DID_80969.pdf
PDF 173 KB Posted
- Solicitation number
- FD20302400009
About this file
This document is a Data Item Description (DID) for a Production Surge Plan, with the identification number DI-MGMT-80969. The document provides detailed instructions for creating a comprehensive plan that demonstrates a contractor's capability to rapidly accelerate and sustain production using existing facilities and equipment during a peace-time acquisition environment, without requiring a declaration of war or mobilization.
The Production Surge Plan must include specific elements such as the maximum sustainable production rate, lists of subcontracted and non-subcontracted items/components, critical components that could impact production, labor requirements, strategic or critical materials, and production equipment. The plan should identify contract numbers, items, leadtimes, critical or pacing items, and potential surge production impacts. Contractors must detail how they can increase production rates, address skilled labor needs, manage material inventory, and outline potential tooling and equipment investments to support surge production capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA811825R0034.pdf | ||
| 4087596_PKGRQMT_REPORT.pdf | ||
| DID_80441.pdf | ||
| JQRR.pdf | ||
| 4087596_PKGRQMT_REPORT.pdf | ||
| DID_80503.pdf | ||
| DID_81995A.pdf | ||
| GFP_ATTACH.pdf | ||
| 4087431_SOW.pdf | ||
| 4107922_CDRL1_REPORT_02.pdf | ||
| CAV_AF.docx | DOCX document | |
| 4087595_TRNSPDATA_REPORT.pdf | ||
| DID_81838.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .