Diesel Fired Hammer Overhaul SOW (Supply) (2).doc

DOC document 82 KB Posted

Attached to
HAMMER, PILE DRIVER, , SELF POWERED Federal contract opportunity
Solicitation number
70Z08524Q49013B00
Issued by
Department of Homeland Security US Coast Guard

About this file

This document is a Statement of Work (SOW) for the overhaul of a Delmag Model D6-32 Diesel Hammer. The SOW outlines the contractor's requirements to completely disassemble, inspect, repair, reassemble, and test the diesel hammer. Key tasks include submitting a Condition Found Report, renewing specified components, preserving and packaging the equipment for shipping, and performing operational testing. The SOW references several industry standards and Coast Guard publications.

The related federal contract opportunity is a solicitation from the Department of Homeland Security U.S. Coast Guard for a "Hammer, Pile Driver, Self Powered" with the solicitation number 70Z08524Q49013B00. The SOW provided appears to be the technical requirements document for this solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to HAMMER, PILE DRIVER, , SELF POWERED, newest first.
File Type Posted
RFQ.docx DOCX document
FARCLAUSES01JAN2024.docx DOCX document
posting RD.pdf PDF
CLIN Structure.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

57361_ACC_0619_IBCT

WORK ITEM 1: Diesel Fired Hammer, Overhaul

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to overhaul a Delmag Model D6-32 Diesel Hammer.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN
P/N
QTY

(Each)

Y
Hammer, Pile Driver, Self Powered
3895-01-681-8298
D6-42
01

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.

2. REFERENCES

Coast Guard Drawings

None

Coast Guard Publications

Coast Guard Technical Publication (TP) 3124, SWBS 573, Oct 1991, Maintenance and Operating Manual for Delmag Model D6-32 Diesel Hammer Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Other References

ASTM International (ASTM) D3951, 2015, Standard Practice for Commercial Packaging ASTM D6880/D6880M, Dated 2011, Standard Specification for Wood Boxes ASTM D7478/D7478M, Dated 2011, Standard Specification for Heavy Duty Sheathed Wood Crates ISO/IEC 16388-2007 Information technology — Automatic Identification and Data Capture Techniques — Code 39 Bar Code Symbology Specification.

SAE AMS-STD 595A (2017) Colors used in Government Procurement

3. REQUIREMENTS

3.1 General.

3.1.1 Condition Found Report (CFR). The Contractor shall submit a CFR for the inspections listed in the following paragraph(s):

· 3.2.2.1 Hammer visual inspection results and component repair/renewal list.

3.1.2 Tech Rep. Not applicable.

3.2 Diesel hammer overhaul particulars. The Contractor shall perform the work specified below in accordance with the references listed in Section 2:

3.2.1 Hammer definition. For the purposes of this work item, the diesel fired hammer assembly includes, but is not limited to: the impact block, striking weight, upper and lower cylinders, lube oil and fuel pumps, guides, tripping device, and associated hoses, connections and hardware.

3.2.2 Inspection. The Contractor shall completely disassemble the hammer and pile driver assembly to conduct a comprehensive inspection of all components. Clean all subcomponents to facilitate inspection, assessment, and reassembly. Visually inspect all surfaces of each subcomponent, noting all wear and damage.

3.2.2.1 Contractor shall submit a CFR of inspection results in thorough detail to document condition of diesel fired hammer. Include in the CFR a list of recommended parts for renewal, a list of parts that require refurbishment, and all associated labor hours. Itemize pricing for each component and labor task separately. Do not include items called out in paragraph 3.2.3, which are renewed regardless of condition and are within the scope of the original bid.

note

In accordance with Coast Guard Technical Publication 3124, SWBS 573, Maintenance and Operating Manual for Delmag Model D6-32 Diesel Hammer, no substitute replacement parts/components are acceptable.

3.2.3 Component renewal. The Contractor shall renew the following components:

· All hoses and associated hardware.

· All filter nozzles.

· All gaskets, o-rings, and seals.

· All fluids.

· Guides (if missing)

· Tripping Devices (if missing)

3.2.4 Wire rope. The Contractor shall inspect, pull test, and certify two (02) safety wire ropes. Submit a CFR detailing existing condition and providing certification documents.

3.2.5 Preservation. The Contractor shall prepare and coat all exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).

3.2.6 Reassemble and groom. The Contractor shall completely reassemble the diesel fired hammer assembly using components that were renewed and repaired. Visually inspect all components upon reassembly. Ensure all reservoirs are properly filled and no leaks are present. Ensure that system is properly lubricated by performing all tasks in Section 6 of TP 3124. Every component that is designed to receive grease shall be properly lubricated. Document results with a CFR.

3.2.7 Testing. The Contractor shall perform the following to test the overhauled diesel fired hammer assembly:

3.2.7.1 Test the compression in accordance with paragraph titled ‘Testing the compression’ on page 9-5 of TP 3124. Satisfactory result is three or greater rebounds. Document results in CFR.

3.2.7.2 Prior to performing operational test of the diesel fired hammer assembly, bleed the fuel pump and injection valves in accordance with Section 7, paragraph 2 of TP 3124. Blow out hammer upon completion in accordance with Section 7, paragraph 3 of TP 3124.

3.2.7.3 Perform an operational test of the hammer. Fire the hammer a minimum of 15 times on each fuel pump setting, noting the change in performance with each new setting. Exercise equipment demonstrating that all subcomponents function as designed, including but not limited to fuel pump and tripping device. Document results in CFR. Upon successful completion of test, blow out and clean hammer.

WARNING

Diesel fired hammer must be configured with lead, helmet, and refusal pile or a suitable test stand that will ensure no damage comes to the hammer, equipment, or personnel. Do not fire hammer without a test rig that can absorb impact of hammer blows.

3.3 Final report. Upon completion of work, provide a final report documenting arrival condition, maintenance tasks completed and components repaired/renewed, final testing results, and any other supplemental forms relevant for the hammer’s maintenance history to the KO.

3.4 Preservation, packaging, and marking. Preservation of the diesel fired hammer assembly shall be in accordance WITH MIL-STD-2073- L E METHOD 10 and as below:

3.4.1 Preservation. To prepare diesel fired hammer for travel, install safety/protection clamps, covers, screws, and caps in accordance with Section 3 of TP 3124.

3.4.2 Packaging. If shipping weight is less than 1000 pounds, packing shall comply with ASTM D6880/D6880M-11 Class 2 Style 2 with skid mounts. If the shipping weight is greater than 1000 pounds, the packing will comply with ASTM D7478/7478M Type 2, Class 2, Style A with skid mounts.

3.4.2.1 INDIVIDUALLY PACKAGED IN ACCORDANCE WITH MIL-STD-2073- L E METHOD 10, UTILIZING CUSHIONING, BLOCKING AND BRACING INSIDE A TYPE V, STYLE B COVERED REUSABLE CRATE WITH LAG BOLTS CONFORMING TO ASTM D6039. THESE HAMMERS MUST BE CRATED TO PROTECT THEM FROM MULTIPLE CROSS-COUNTRY SHIPMENTS. All components shall be protected from physical damage and mechanical malfunction The materials selected for all blocking and bracing, and the design and application thereof, shall be compatible with the item and its bearing load limitations. Materials shall be as clean and as dry as practicable.

3.4.2.2 The diesel fired hammer and GFP lead shall be packaged in their own individual wooden shipping container.

3.4.3 Marking. The marking described herein shall be placed on the longest two sides of each box on opposite ends. Each container shall be marked in legible ½-inch to ¾-inch high black waterproof print on a contrasting background.

3.4.3.1 Marking layout.

NSN: 3895-01-681-8298

Item Name: Hammer, Pile Driver, Self Powered

Part Number: D6-42 Contract Number: As Determined By Contract

Delivery Order Number: As Determined By Contract Shipping Weight: As Determined By Contractor

Quantity & Unit of Issue: Each

Condition Code: “A”

U.S. Coast Guard SFLC Material

3.4.4 Bar coding. U.S. Coast Guard requires bar coding of the NSN, in accordance with ISO/IEC 16388-2007 Code 39 Symbology.

3.4.4.1 The Bar Code Label can be applied separately or as part of the marking required in paragraph 3.4.3.

3.4.5 Shipping. The Contractor shall ship, and deliver the parts and components to the government address specified in paragraph 3.4.5.1. Notify the Contracting Officer Representative (COR) and Contracting Officer about the shipment 7 days in advance. Provide timely shipping information to COR including the name of the shipping company, date of shipment leaving Contractor’s facility, and expecting arrival date and time at the government facility. No shipment shall arrive outside of government normal business hours as determined by the Contracting Officer.

3.4.5.1 Address. Unless otherwise specified, the Contractor shall ship and deliver all parts to the following government addresses:

US Coast Guard

Surface Forces Logistics Center

2401 Hawkins Point Road

Receiving - Bldg 88

Baltimore, MD 21226

4. NOTES

4.1 Document sources.

4.1.1 Government document sources.

· Department of Defense Single Stock Point (DODSSP)

Building 4, Section D

700 Robbins Avenue

Philadelphia, PA 19111-5094

215-697-2667/2179

FAX 215-697-1462

· DOD & Navy Publications & Forms (Other Than DODSSP)

Naval Publication and Forms Center

5801 Tabor Ave.

Philadelphia, PA 19120

215-697-2000

4.1.2 Coast Guard document sources.

· USCG Surface Forces Logistics Center

2401 Hawkins Point Road

Baltimore, MD. 21226-5000

Phone: 410-762-6171

ATTN: Contracting Branch, CPD1

4.1.3 Commercial document sources.

· Society of Automotive Engineers Inc. (SAE)

400 Commonwealth Drive

Warrendale, PA 15096

1-877-606-7323

FAX: 1-724-776-0790

· American Society for Testing & Materials (ASTM)

100 Barr Harbor Drive

West Conshohocken, PA 19428

610-832-9500

FAX: 610-832-9555

· American Society for Quality Control (ASQC)

611 East Wisconsin Ave.

Milwaukee, WI 53202

414-272-8575

FAX: 414-272-1734

· International Standard Organization (ISO)

1, ch. De la Voie-Creuse

CP 56 – CH-1211 Geneva 20

Switzerland

Phone +41 22 749 01 11

Fax: +41 22 733 34 30