DID Production Surge Plan.pdf
PDF 368 KB Posted
- Attached to
- Overhaul of C-130 Motor
- Solicitation number
- FA811825R0040
About this file
This document is a Data Item Description (DID) for a Production Surge Plan, with the identification number DI-MGMT-80969. The purpose of the Production Surge Plan is to delineate a contractor's capability to rapidly accelerate and sustain production utilizing existing facilities and equipment in a peace-time acquisition environment, without a declaration of war or mobilization.
The document outlines specific requirements for the Production Surge Plan, including detailing the maximum sustainable production rate, identifying critical or long-lead items/components with potential surge impact, listing subcontracted and non-subcontracted items, and documenting Government contracts being performed at the contractor's facility. Key elements include providing data on production constraints, surge impacts, additional labor requirements, strategic materials, and production equipment. The plan must address potential impacts on current and other Government contracts, labor needs, material requirements, and production capabilities, with the goal of developing a comprehensive surge planning approach for select items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA811825R0040_0001.pdf | ||
| CAV AF ATTACH.pdf | ||
| DID CAV AF.pdf | ||
| GFP.pdf | ||
| DID GFP.pdf | ||
| PWS.pdf | ||
| CDRL.pdf | ||
| DID CDM.pdf | ||
| Packaging Requiremenmts.pdf | ||
| Transportation Data.pdf | ||
| WAGE DETERMINATION.docx | DOCX document | |
| FA811825R0040.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .