DID 80639E.pdf

PDF 125 KB Posted

Attached to
Repair of Cathode Ray Tube
Solicitation number
FA811722R0025
Issued by

View the file

Other files

File Type Posted
FA811722R0025_______0002.pdf PDF
FA811722R0025_______0001.pdf PDF
DID 80441D.pdf PDF
DID 81832.pdf PDF
DID 80969.pdf PDF
FA811722R0025 Solicitation.pdf PDF
3471309_CDRL1_REPORT.pdf PDF
DID 81995A.pdf PDF
DID 81534A.pdf PDF
DID 81838.pdf PDF
DID 81535A.pdf PDF
PWS.pdf PDF
3491774_TRNSPDATA_REPORT.pdf PDF
3491771_PKGRQMT_REPORT.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: ENGINEERING CHANGE PROPOSAL (ECP)

Number: DI-SESS-80639E Approval Date: 20200211

AMSC Number: N10140 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: NM Project Number: SESS-2020-003

Applicable Forms: DD Form 1692, Engineering Change Proposal (ECP)

Use/relationship: An Engineering Change Proposal (ECP) provides the documentation in which the engineering change is described and specifies how the proposed change will be implemented.

a. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in EIA-649-1 and the principles of EIA-649 (Copies of these standards are available online at www.sae.org or from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 [inside USA and Canada] or 724-776-4970 [outside

USA]).

b. This DID may be used in conjunction with DI-SESS-80642, Notice of Revision (NOR). A requirement for NORs and Specification Change Notices (SCN) should be contractually imposed in conjunction with this DID.

c. This DID supersedes DI-SESS-80639D.

d. An electronic version of DD Form 1692, Engineering Change Proposal (ECP), is available online at https://www.esd.whs.mil/dd/.

Requirements:

1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The ECP shall be in one of the following formats:

a. DD Form 1692, Engineering Change Proposal (ECP),

b. The schema required by the Acquirer’s Integrated Digital Environment (IDE), or

c. The Supplier’s preferred format.

3. Content. The ECP shall contain all the information required by DD Form 1692.

End of DI-SESS-80639E

DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.

Source: http://assist.dla.mil -- Downloaded: 2020-03-16T20:28Z

Check the source to verify that this is the current version before use.

http://www.sae.org/ http://www.esd.whs.mil/dd/

File details come from the government source that posted it. Updated .