This is a refurbishment specification document issued by Dartmouth Fire District 2 in Dartmouth, Massachusetts, for the refurbishment of a 2004 KME Rescue Pumper fire apparatus. The specification details comprehensive requirements for cab and chassis component restoration, water tank refurbishment, fire body work, electrical system upgrades, painting, and equipment installation. The project encompasses numerous upgrades including replacement of windshield wipers, circulation fans, handrails, cab fenderettes, wheels, air system diagnostics, exhaust extraction system provisions, electrical outlets, USB charging ports, LED lighting systems throughout the apparatus, pump certification testing, and compartment accessories. Bidders must submit proposals through COMMBUYS by dates specified in the bid solicitation, with delivery required within 120 calendar days from contract acceptance. All bids must include detailed compliance statements with specifications, with any deviations documented on a separate "Exceptions" page; failure to comply with this requirement results in bid rejection. Bidders must provide proof of product liability and facility insurance of at least $2,000,000, descriptions of service center facilities with photographic evidence, and evidence of manufacturing capability and post-delivery support capacity.
The specification requires bidders to provide equipment that is either the brand specified or demonstrably equal in quality, design, and function, with the fire district retaining final determination of acceptability for substitutions. A $15,000 contingency fund is included in the proposal price for potential additional options or equipment, with unused portions credited back to the district. The fire department reserves the right to reject any and all bids and to waive informalities or reject incomplete, conditional, or non-responsive bids at its discretion. The specification emphasizes strict adherence to current NFPA-1901 standards for electrical and safety systems, comprehensive corrosion treatment and undercoating, high-quality automotive-grade refinishing in specified paint colors (FLNA3225 E-1 red and FLNA 92260 metallic grey), and installation of reflective striping and safety markings. No pricing information, set-asides, or funding source details are provided in this specification document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dartmouth Fire District 2
1100 Russells Mills Road
Dartmouth, MA 02748
Refurb Specification for a 2004 KME Rescue Pumper
PROPOSAL
INTRODUCTION
PROPOSAL REQUIREMENTS
GENERAL INFORMATION
These specifications detail the requirements for general refurb criteria of cab and chassis components and related components, water tank, fire body, electrical components, painting, and equipment. In evaluating the bid proposals to determine which proposal is the most advantageous, these major items shall be considered.
Apparatus and equipment must meet the specific requirements and intent of the requirements as specified herein. All items of these specifications shall conform to the character of the proposed apparatus and the purpose for which it is intended. Each bidder shall provide only that equipment as required in the following specifications.
The fire apparatus and equipment to be furnished in meeting these specifications must be the products of an established, reputable fire apparatus and/or equipment manufacturer. Each bidder shall furnish satisfactory evidence of the manufacturer's ability to construct, supply service parts and technical assistance for the apparatus specified. Each bidder must state the location of the factory and location for post delivery service.
The bidder shall include in this proposal to make changes to the fire department pumper truck. Rework on the unit will include work listed in this proposal specification.
Additional rework required will be charged accordingly to the customer if needed only after approval from the customer!
BID COMPLIANCE INSTRUCTIONS
Each bidder must indicate his compliance with these specifications. Any deviation from the specification, no matter how small, must be so explained. All exceptions must be fully explained on a separate page, titled "Exceptions", giving reference to the page and paragraph where the exception is being taken. Failure to comply with this requirement shall result in the bid proposal being rejected.
Dartmouth Fire District 2 shall be the sole arbiter as to what exceptions may be allowed or disallowed. In the event a bidder fails to make any indication of compliance for any or all provisions it will be assumed that the bidder is taking total exception to the specification and the bid shall be disallowed.
BIDDER INSTRUCTIONS
Bids shall be done through COMMBUYS and must be submitted by the dates on the bid solicitation.
Brand names or model numbers have been specified for some items. These have been carefully selected because of their reliability and availability for replacement locally. In order to be most responsive, items named, or an item "equal to" the particular item specified by brand name or model, should be contained in the bid proposal. It is the bidder's responsibility to prove to the Dartmouth Fire District 2 that an item bid as "equal to" a particular specified item, is truly of equal quality, design, and function. The Dartmouth Fire District 2 maintains the right to make a final decision as to the acceptability of an item bid as "equal to" a particular specified item.
No exception shall be allowed for any of the aforementioned instructions. Bids not submitted in accordance with these instructions shall be rejected.
PRODUCT LIABILITY INSURANCE
Each bidder shall supply proof of product liability and facility insurance equal to or exceeding $2,000,000.00. This shall be provided as part of the proposal.
Garage insurance is not acceptable.
PAINT PERFORMANCE CERTIFICATION
The finish paint shall be certified by the apparatus manufacturer as conforming to all applicable Commercial Vehicle Paint Standards in effect at the date of contract.
SERVICE CENTER INFORMATION
The center must provide a fulltime staff of experienced technicians with all of the required equipment to provide modern, accurate and efficient service. Bidders shall state the size of their shop and office area in square feet. They shall state the location of the facility and provide photos of both the exterior and interior of the center. Accuracy of the description of the service center is of great importance.
DELIVERY TIME
Each bidder shall state the completed apparatus delivery time based on the number of calendar days, starting from the date the contract is signed and accepted by the apparatus manufacturer. But no longer than 120 calendar days. Dartmouth Fire District 2 reserves the right to accept or deny a bid that is over the 120 days.
Delivery Time in Calendar days
CONTINGENCY FUND
An allowance of $15,000.00 is included in the proposal price to be used by Dartmouth Fire District 2 for additional options or equipment. In the event this fund is not utilized completely, the remaining funds shall be credited back to the Dartmouth Fire District 2.
FIRE DEPARTMENT’S RIGHT TO REJECT BIDS
The awarding authority reserves the right to reject any and all bids, if it is in the public interest to do so.
The Fire Department may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informality or reject any and all bids, should the Fire Department deem it to be in the public interest.
The Fire Department may also reject bids which in its sole judgment are incomplete, conditional, obscure, or not responsive or which contain additional not called for, erasures not properly initialed, alterations or similar irregularities, or the Fire Department may waive such omissions, conditions, or irregularities, if considered minor.
WINDSHIELD WIPERS
The dual, electric operated, pantographic type windshield wipers shall be provided replaced. One (1) electric drive motor shall be provided for each wiper.
CIRCULATION FANS
Two (2), eight (8) inch diameter, two-speed circulation fans shall be provided in the Driver and officer area facing the windshield.
HANDRAILS
Two (2) vertical handrails shall be mounted above each pump panel, (1) each side.
Interior grab rails shall be mounted inside both rear crew doors and the inside of the officer side door to match drivers side grab rail.
CAB FENDERETTES
The cab wheel well openings shall be trimmed with replaceable, bolt-in, polished stainless steel fenderettes. The fenderettes shall be secured to the cab with stainless steel threaded fasteners along the internal perimeter of the wheel well. Dissimilar metal tape and black vinyl trim molding shall be used where the cab and fender meet.
WHEELS
The mill finished aluminum disc front wheels shall be provided with bright nut covers and hub caps.
The single rear axle steel disc wheels shall be provided with bright nut covers and hub caps.
The front and rear aluminum wheels will be buffed and cleaned to bring back shine.
AIR SYSTEM
The chassis air leak will be diagnosed and repaired. Any major parts are subject to additional costs.
PROVISIONS FOR PLYMOVENT EXHAUST EXTRACTION SYSTEM
The exhaust outlet shall be straight pipe, forward of the rear axle, terminating minimum 6" forward of rear tire, minimum 2.5" below rub rail/body, and flush with outboard of rub rail/body to connect with a Plymovent ventilation system.
SHORELINE OUTLETS
New duplex 110V household 20A outlets shall be installed in both L1 & R3 compartments. The outlets shall be wired to the shoreline inlet in the cab and labeled “SHORELINE ONLY”.
USB CHARGING PORT NEAR DRIVER
One (1) round USB charging port(s) shall be installed in the cab of the truck for the fire departments accessory devices. Each port shall have two (2) USB connections and shall have a 5 volt, 2.1 amp max output. The port(s) shall be located as directed near the driver's seating position for devices such as cellular phones.
USB CHARGING PORT NEAR OFFICER
One (1) round USB charging port(s) shall be installed in the cab of the truck for the fire departments accessory devices. Each port shall have two (2) USB connections and shall have a 5 volt, 2.1 amp max output. The port(s) shall be located as directed near the officer's seating position for devices such as cellular phones.
HEADLIGHTS CLUSTER
Two (2) dual, rectangular, LED headlight modules with a chrome plated bezel shall be furnished, one (1) each side, on the front of the cab. Each head light module shall incorporate an individual LED low beam and a LED high beam headlight. High beam actuation shall be controlled on the turn signal lever.
DAYTIME RUNNING LIGHTS
The chassis head lights shall have integrated circuitry to actuate the low beam headlights at a maximum of 80 percent of capacity whenever the chassis engine is running.
The daytime running lights shall be interlocked with the parking brake.
SECONDARY DUAL LIGHT MODULE
Two (2) arrow shaped, amber LED turn signals shall be provided, one (1) in each side of the dual light module above the headlights.
Two (2) LED light heads shall be provided, red LEDs and a colored lens shall be provided, one (1) in each side of the dual light module above the headlights.
The dual light module shall be equipped with a chrome plated bezel.
The lights noted above shall be activated by the master control and they will be wired through the load management system to prevent excessive amperage draw.
HOSE BED LIGHTS
One (1) Amdor LED strip surface mounted lights shall be mounted in the hose bed on the front wall to illuminate the hose bed area.
HOSE BED WORK LIGHT - SWITCH
The hose bed work light shall have a protected 12-volt switch at the rear body panel. The switch will be labeled "HOSE BED WORK LIGHTS".
CORD REEL
The cord reel in the R2 compartment shall be removed and the associated breaker disconnected.
OFFICER’S FOOT SWITCH
The two (2) corroded foot switches on the officer’s side cab floor for the Q2B siren & air horn shall be replaced.
ADD BROW LIGHT TO CAB, HEADLINER REMOVAL, SPECIAL HARNESS, ETC.
The chassis headline/interior will be removed for installation of exterior cab lighting, harnessing, etc. All components will be reinstalled to original status.
LED BROW LIGHT - ABOVE WINDSHIELD
The 120V brow light on the center cab shall be removed and all holes welded prior to paint.
Two (2) new LED Whelen PCH2B pioneer plus dual panel spot/flood black scene lights shall be installed one over each windshield with PBHKMEB KME brow mounts. The brow lights shall be wired to 12V power and switched as original.
COMPARTMENT LIGHT ACTIVATION
Compartment lighting shall be switched either from an integral switch as provided by the roll up door manufacturer or a magnetic proximity switch.
AMDOR LUMA BAR DUAL COLOR COMPARTMENT LIGHTS - LED
Each individual, equipment storage compartment shall be equipped with the AMDOR red/white Luma Bar LED light fixture mounted on the forward (or rearward) vertical door frame. A switch to control the color selection shall be located in the drivers side front body compartment.
SURFACE MOUNT 75W PIONEER LED FLOOD/SPOT LIGHTS – DRIVER SIDE
Two (2) Whelen Pioneer model # PCPSM1C surface mounted flood/spot lights shall be installed one rearward and one forward on the driver side of the body, each using a chrome plated flange.
Each lamp head shall draw 6 amps and generate 8,000 lumens.
SURFACE MOUNT 75W PIONEER LED FLOOD/SPOT LIGHTS – OFFICER SIDE
Two (2) Whelen Pioneer model # PCPSM1C surface mounted flood/spot lights shall be installed one rearward and one forward on the officer side of the body, each using a chrome plated flange.
Each lamp head shall draw 6 amps and generate 8,000 lumens.
OFFICER SIDE OF BODY LIGHT SWITCHING - CAB
A switch shall be provided in the cab warning light switch console to turn the officer side of body lights on and off.
DRIVER SIDE OF BODY LIGHT SWITCHING - CAB
A switch shall be provided in the cab warning light switch console to turn the driver side of body lights on and off.
POLE LIGHTS
The two (2) pole lights on the rear of the cab shall be removed and any holes filled prior to paint. They will not be remounted on the engine.
PUMP CERTIFICATION
The pump shall be performance tested to meet the requirements of NFPA-1901. To ensure top quality and integrity, the test company shall be a certified testing company.
FRONT INTAKE
The front intake swivel shall be replaced with a chrome model with a new plain chrome cap.
FRONT DISCHARGE
The front bumper discharge swivel shall be replaced with a chrome model with a 1.5” NH thread.
COLOR CODED IDENTIFICATION TAGS
Color coded identification tags shall be provided for all gauges, controls, connections, switches, inlets and outlets.
· The pump panel lights will be changed to two (2) 20" Amdor Luma Bar H2O super bright led strip lights.
One (1) light under the operator's panel light shield shall be actuated when fire pump is engaged in addition to the pump engaged light.
OFFICER SIDE PANEL LIGHT SHIELD
The officer side pump panel shall be equipped with a light shield that shall be full width of the control panel, and shall be positioned to cover the lights and prevent glare.
The light shield shall be equipped with the following lights:
· Two (2) 20" Amdor Luma Bar H2O super bright led strip lights.
The lights shall be switched with the operator panel lights.
TANK LEVEL GAUGE
Two (2) new Whelen Strip-Lite Plus XL tank level lights shall be installed one (1) each side on the upper diamond plate section of the pump module. The lights shall be wired to a controller driven by the existing tank level gauge. The surround on the existing tankvision gauge shall be painted black and the decal replaced.
ROLL-UP DOORS
Roll-up doors shall be provided on all compartments. The roll-up doors shall be constructed from aluminum extruded slats which shall have a flexible seal between each slat for proper sealing of the door.
A synthetic rubber seal shall be provided at each side, top and bottom edge of the door to prevent entry of dirt into the compartment.
The door shall be equipped with a lift bar style latch mechanism which shall latch at the bottom of the door mounting extrusion.
The roll-up door assembly shall be furnished with a spring-loaded, counter balance assembly to assist in door actuation.
All running board and high side compartments shall be equipped with roll-up doors.
AMDOR ROLL-UP DOORS
The roll-up doors shall be Amdor brand roll-up doors. The doors shall be painted to match the required color of the fire department.
A total of seven (7) doors shall be provided and six (6) shall be painted to match the apparatus color.
****120/240 VOLT A.C. ELECTRICAL AND GENERATOR SECTION ****
120/240 VOLT ELECTRICAL SYSTEM TESTING
All line voltage wiring and permanently connected devices and equipment shall be subjected to a dielectric voltage withstand test of 900 volts for one minute. The test shall be conducted between live parts and the neutral conductor and between live parts and the vehicle frame with any switches in the circuits closed. The test shall be conducted after all bodywork has been completed. The dielectric tester shall have a minimum 500 VA transformer with a sinusoidal output voltage that can be verified.
Electrical polarity verification shall be made of all permanently wired equipment and receptacles to determine that connections have been properly made.
OPERATIONAL TESTING
The apparatus manufacturer shall perform the following operation test and shall certify that the power source and any devices that are attached to the line voltage electrical system are properly connected and in working order.
The generator shall be started from a cold start condition and the line voltage electrical system shall be loaded to 100 percent of the nameplate voltage rating.
The following items shall be monitored and documented every 15 minutes:
· The cranking time until the generator starts and runs.
· The voltage, frequency, and amperes at continuous full rated load.
· The generator oil pressure, water temperature, transmission temperature, hydraulic temperature, and the battery rate charge, as applicable.
· The ambient temperature and altitude.
The generator shall operate at 100 percent of its nameplate wattage for a minimum of two (2) hours.
120/240 VOLT WIRING METHODS
Wiring/conduit shall not be attached to any chassis suspension components, water or fuel lines, air or air brake lines, fire pump piping, hydraulic lines, exhaust system components or low voltage wiring.
All wiring shall be installed at a minimum of 12 inches away from any exhaust piping and a minimum of 6 inches from any fuel lines.
All wiring shall be securely clamped within 6 inches of any junction box and at a minimum of every 24 inches of run. All supports shall be of nonmetallic material or corrosion protected metal. All supports shall not cut or abrade conduit or cable and shall be mechanically fastened to the vehicle.
All power supply assembly conductors, including neutral and grounding conductors, shall have an equivalent amperage rating and shall be sized to carry not less than 115% of the main breaker rating.
All Type SO or Type SEO cable not installed in a compartment shall be installed in wire loom. Where Type SO or Type SEO cable penetrates a metal surface, a rubber or plastic grommet or bushing shall be provided.
The installation of all 120/240 wiring shall meet the current NFPA-1901 Standards .
120/240 VOLT WIRING IDENTIFICATION
All line voltage conductors located inside the main breaker panel box shall be individually and permanently identified. When pre-wiring for future power wiring installations, the non-terminated ends shall be labeled showing function and wire size.
120/240 VOLT GROUNDING
The neutral conductor of the power source shall be bonded to the vehicle frame only at the power source.
The grounded current carrying conductor (neutral) shall be insulated from the equipment grounding conductors and from the equipment enclosures and other grounded parts. The neutral conductor shall be colored white or gray.
In addition to the bonding required for the lower voltage return current, each body and driving/crew compartment enclosure shall be bonded to the vehicle frame by a copper conductor. The conductor shall have a minimum amperage rating of 115 percent of the name plate current rating of the power source specification label.
120/240 VOLT CIRCUIT BREAKER / RECEPTACLE INSTALLATION
The system shall be installed by highly qualified electrical technicians to assure the required level of safety and protection to the fire apparatus operators. When multiple circuits are required, the circuits shall be wired to the breaker panel in a staggered configuration to minimize electrical loads on each breaker or generator (leg) circuit. The wiring, electrical fixtures and components shall be to the highest industry quality standards available on the domestic market. The equipment shall be the type as designed for mobile type installations subject to vibration, moisture and severe continuous usage.
120/240 VOLT RECEPTACLE INSTALLATIONS
Any receptacle installed in a wet location must be a minimum of 24 inches above the ground and provided with an approved wet location cover. Wet receptacles may not be mounted at more than 45 degrees from vertical, nor can they be mounted in a face-up position.
The six (6) 120V outlets on the cab/body exterior shall be replaced with 20A household receptacles with hinged covers.
The receptacle(s) shall require 20 amp, 120 volt circuit breaker(s) to be installed in the load center to properly protect the six (6) receptacle(s).
LOOSE EQUIPMENT
The following items shall be provided and shipped loose with the completed apparatus at the time of delivery:
WHEEL CHOCKS
Two (2) ZICO #SAC-44 folding wheel chocks shall be mounted forward of the rear wheels on the driver side below the side running board compartments.
**** PAINT SECTION ****
PAINT, PREPARATION AND FINISH
The apparatus body shall be painted. The paint process shall meet or exceed current state regulations concerning paint operations. Pollution control shall include measures to protect the atmosphere, water, and soil. Contractor shall, upon demand, provide evidence that the manufacturing facility is in compliance with State EPA rules and regulations.
The exterior shall have no mounted components prior to painting to assure full coverage of metal treatments and paint to the exterior surfaces of the body. Any vertically or horizontally hinged smooth-plate compartment doors shall be painted separately to assure proper paint coverage on body, door jambs and door edges.
All areas of corrosion on the cab and body shall be ground/sandblasted prior to paint. The apparatus cab exterior and body exterior (not inc. compartment interiors, hosebed or crosslay wall etc.) shall be prepared and refinished to match the existing paint codes using a high-grade automotive refinishing process that is approved for use on aluminum. To assure full coverage of metal treatments and paint to the exterior painted surfaces of the apparatus, the cab and body shall have no fastener mounted or otherwise removable components still mounted prior to the preparation and paint application. Any hinged cab and body doors shall be painted separately (off the truck) to ensure proper paint coverage on the doors and jambs.
Paint colors to be FLNA3225 E-1 red and FLNA 92260 metallic grey. Paint break should match the Department’s E6 as closely as possible inc. a dip to the grille. The AC condenser cover shall be painted to match the top of the cab.
Any location where the material is penetrated after painting, for the purpose of mounting steps, hand rails, doors, lights, or other specified components shall be treated at the point of penetration with a corrosion inhibiting pre-treatment (ECK Corrosion Control). The pre-treatment shall be applied to the aluminum sheet metal or aluminum extrusions in all locations where the aluminum has been penetrated. All hardware used in mounting steps, hand rails, doors, lights, or other specified components shall be individually treated with the corrosion inhibiting pre-treatment.
After the paint process is complete, the gloss rating of the unit shall be tested with a 20 degree gloss meter. Coating thickness shall be measured with a digital MIL gauge and the orange peel with a digital wave scan device.
DEBADGE TRUCK
All logos or badges on the cab or body shall be removed prior to paint. Any mounting holes shall be filled. The badges/logos shall NOT be reinstalled after paint.
BODY PRIMER & PREPARATION
All exposed welds shall be ground smooth for final finishing of areas to be painted. The compartments and doors are totally degreased and phosphatized. After final body work is completed, grinding (36 and 80 grit), and finish sanding shall be used in preparation for priming.
BODY FINISH PAINT
The body shall be finish sanded and prepared for final paint. Upon completion of final preparation, the body shall be painted utilizing the highest quality, state of the art, low V.O.C., polyurethane base paint. Finish paint shall be applied in multiple coats to ensure proper paint coverage with a high gloss finish.
The entire body shall be buffed and detailed.
COMPREHENSIVE CORROSION TREATMENT UNDERCOATING
Upon apparatus completion, the underside of the apparatus shall have anti corrosion film applied to help inhibit rust and the corrosion process. The semi-firm wax film shall be applied by air spray method. The film shall be applied as a minimum to the chassis major components such as: chassis frame rails and cross members, axles, springs, drive line components, lower radiator supports, fuel tank, air tanks, running boards, bumper apron and other related components.
The underside of the cab and body shall have the film applied to the following areas: cab steps, front gravel shield and underside of battery box, body substructure, underside of all body compartments, running board supports and rear step supports. No film shall be directly applied to the exhaust system or wheel wells.
NOTE: The film shall remain semi-firm to promote self-sealing. The film may leave a light tinted color to those areas treated.
WINDOW TRIM ON FOUR CAB DOORS PAINTED FLAT BLACK
The window trim on the four (4) cab doors will be painted flat black.
COMPARTMENT PAINT
The interior of the compartments shall be finish painted with Multispec Gray Marble Stone scuff resistant paint to provide a protective application over all of the compartment interior surfaces.
BODY PAINT
The body paint finish shall be in a two-tone configuration, to match customer furnished paint codes and requirements.
PUMP MODULE FINISH
The pump enclosure and pump/plumbing components within the pump enclosure shall have an unpainted finish.
FENDER STORAGE COMPARTMENT PAINT
The interior of the fender storage compartments (if fender compartments are specified) shall be finish painted job color.
CAB PRIMER & PREPARATION
The cab primer shall be a two (2) stage process. First stage shall be a coating with a two part component, self etching, and corrosion resistant primer to chemically bond the surface of the metal for increased adhesion. Second stage shall be multiple coats of a catalyzed, two component, polyurethane primer applied for leveling of small imperfections and top coat sealing.
FINALIZATION & DETAILING
Prior to delivery the vehicle, the interior and exterior be cleaned and detailed. The finalization process detailing shall include installation of NFPA required labels, checking fluid levels, sealing and caulking required areas of the cab and body, rust proofing, paint touch-up, etc.
**** LETTERING AND STRIPING ****
LETTERING
Lettering shall not be provided anywhere on the apparatus.
**** NFPA REQUIRED SCOTCH-LITE STRIPING ****
SCOTCH-LITE STRIPE
A six (6) inch high "Scotch-Lite" stripe shall be provided. The stripe shall be applied on a minimum of 60 percent of each side of the unit, 60 percent on the rear of the unit and 40 percent on the front of the unit. The Scotch-Lite stripe layout shall be determined by the Fire Department.
The Scotch-Lite shall be black in color.
GOLD LEAF ACCENT STRIPES
A half (1/2) inch high "Sign Gold" gold leaf accent stripe shall be incorporated into the Scotch-Lite scheme to border the primary Scotch-Lite stripe on the top and bottom edges. Final layout of this configuration shall be determined by the Fire Department.
REAR CHEVRON STRIPING
ALUMINUM SHEET ADDED FOR REAR CHEVRON
An aluminum panel will be installed over the treadplate rear panel for installation of the Chevron material.
The entire rear of the truck shall be covered with alternating strips of reflective striping.
The striping shall be 6" Diamond Grade Scotch-Lite.
The Diamond Grade Scotch-Lite shall be Red and Fluorescent Yellow Green in color.
**** COMPARTMENT ACCESSORIES ****
ADJUSTABLE SHELVING
Compartment shelving shall be constructed of 3/16” brush finish aluminum with a 2” upward bend at front and rear, and side supports. Shelving shall be vertically adjustable with spring nuts in aluminum strut channel.
Adjustable shelves shall be located as follows:
One (1) in the rear step compartment
PAC TRAC HOOKLOK MOUNTING BRACKET
Two (2) Hooklok bracket(s) shall be mounted with stainless steel hardware on the Pac Trac channel in a location specified by the customer.
PAC TRAC HOOKLOK MOUNTING BRACKET
Two (2) Flexmount bracket(s) shall be mounted with stainless steel hardware on the Pac Trac channel in a location specified by the customer.
PAC TRAC HANDLELOK MOUNTING BRACKET
Two (2) universal mount bracket(s) shall be mounted on the Pac Trac channel with stainless steel hardware as specified by the customer.