DHR Barbour Co Installation LED Lightbulbs Specification revised 8_19_2024.docx

DOCX document 15 KB Posted

Attached to
Barbour Co DHR Light/ballast installation
Solicitation number
SRC0000024028
Issued by
Barbour County, Alabama

About this file

This document is a specification for the installation of LED light bulbs in the DHR Barbour Co. office in Clayton, Alabama. The work scope involves the one-time removal of existing fluorescent ballasts and bulbs, and the installation of new LED bulbs, including rewiring the light fixtures in the hallway and lobby areas. The state and local contract opportunity associated with this specification is for Barbour County DHR to obtain quotes for this light and ballast installation project.

The specification details the types and quantities of LED bulbs to be installed, including 30 GB Part #25438080 bulbs, 12 GB Part #26493759 bulbs, and 12 GB Part #26189130 bulbs. The installation must be completed in one trip by September 13, 2024, and vendors must have a current license at the time of award and installation. Payment terms are net 30, paid in arrears, with no invoicing prior to completion of the service. The contract opportunity does not provide information on pricing terms, set-asides, incumbents, funding requirements, or other salient details.

View the file

Other files

File Type Posted
Quick Quote Standard Boilerplate updated 8-9-24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DHR Barbour Co DHR Installation LED Lightbulbs Specification Site visit- Site Visit – recommended

Address:

DHR Barbour Co.

Clayton Industrial Pk.

276 Highway 239 South Clayton, AL. 360160547 POC: Leslie Adams: 334-775-2020 (Primary) Main: Shanika March 334-775-2012(Secondary)

Work scope:

Line 1: One time removal and installation of LED Bulbs. Interior of building DHR will Supply all bulbs- Unit Price shall represent total cost for installation.

Installation includes removal of fluorescent ballast and rewire existing light fixtures to install new U shaped LED bulbs in the hallway. Also rewiring the can lights in the lobby so LED bulbs can be installed also plus clean up.

Remove Reg. light bulbs and replace bulbs with LED Bulbs listed below

· 30 EA Bulbs GB Part#25438080 Supplier: Current Lighting SOL Catalog: F34/CX41/WM/ECO Description: T12 34W CX 4100K WM ECO

· 12 EA Bulbs GB Part# 26493759 Supplier: Current Lighting SOL Catalog: LED13BDT8/U6/8 40 Description: BALLAST BYPASS DE T8 U6-LED TUBE 4000K

· 12 EA

GB Part# 26189130 U Supplier: CURRENT LIGHTING SOL Catalog: BT8-1AFUSEKIT Description: 1 FUSE 1A AND 1FUSE HOLDER

· All debris is to be removed and work area to be left clean.

· All vendors need to have current license on file at time of award and installation.

· Installation shall be completed in One trip by September 13, 2024.

Payment terms: Net 30, paid in arrears. No Invoicing prior to completion of service.

File details come from the government source that posted it. Updated .