Dirt Road Repairs_ golden triangle.docx

DOCX document 41 KB Posted

Attached to
Dirt Road Repairs, Improvements
Solicitation number
PE-77131-NONST-2026-000000015
Issued by
Barrow County, Georgia

About this file

This document is a Price Quote Request for Unpaved Road Restoration issued by the County of Baker, covering multiple road restoration sites including Oscar Jordan, Sheffield Road, Hoggards Mill, and Colquitt Ford. The project involves comprehensive road repair and improvement services across five different sites, with a uniform price quote template due on 10/27/2025 at 5:00 PM. Each site-specific quote requires contractors to provide pricing for ten distinct road restoration activities, including grading, shaping, road re-crowning, ditching, gravel supply and placement, compaction, culvert replacement, turnout creation, road bed raising, erosion control matting installation, and native grass seeding.

The pricing structure requires contractors to provide unit prices for each line item, with estimated quantities to be inserted by the bidder. Contractors must include all overhead, labor, materials, equipment, insurance, and applicable taxes in their unit pricing. The document provides detailed instructions for completing the price quote, emphasizing the need for accuracy, completeness, and adherence to specified formatting requirements. The quote includes sections for contractor information, a comprehensive pricing table, schedule and availability details, and a certification section where an authorized company representative must sign and confirm the accuracy and validity of the submitted information.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROCEDURE FOR COMPLETING THE PRICE QUOTE SHEET

Project Name: Unpaved Road Restoration Issued By: County of BAKER Project No.: HCP SPRING CREEK/ICH

1. Read the Full Package First Before filling out the price quote sheet, the contractor must:

· Carefully read the full scope of work for each road restoration, technical specifications, and project requirements included in the price package.

· Attend any pre- meetings or site visits if scheduled.

2. General Instructions

· Type or print BAKER in black or blue ink.

· Ensure all prices are entered in U.S. Dollars ($).

· If a line item is not required for the specific road restoration cross through it and state N/A

· Do not leave any unit price fields blank. Enter “0.00” if no cost is being applied to a line item.

· Round unit prices to the nearest cent (e.g., $0.01).

· Ensure all fields are completed, including company details, signature, and required attachments.

3. Completing Section 1: Contractor Information Fill in the following fields completely:

· Company Name: Full legal name of your business.

· Business Address: Street, City, State, ZIP.

· Phone Number: Main business contact number.

· Email Address: A valid email where communications will be sent.

· License Number & Type: Valid contractor license number and classification.

· Contact Person: Name and title of the individual authorized to answer price -related questions.

4. Completing Section 2: Pricing Table For each line item:

Column
Instructions
Description
Review and confirm you understand the work required. Clarifications may be requested in writing before the deadline.
Unit
Pricing must be per the listed unit (e.g., per mile, per ton, per square yard). Do not alter units.

Estimated Quantity Estimate the quantity required per the scope of work for linear feet restoration

Unit Price ($)
Enter the price per unit of work or material. Include all overhead, labor, materials, equipment, insurance, and applicable taxes.
Extended Price ($)
Multiply the Unit Price by the Estimated Quantity (Extended Price = Unit Price × Estimated Quantity).

Total Price: Add all Extended Prices to calculate the total. Double-check your math. If submitting in Excel, formulas may be used.

5. Completing Section 3: Schedule & Availability

· Provide the earliest possible start date if awarded.

· Estimate how many calendar days the project will take to complete.

6. Completing Section 5: Certification

· The authorized company representative must sign and date the form.

· Print their full name and title BAKER.

· By signing, the contractor certifies that:

· All information is truthful.

· Pricing is valid for the duration specified in the price (e.g., 60 or 90 days).

· The company agrees to the terms and specifications of the price .

7. Final Review Before Submission

· Recheck calculations and attachments.

· Ensure that all pages are complete and signed.

· Submit the completed price sheet and all required documents by the deadline via the method indicated (in-person, mail, or electronically).

MUSSEL PROJECT

COUNTY OF BAKER

PRICE QUOTE

UNPAVED ROAD RESTORATION- BAKER

PROJECT NO.: MS/SPRING-ICH/BAKER/OSCAR JORDAN SITE 1

Price Quote Due Date: 10/27/2025 Time: 5:00 PM

1. CONTRACTOR INFORMATION

Field
Response

Company Name

Business Address

Phone Number

Email Address

License Number & Type

Contact Person

2. PRICING TABLE

Item No.
Description
Unit
Estimated Quantity
Unit Price ($)
Extended Price ($)
1
Grading and Shaping
Mile
[insert]
__________
__________
2
Roadway Re-Crowning
Mile
[insert]
__________
__________
3
Ditching/Cleaning Shoulders
Linear Foot
[insert]
__________
__________
4
Gravel Supply & Placement (Rock #5, Rock #3, Rip rap and crusher run")
Ton
[insert]
__________
__________
5
Compaction (Vibratory Roll)
Mile
[insert]
__________
__________
6
Culvert Replacement (24,30,40")
Each
[insert]
__________
__________
7
Turnout Creation
Each
[insert]
__________
__________
8
Raising the Road Bed (Min. 3-4")
Linear Foot
[insert]
__________
__________
9
Erosion Control Matting Installation
Square Yard
[insert]
__________
__________
10
Native Grass Seeding (Roadside Shoulders)

Total linear feet

Acre
[insert]
__________
__________

Subtotal: $________________ Applicable Taxes (if any): $________________

TOTAL PRICE $________________

3. SCHEDULE & AVAILABILITY

· Earliest Available Start Date: __________________________

· Estimated Duration (Days): _____________________________

4. CERTIFICATION

I, the undersigned, certify that:

· I am authorized to submit this price on behalf of the company.

· The prices quoted are within industry standards for reasonable and customary charges for raw materials.

· I have read and understood the specifications, scope, and terms.

Authorized Signature: ___________________________ Print Name & Title: ___________________________ Date: ___________________________

PRICE QUOTE

UNPAVED ROAD RESTORATION- BAKER

PROJECT NO.: MS/SPRING-ICH/BAKER/OSCAR JORDAN SITE 2

Price Quote Due Date: 10/27/2025 Time: 5:00 PM

1. CONTRACTOR INFORMATION

Field
Response

Company Name

Business Address

Phone Number

Email Address

License Number & Type

Contact Person

Item No.
Description
Unit
Estimated Quantity
Unit Price ($)
Extended Price ($)
1
Grading and Shaping
Mile
[insert]
__________
__________
2
Roadway Re-Crowning
Mile
[insert]
__________
__________
3
Ditching/Cleaning Shoulders
Linear Foot
[insert]
__________
__________
4
Gravel Supply & Placement (Rock #5, Rock #3, Rip rap and crusher run")
Ton
[insert]
__________
__________
5
Compaction (Vibratory Roll)
Mile
[insert]
__________
__________
6
Culvert Replacement (24,30,40")
Each
[insert]
__________
__________
7
Turnout Creation
Each
[insert]
__________
__________
8
Raising the Road Bed (Min. 3-4")
Linear Foot
[insert]
__________
__________
9
Erosion Control Matting Installation
Square Yard
[insert]
__________
__________
10
Native Grass Seeding (Roadside Shoulders)

Total Linear feet

Acre
[insert]
__________
__________

TOTAL PRICE $________________

3. SCHEDULE & AVAILABILITY

· I am authorized to submit this price on behalf of the company.

· The prices quoted are within industry standards for reasonable and customary charges for raw materials.

· I have read and understood the specifications, scope, and terms.

Authorized Signature: ___________________________

PRICE QUOTE

UNPAVED ROAD RESTORATION- BAKER

PROJECT NO.: MS/SPRING-ICH/BAKER/SHEFFIELD ROAD SITE 1

Price Quote Due Date: 10/27/2025 Time: 5:00 PM

1. CONTRACTOR INFORMATION

Field
Response

Company Name

Business Address

Phone Number

Email Address

License Number & Type

Contact Person

Item No.
Description
Unit
Estimated Quantity
Unit Price ($)
Extended Price ($)
1
Grading and Shaping
Mile
[insert]
__________
__________
2
Roadway Re-Crowning
Mile
[insert]
__________
__________
3
Ditching/Cleaning Shoulders
Linear Foot
[insert]
__________
__________
4
Gravel Supply & Placement (Rock #5, Rock #3, Rip rap and crusher run")
Ton
[insert]
__________
__________
5
Compaction (Vibratory Roll)
Mile
[insert]
__________
__________
6
Culvert Replacement (24,30,40")
Each
[insert]
__________
__________
7
Turnout Creation
Each
[insert]
__________
__________
8
Raising the Road Bed (Min. 3-4")
Linear Foot
[insert]
__________
__________
9
Erosion Control Matting Installation
Square Yard
[insert]
__________
__________
10
Native Grass Seeding (Roadside Shoulders)

Total linear feet

Acre
[insert]
__________
__________

TOTAL PRICE $________________

3. SCHEDULE & AVAILABILITY

· I am authorized to submit this price on behalf of the company.

· The prices quoted are within industry standards for reasonable and customary charges for raw materials.

· I have read and understood the specifications, scope, and terms.

Authorized Signature: ___________________________

PRICE QUOTE

UNPAVED ROAD RESTORATION- BAKER

PROJECT NO.: MS/SPRING-ICH/BAKER/SHEFFIELD RD SITE 2

Price Quote Due Date: 10/27/2025 Time: 5:00 PM

1. CONTRACTOR INFORMATION

Field
Response

Company Name

Business Address

Phone Number

Email Address

License Number & Type

Contact Person

Item No.
Description
Unit
Estimated Quantity
Unit Price ($)
Extended Price ($)
1
Grading and Shaping
Mile
[insert]
__________
__________
2
Roadway Re-Crowning
Mile
[insert]
__________
__________
3
Ditching/Cleaning Shoulders
Linear Foot
[insert]
__________
__________
4
Gravel Supply & Placement (Rock #5, Rock #3, Rip rap and crusher run")
Ton
[insert]
__________
__________
5
Compaction (Vibratory Roll)
Mile
[insert]
__________
__________
6
Culvert Replacement (24,30,40")
Each
[insert]
__________
__________
7
Turnout Creation
Each
[insert]
__________
__________
8
Raising the Road Bed (Min. 3-4")
Linear Foot
[insert]
__________
__________
9
Erosion Control Matting Installation
Square Yard
[insert]
__________
__________
10
Native Grass Seeding (Roadside Shoulders)

Total Linear Feet

Acre
[insert]
__________
__________

TOTAL PRICE $________________

3. SCHEDULE & AVAILABILITY

· I am authorized to submit this price on behalf of the company.

· The prices quoted are within industry standards for reasonable and customary charges for raw materials.

· I have read and understood the specifications, scope, and terms.

Authorized Signature: ___________________________

PRICE QUOTE

UNPAVED ROAD RESTORATION- BAKER

PROJECT NO.: MS/SPRING-ICH/BAKER/HOGGARDS MILL SITE 2

Price Quote Due Date: 10/27/2025 Time: 5:00 PM

1. CONTRACTOR INFORMATION

Field
Response

Company Name

Business Address

Phone Number

Email Address

License Number & Type

Contact Person

Item No.
Description
Unit
Estimated Quantity
Unit Price ($)
Extended Price ($)
1
Grading and Shaping
Mile
[insert]
__________
__________
2
Roadway Re-Crowning
Mile
[insert]
__________
__________
3
Ditching/Cleaning Shoulders
Linear Foot
[insert]
__________
__________
4
Gravel Supply & Placement (Rock #5, Rock #3, Rip rap and crusher run")
Ton
[insert]
__________
__________
5
Compaction (Vibratory Roll)
Mile
[insert]
__________
__________
6
Culvert Replacement (24,30,40")
Each
[insert]
__________
__________
7
Turnout Creation
Each
[insert]
__________
__________
8
Raising the Road Bed (Min. 3-4")
Linear Foot
[insert]
__________
__________
9
Erosion Control Matting Installation
Square Yard
[insert]
__________
__________
10
Native Grass Seeding (Roadside Shoulders)

Total Linear Feet

Acre
[insert]
__________
__________

TOTAL PRICE $________________

3. SCHEDULE & AVAILABILITY

· I am authorized to submit this price on behalf of the company.

· The prices quoted are within industry standards for reasonable and customary charges for raw materials.

· I have read and understood the specifications, scope, and terms.

Authorized Signature: ___________________________

PRICE QUOTE

UNPAVED ROAD RESTORATION-SPRING/ICH- BAKER

PROJECT NO.: MS/SPRING-ICH/BAKER/COLQUITT FORD-CRUSHER RUN ONLY

Price Quote Due Date: 10/27/2025 Time: 5:00 PM

1. CONTRACTOR INFORMATION

Field
Response

Company Name

Business Address

Phone Number

Email Address

License Number & Type

Contact Person

Item No.
Description
Unit
Estimated Quantity
Unit Price ($)
Extended Price ($)
1
Grading and Shaping
Mile
[insert]
__________
__________
2
Roadway Re-Crowning
Mile
[insert]
__________
__________
3
Ditching/Cleaning Shoulders
Linear Foot
[insert]
__________
__________
4
Gravel Supply & Placement (Rock #5, Rock #3, Rip rap and crusher run")
Ton
[insert]
__________
__________
5
Compaction (Vibratory Roll)
Mile
[insert]
__________
__________
6
Culvert Replacement (24,30,40")
Each
[insert]
__________
__________
7
Turnout Creation
Each
[insert]
__________
__________
8
Raising the Road Bed (Min. 3-4")
Linear Foot
[insert]
__________
__________
9
Erosion Control Matting Installation
Square Yard
[insert]
__________
__________
10
Native Grass Seeding (Roadside Shoulders)

Total Linear Feet

Acre
[insert]
__________
__________

TOTAL PRICE $________________

3. SCHEDULE & AVAILABILITY

· I am authorized to submit this price on behalf of the company.

· The prices quoted are within industry standards for reasonable and customary charges for raw materials.

· I have read and understood the specifications, scope, and terms.

Authorized Signature: ___________________________ image1.png

File details come from the government source that posted it. Updated .