DID_81995.pdf

PDF 147 KB Posted

Attached to
Repair of the TF33‐PW‐100 2nd‐4th Stage Turbine Nozzle Vanes
Solicitation number
FA8121-21-R-0029
Issued by

View the file

Other files

File Type Posted
2-4 Vanes PWS Rev 3 - 2 August 2021.pdf PDF
FA812121R0029 Combined Synopsis Solicitation.pdf PDF
ITMDESC_REPORT_NSN_3028.pdf PDF
UIIEC_REPORT_1259.pdf PDF
UIIEC_REPORT_1264.pdf PDF
RDL_NSN_1259.pdf PDF
Performance Work Statement.pdf PDF
RDL_NSN_0303.pdf PDF
RDL_NSN_3028.pdf PDF
RDL_NSN_1265.pdf PDF
UIIEC_REPORT_6721.pdf PDF
ITMDESC_REPORT_NSN 3030.pdf PDF
DID_81832.pdf PDF
UIIEC_REPORT_3029.pdf PDF
ITMDESC_REPORT_NSN 1263.pdf PDF
ITMDESC_REPORT_NSN_0305.pdf PDF
CDRL REPORT.pdf PDF
UIIEC_REPORT_1262.pdf PDF
ITMDESC_REPORT_NSN 0307.pdf PDF
ITMDESC_REPORT_NSN_1259.pdf PDF
UIIEC_REPORT_1265.pdf PDF
UIIEC_REPORT_0305.pdf PDF
ITMDESC_REPORT_NSN_1256.pdf PDF
ITMDESC_REPORT_NSN_1262.pdf PDF
UIIEC_REPORT_0304.pdf PDF
RDL_NSN_1263.pdf PDF
DID_80727A.pdf PDF
ITMDESC_REPORT_NSN 2210.pdf PDF
DID_81838.pdf PDF
UIIEC_REPOR_3027.pdf PDF
RDL_NSN_8081.pdf PDF
UIIEC_REPORT_1263.pdf PDF
DID_80441C.pdf PDF
UIIEC_REPORT_3027.pdf PDF
DID_80503.pdf PDF
RDL-NSN_3030.pdf PDF
UIIEC_REPORT_1256.pdf PDF
TRNSPDATA_REPORT_PR_19-03037.pdf PDF
ITMDESC_REPORT_NSN 3027.pdf PDF
ITMDESC_REPORT_NSN_3027.pdf PDF
RDL_NSN_1261.pdf PDF
RDL_NSN_0307.pdf PDF
UIIEC_REPORT_3030.pdf PDF
RDL_NSN-1262.pdf PDF
RDL_NSN_6721.pdf PDF
RDL_NSN_1264.pdf PDF
ITMDESC_REPORT_NSN_3029.pdf PDF
PKGRQMT_REPORT_PR_19-03037.pdf PDF
RDL_NSN_1256.pdf PDF
RDL_NSN_2162.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT

Number: DI-PSSS-81995 Approved Date: 20150904 AMSC Number: 9576 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This DID may be used on any depot level maintenance contract.

Requirements:

1. Format. This report shall be provided in the format of Table I.

2. Content. The report shall consist of two parts and contain the following information:

a. Part I:

(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.

(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.

(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.

(4) Block 3, Contract number and Program or Weapon System supported.

(5) Block 4, Government item manager or technical Point of Contact.

(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.

(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.

(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the contract.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:42Z Check the source to verify that this is the current version before use.

DI-PSSS-81995

(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.

(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.

(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.

(12) Block G, Reparables inducted into repair during report month.

(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.

(14) Block I, Quantity produced. The quantity produced during the month.

(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.

(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.

(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.

(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.

(19) Block N, Report date. Enter date of report.

b. Part II, Production problems. Report shall be in narrative format and only required if:

(1) Previous reports production forecast was not shipped.

(2) Current forecast does not equal contract scheduled quantity.

(3) Contract anticipates a problem in the near future.

TABLE I. Contract Depot Maintenance (CDM) Production Report format.

CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT Month and As-Of Date

(YYYYMMDD)

Part I

1. ISSUED BY: 2. CONTRACTOR AND ACTIVITY ADDRESS CODE 3. CONTRACT NUMBER/PRGM/WS 4. GOVERNMENT ITEM MANAGER OR TECHNICAL POC

DURING REPORT PERIOD/TOTAL TO DATE

A.

ITEM

IDENTIFICATION

B.

DELIVERY/

CALL NUMBER

C.

CONTRACT

LINE ITEM

(CLIN)

D.

DOCUMENT/

VOUCHER

NUMBER

E.

QTY ON

CONTRACT

OR

DO/CALL

F.

REPARABLES

RECEIVED

G.

QTY

IND TO

WORK

H.

REPS ON

HAND

I.

QTY

PROD

J.

SERVICEABLES

SHIPPED

K.

SERV ON

HAND

L.

QTY

CONDEMNED

M.

FORECAST PROD

N.

REPORT DATE

FSC NIIN

1 2 1 2 3 1 2 1 2 1 2

Part II, Production Summary

End of DI-PSSS-81995.

File details come from the government source that posted it. Updated .