DF_013847.04_-_Butler_Springs_Park_Remediation_IFC_20250611.pdf

PDF 5 MB Posted

Attached to
Butler Springs Erosion Control
Solicitation number
IFB #26031
Issued by
Greenville County, South Carolina

About this file

These are engineering and construction documents for the Butler Springs Park Remediation project, prepared by Davis & Floyd, Inc. for Greenville County Parks, Recreation & Tourism in Greenville, South Carolina. The project involves comprehensive site remediation including demolition of existing asphalt, installation of new storm drainage systems, grading, and erosion control measures. The project documents are dated May 2025, with construction documents issued on 06/11/2025, and include detailed plans for storm drainage profiles, site grading, demolition, and environmental control measures.

The project scope includes removing existing asphalt, installing new storm drainage infrastructure with multiple inline drains (A1-A5) using HDPE pipes ranging from 8" to 15" in diameter, implementing sediment control tubes, and performing site stabilization. Technical specifications outline precise installation requirements, including pipe gradients, tie-ins to existing infrastructure, and detailed erosion control procedures. The plans emphasize environmental protection, with specific notes on sediment tube installation, maintenance protocols, and requirements for permanent site stabilization. The project appears to be funded through local government parks and recreation funds, with a focus on infrastructure improvement and environmental management.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRID 2

GRID 1

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LODLOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LO

D

LOD

LOD

00 20' 40'

SCALE: 1" = 20'

N

ST

AT

E

PL

AN

E

OW

NE

R

TH

ES

E

DR

AW

IN

GS

A

ND

T

HE

D

ES

IG

N

TH

ER

EO

N

AR

E

TH

E

PR

OP

ER

TY

O

F

DA

VI

S

FL

OY

D, IN

C.

A

ND

M

AY

N

OT

B E

US

ED

IN

W

HO

LE

O R

IN

P

AR

T

W

IT

HO

UT

W

RI

TT

EN

C

ON

SE

NT

O F

TH

E

EN

GI

NE

ER

/ A

RC

HI

TE

CT

A

ND

A

NY

IN

FR

IN

GE

ME

NT

W

ILL

B

E

SU

BJ

EC

T

TO

LE

GA

L A

CT

IO

N

K:

\Jo bs od d\1

-0

4\P ro du cti on \C ivi l\D ra wi ng s\0

7.0 4-

DE

MO

.dw g

, 6 /11

/20

8:

:48 A

M, ja me s d . c om pto n, pe

PR

OJ

EC

T

TI

TL

E

DR

AW

IN

G

TI

TL

E

NO

RE

LE

AS

ED

CH

EC

KE

D

DA

TE

PAGE OF

CH

EC

KE

D

DE

SI

GN

ED

JO

B

NO

DR

AW

N

AP

PR

OV

ED

DA

TE

4 M

ILE

ST

ON

E

W

AY

, S

UI

TE

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

(8

) 5

-9

EX

IS

TI

NG

C

ON

DI

TI

ON

S

AN

D

DE

MO

P

LA

N

GR

EE

NV

ILL

E

CO

UN

TY

P

AR

KS

RE

CR

EA

TI

ON

T

OU

RI

SM

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

BU

TL

ER

S

PR

IN

GS

P

AR

K

RE

ME

DI

AT

IO

N

C100

CA

G

CA

G

JD

C

JD

C

MA

Y

.04

IS

SU

ED

F

OR

C

ON

ST

RU

CT

IO

N

JD

C

/11 /20

PROJECT DATUM INFORMATION:

HORIZONTAL DATUM: SC83IF

VERTICAL DATUM: NAVD88

R

Know what's below.

before you dig.Call

DEMOLITION PLAN NOTES

1. EXISTING CONDITIONS WERE OBTAINED FROM AVAILABLE RECORD DRAWINGS AND

FIELD SURVEYS AND ARE NOT WARRANTED TO BE COMPLETE OR ACCURATE.

CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL UTILITIES IN THE FIELD PRIOR

TO THE START OF ANY WORK.

2. PROTECT AND MAINTAIN EROSION CONTROLS THROUGHOUT DEMOLITION AND

CONSTRUCTION.

3. CONTRACTOR SHALL USE CARE WHEN WORKING NEAR EXISTING OCCUPIED

BUILDINGS AND OTHER INFRASTRUCTURE. ALL MATERIALS ON SITE SHALL BE

PROPERLY RESTRAINED AND COVERED.

4. ALL UTILITIES AND SITE FEATURES NOT SPECIFIED TO BE DEMOLISHED SHALL REMAIN

UNDISTURBED.

5. PRIOR TO BEGINNING DEMOLITION, THE CONTRACTOR SHALL ENSURE THAT PHASE 1

SEDIMENT AND EROSION CONTROL MEASURES ARE INSTALLED

6. ALL DEMOLITION INCLUDES PROPER REMOVAL AND OFFSITE DISPOSAL OF

MATERIALS BY CONTRACTOR.

7. STRIP TOPSOIL FROM LIMITS OF CONSTRUCTION AS NEEDED FOR CONSTRUCTION.

STOCKPILE TOPSOIL ONSITE TO ASSIST IN FINAL STABILIZATION.

DEMOLITION LEGEND

ASPHALT TO BE REMOVED

PROPERTY LINE

LIMITS OF DISTURBANCE NPDES

SOUT

H

CA

RO

L INA

CERT I F ICAT

E

OF

A

UT

HO

RIZATION

DA

VI

S

FL

OY

D, IN

C

No . C

SOUT

H

CA

RO

L I

NA

LICENSED PRO

FE

SS

IO

NA

L ENGINEER

JAMES D

AV

ID

C

OM

PTON

No . 4

ISSUED FOR

CONSTRUCTION

/11

/20

AutoCAD SHX Text

LP

AutoCAD SHX Text

LP

AutoCAD SHX Text

SD

AutoCAD SHX Text

1.5' RAP

AutoCAD SHX Text W

DEMOLISH EXISTING

ASPHALT

DEMOLISH EXISTING

ASPHALT

LIMITS OF

DISTURBANCE

LODLODLODLOD

LOD

LOD

LOD

LODLODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD LO

D

LOD LOD LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

SAWCUT ASPHALT ALONG

LIMITS OF DEMOLITION (TYP.)

- REFER TO BASIS OF DESIGN

ON C801 FOR TRENCH WIDTH

LIMITS OF

DISTURBANCE

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

00 10' 20'

SCALE: 1" = 10'

N

ST

AT

E

PL

AN

E

OW

NE

R

TH

ES

E

DR

AW

IN

GS

A

ND

T

HE

D

ES

IG

N

TH

ER

EO

N

AR

E

TH

E

PR

OP

ER

TY

O

F

DA

VI

S

FL

OY

D, IN

C.

A

ND

M

AY

N

OT

B E

US

ED

IN

W

HO

LE

O R

IN

P

AR

T

W

IT

HO

UT

W

RI

TT

EN

C

ON

SE

NT

O F

TH

E

EN

GI

NE

ER

/ A

RC

HI

TE

CT

A

ND

A

NY

IN

FR

IN

GE

ME

NT

W

ILL

B

E

SU

BJ

EC

T

TO

LE

GA

L A

CT

IO

N

K:

\Jo bs od d\1

-0

4\P ro du cti on \C ivi l\D ra wi ng s\0

7.0 4-

DE

MO

.dw g

, 6 /11

/20

8:

:48 A

M, ja me s d . c om pto n, pe

PR

OJ

EC

T

TI

TL

E

DR

AW

IN

G

TI

TL

E

NO

RE

LE

AS

ED

CH

EC

KE

D

DA

TE

PAGE OF

CH

EC

KE

D

DE

SI

GN

ED

JO

B

NO

DR

AW

N

AP

PR

OV

ED

DA

TE

4 M

ILE

ST

ON

E

W

AY

, S

UI

TE

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

(8

) 5

-9

EX

IS

TI

NG

C

ON

DI

TI

ON

S

AN

D

DE

MO

P

LA

N

GR

ID

GR

EE

NV

ILL

E

CO

UN

TY

P

AR

KS

RE

CR

EA

TI

ON

T

OU

RI

SM

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

BU

TL

ER

S

PR

IN

GS

P

AR

K

RE

ME

DI

AT

IO

N

C101

CA

G

CA

G

JD

C

JD

C

MA

Y

.04

IS

SU

ED

F

OR

C

ON

ST

RU

CT

IO

N

JD

C

/11

PROJECT DATUM INFORMATION:

HORIZONTAL DATUM: SC83IF

VERTICAL DATUM: NAVD88

R

Know what's below.

before you dig.Call

DEMOLITION PLAN NOTES

1. EXISTING CONDITIONS WERE OBTAINED FROM AVAILABLE RECORD DRAWINGS AND

FIELD SURVEYS AND ARE NOT WARRANTED TO BE COMPLETE OR ACCURATE.

CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL UTILITIES IN THE FIELD PRIOR

TO THE START OF ANY WORK.

2. PROTECT AND MAINTAIN EROSION CONTROLS THROUGHOUT DEMOLITION AND

CONSTRUCTION.

3. CONTRACTOR SHALL USE CARE WHEN WORKING NEAR EXISTING OCCUPIED

BUILDINGS AND OTHER INFRASTRUCTURE. ALL MATERIALS ON SITE SHALL BE

PROPERLY RESTRAINED AND COVERED.

4. ALL UTILITIES AND SITE FEATURES NOT SPECIFIED TO BE DEMOLISHED SHALL REMAIN

UNDISTURBED.

5. PRIOR TO BEGINNING DEMOLITION, THE CONTRACTOR SHALL ENSURE THAT PHASE 1

SEDIMENT AND EROSION CONTROL MEASURES ARE INSTALLED

6. ALL DEMOLITION INCLUDES PROPER REMOVAL AND OFFSITE DISPOSAL OF

MATERIALS BY CONTRACTOR.

7. STRIP TOPSOIL FROM LIMITS OF CONSTRUCTION AS NEEDED FOR CONSTRUCTION.

STOCKPILE TOPSOIL ONSITE TO ASSIST IN FINAL STABILIZATION.

DEMOLITION LEGEND

ASPHALT TO BE REMOVED

SOUT

H

CA

RO

L INA

CERT I F ICATE

O

F

AU

TH

OR

IZATION

DA

VI

S

FL

OY

D, IN

C

No . C

SOUT

H

CA

RO

L INA

LICENSED PRO

FE

SS

IO

NA

L ENGINEER

JAMES D

AV

ID

C

OM

PTON

No . 4

ISSUED FOR

CONSTRUCTION

/11

/20

PROPERTY LINE

LIMITS OF DISTURBANCE NPDES

AutoCAD SHX Text

LP

AutoCAD SHX Text

SD

AutoCAD SHX Text

1.5' RAP

AutoCAD SHX Text

20"" OAK

AutoCAD SHX Text

DOUBLE 30"" MAPLE

AutoCAD SHX Text

36"" MAPLE

AutoCAD SHX Text

QUAD 16"" OAK

AutoCAD SHX Text

8"" OAK

AutoCAD SHX Text

QUAD 16"" OAK

AutoCAD SHX Text

11"" OAK

AutoCAD SHX Text

DOUBLE 12"" OAK

AutoCAD SHX Text Playground

AutoCAD SHX Text

ELEC PANEL W/BREAKER & METER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONTROL POINT #2 N: 1106910.74 E: 1599159.30 EL: 991.38

AutoCAD SHX Text

24" HDPE IE: 992.31'

AutoCAD SHX Text

MH-D RIM: 993.11' IN: 24" HDPE 987.88' IN: 24" HDPE 987.72' OUT: 24"HDPE 987.51'

AutoCAD SHX Text

LP

AutoCAD SHX Text W

AutoCAD SHX Text

QUAD 16"" OAK

AutoCAD SHX Text

QUAD 16"" OAK

AutoCAD SHX Text

DOUBLE 12"" OAK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONTROL POINT #3 N: 1106956.60 E: 1598676.61 EL:988.49'

24"HPDE IE:984.78'

GRID 2

GRID 1

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LODLOD

LOD

LODLOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LO

D

LOD

LOD

PROJECT DATUM INFORMATION:

HORIZONTAL DATUM: SC83IF

VERTICAL DATUM: NAVD88

00 20' 40'

SCALE: 1" = 20'

R

Know what's below.

before you dig.Call

SOUT

H

CA

RO

L INA

CERT I F ICAT

E

OF

A

UT

HO

RIZATION

DA

VI

S

FL

OY

D, IN

C

No . C

SOUT

H

CA

RO

L I

NA

LICENSED PRO

FE

SS

IO

NA

L ENGINEER

JAMES D

AV

ID

C

OM

PTON

No . 4

ISSUED FOR

CONSTRUCTION

/11

/20

N

ST

AT

E

PL

AN

E

OW

NE

R

TH

ES

E

DR

AW

IN

GS

A

ND

T

HE

D

ES

IG

N

TH

ER

EO

N

AR

E

TH

E

PR

OP

ER

TY

O

F

DA

VI

S

FL

OY

D, IN

C.

A

ND

M

AY

N

OT

B E

US

ED

IN

W

HO

LE

O R

IN

P

AR

T

W

IT

HO

UT

W

RI

TT

EN

C

ON

SE

NT

O F

TH

E

EN

GI

NE

ER

/ A

RC

HI

TE

CT

A

ND

A

NY

IN

FR

IN

GE

ME

NT

W

ILL

B

E

SU

BJ

EC

T

TO

LE

GA

L A

CT

IO

N

K:

\Jo bs od d\1

-0

4\P ro du cti on \C ivi l\D ra wi ng s\0

7.0 4-

SM

AL

L P

RO

JE

CT

.dw g

, 6 /11

/20

8:

:00 A

M, ja me s d . c om pto n, pe

PR

OJ

EC

T

TI

TL

E

DR

AW

IN

G

TI

TL

E

NO

RE

LE

AS

ED

CH

EC

KE

D

DA

TE

PAGE OF

CH

EC

KE

D

DE

SI

GN

ED

JO

B

NO

DR

AW

N

AP

PR

OV

ED

DA

TE

4 M

ILE

ST

ON

E

W

AY

, S

UI

TE

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

(8

) 5

-9

SI

TE

A

ND

G

RA

DI

NG

P

LA

N

GR

EE

NV

ILL

E

CO

UN

TY

P

AR

KS

RE

CR

EA

TI

ON

T

OU

RI

SM

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

BU

TL

ER

S

PR

IN

GS

P

AR

K

RE

ME

DI

AT

IO

N

C200

CA

G

CA

G

JD

C

JD

C

MA

Y

.04

IS

SU

ED

F

OR

C

ON

ST

RU

CT

IO

N

JD

C

/11

SAFETY FENCING

PROPOSED PATCHED

ASPHALT

LEGEND

EXISTING CONTOUR - MAJOR 105

EXISTING CONTOUR - MINOR 104

PROPOSED CONTOUR - MAJOR 105

104PROPOSED CONTOUR - MINOR

SURFACE FLOW

DIRECTIONAL ARROW

PROPOSED STORM PIPE

YARD INLET

PROPOSED GRAVEL

RIP-RAP

TEMPORARY BARRICADE

SEDIMENT TUBES

PROPERTY LINE

LIMITS OF DISTURBANCE LOD LOD

EXISTING STORM PIPE

GRADE ELEVATION:

PROPOSED ELEVATION 0.00

AutoCAD SHX Text

LP

AutoCAD SHX Text

LP

AutoCAD SHX Text

SD

W

25'

CONTRACTOR SHALL FILL IN ERODED

AREA W/ SOIL COMPACTED TO 98%

STANDARD MAX DRY DENSITY AND

REGRADE DITCH WITH POSITIVE

DRAINAGE FROM THE PIPE OUTFALL

LINE DITCH WITH RIPRAP

OUTLET PROTECTION OVER

GEOTEXTILE FABRIC

PROVIDE BARRICADES WITH SIGNAGE

FOR WALKING PATH CLOSURE

PROVIDE BARRICADES WITH SIGNAGE

FOR WALKING PATH CLOSURE

PROVIDE HIGH VISIBILITY SAFETY FENCING

AROUND CONSTRUCTION LIMITS

PROVIDE SEDIMENT

TUBE IN DITCH

CONTRACTOR SHALL CLEAN OUT

EXISTING STORM DRAINS ONCE

PERMANENT STABILIZATION IS

ACHIEVED

0+

0+

.07

0+

0+

.47

3 LF

8" HDPE SD

@1.00% 16 LF

15" HDPE SD

@1.00% 16 LF

15" HDPE SD

@1.00%

3 LF

8" HDPE SD

@1.00%

990 990

4 LF

10" HDPE SD

@1.00%

0+

0+

.73

0+

0+

.41

0+

0+

.39

LODLODLODLOD

LOD

LOD

LOD

LODLODLOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD LO

D

LOD LOD LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

TIE ALL PROPOSED STORM DRAINS TO

EXISTING PIPE WITH ADS INSERTA TEES

OR APPROVED EQUAL (TYP.)

PATCH ASPHALT AFTER

INSTALLATION OF NEW

STORM DRAINAGE

PATCH ASPHALT AFTER

INSTALLATION OF NEW

STORM DRAINAGE

PROVIDE TYPE A INLET PROTECTION

AROUND ALL INLETS ONCE INSTALLED UNTIL

FINAL STABILIZATION IS ACHIEVED (TYP.)

PROVIDE HIGH VISIBILITY SAFETY FENCING

AROUND CONSTRUCTION LIMITS

PROVIDE BARRICADES WITH SIGNAGE

FOR WALKING PATH CLOSURE

PROVIDE BARRICADES WITH SIGNAGE

FOR WALKING PATH CLOSURE

CONTRACTOR SHALL CLEAN OUT

EXISTING STORM DRAINS ONCE

PERMANENT STABILIZATION IS

ACHIEVED

CONTRACTOR SHALL CLEAN OUT

EXISTING STORM DRAINS ONCE

PERMANENT STABILIZATION IS

ACHIEVED

PROVIDE SEDIMENT TUBES ABOVE

DISTURBED SLOPE - REMOVE

SEDIMENT TUBES ONCE THE SLOPE

HAS BEEN PERMANENTLY STABILIZED

LINE SLOPE AND DITCH WITH TRM

AND HYDROSEED IMMEDIATELY

ONCE FINAL GRADES ARE MET

989.97

990.52

990.00

990.57

989.63 990.23

990.00

989.72

990.53

990.46

990.00

990.60

989.82

990.72

990.18

HYDROSEED DISTURBED AREAS

ONCE LAND DISTURBING

ACTIVITIES HAVE CEASED (TYP.)

DITCH STARTS AT 0.33' DEPTH WITH 4:1

SLOPE ON TRAIL SIDE AND 2:1 SLOPE ON

HILL SIDE AT 1% LONGITUDINAL SLOPE

A3

8" DROP IN GRATE

NYLOPLAST INLINE DRAIN

TOP: 989.82

IE OUT (8"): 987.50

A1

15" STANDARD GRATE

NYLOPLAST INLINE DRAIN

TOP: 989.79

IE OUT (15"): 987.40

A2

15" STANDARD GRATE

NYLOPLAST INLINE DRAIN

TOP: 989.93

IE OUT (15"): 987.68

A4

8" DROP IN GRATE

NYLOPLAST INLINE DRAIN

TOP: 989.72

IE OUT (8"): 987.39

A5

10" DROP IN GRATE

NYLOPLAST INLINE DRAIN

TOP: 989.63

IE OUT (10"): 987.17

CARE SHALL BE TAKEN TO

PROTECT EXISTING TREE ROOTS

FROM DAMAGE DURING

GRADING ACTIVITIES

AT GRATE DITCH SHALL BE 1' DEEP WITH 1.25' FLAT

BOTTOM WITH 3:1 SLOPE ON TRAIL SIDE AND 2:1

SLOPE ON HILL SIDE WITH 1% LONGITUDINAL SLOPE

990.35 989.93

990.93

991.43

990.95

990.81

989.79 990.24

990.58

DITCH STARTS AT 0.5' DEPTH WITH 8:1

SLOPE ON TRAIL SIDE AND 2:1 SLOPE ON

HILL SIDE AT 2.5% LONGITUDINAL SLOPE

AT GRATE DITCH SHALL BE 1' DEEP WITH 1.25' FLAT

BOTTOM WITH 3:1 SLOPE ON TRAIL SIDE AND 2:1 SLOPE

ON HILL SIDE WITH 2.5% LONGITUDINAL SLOPE

PROVIDE SEDIMENT TUBES ALONG

BALLFIELD - REMOVE SEDIMENT

TUBES ONCE PROJECT SITE HAS

BEEN PERMANENTLY STABILIZED

PROVIDE SEDIMENT TUBES ALONG

BALLFIELD - REMOVE SEDIMENT

TUBES ONCE PROJECT SITE HAS

BEEN PERMANENTLY STABILIZED

PROJECT DATUM INFORMATION:

HORIZONTAL DATUM: SC83IF

VERTICAL DATUM: NAVD88

00 10' 20'

SCALE: 1" = 10'

R

Know what's below.

before you dig.Call

SOUT

H

CA

RO

L INA

CERT I F ICAT

E

OF

A

UT

HO

RIZATION

DA

VI

S

FL

OY

D, IN

C

No . C

SOUT

H

CA

RO

L I

NA

LICENSED PRO

FE

SS

IO

NA

L ENGINEER

JAMES D

AV

ID

C

OM

PTON

No . 4

ISSUED FOR

CONSTRUCTION

/11

/20

N

ST

AT

E

PL

AN

E

OW

NE

R

TH

ES

E

DR

AW

IN

GS

A

ND

T

HE

D

ES

IG

N

TH

ER

EO

N

AR

E

TH

E

PR

OP

ER

TY

O

F

DA

VI

S

FL

OY

D, IN

C.

A

ND

M

AY

N

OT

B E

US

ED

IN

W

HO

LE

O R

IN

P

AR

T

W

IT

HO

UT

W

RI

TT

EN

C

ON

SE

NT

O F

TH

E

EN

GI

NE

ER

/ A

RC

HI

TE

CT

A

ND

A

NY

IN

FR

IN

GE

ME

NT

W

ILL

B

E

SU

BJ

EC

T

TO

LE

GA

L A

CT

IO

N

K:

\Jo bs od d\1

-0

4\P ro du cti on \C ivi l\D ra wi ng s\0

7.0 4-

SM

AL

L P

RO

JE

CT

.dw g

, 6 /11

/20

8:

:07 A

M, ja me s d . c om pto n, pe

PR

OJ

EC

T

TI

TL

E

DR

AW

IN

G

TI

TL

E

NO

RE

LE

AS

ED

CH

EC

KE

D

DA

TE

PAGE OF

CH

EC

KE

D

DE

SI

GN

ED

JO

B

NO

DR

AW

N

AP

PR

OV

ED

DA

TE

4 M

ILE

ST

ON

E

W

AY

, S

UI

TE

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

(8

) 5

-9

SI

TE

A

ND

G

RA

DI

NG

P

LA

N

GR

ID

GR

EE

NV

ILL

E

CO

UN

TY

P

AR

KS

RE

CR

EA

TI

ON

T

OU

RI

SM

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

BU

TL

ER

S

PR

IN

GS

P

AR

K

RE

ME

DI

AT

IO

N

C201

CA

G

CA

G

JD

C

JD

C

MA

Y

.04

IS

SU

ED

F

OR

C

ON

ST

RU

CT

IO

N

JD

C

/11

SAFETY FENCING

PROPOSED PATCHED

ASPHALT

LEGEND

EXISTING CONTOUR - MAJOR 105

EXISTING CONTOUR - MINOR 104

PROPOSED CONTOUR - MAJOR 105

104PROPOSED CONTOUR - MINOR

SURFACE FLOW

DIRECTIONAL ARROW

PROPOSED STORM PIPE

YARD INLET

PROPOSED GRAVEL

RIP-RAP

TEMPORARY BARRICADE

SEDIMENT TUBES

PROPERTY LINE

LIMITS OF DISTURBANCE LOD LOD

EXISTING STORM PIPE

GRADE ELEVATION:

PROPOSED ELEVATION 0.00

SWPPP SEQUENCE OF CONSTRUCTION:

1. OWNER TO RECEIVE LETTER OF EXEMPTION FROM SCDES FOR LAND DISTURBANCE

ACTIVITIES.

2. INSTALL PERIMETER CONTROL BMPS AND BEGIN MAINTENANCE OF SEDIMENT

CONTROLS AS NECESSARY. CONTINUE MAINTENANCE UNTIL ALL FINAL STABILIZATION

MEASURES ARE IN PLACE.

3. CONDUCT DEMOLITION OF ITEMS AS IDENTIFIED ON SHEET C110.

4. GRADING OF SITE.

5. INSTALL PROPOSED STORM DRAINS.

6. PATCH ASPHALT WALKWAY.

7. SITE SHALL BE 100% STABILIZED TO A MINIMUM DENSITY OF 70%.

8. REMOVE SEDIMENT FROM STORM DRAINAGE NETWORK.

9. TEMPORARY BMPS SHALL BE REMOVED AFTER THE ENTIRE AREA DRAINING TO IT HAS

BEEN PERMANENTLY STABILIZED.

SWPPP NOTES:

1. IF A PORTABLE TOILET IS PROVIDED ON SITE, IT SHALL BE LOCATED IN AN AREA THAT IS

NOT ADJACENT TO A WATERWAY OR STORM DRAINAGE.

2. EROSION CONTROL MEASURES SHALL BE MAINTAINED AT ALL TIMES. IF FILL

IMPLEMENTATION OF EROSION CONTROL MEASURES INDICATED DOES NOT PROVIDE

FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL

MEASURES SHALL BE IMPLEMENTED AS DIRECTED BY THE ON-SITE INSPECTOR.

3. THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION

CONTROL MEASURES INCLUDING REPLACING OR REPAIRING AND DAMAGED DEVICES.

4. AFTER FINAL STABILIZATION IS APPROVED, CONTRACTOR SHALL REMOVE ALL

SEDIMENT FROM STORM DRAINAGE PIPES.

AutoCAD SHX Text

LP

SD

SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL

STORM A1 PROFILE

-0+10 0+00 0+25

SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL

STORM A2 PROFILE

-0+10 0+00 0+25

SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL

STORM A3 PROFILE

-0+10 0+00 0+25

SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL

STORM A4 PROFILE

-0+10 0+00 0+25

SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL

STORM A5 PROFILE

-0+10 0+00 0+25

16 LF

15" HDPE SD

@1.00%

A1

" S

TA

ND

AR

D

GR

AT

E

NY

LO

PL

AS

T

IN

LIN

E

DR

AI

N

TO

P:

9.7

IE

O

UT

(1

5"

7.4

16 LF

15" HDPE SD

@1.00%

A2

" S

TA

ND

AR

D

GR

AT

E

NY

LO

PL

AS

T

IN

LIN

E

DR

AI

N

TO

P:

9.9

IE

O

UT

(1

5"

7.6

3 LF

8" HDPE SD

@1.00%

A3 8"

D

RO

P

IN

G

RA

TE

NY

LO

PL

AS

T

IN

LIN

E

DR

AI

N

TO

P:

9.8

IE

O

UT

(8

7.5

A4 8"

D

RO

P

IN

G

RA

TE

NY

LO

PL

AS

T

IN

LIN

E

DR

AI

N

TO

P:

9.7

IE

O

UT

(8

7.3

4 LF

10" HDPE SD

@1.00%

A5

" D

RO

P

IN

G

RA

TE

NY

LO

PL

AS

T

IN

LIN

E

DR

AI

N

TO

P:

9.6

IE

O

UT

(1 0"

7.1

TIE TO EXISTING PIPE WITH

ADS INSERTA TEE OR

INDUSTRY EQUIVALENT

3 LF

8" HDPE SD

@1.00%

TIE TO EXISTING PIPE WITH

ADS INSERTA TEE OR

INDUSTRY EQUIVALENT

TIE TO EXISTING PIPE WITH

ADS INSERTA TEE OR

INDUSTRY EQUIVALENT

TIE TO EXISTING PIPE WITH

ADS INSERTA TEE OR

INDUSTRY EQUIVALENT

TIE TO EXISTING PIPE WITH

ADS INSERTA TEE OR

INDUSTRY EQUIVALENT

SOUT

H

CA

RO

L INA

CERT I F ICAT

E

OF

A

UT

HO

RIZATION

DA

VI

S

FL

OY

D, IN

C

No . C

SOUT

H

CA

RO

L I

NA

LICENSED PRO

FE

SS

IO

NA

L ENGINEER

JAMES D

AV

ID

C

OM

PTON

No . 4

ISSUED FOR

CONSTRUCTION

/11

/20

OW

NE

R

TH

ES

E

DR

AW

IN

GS

A

ND

T

HE

D

ES

IG

N

TH

ER

EO

N

AR

E

TH

E

PR

OP

ER

TY

O

F

DA

VI

S

FL

OY

D, IN

C.

A

ND

M

AY

N

OT

B E

US

ED

IN

W

HO

LE

O R

IN

P

AR

T

W

IT

HO

UT

W

RI

TT

EN

C

ON

SE

NT

O F

TH

E

EN

GI

NE

ER

/ A

RC

HI

TE

CT

A

ND

A

NY

IN

FR

IN

GE

ME

NT

W

ILL

B

E

SU

BJ

EC

T

TO

LE

GA

L A

CT

IO

N

K:

\Jo bs od d\1

-0

4\P ro du cti on \C ivi l\D ra wi ng s\0

7.0 4-

SM

AL

L P

RO

JE

CT

.dw g

, 6 /11

/20

8:

:07 A

M, ja me s d . c om pto n, pe

PR

OJ

EC

T

TI

TL

E

DR

AW

IN

G

TI

TL

E

NO

RE

LE

AS

ED

CH

EC

KE

D

DA

TE

PAGE OF

CH

EC

KE

D

DE

SI

GN

ED

JO

B

NO

DR

AW

N

AP

PR

OV

ED

DA

TE

4 M

ILE

ST

ON

E

W

AY

, S

UI

TE

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

(8

) 5

-9

ST

OR

M

DR

AI

NA

GE

P

RO

FI

LE

S

GR

EE

NV

ILL

E

CO

UN

TY

P

AR

KS

RE

CR

EA

TI

ON

T

OU

RI

SM

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

BU

TL

ER

S

PR

IN

GS

P

AR

K

RE

ME

DI

AT

IO

N

C400

CA

G

CA

G

JD

C

JD

C

MA

Y

.04

IS

SU

ED

F

OR

C

ON

ST

RU

CT

IO

N

JD

C

/11

00 10' 20'

SCALE: 1" = 10'

2.5'

5'

SCALE: 1" = 5'

EXISTING GRADE

PROPOSED GRADE

PROFILE LEGEND

OW

NE

R

TH

ES

E

DR

AW

IN

GS

A

ND

T

HE

D

ES

IG

N

TH

ER

EO

N

AR

E

TH

E

PR

OP

ER

TY

O

F

DA

VI

S

FL

OY

D, IN

C.

A

ND

M

AY

N

OT

B E

US

ED

IN

W

HO

LE

O R

IN

P

AR

T

W

IT

HO

UT

W

RI

TT

EN

C

ON

SE

NT

O F

TH

E

EN

GI

NE

ER

/ A

RC

HI

TE

CT

A

ND

A

NY

IN

FR

IN

GE

ME

NT

W

ILL

B

E

SU

BJ

EC

T

TO

LE

GA

L A

CT

IO

N

K:

\Jo bs od d\1

-0

4\P ro du cti on \C ivi l\D ra wi ng s\0

7.0 4-

DE

TA

ILS

.dw g , 6

/11 /20

8:

:54

A M, ja me s d

. c om pto n, pe

PR

OJ

EC

T

TI

TL

E

DR

AW

IN

G

TI

TL

E

NO

RE

LE

AS

ED

CH

EC

KE

D

DA

TE

PAGE OF

CH

EC

KE

D

DE

SI

GN

ED

JO

B

NO

DR

AW

N

AP

PR

OV

ED

DA

TE

4 M

ILE

ST

ON

E

W

AY

, S

UI

TE

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

(8

) 5

-9

DE

TA

ILS

(S

HE

ET

OF

2)

GR

EE

NV

ILL

E

CO

UN

TY

P

AR

KS

RE

CR

EA

TI

ON

T

OU

RI

SM

GR

EE

NV

ILL

E, S

OU

TH

C

AR

OL

IN

A

BU

TL

ER

S

PR

IN

GS

P

AR

K

RE

ME

DI

AT

IO

N

C801

CA

G

CA

G

JD

C

JD

C

MA

Y

.04

IS

SU

ED

F

OR

C

ON

ST

RU

CT

IO

N

JD

C

/11

SOUT

H

CA

RO

L INA

CERT I F ICAT

E

OF

A

UT

HO

RIZATION

DA

VI

S

FL

OY

D, IN

C

No . C

SOUT

H

CA

RO

L I

NA

LICENSED PRO

FE

SS

IO

NA

L ENGINEER

JAMES D

AV

ID

C

OM

PTON

No . 4

ISSUED FOR

CONSTRUCTION

/11

/20

SEDIMENT TUBE INSTALLATION

INSPECTION & MAINTENANCE:

1. THE KEY TO FUNCTIONAL SEDIMENT TUBES IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND

REGULAR SEDIMENT REMOVAL.

2. REGULAR INSPECTIONS OF SEDIMENT TUBES SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH RAINFALL EVEN THAT PRODUCES 1/2-INCH OR

MORE OF PRECIPITATION.

3. ATTENTION TO SEDIMENT ACCUMULATIONS IN FRONT OF THE SEDIMENT TUBE IS EXTREMELY

IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN

NECESSARY.

4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE SEDIMENT TUBE.

5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS

DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED.

6. LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED FROM IN FRONT OF TUBES WHEN FOUND.

7. IF EROSION CAUSES THE EDGES TO FALL TO A HEIGHT EQUAL TO OR BELOW THE HEIGHT OF THE SEDIMENT TUBE, REPAIRS SHOULD BE MADE IMMEDIATELY TO PREVENT RUNOFF FROM BYPASSING

TUBE.

8. SEDIMENT TUBES SHOULD BE REMOVED AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN

COMPLETELY STABILIZED. PERMANENT VEGETATION SHOULD REPLACE AREAS FROM WHICH

SEDIMENT TUBES HAVE BEEN REMOVED.

GENERAL NOTES:

1. SEDIMENT TUBES MAY BE INSTALLED ALONG CONTOURS, IN DRAINAGE CONVEYANCE CHANNELS, AND

AROUND INLETS TO HELP PREVENT OFF-SITE DISCHARGE OF SEDIMENT-LADEN STORM WATER

RUNOFF.

2. SEDIMENT TUBES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER, OR HARDWOOD MULCH. STRAW, PINE NEEDLE, AND LEAF MULCH-FILLED

SEDIMENT TUBES ARE NOT PERMITTED.

3. THE OUTER NETTING OF THE SEDIMENT TUBE SHOULD CONSIST OF SEAMLESS, HIGH-DENSITY

POLYETHYLENE PHOTODEGRADABLE MATERIALS TREATED WITH ULTRAVIOLET STABILIZERS OR A

SEAMLESS, HIGH-DENSITY POLYETHYLENE NON-DEGRADABLE MATERIAL.

4. SEDIMENT TUBES, WHEN USED AS CHECKS WITHIN CHANNELS, SHOULD RANGE BETWEEN 18-INCHES AND 24-INCHES DEPENDING ON CHANNEL DIMENSIONS. DIAMETERS OUTSIDE THIS RANGE MAY BE

ALLOWED WHERE NECESSARY WHEN APPROVED.

5. CURLED EXCELSIOR WOOD, OR NATURAL COCONUT PRODUCTS THAT ARE ROLLED UP TO CREATE A

SEDIMENT TUBE ARE NOT ALLOWED.

6. SEDIMENT TUBES SHOULD BE STAKED USING WOODEN STAKES (2-INCH X 2-INCH) OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) AT A MINIMUM

OF 48-INCHES IN LENGTH PLACED ON 2-FOOT CENTERS.

7. INSTALL ALL SEDIMENT TUBES TO ENSURE THAT NO GAPS EXIST BETWEEN THE SOIL AND THE BOTTOM

OF THE TUBE. MANUFACTURER'S RECOMMENDATIONS SHOULD ALWAYS BE CONSULTED BEFORE

INSTALLATION.

8. THE ENDS OF ADJACENT SEDIMENT TUBES SHOULD BE OVERLAPPED 6-INCHES TO PREVENT FLOW

AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT.

9. SEDIMENT TUBES SHOULD NOT BE STACKED ON TOP OF ONE ANOTHER, UNLESS RECOMMENDED BY

MANUFACTURER.

10. EACH SEDIMENT TUBE SHOULD BE INSTALLED IN A TRENCH WITH A DEPTH EQUAL TO 1/5 THE

DIAMETER OF THE SEDIMENT TUBE.

11. SEDIMENT TUBES SHOULD CONTINUE UP THE SIDE SLOPES A MINIMUM OF 1-FOOT ABOVE THE DESIGN

FLOW DEPTH OF THE CHANNEL.

12. INSTALL STAKES AT A DIAGONAL FACING INCOMING RUNOFF.

" M

IN

IM

UM

L

EN

GT

H

2.

0'

M

IN

IM

UM

FL

OW

SLOPE MAX SPACING (FT.)

< 2% 150 2% 100 3% 75 4% 50 5% 40 6% 30

> 6% 25

NOT TO SCALE

SEDIMENT TUBES

2" X 2" WOOD STAKES OR

1.25 #/FT STEEL POST

STAKES PLACED

AT 2' MINIMUM

SPACING

2' SPACING

CONTINUOUS ALONG

TUBE (TYP.)

PLAN SYMBOL

PERMANENT SEEDING SCHEDULE

1. EXTENT OF WORK - PROVIDE SOIL ESTABLISHMENT OF FINISH GRADE, PREPARATION,

FERTILIZING AND SEEDING, OF ALL NEWLY GRADED FINISHED EARTH SURFACES, UNLESS

INDICATED OTHERWISE, AND AT ALL AREAS INSIDE OR OUTSIDE THE LIMITS OF

CONSTRUCTION THAT ARE DISTURBED BY THE CONTRACTOR'S OPERATIONS.

2. TURF ESTABLISHMENT PERIOD - THE ESTABLISHMENT PERIOD FOR TURF SHALL BEGIN

IMMEDIATELY AFTER INSTALLATION, WITH THE APPROVAL OF THE ENGINEER, AND CONTINUE

UNTIL THE DATE THAT THE OWNER ACCEPTS THE PROJECT OR PHASE FOR BENEFICIAL

USE AND OCCUPANCY AND A STAND OF GRASS IS ACHIEVED. DURING THE TURF

ESTABLISHMENT PERIOD THE CONTRACTOR SHALL:

A. WATER THE TURF TO MAINTAIN AN ADEQUATE SUPPLY OF MOISTURE WITHIN

ROOT ZONE. AN ADEQUATE SUPPLY OF MOISTURE IS THE EQUIVALENT OF 1 INCH

OF ABSORBED WATER PER WEEK EITHER THROUGH NATURAL RAINFALL OR

AUGMENTED BY PERIODIC WATERING. APPLY WATER AT A MODERATE RATE SO

AS NOT TO FLOOD THE TURF.

B. PROVIDE THE FOLLOWING TURF ESTABLISHMENT:

1. ERADICATE ALL WEEDS. WATER, FERTILIZE, OVERSEED, AND PERFORM ANY

OTHER OPERATION NECESSARY TO PROMOTE THE GROWTH OF GRASS.

2. RESEED OR RE-SOD AREAS VOID OF TURF ONE SQUARE FOOT AND LARGER IN AREA.

3. MOW THE NEW LAWN AT LEAST THREE TIMES PRIOR TO THE FINAL INSPECTION.

BEGIN MOWING WHEN GRASS IS 4 INCHES HIGH. MOW TO A 2 1/2 INCH HEIGHT.

PERMANENT GRASS SEEDING RATES- SEED MIXTURE

PLANTING SEASON VARIETY LB/ 1000 S.F.

SPRING/SUMMER (APRIL 1 - AUG. 31)

BROWN TOP MILLET 1/2 LB.

HULLED BERMUDA GRASS 2 LBS.

FALL/WINTER (SEPT 1. - MAR. 31)

ANNUAL RYE GRASS 6 LBS.

HULLED BERMUDA GRASS 1 LB.

UNHULLED BERMUDA GRASS 3 LBS.

NOTE: SOME ANNUAL GRASS SPECIES ARE INCLUDED IN THIS MIX. THESE ARE TO

BE PLANTED AT THE SAME TIME AS THE PERENNIAL GRASS SPECIES TO PROVIDE

QUICK COVER AND STABILIZE THE SOIL UNTIL THE PERENNIAL SEEDS GERMINATE

AND BECOME ESTABLISHED.

4. WOOD CELLULOSE FIBER MULCH - USE RECOVERED MATERIALS OF EITHER PAPER-

BASED(100 PERCENT) OR WOOD-BASED (100 PERCENT) HYDRAULIC MULCH. PROCESSED

TO CONTAIN NO GROWTH OR GERMINATION-INHIBITING FACTORS AND DYED AN APPROPRIATE

COLOR TO FACILITATE VISUAL METERING OF MATERIALS APPLICATION. COMPOSITION ON

AIR-DRY WEIGHT BASIS: 9 TO 15 PERCENT MOISTURE, pH RANGE FROM 3.5 TO 5.0. USE WITH

HYDRAULIC APPLICATION OF GRASS SEED AND FERTILIZER. FIRST, MIX WATER AND FIBER.

FIBER SHALL BE ADDED AT 1,000 POUNDS, DRY WEIGHT, PER ACRE. THEN ADD FERTILIZER TO

PRODUCE A HOMOGENEOUS SLURRY. WHEN HYDRAULICALLY SPRAYED ON THE GROUND,

MATERIAL SHALL FORM A BLOTTER LIKE COVER IMPREGNATED UNIFORMLY WITH GRASS SEED.

APPLY SEEDED SLURRY EVENLY IN TWO INTERSECTION DIRECTIONS TO ACHIEVE A MINIMUM

60% COVERAGE.

5. SOIL ANALYSIS - IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE A SOIL

ANALYSIS PERFORMED BY THE COUNTY EXTENSION SERVICE OR SOME OTHER APPROVED

LABORATORY FOR A SOIL ANALYSIS REPORT. THE CONTRACTOR SHALL THEN PROVIDE THE

RECOMMENDATIONS OF THE REPORT TO THE ENGINEER FOR WRITTEN APPROVAL.

RECOMMENDATIONS SHALL ENSURE THAT SOIL pH IS WITHIN 6-7 PRIOR TO SEEDING AND SHALL

INCLUDE RATES FOR LIME, AND FERTILIZER.

6. SOIL PREPARATION - PRIOR TO MASS GRADING, REMOVE EXISTING TOPSOIL AND STOCKPILE. IF AREAS TO BE GRADED ARE COVERED WITH GRAVEL, COMPLETELY REMOVE GRAVEL AND DISPOSE OF OFF-SITE IN A MANNER THAT COMPILES WITH ALL LOCAL, STATE, AND FEDERAL LAWS. AFTER AREAS HAVE BEEN BROUGHT TO FINISH

SUBGRADE ELEVATION, THOROUGHLY TILL TO MINIMUM DEPTH OF 6 INCHES BY SCARIFYING,

DISKING OR HARROWING. REMOVE DEBRIS AND STONES LARGER THAN ONE INCH IN ANY

DIMENSION REMAINING ON SURFACE AFTER TILLAGE. SPREAD STOCKPILED OR HAULED IN

TOPSOIL EVENLY TO A MIN. DEPTH OF 6" TO PROVIDE POSITIVE DRAINAGE. DO NOT SPREAD

TOPSOIL WHEN FROZEN OR EXCESSIVELY WET OR DRY. CORRECT IRREGULARITIES IN FINISHED

SURFACES TO ELIMINATE DEPRESSIONS. PROTECT FINISHED PREPARED SOIL AREAS FROM

DAMAGE BY VEHICULAR OR PEDESTRIAN TRAFFIC.

6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SUPPLY WATER TO ALL TREES, SHRUBS, GROUNDCOVER AND TURF UNTIL FINAL ACCEPTANCE BY THE OWNER. THE OWNER IS RESPONSIBLE FOR IRRIGATING PLANT MATERIALS AND TURF AFTER FINAL ACCEPTANCE IF HE CHOOSES. THE CONTRACTOR SHALL WARRANTY ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE AND SHALL GUARANTEE A STAND OF PERMANENT GRASS PER SCDHEC NPDES PERMIT REQUIREMENTS AND SHALL BE RELIEVED OF THIS REPONSIBILTY ONCE THE PROJECT HAS BEEN ACCEPTED AND AFTER THE OWNER HAS FILED A NOTICE OF TERMINATION OR ACCEPTED BY THE

OWNER, WHICHEVER OCCURS FIRST.

POST INSTALLATION DETAIL

FILTER FABRIC INSTALLATION DETAIL

FILTER FABRIC BURIAL DETAIL

POST REQUIREMENTS:

1. SILT FENCE POSTS MUST BE 48-INCH LONG STEEL POSTS THAT MEET, AT A MINIMUM, THE FOLLOWING

PHYSICAL CHARACTERISTICS.

- COMPOSED OF A HIGH STRENGTH STEEL WITH A MINIMUM YIELD STRENGTH OF 50,000 PSI.

- INCLUDE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND A NOMINAL "T"

LENGTH OF 1.48-INCHES.

- WEIGH 1.25 POUNDS PER FOOT (± 8%)

2. POSTS SHALL BE EQUIPPED WITH PROJECTIONS TO AID IN FASTENING OF FILTER FABRIC.

3. INSTALL POSTS TO A MINIMUM OF 24-INCHES. A MINIMUM HEIGHT OF 1- TO 2- INCHES ABOVE THE FABRIC SHALL BE MAINTAINED, AND A MAXIMUM HEIGHT OF 3 FEET SHALL BE MAINTAINED ABOVE THE

GROUND.

4. POST SPACING SHALL BE AT A MAXIMUM OF 3-FEET ON CENTER.

5. INSTALL RUBBER SAFETY CAPS ON TOP OF STEEL POSTS.

INSPECTION & MAINTENANCE:

1. THE KEY TO FUNCTIONAL INLET PROTECTION IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND

REGULAR SEDIMENT REMOVAL.

2. REGULAR INSPECTIONS OF INLET PROTECTION SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2-INCH

OR MORE OF PRECIPITATION.

3. ATTENTION TO SEDIMENT ACCUMULATIONS ALONG THE FILTER FABRIC IS EXTREMELY IMPORTANT.

ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN NECESSARY.

4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE FILTER FABRIC. WHEN A SUMP IS INSTALLED IN FRONT OF THE FABRIC, SEDIMENT SHOULD BE REMOVED WHEN IT FILLS

APPROXIMATELY 1/3 THE DEPTH OF THE SUMP.

5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS

DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED.

6. CHECK FOR AREAS WHERE STORM WATER RUNOFF HAS ERODED A CHANNEL BENEATH THE FILTER FABRIC, OR WHERE THE FABRIC HAS SAGGED OR COLLAPSED DUE TO RUNOFF OVERTOPPING THE

INLET PROTECTION.

7. CHECK FOR TEARS WITHIN THE FILTER FABRIC, AREAS WHERE FABRIC HAS BEGUN TO DECOMPOSE, AND FOR ANY OTHER CIRCUMSTANCE THAT MAY RENDER THE INLET PROTECTION INEFFECTIVE.

REMOVE DAMAGED FABRIC AND REINSTALL NEW FILTER FABRIC IMMEDIATELY.

8. INLET PROTECTION STRUCTURES SHOULD BE REMOVED AFTER ALL THE DISTURBED AREAS ARE PERMANENTLY STABILIZED. REMOVE ALL CONSTRUCTION MATERIAL AND SEDIMENT, AND DISPOSE OF THEM PROPERLY. GRADE THE DISTURBED AREA TO THE ELEVATION OF THE DROP INLET STRUCTURE

CREST. STABILIZE ALL BARE AREAS IMMEDIATELY.

-IN

. M

IN

. 8-

IN

(M

IN

-IN

TO

IN

FOLD FABRIC TO OVERLAP 1

FOOT AND SECURE TO POSTS

WITH HEAVY DUTY PLASTIC TIES

ATTACH FILTER FABRIC TO POSTS

WITH HEAVY DUTY PLASTIC TIES

ALONG TOP 8-INCHES OF FABRIC

BURY & TRENCH MINIMUM OF

12- INCHES OF FILTER FABRIC

3-FT. MAX.

SPACING

FILTER FABRIC REQUIREMENTS:

1. SILT FENCE MUST BE COMPOSED OF WOVEN GEOTEXTILE FILTER FABRIC THAT CONSISTS OF THE

FOLLOWING REQUIREMENTS:

- COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS OF AT LEAST 85% BY

WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES THAT ARE FORMED INTO A NETWORK

SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER;

- FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL PROPERTIES

AFTER INSTALLATION;

- FREE OF ANY DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING

PROPERTIES; AND,

- HAVE A MINIMUM WIDTH OF 36-INCHES.

2. USE ONLY FABRIC APPEARING ON SC DOT'S QUALIFIED PRODUCTS LISTING (QPL), APPROVAL SHEET

#34, MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE SCDOT STANDARD

SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.

3. 12-INCHES OF THE FABRIC SHOULD BE PLACED WITHIN EXCAVATED TRENCH AND TOED IN WHEN THE

TRENCH IS BACKFILLED.

4. FILTER FABRIC SHALL BE PURCHASED IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF THE

BARRIER TO AVOID JOINTS.

5. FILTER FABRIC SHALL BE INSTALLED AT A MINIMUM OF 24-INCHES ABOVE THE GROUND.

-IN

M

IN

BURY FABRIC

(SEE DETAIL)

1.25 LB/FT

STEEL POSTS

NOT TO SCALE

TYPE A INLET PROTECTION - FILTER FABRIC

INSTALL RUBBER

SAFETY CAPS ON THE

TOP OF STEEL POSTS

PLAN SYMBOL

INSTALL RUBBER

SAFETY CAPS ON THE

TOP OF STEEL POSTS

INSTALL RUBBER

SAFETY CAPS ON THE

TOP OF STEEL POSTS

A

BASIS OF DESIGN

NOTES:

1. THE SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY, AS

DETERMINED BY THE STANDARD PROCTOR TEST.

ASPHALT PATCH SECTION

NOT TO SCALE

COMPACTED SUBGRADE

2" SURFACE COURSE

File details come from the government source that posted it. Updated .