwide Asphalt Repair & Sealing Unit Price Bid

(“Project” or “Contract”) which Contract dated , and all of the Contract Documents attached to or forming a part of the

Contract, are hereby referred to and made a part hereof, and

WHEREAS, the Principal is required under the terms of the Contract to furnish a bond for the faithful performance of the Contract;

NOW, THEREFORE, we, the Principal, and

(“Surety”) are held and firmly bound unto the District in the penal sum of:

$ DOLLARS ($ ),

lawful money of the United States of America, for payment to the District and will and truly be made pursuant to the provisions herein. Principal and Surety, each of us, bind ourselves, our heirs, executors, administrators, successors, and assigns jointly and severally to:

- Perform all the work required to complete the Project; and

- Pay to the District all damages the District incurs as a result of the Principal's failure to perform all the

Work required to complete the Project.

In the event the Principal is declared by the District to be in breach or default in the performance of the

Contract, then, after written notice from the District to the Surety, as provided for herein, the Surety shall either remedy the default or breach of the Principal or shall take charge of the Work of the Contract and complete the

Contract with a Contractor other than the Principal at its own expense; provided, however, that the procedure by which the Surety undertakes to discharge its obligations under this Bond shall be subject to the advance written approval of the District.

The condition of the obligation is such that, if the above bounden Principal, his or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions, and agreements in the Contract and any alteration…