Part A - Sources Sought
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C.SchemDH-and-CHP-as-of2018-10-28.pdf | ||
| D.Q&As-consolidated.pdf | ||
| B.DH-ExchangePoint-as-of2018-03-28.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT TECHNICAL DESCRIPTION FOR
DISTRICT HEAT SUPPLY (INCL. OPERATION AND MAINTENANCE)
A. INTRODUCTION
The Theater Contracting Center Kaiserslautern is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support the requirement District Heat Supply (incl. operation and maintenance) up to the exchange-point (EP) for the Rhein Ordinance Barracks Medical Center Replacement (ROB MCR) currently under construction at 67685 Weilerbach (Germany). Heat supply shall commence on or about 1 January 2021.
BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE / MARKET
RESEARCH, THIS REQUIREMENT WILL BE PROCURED THROUGH FULL AND
OPEN COMPETITION.
B. PLACE OF PERFORMANCE
ROB MCR, L 369, 67685 Weilerbach, Germany.
C. DISCLAIMER
“THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS
NOT A “REQUEST FOR PROPOSAL (RFP)” TO BE SUBMITTED. IT DOES NOT
CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A
COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT
OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A
CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE
TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY
INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL
DESCRIPTION IS STRICTLY VOLUNTARY. RESPPONSES WILL NOT BE RETURNED
TO THE RESPONDER. NOT RESPONDING TO THIS NOTICE DOES NOT PRECLUDE
PARTICIPATION IN ANY FUTURE REQUEST FOR QUOTE (RFQ) OR INVITATION
FOR BID (IFB) OR RFP, IF ANY ISSUED. IF A SOLICITATION IS RELEASED, IT WILL
BE SYNOPSIZED ON THE GOVERNMENT-WIDE POINT OF ENTRY (GPE;
www.fbo.gov). IT IS THE RESPONSIBILITY OF POTENTIAL OFFERORS TO MONITOR
THE GPE FOR ADDITIONAL INFORMATION PERTAINING TO THIS REQUIREMENT.”
D. PROGRAM BACKGROUND
The Corps of Engineers (CoE) is designated as the requiring activity. In accordance with these assignments, CoE provides the following: design and construction of the ROB MCR.
http://www.fbo.gov/
E. REQUIRED CAPABILITIES
The Contractor shall provide district heat (including operation and maintenance) up to the exchange point for the new Army Hospital currently under construction at 67685 Weilerbach, Germany.
a) Planned District Heat EP: See attached .pdf entitled “District Heat Exchange Point as of 28 MAR 18: EP- Southeast corner of Central Utility Plant (CUP) 1.”
b) Estimated demand values:
(1) Initial capacity for 2021 - 2023 is expected at 3.500 to 4.000 MW.
Full capacity is expected in 2024.
For details see attached “Schematic District Heating + CHP”
(2) Supply Temperature needed at CUP 1:
Minimum: 80 degrees Celsius.
Preferred: 95 degrees Celsius.
If your organization has the capacity to perform this requirement, please provide the following information:
1) Organization name, address, email address, web site address, telephone number, and size and type of ownership for the organization; and
2) Tailored capability statements addressing the particulars of this effort, with appropriate documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements.
The Government will evaluate market information to ascertain potential market capacity to:
1) provide services consistent, in scope and scale, with those described in this notice;
2) secure and apply the full range of corporate financial, human capital, and technical resources required to successfully perform similar requirements;
3) implement a successful project management plan that includes: compliance with tight program schedules; cost containment; meeting and tracking performance; hiring and retention of key personnel and risk mitigation; and
4) provide services under a performance based service acquisition contract.
F. ELIGIBILITY
The applicable NAICS code for this requirement is 22 13 30. The Product Service Code is S 119.
G. ADDITIONAL INFORMATION AND SUBMISSION DETAILS
(CAPABILITIES STATEMENT)
Please answer the following questions and provide the documents as requested:
a) What line routing would you follow from your heating plant to the EP?
Please provide a drawing reflecting your recommended pipe routing.
b) How much time (for construction, obtaining approvals, etc.) would be needed in order to provide district heat to the EP?
Please provide a progress schedule reflecting your milestones and estimated duration of the entire project.
c) What diameter supply and return line would you use from your heating plant to the EP?
d) A Third Party Heating Plant cannot be constructed on the Hospital Site due to environmental permitting concerns. How will you ensure an uninterrupted supply of district heat to the EP in compliance with the 2019 National Defense Authorization Act Section 2811 requirements to include a diverse energy (mixed-fuel) supply?
The response should:
(1) explain which fuels will be utilized to supply district heat and how district heat production will continue in the event of a fuel supply disruption;
(2) explain how fuels sourced from inside the Russian Federation will be minimized;
(3) list the countries of origin for the fuels sourced;
(4) explain how redundancy will be built into the district heat production system and delivery lines, and explain to what extent U. S. domestically sourced fuels can be utilized as a preferred source for furnished energy.
e) Price Inquiry: What is your rough cost estimate to provide the Maximum Heat Capacity to the EP? Please break it down into the following cost elements, if do-able:
(1) Demand Charge I: Investment/Capital Cost
(2) Demand Charge II: Operation & Maintenance Cost per year (or if included in the
Consumption Price provide the respective ratio)
(3) Consumption Price per MWh
f) This documentation must also address at a minimum the following items:
(1) What type of work has your company performed in the past in support of the same or similar requirements?
(2) Can or has your company managed a task of this nature? If so, please provide details.
(3) Can or has your company managed a team of subcontractors before? If so, provide details.
(4) What specific technical skills does your company possess which ensure capability to perform the tasks?
(5) Provide a statement including current business status and company profile to include number of employees, annual revenue history, office locations, DUNS number, etc.
The estimated period of performance for the delivery of district heat consists of 10 years (01 Jan 2021 (Fiscal Year (FY) ’21) with performance ending on 31 Dec 2030 (FY ’31)).
The contract type is anticipated to be Firm-Fixed Unit Price (with price adjustment clause).
All data received in response to this Sources Sought that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government.
Interested parties are requested to submit a capabilities statement of no more than ten
(10) pages in length in Times New Roman font of not less than 10 pitch (either as .doc or .pdf). The deadline for response to this request is no later than 14:00 h Central European Time 23 November 2018. All responses under this Sources Sought Notice must be e-mailed to Peter.J.Flaskamp.LN@mail.mil, Frank.I.Hackbarth.LN@mail.mil and A.Marius.Fara.LN@mail.mil.
All questions must be submitted to the contract specialists identified above in writing. The Government is not committed nor obligated to pay for the information provided, and no basis for claims against the Government shall arise as a result of a response to this Sources Sought.
*** End of notice *** mailto:Peter.J.Flaskamp.LN@mail.mil mailto:Frank.I.Hackbarth.LN@mail.mil mailto:A.Marius.Fara.LN@mail.mil