DID Production Surge Plan.pdf

PDF 368 KB Posted

Attached to
FD20302302176 Remanufacture of B-1 Cylinder Assemblies (Bungees)
Solicitation number
FA811825R0073
Issued by

About this file

This document is a Data Item Description (DID) for a Production Surge Plan, identified by number DI-MGMT-80969. The DID provides a standardized format and content preparation instructions for contractors to develop a plan demonstrating their capability to rapidly accelerate and sustain production using existing facilities and equipment during a peace-time acquisition environment or subsequent emergency scenarios.

The document outlines specific requirements for the Production Surge Plan, including: detailing the maximum sustainable production rate with a production building schedule, creating two comprehensive lists of subcontracted and non-subcontracted items/components, identifying potential surge impacts, listing additional skilled labor requirements, documenting strategic or critical materials needed, and inventorying production equipment. The plan must address production/delivery of components, potential bottlenecks, and include details on tooling, equipment costs, and potential production rate increases. The document is intended to help contractors demonstrate their surge production capabilities for government contracts and provides a systematic approach to surge planning across different tiers of subcontractors.

View the file

Other files

File Type Posted
DID CAV Reporting.pdf PDF
SOW.pdf PDF
Transportation Data for Solicitation.pdf PDF
Special Packaging Instruction.pdf PDF
CAV AF.pdf PDF
CDRLS.pdf PDF
Packaging Requirement.pdf PDF
DID GFP.pdf PDF
FA811825R0073.pdf PDF
DID Report of Shipping Packaging Discrepancy.pdf PDF
DID CDM Report.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .