DHR Tallapoosa Co Exterior fixtures Installation Specification.docx

DOCX document 15 KB Posted

Attached to
Tallapoosa Co DHR Exterior lighting Installation
Solicitation number
SRC0000024206
Issued by
Tallapoosa County, Alabama

About this file

This document is a specification for the installation of exterior light fixtures at the Tallapoosa County Department of Human Resources (DHR) building located at 1279 S Tallassee St. Dadeville, AL 36853. The work scope includes the one-time installation of 2 - 30' pole lights, 3 outside wall pack fixtures, 1 mini pole light, 2 - 2x4 lay-in fixtures, and 1 recess can light. All existing fixtures are to be disposed of, and the work area is to be left clean upon completion. The work must be completed by September 30, 2024.

The quote must include all trip charges, mileage, supplies, labor, fees, permit fees, lift trucks, and any other amounts necessary to complete the work as specified. Vendors must have a current license on file at the time of award and installation. Payment terms are net 30 paid in arrears after completion of service, and vendors are not to invoice prior to completion.

View the file

Other files

File Type Posted
Quick Quote Standard Boilerplate updated 8-9-24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DHR Tallapoosa Co Exterior light fixtures Installation Specification

Site Visit recommended Address:

Tallapoosa Co DHR 1279 S Tallassee St.

Dadeville, AL 36853 POC: Toni McCary: 256-825-3718 Main Line – 256-8253700 Work Scope:

One time installation Exterior of building.

Supplier shall dispose of existing and install new (Provided by DHR)

· 2- 30’ Pole Lights

· 3- Outside Wall Pack Fixtures

· Mini Pole Light

· 2- 2X4 Lay-In Fixtures

· Recess Can Light

· All debris is to be removed and work area to be left clean.

· Quote must include all trip charges, mileage, supplies, labor, fees, permit fees (if applicable), lift trucks and all amounts necessary to complete the work as specified.

· All vendors need to have current license on file at time of award and installation.

· Must be completed by September 30, 2024.

Payment terms:

Net 30 paid in arrears after completion of service. Vendor is not to invoice prior to completion of service.

File details come from the government source that posted it. Updated .