DID Production Surge Plan.pdf
PDF 368 KB Posted
- Solicitation number
- FA811825R0073
About this file
This document is a Data Item Description (DID) for a Production Surge Plan, identified by number DI-MGMT-80969. The DID provides a standardized format and content preparation instructions for contractors to develop a plan demonstrating their capability to rapidly accelerate and sustain production using existing facilities and equipment during a peace-time acquisition environment or subsequent emergency scenarios.
The document outlines specific requirements for the Production Surge Plan, including: detailing the maximum sustainable production rate with a production building schedule, creating two comprehensive lists of subcontracted and non-subcontracted items/components, identifying potential surge impacts, listing additional skilled labor requirements, documenting strategic or critical materials needed, and inventorying production equipment. The plan must address production/delivery of components, potential bottlenecks, and include details on tooling, equipment costs, and potential production rate increases. The document is intended to help contractors demonstrate their surge production capabilities for government contracts and provides a systematic approach to surge planning across different tiers of subcontractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DID CAV Reporting.pdf | ||
| SOW.pdf | ||
| Transportation Data for Solicitation.pdf | ||
| Special Packaging Instruction.pdf | ||
| CAV AF.pdf | ||
| CDRLS.pdf | ||
| Packaging Requirement.pdf | ||
| DID GFP.pdf | ||
| FA811825R0073.pdf | ||
| DID Report of Shipping Packaging Discrepancy.pdf | ||
| DID CDM Report.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .