DF_013847.04_-_Butler_Springs_Park_Remediation_IFC_20250611.pdf
PDF 5 MB Posted
- Attached to
- Butler Springs Erosion Control
- Solicitation number
- IFB #26031
- Issued by
- Greenville County, South Carolina
About this file
This document is a set of construction engineering plans for the Butler Springs Park Remediation project, prepared by Davis & Floyd, Inc. for Greenville County Parks, Recreation & Tourism in South Carolina. The project involves a comprehensive site remediation and infrastructure improvement plan, specifically focusing on demolition of existing asphalt surfaces, storm drainage system modifications, and site grading. The plans are dated May 2025 and were issued for construction on 06/11/2025, with detailed drawings covering existing conditions, demolition, site grading, storm drainage profiles, and technical details.
The project includes specific technical specifications for storm drainage infrastructure, including five separate storm drain profiles (A1-A5) with High-Density Polyethylene (HDPE) pipes ranging from 8" to 15" in diameter, installed at a 1% grade. The plans outline extensive erosion control measures, including sediment tube installations, filter fabric protection, and a strict maintenance schedule for stabilizing disturbed areas. The engineering drawings provide precise grid layouts, elevation details, and comprehensive notes on construction procedures, with particular emphasis on environmental protection, utility preservation, and proper site restoration techniques. The project uses South Carolina state plane datum (SC83) for horizontal measurements and NAVD88 for vertical measurements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRID 2
GRID 1
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LODLOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LOD
LOD
00 20' 40'
SCALE: 1" = 20'
N
ST
AT
E
PL
AN
E
OW
NE
R
TH
ES
E
DR
AW
IN
GS
A
ND
T
HE
D
ES
IG
N
TH
ER
EO
N
AR
E
TH
E
PR
OP
ER
TY
O
F
DA
VI
S
FL
OY
D, IN
C.
A
ND
M
AY
N
OT
B E
US
ED
IN
W
HO
LE
O R
IN
P
AR
T
W
IT
HO
UT
W
RI
TT
EN
C
ON
SE
NT
O F
TH
E
EN
GI
NE
ER
/ A
RC
HI
TE
CT
A
ND
A
NY
IN
FR
IN
GE
ME
NT
W
ILL
B
E
SU
BJ
EC
T
TO
LE
GA
L A
CT
IO
N
K:
\Jo bs od d\1
-0
4\P ro du cti on \C ivi l\D ra wi ng s\0
7.0 4-
DE
MO
.dw g
, 6 /11
/20
8:
:48 A
M, ja me s d . c om pto n, pe
PR
OJ
EC
T
TI
TL
E
DR
AW
IN
G
TI
TL
E
NO
RE
LE
AS
ED
CH
EC
KE
D
DA
TE
PAGE OF
CH
EC
KE
D
DE
SI
GN
ED
JO
B
NO
DR
AW
N
AP
PR
OV
ED
DA
TE
4 M
ILE
ST
ON
E
W
AY
, S
UI
TE
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
(8
) 5
-9
EX
IS
TI
NG
C
ON
DI
TI
ON
S
AN
D
DE
MO
P
LA
N
GR
EE
NV
ILL
E
CO
UN
TY
P
AR
KS
RE
CR
EA
TI
ON
T
OU
RI
SM
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
BU
TL
ER
S
PR
IN
GS
P
AR
K
RE
ME
DI
AT
IO
N
C100
CA
G
CA
G
JD
C
JD
C
MA
Y
.04
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
JD
C
/11 /20
PROJECT DATUM INFORMATION:
HORIZONTAL DATUM: SC83IF
VERTICAL DATUM: NAVD88
R
Know what's below.
before you dig.Call
DEMOLITION PLAN NOTES
1. EXISTING CONDITIONS WERE OBTAINED FROM AVAILABLE RECORD DRAWINGS AND
FIELD SURVEYS AND ARE NOT WARRANTED TO BE COMPLETE OR ACCURATE.
CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL UTILITIES IN THE FIELD PRIOR
TO THE START OF ANY WORK.
2. PROTECT AND MAINTAIN EROSION CONTROLS THROUGHOUT DEMOLITION AND
CONSTRUCTION.
3. CONTRACTOR SHALL USE CARE WHEN WORKING NEAR EXISTING OCCUPIED
BUILDINGS AND OTHER INFRASTRUCTURE. ALL MATERIALS ON SITE SHALL BE
PROPERLY RESTRAINED AND COVERED.
4. ALL UTILITIES AND SITE FEATURES NOT SPECIFIED TO BE DEMOLISHED SHALL REMAIN
UNDISTURBED.
5. PRIOR TO BEGINNING DEMOLITION, THE CONTRACTOR SHALL ENSURE THAT PHASE 1
SEDIMENT AND EROSION CONTROL MEASURES ARE INSTALLED
6. ALL DEMOLITION INCLUDES PROPER REMOVAL AND OFFSITE DISPOSAL OF
MATERIALS BY CONTRACTOR.
7. STRIP TOPSOIL FROM LIMITS OF CONSTRUCTION AS NEEDED FOR CONSTRUCTION.
STOCKPILE TOPSOIL ONSITE TO ASSIST IN FINAL STABILIZATION.
DEMOLITION LEGEND
ASPHALT TO BE REMOVED
PROPERTY LINE
LIMITS OF DISTURBANCE NPDES
SOUT
H
CA
RO
L INA
CERT I F ICAT
E
OF
A
UT
HO
RIZATION
DA
VI
S
FL
OY
D, IN
C
No . C
SOUT
H
CA
RO
L I
NA
LICENSED PRO
FE
SS
IO
NA
L ENGINEER
JAMES D
AV
ID
C
OM
PTON
No . 4
ISSUED FOR
CONSTRUCTION
/11
/20
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
SD
AutoCAD SHX Text
1.5' RAP
AutoCAD SHX Text W
DEMOLISH EXISTING
ASPHALT
DEMOLISH EXISTING
ASPHALT
LIMITS OF
DISTURBANCE
LODLODLODLOD
LOD
LOD
LOD
LODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD LO
D
LOD LOD LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
SAWCUT ASPHALT ALONG
LIMITS OF DEMOLITION (TYP.)
- REFER TO BASIS OF DESIGN
ON C801 FOR TRENCH WIDTH
LIMITS OF
DISTURBANCE
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
00 10' 20'
SCALE: 1" = 10'
N
ST
AT
E
PL
AN
E
OW
NE
R
TH
ES
E
DR
AW
IN
GS
A
ND
T
HE
D
ES
IG
N
TH
ER
EO
N
AR
E
TH
E
PR
OP
ER
TY
O
F
DA
VI
S
FL
OY
D, IN
C.
A
ND
M
AY
N
OT
B E
US
ED
IN
W
HO
LE
O R
IN
P
AR
T
W
IT
HO
UT
W
RI
TT
EN
C
ON
SE
NT
O F
TH
E
EN
GI
NE
ER
/ A
RC
HI
TE
CT
A
ND
A
NY
IN
FR
IN
GE
ME
NT
W
ILL
B
E
SU
BJ
EC
T
TO
LE
GA
L A
CT
IO
N
K:
\Jo bs od d\1
-0
4\P ro du cti on \C ivi l\D ra wi ng s\0
7.0 4-
DE
MO
.dw g
, 6 /11
/20
8:
:48 A
M, ja me s d . c om pto n, pe
PR
OJ
EC
T
TI
TL
E
DR
AW
IN
G
TI
TL
E
NO
RE
LE
AS
ED
CH
EC
KE
D
DA
TE
PAGE OF
CH
EC
KE
D
DE
SI
GN
ED
JO
B
NO
DR
AW
N
AP
PR
OV
ED
DA
TE
4 M
ILE
ST
ON
E
W
AY
, S
UI
TE
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
(8
) 5
-9
EX
IS
TI
NG
C
ON
DI
TI
ON
S
AN
D
DE
MO
P
LA
N
GR
ID
GR
EE
NV
ILL
E
CO
UN
TY
P
AR
KS
RE
CR
EA
TI
ON
T
OU
RI
SM
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
BU
TL
ER
S
PR
IN
GS
P
AR
K
RE
ME
DI
AT
IO
N
C101
CA
G
CA
G
JD
C
JD
C
MA
Y
.04
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
JD
C
/11
PROJECT DATUM INFORMATION:
HORIZONTAL DATUM: SC83IF
VERTICAL DATUM: NAVD88
R
Know what's below.
before you dig.Call
DEMOLITION PLAN NOTES
1. EXISTING CONDITIONS WERE OBTAINED FROM AVAILABLE RECORD DRAWINGS AND
FIELD SURVEYS AND ARE NOT WARRANTED TO BE COMPLETE OR ACCURATE.
CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL UTILITIES IN THE FIELD PRIOR
TO THE START OF ANY WORK.
2. PROTECT AND MAINTAIN EROSION CONTROLS THROUGHOUT DEMOLITION AND
CONSTRUCTION.
3. CONTRACTOR SHALL USE CARE WHEN WORKING NEAR EXISTING OCCUPIED
BUILDINGS AND OTHER INFRASTRUCTURE. ALL MATERIALS ON SITE SHALL BE
PROPERLY RESTRAINED AND COVERED.
4. ALL UTILITIES AND SITE FEATURES NOT SPECIFIED TO BE DEMOLISHED SHALL REMAIN
UNDISTURBED.
5. PRIOR TO BEGINNING DEMOLITION, THE CONTRACTOR SHALL ENSURE THAT PHASE 1
SEDIMENT AND EROSION CONTROL MEASURES ARE INSTALLED
6. ALL DEMOLITION INCLUDES PROPER REMOVAL AND OFFSITE DISPOSAL OF
MATERIALS BY CONTRACTOR.
7. STRIP TOPSOIL FROM LIMITS OF CONSTRUCTION AS NEEDED FOR CONSTRUCTION.
STOCKPILE TOPSOIL ONSITE TO ASSIST IN FINAL STABILIZATION.
DEMOLITION LEGEND
ASPHALT TO BE REMOVED
SOUT
H
CA
RO
L INA
CERT I F ICATE
O
F
AU
TH
OR
IZATION
DA
VI
S
FL
OY
D, IN
C
No . C
SOUT
H
CA
RO
L INA
LICENSED PRO
FE
SS
IO
NA
L ENGINEER
JAMES D
AV
ID
C
OM
PTON
No . 4
ISSUED FOR
CONSTRUCTION
/11
/20
PROPERTY LINE
LIMITS OF DISTURBANCE NPDES
AutoCAD SHX Text
LP
AutoCAD SHX Text
SD
AutoCAD SHX Text
1.5' RAP
AutoCAD SHX Text
20"" OAK
AutoCAD SHX Text
DOUBLE 30"" MAPLE
AutoCAD SHX Text
36"" MAPLE
AutoCAD SHX Text
QUAD 16"" OAK
AutoCAD SHX Text
8"" OAK
AutoCAD SHX Text
QUAD 16"" OAK
AutoCAD SHX Text
11"" OAK
AutoCAD SHX Text
DOUBLE 12"" OAK
AutoCAD SHX Text Playground
AutoCAD SHX Text
ELEC PANEL W/BREAKER & METER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONTROL POINT #2 N: 1106910.74 E: 1599159.30 EL: 991.38
AutoCAD SHX Text
24" HDPE IE: 992.31'
AutoCAD SHX Text
MH-D RIM: 993.11' IN: 24" HDPE 987.88' IN: 24" HDPE 987.72' OUT: 24"HDPE 987.51'
AutoCAD SHX Text
LP
AutoCAD SHX Text W
AutoCAD SHX Text
QUAD 16"" OAK
AutoCAD SHX Text
QUAD 16"" OAK
AutoCAD SHX Text
DOUBLE 12"" OAK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONTROL POINT #3 N: 1106956.60 E: 1598676.61 EL:988.49'
24"HPDE IE:984.78'
GRID 2
GRID 1
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LODLOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LO
D
LOD
LOD
PROJECT DATUM INFORMATION:
HORIZONTAL DATUM: SC83IF
VERTICAL DATUM: NAVD88
00 20' 40'
SCALE: 1" = 20'
R
Know what's below.
before you dig.Call
SOUT
H
CA
RO
L INA
CERT I F ICAT
E
OF
A
UT
HO
RIZATION
DA
VI
S
FL
OY
D, IN
C
No . C
SOUT
H
CA
RO
L I
NA
LICENSED PRO
FE
SS
IO
NA
L ENGINEER
JAMES D
AV
ID
C
OM
PTON
No . 4
ISSUED FOR
CONSTRUCTION
/11
/20
N
ST
AT
E
PL
AN
E
OW
NE
R
TH
ES
E
DR
AW
IN
GS
A
ND
T
HE
D
ES
IG
N
TH
ER
EO
N
AR
E
TH
E
PR
OP
ER
TY
O
F
DA
VI
S
FL
OY
D, IN
C.
A
ND
M
AY
N
OT
B E
US
ED
IN
W
HO
LE
O R
IN
P
AR
T
W
IT
HO
UT
W
RI
TT
EN
C
ON
SE
NT
O F
TH
E
EN
GI
NE
ER
/ A
RC
HI
TE
CT
A
ND
A
NY
IN
FR
IN
GE
ME
NT
W
ILL
B
E
SU
BJ
EC
T
TO
LE
GA
L A
CT
IO
N
K:
\Jo bs od d\1
-0
4\P ro du cti on \C ivi l\D ra wi ng s\0
7.0 4-
SM
AL
L P
RO
JE
CT
.dw g
, 6 /11
/20
8:
:00 A
M, ja me s d . c om pto n, pe
PR
OJ
EC
T
TI
TL
E
DR
AW
IN
G
TI
TL
E
NO
RE
LE
AS
ED
CH
EC
KE
D
DA
TE
PAGE OF
CH
EC
KE
D
DE
SI
GN
ED
JO
B
NO
DR
AW
N
AP
PR
OV
ED
DA
TE
4 M
ILE
ST
ON
E
W
AY
, S
UI
TE
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
(8
) 5
-9
SI
TE
A
ND
G
RA
DI
NG
P
LA
N
GR
EE
NV
ILL
E
CO
UN
TY
P
AR
KS
RE
CR
EA
TI
ON
T
OU
RI
SM
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
BU
TL
ER
S
PR
IN
GS
P
AR
K
RE
ME
DI
AT
IO
N
C200
CA
G
CA
G
JD
C
JD
C
MA
Y
.04
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
JD
C
/11
SAFETY FENCING
PROPOSED PATCHED
ASPHALT
LEGEND
EXISTING CONTOUR - MAJOR 105
EXISTING CONTOUR - MINOR 104
PROPOSED CONTOUR - MAJOR 105
104PROPOSED CONTOUR - MINOR
SURFACE FLOW
DIRECTIONAL ARROW
PROPOSED STORM PIPE
YARD INLET
PROPOSED GRAVEL
RIP-RAP
TEMPORARY BARRICADE
SEDIMENT TUBES
PROPERTY LINE
LIMITS OF DISTURBANCE LOD LOD
EXISTING STORM PIPE
GRADE ELEVATION:
PROPOSED ELEVATION 0.00
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
SD
W
25'
CONTRACTOR SHALL FILL IN ERODED
AREA W/ SOIL COMPACTED TO 98%
STANDARD MAX DRY DENSITY AND
REGRADE DITCH WITH POSITIVE
DRAINAGE FROM THE PIPE OUTFALL
LINE DITCH WITH RIPRAP
OUTLET PROTECTION OVER
GEOTEXTILE FABRIC
PROVIDE BARRICADES WITH SIGNAGE
FOR WALKING PATH CLOSURE
PROVIDE BARRICADES WITH SIGNAGE
FOR WALKING PATH CLOSURE
PROVIDE HIGH VISIBILITY SAFETY FENCING
AROUND CONSTRUCTION LIMITS
PROVIDE SEDIMENT
TUBE IN DITCH
CONTRACTOR SHALL CLEAN OUT
EXISTING STORM DRAINS ONCE
PERMANENT STABILIZATION IS
ACHIEVED
0+
0+
.07
0+
0+
.47
3 LF
8" HDPE SD
@1.00% 16 LF
15" HDPE SD
@1.00% 16 LF
15" HDPE SD
@1.00%
3 LF
8" HDPE SD
@1.00%
990 990
4 LF
10" HDPE SD
@1.00%
0+
0+
.73
0+
0+
.41
0+
0+
.39
LODLODLODLOD
LOD
LOD
LOD
LODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD LO
D
LOD LOD LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
TIE ALL PROPOSED STORM DRAINS TO
EXISTING PIPE WITH ADS INSERTA TEES
OR APPROVED EQUAL (TYP.)
PATCH ASPHALT AFTER
INSTALLATION OF NEW
STORM DRAINAGE
PATCH ASPHALT AFTER
INSTALLATION OF NEW
STORM DRAINAGE
PROVIDE TYPE A INLET PROTECTION
AROUND ALL INLETS ONCE INSTALLED UNTIL
FINAL STABILIZATION IS ACHIEVED (TYP.)
PROVIDE HIGH VISIBILITY SAFETY FENCING
AROUND CONSTRUCTION LIMITS
PROVIDE BARRICADES WITH SIGNAGE
FOR WALKING PATH CLOSURE
PROVIDE BARRICADES WITH SIGNAGE
FOR WALKING PATH CLOSURE
CONTRACTOR SHALL CLEAN OUT
EXISTING STORM DRAINS ONCE
PERMANENT STABILIZATION IS
ACHIEVED
CONTRACTOR SHALL CLEAN OUT
EXISTING STORM DRAINS ONCE
PERMANENT STABILIZATION IS
ACHIEVED
PROVIDE SEDIMENT TUBES ABOVE
DISTURBED SLOPE - REMOVE
SEDIMENT TUBES ONCE THE SLOPE
HAS BEEN PERMANENTLY STABILIZED
LINE SLOPE AND DITCH WITH TRM
AND HYDROSEED IMMEDIATELY
ONCE FINAL GRADES ARE MET
989.97
990.52
990.00
990.57
989.63 990.23
990.00
989.72
990.53
990.46
990.00
990.60
989.82
990.72
990.18
HYDROSEED DISTURBED AREAS
ONCE LAND DISTURBING
ACTIVITIES HAVE CEASED (TYP.)
DITCH STARTS AT 0.33' DEPTH WITH 4:1
SLOPE ON TRAIL SIDE AND 2:1 SLOPE ON
HILL SIDE AT 1% LONGITUDINAL SLOPE
A3
8" DROP IN GRATE
NYLOPLAST INLINE DRAIN
TOP: 989.82
IE OUT (8"): 987.50
A1
15" STANDARD GRATE
NYLOPLAST INLINE DRAIN
TOP: 989.79
IE OUT (15"): 987.40
A2
15" STANDARD GRATE
NYLOPLAST INLINE DRAIN
TOP: 989.93
IE OUT (15"): 987.68
A4
8" DROP IN GRATE
NYLOPLAST INLINE DRAIN
TOP: 989.72
IE OUT (8"): 987.39
A5
10" DROP IN GRATE
NYLOPLAST INLINE DRAIN
TOP: 989.63
IE OUT (10"): 987.17
CARE SHALL BE TAKEN TO
PROTECT EXISTING TREE ROOTS
FROM DAMAGE DURING
GRADING ACTIVITIES
AT GRATE DITCH SHALL BE 1' DEEP WITH 1.25' FLAT
BOTTOM WITH 3:1 SLOPE ON TRAIL SIDE AND 2:1
SLOPE ON HILL SIDE WITH 1% LONGITUDINAL SLOPE
990.35 989.93
990.93
991.43
990.95
990.81
989.79 990.24
990.58
DITCH STARTS AT 0.5' DEPTH WITH 8:1
SLOPE ON TRAIL SIDE AND 2:1 SLOPE ON
HILL SIDE AT 2.5% LONGITUDINAL SLOPE
AT GRATE DITCH SHALL BE 1' DEEP WITH 1.25' FLAT
BOTTOM WITH 3:1 SLOPE ON TRAIL SIDE AND 2:1 SLOPE
ON HILL SIDE WITH 2.5% LONGITUDINAL SLOPE
PROVIDE SEDIMENT TUBES ALONG
BALLFIELD - REMOVE SEDIMENT
TUBES ONCE PROJECT SITE HAS
BEEN PERMANENTLY STABILIZED
PROVIDE SEDIMENT TUBES ALONG
BALLFIELD - REMOVE SEDIMENT
TUBES ONCE PROJECT SITE HAS
BEEN PERMANENTLY STABILIZED
PROJECT DATUM INFORMATION:
HORIZONTAL DATUM: SC83IF
VERTICAL DATUM: NAVD88
00 10' 20'
SCALE: 1" = 10'
R
Know what's below.
before you dig.Call
SOUT
H
CA
RO
L INA
CERT I F ICAT
E
OF
A
UT
HO
RIZATION
DA
VI
S
FL
OY
D, IN
C
No . C
SOUT
H
CA
RO
L I
NA
LICENSED PRO
FE
SS
IO
NA
L ENGINEER
JAMES D
AV
ID
C
OM
PTON
No . 4
ISSUED FOR
CONSTRUCTION
/11
/20
N
ST
AT
E
PL
AN
E
OW
NE
R
TH
ES
E
DR
AW
IN
GS
A
ND
T
HE
D
ES
IG
N
TH
ER
EO
N
AR
E
TH
E
PR
OP
ER
TY
O
F
DA
VI
S
FL
OY
D, IN
C.
A
ND
M
AY
N
OT
B E
US
ED
IN
W
HO
LE
O R
IN
P
AR
T
W
IT
HO
UT
W
RI
TT
EN
C
ON
SE
NT
O F
TH
E
EN
GI
NE
ER
/ A
RC
HI
TE
CT
A
ND
A
NY
IN
FR
IN
GE
ME
NT
W
ILL
B
E
SU
BJ
EC
T
TO
LE
GA
L A
CT
IO
N
K:
\Jo bs od d\1
-0
4\P ro du cti on \C ivi l\D ra wi ng s\0
7.0 4-
SM
AL
L P
RO
JE
CT
.dw g
, 6 /11
/20
8:
:07 A
M, ja me s d . c om pto n, pe
PR
OJ
EC
T
TI
TL
E
DR
AW
IN
G
TI
TL
E
NO
RE
LE
AS
ED
CH
EC
KE
D
DA
TE
PAGE OF
CH
EC
KE
D
DE
SI
GN
ED
JO
B
NO
DR
AW
N
AP
PR
OV
ED
DA
TE
4 M
ILE
ST
ON
E
W
AY
, S
UI
TE
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
(8
) 5
-9
SI
TE
A
ND
G
RA
DI
NG
P
LA
N
GR
ID
GR
EE
NV
ILL
E
CO
UN
TY
P
AR
KS
RE
CR
EA
TI
ON
T
OU
RI
SM
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
BU
TL
ER
S
PR
IN
GS
P
AR
K
RE
ME
DI
AT
IO
N
C201
CA
G
CA
G
JD
C
JD
C
MA
Y
.04
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
JD
C
/11
SAFETY FENCING
PROPOSED PATCHED
ASPHALT
LEGEND
EXISTING CONTOUR - MAJOR 105
EXISTING CONTOUR - MINOR 104
PROPOSED CONTOUR - MAJOR 105
104PROPOSED CONTOUR - MINOR
SURFACE FLOW
DIRECTIONAL ARROW
PROPOSED STORM PIPE
YARD INLET
PROPOSED GRAVEL
RIP-RAP
TEMPORARY BARRICADE
SEDIMENT TUBES
PROPERTY LINE
LIMITS OF DISTURBANCE LOD LOD
EXISTING STORM PIPE
GRADE ELEVATION:
PROPOSED ELEVATION 0.00
SWPPP SEQUENCE OF CONSTRUCTION:
1. OWNER TO RECEIVE LETTER OF EXEMPTION FROM SCDES FOR LAND DISTURBANCE
ACTIVITIES.
2. INSTALL PERIMETER CONTROL BMPS AND BEGIN MAINTENANCE OF SEDIMENT
CONTROLS AS NECESSARY. CONTINUE MAINTENANCE UNTIL ALL FINAL STABILIZATION
MEASURES ARE IN PLACE.
3. CONDUCT DEMOLITION OF ITEMS AS IDENTIFIED ON SHEET C110.
4. GRADING OF SITE.
5. INSTALL PROPOSED STORM DRAINS.
6. PATCH ASPHALT WALKWAY.
7. SITE SHALL BE 100% STABILIZED TO A MINIMUM DENSITY OF 70%.
8. REMOVE SEDIMENT FROM STORM DRAINAGE NETWORK.
9. TEMPORARY BMPS SHALL BE REMOVED AFTER THE ENTIRE AREA DRAINING TO IT HAS
BEEN PERMANENTLY STABILIZED.
SWPPP NOTES:
1. IF A PORTABLE TOILET IS PROVIDED ON SITE, IT SHALL BE LOCATED IN AN AREA THAT IS
NOT ADJACENT TO A WATERWAY OR STORM DRAINAGE.
2. EROSION CONTROL MEASURES SHALL BE MAINTAINED AT ALL TIMES. IF FILL
IMPLEMENTATION OF EROSION CONTROL MEASURES INDICATED DOES NOT PROVIDE
FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE IMPLEMENTED AS DIRECTED BY THE ON-SITE INSPECTOR.
3. THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION
CONTROL MEASURES INCLUDING REPLACING OR REPAIRING AND DAMAGED DEVICES.
4. AFTER FINAL STABILIZATION IS APPROVED, CONTRACTOR SHALL REMOVE ALL
SEDIMENT FROM STORM DRAINAGE PIPES.
AutoCAD SHX Text
LP
SD
SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL
STORM A1 PROFILE
-0+10 0+00 0+25
SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL
STORM A2 PROFILE
-0+10 0+00 0+25
SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL
STORM A3 PROFILE
-0+10 0+00 0+25
SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL
STORM A4 PROFILE
-0+10 0+00 0+25
SCALES: 1" = 10' HORIZONTAL, 1" = 5' VERTICAL
STORM A5 PROFILE
-0+10 0+00 0+25
16 LF
15" HDPE SD
@1.00%
A1
" S
TA
ND
AR
D
GR
AT
E
NY
LO
PL
AS
T
IN
LIN
E
DR
AI
N
TO
P:
9.7
IE
O
UT
(1
5"
7.4
16 LF
15" HDPE SD
@1.00%
A2
" S
TA
ND
AR
D
GR
AT
E
NY
LO
PL
AS
T
IN
LIN
E
DR
AI
N
TO
P:
9.9
IE
O
UT
(1
5"
7.6
3 LF
8" HDPE SD
@1.00%
A3 8"
D
RO
P
IN
G
RA
TE
NY
LO
PL
AS
T
IN
LIN
E
DR
AI
N
TO
P:
9.8
IE
O
UT
(8
7.5
A4 8"
D
RO
P
IN
G
RA
TE
NY
LO
PL
AS
T
IN
LIN
E
DR
AI
N
TO
P:
9.7
IE
O
UT
(8
7.3
4 LF
10" HDPE SD
@1.00%
A5
" D
RO
P
IN
G
RA
TE
NY
LO
PL
AS
T
IN
LIN
E
DR
AI
N
TO
P:
9.6
IE
O
UT
(1 0"
7.1
TIE TO EXISTING PIPE WITH
ADS INSERTA TEE OR
INDUSTRY EQUIVALENT
3 LF
8" HDPE SD
@1.00%
TIE TO EXISTING PIPE WITH
ADS INSERTA TEE OR
INDUSTRY EQUIVALENT
TIE TO EXISTING PIPE WITH
ADS INSERTA TEE OR
INDUSTRY EQUIVALENT
TIE TO EXISTING PIPE WITH
ADS INSERTA TEE OR
INDUSTRY EQUIVALENT
TIE TO EXISTING PIPE WITH
ADS INSERTA TEE OR
INDUSTRY EQUIVALENT
SOUT
H
CA
RO
L INA
CERT I F ICAT
E
OF
A
UT
HO
RIZATION
DA
VI
S
FL
OY
D, IN
C
No . C
SOUT
H
CA
RO
L I
NA
LICENSED PRO
FE
SS
IO
NA
L ENGINEER
JAMES D
AV
ID
C
OM
PTON
No . 4
ISSUED FOR
CONSTRUCTION
/11
/20
OW
NE
R
TH
ES
E
DR
AW
IN
GS
A
ND
T
HE
D
ES
IG
N
TH
ER
EO
N
AR
E
TH
E
PR
OP
ER
TY
O
F
DA
VI
S
FL
OY
D, IN
C.
A
ND
M
AY
N
OT
B E
US
ED
IN
W
HO
LE
O R
IN
P
AR
T
W
IT
HO
UT
W
RI
TT
EN
C
ON
SE
NT
O F
TH
E
EN
GI
NE
ER
/ A
RC
HI
TE
CT
A
ND
A
NY
IN
FR
IN
GE
ME
NT
W
ILL
B
E
SU
BJ
EC
T
TO
LE
GA
L A
CT
IO
N
K:
\Jo bs od d\1
-0
4\P ro du cti on \C ivi l\D ra wi ng s\0
7.0 4-
SM
AL
L P
RO
JE
CT
.dw g
, 6 /11
/20
8:
:07 A
M, ja me s d . c om pto n, pe
PR
OJ
EC
T
TI
TL
E
DR
AW
IN
G
TI
TL
E
NO
RE
LE
AS
ED
CH
EC
KE
D
DA
TE
PAGE OF
CH
EC
KE
D
DE
SI
GN
ED
JO
B
NO
DR
AW
N
AP
PR
OV
ED
DA
TE
4 M
ILE
ST
ON
E
W
AY
, S
UI
TE
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
(8
) 5
-9
ST
OR
M
DR
AI
NA
GE
P
RO
FI
LE
S
GR
EE
NV
ILL
E
CO
UN
TY
P
AR
KS
RE
CR
EA
TI
ON
T
OU
RI
SM
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
BU
TL
ER
S
PR
IN
GS
P
AR
K
RE
ME
DI
AT
IO
N
C400
CA
G
CA
G
JD
C
JD
C
MA
Y
.04
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
JD
C
/11
00 10' 20'
SCALE: 1" = 10'
2.5'
5'
SCALE: 1" = 5'
EXISTING GRADE
PROPOSED GRADE
PROFILE LEGEND
OW
NE
R
TH
ES
E
DR
AW
IN
GS
A
ND
T
HE
D
ES
IG
N
TH
ER
EO
N
AR
E
TH
E
PR
OP
ER
TY
O
F
DA
VI
S
FL
OY
D, IN
C.
A
ND
M
AY
N
OT
B E
US
ED
IN
W
HO
LE
O R
IN
P
AR
T
W
IT
HO
UT
W
RI
TT
EN
C
ON
SE
NT
O F
TH
E
EN
GI
NE
ER
/ A
RC
HI
TE
CT
A
ND
A
NY
IN
FR
IN
GE
ME
NT
W
ILL
B
E
SU
BJ
EC
T
TO
LE
GA
L A
CT
IO
N
K:
\Jo bs od d\1
-0
4\P ro du cti on \C ivi l\D ra wi ng s\0
7.0 4-
DE
TA
ILS
.dw g , 6
/11 /20
8:
:54
A M, ja me s d
. c om pto n, pe
PR
OJ
EC
T
TI
TL
E
DR
AW
IN
G
TI
TL
E
NO
RE
LE
AS
ED
CH
EC
KE
D
DA
TE
PAGE OF
CH
EC
KE
D
DE
SI
GN
ED
JO
B
NO
DR
AW
N
AP
PR
OV
ED
DA
TE
4 M
ILE
ST
ON
E
W
AY
, S
UI
TE
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
(8
) 5
-9
DE
TA
ILS
(S
HE
ET
OF
2)
GR
EE
NV
ILL
E
CO
UN
TY
P
AR
KS
RE
CR
EA
TI
ON
T
OU
RI
SM
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
BU
TL
ER
S
PR
IN
GS
P
AR
K
RE
ME
DI
AT
IO
N
C801
CA
G
CA
G
JD
C
JD
C
MA
Y
.04
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
JD
C
/11
SOUT
H
CA
RO
L INA
CERT I F ICAT
E
OF
A
UT
HO
RIZATION
DA
VI
S
FL
OY
D, IN
C
No . C
SOUT
H
CA
RO
L I
NA
LICENSED PRO
FE
SS
IO
NA
L ENGINEER
JAMES D
AV
ID
C
OM
PTON
No . 4
ISSUED FOR
CONSTRUCTION
/11
/20
SEDIMENT TUBE INSTALLATION
INSPECTION & MAINTENANCE:
1. THE KEY TO FUNCTIONAL SEDIMENT TUBES IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND
REGULAR SEDIMENT REMOVAL.
2. REGULAR INSPECTIONS OF SEDIMENT TUBES SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH RAINFALL EVEN THAT PRODUCES 1/2-INCH OR
MORE OF PRECIPITATION.
3. ATTENTION TO SEDIMENT ACCUMULATIONS IN FRONT OF THE SEDIMENT TUBE IS EXTREMELY
IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN
NECESSARY.
4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE SEDIMENT TUBE.
5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS
DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED.
6. LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED FROM IN FRONT OF TUBES WHEN FOUND.
7. IF EROSION CAUSES THE EDGES TO FALL TO A HEIGHT EQUAL TO OR BELOW THE HEIGHT OF THE SEDIMENT TUBE, REPAIRS SHOULD BE MADE IMMEDIATELY TO PREVENT RUNOFF FROM BYPASSING
TUBE.
8. SEDIMENT TUBES SHOULD BE REMOVED AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN
COMPLETELY STABILIZED. PERMANENT VEGETATION SHOULD REPLACE AREAS FROM WHICH
SEDIMENT TUBES HAVE BEEN REMOVED.
GENERAL NOTES:
1. SEDIMENT TUBES MAY BE INSTALLED ALONG CONTOURS, IN DRAINAGE CONVEYANCE CHANNELS, AND
AROUND INLETS TO HELP PREVENT OFF-SITE DISCHARGE OF SEDIMENT-LADEN STORM WATER
RUNOFF.
2. SEDIMENT TUBES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER, OR HARDWOOD MULCH. STRAW, PINE NEEDLE, AND LEAF MULCH-FILLED
SEDIMENT TUBES ARE NOT PERMITTED.
3. THE OUTER NETTING OF THE SEDIMENT TUBE SHOULD CONSIST OF SEAMLESS, HIGH-DENSITY
POLYETHYLENE PHOTODEGRADABLE MATERIALS TREATED WITH ULTRAVIOLET STABILIZERS OR A
SEAMLESS, HIGH-DENSITY POLYETHYLENE NON-DEGRADABLE MATERIAL.
4. SEDIMENT TUBES, WHEN USED AS CHECKS WITHIN CHANNELS, SHOULD RANGE BETWEEN 18-INCHES AND 24-INCHES DEPENDING ON CHANNEL DIMENSIONS. DIAMETERS OUTSIDE THIS RANGE MAY BE
ALLOWED WHERE NECESSARY WHEN APPROVED.
5. CURLED EXCELSIOR WOOD, OR NATURAL COCONUT PRODUCTS THAT ARE ROLLED UP TO CREATE A
SEDIMENT TUBE ARE NOT ALLOWED.
6. SEDIMENT TUBES SHOULD BE STAKED USING WOODEN STAKES (2-INCH X 2-INCH) OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) AT A MINIMUM
OF 48-INCHES IN LENGTH PLACED ON 2-FOOT CENTERS.
7. INSTALL ALL SEDIMENT TUBES TO ENSURE THAT NO GAPS EXIST BETWEEN THE SOIL AND THE BOTTOM
OF THE TUBE. MANUFACTURER'S RECOMMENDATIONS SHOULD ALWAYS BE CONSULTED BEFORE
INSTALLATION.
8. THE ENDS OF ADJACENT SEDIMENT TUBES SHOULD BE OVERLAPPED 6-INCHES TO PREVENT FLOW
AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT.
9. SEDIMENT TUBES SHOULD NOT BE STACKED ON TOP OF ONE ANOTHER, UNLESS RECOMMENDED BY
MANUFACTURER.
10. EACH SEDIMENT TUBE SHOULD BE INSTALLED IN A TRENCH WITH A DEPTH EQUAL TO 1/5 THE
DIAMETER OF THE SEDIMENT TUBE.
11. SEDIMENT TUBES SHOULD CONTINUE UP THE SIDE SLOPES A MINIMUM OF 1-FOOT ABOVE THE DESIGN
FLOW DEPTH OF THE CHANNEL.
12. INSTALL STAKES AT A DIAGONAL FACING INCOMING RUNOFF.
" M
IN
IM
UM
L
EN
GT
H
2.
0'
M
IN
IM
UM
FL
OW
SLOPE MAX SPACING (FT.)
< 2% 150 2% 100 3% 75 4% 50 5% 40 6% 30
> 6% 25
NOT TO SCALE
SEDIMENT TUBES
2" X 2" WOOD STAKES OR
1.25 #/FT STEEL POST
STAKES PLACED
AT 2' MINIMUM
SPACING
2' SPACING
CONTINUOUS ALONG
TUBE (TYP.)
PLAN SYMBOL
PERMANENT SEEDING SCHEDULE
1. EXTENT OF WORK - PROVIDE SOIL ESTABLISHMENT OF FINISH GRADE, PREPARATION,
FERTILIZING AND SEEDING, OF ALL NEWLY GRADED FINISHED EARTH SURFACES, UNLESS
INDICATED OTHERWISE, AND AT ALL AREAS INSIDE OR OUTSIDE THE LIMITS OF
CONSTRUCTION THAT ARE DISTURBED BY THE CONTRACTOR'S OPERATIONS.
2. TURF ESTABLISHMENT PERIOD - THE ESTABLISHMENT PERIOD FOR TURF SHALL BEGIN
IMMEDIATELY AFTER INSTALLATION, WITH THE APPROVAL OF THE ENGINEER, AND CONTINUE
UNTIL THE DATE THAT THE OWNER ACCEPTS THE PROJECT OR PHASE FOR BENEFICIAL
USE AND OCCUPANCY AND A STAND OF GRASS IS ACHIEVED. DURING THE TURF
ESTABLISHMENT PERIOD THE CONTRACTOR SHALL:
A. WATER THE TURF TO MAINTAIN AN ADEQUATE SUPPLY OF MOISTURE WITHIN
ROOT ZONE. AN ADEQUATE SUPPLY OF MOISTURE IS THE EQUIVALENT OF 1 INCH
OF ABSORBED WATER PER WEEK EITHER THROUGH NATURAL RAINFALL OR
AUGMENTED BY PERIODIC WATERING. APPLY WATER AT A MODERATE RATE SO
AS NOT TO FLOOD THE TURF.
B. PROVIDE THE FOLLOWING TURF ESTABLISHMENT:
1. ERADICATE ALL WEEDS. WATER, FERTILIZE, OVERSEED, AND PERFORM ANY
OTHER OPERATION NECESSARY TO PROMOTE THE GROWTH OF GRASS.
2. RESEED OR RE-SOD AREAS VOID OF TURF ONE SQUARE FOOT AND LARGER IN AREA.
3. MOW THE NEW LAWN AT LEAST THREE TIMES PRIOR TO THE FINAL INSPECTION.
BEGIN MOWING WHEN GRASS IS 4 INCHES HIGH. MOW TO A 2 1/2 INCH HEIGHT.
PERMANENT GRASS SEEDING RATES- SEED MIXTURE
PLANTING SEASON VARIETY LB/ 1000 S.F.
SPRING/SUMMER (APRIL 1 - AUG. 31)
BROWN TOP MILLET 1/2 LB.
HULLED BERMUDA GRASS 2 LBS.
FALL/WINTER (SEPT 1. - MAR. 31)
ANNUAL RYE GRASS 6 LBS.
HULLED BERMUDA GRASS 1 LB.
UNHULLED BERMUDA GRASS 3 LBS.
NOTE: SOME ANNUAL GRASS SPECIES ARE INCLUDED IN THIS MIX. THESE ARE TO
BE PLANTED AT THE SAME TIME AS THE PERENNIAL GRASS SPECIES TO PROVIDE
QUICK COVER AND STABILIZE THE SOIL UNTIL THE PERENNIAL SEEDS GERMINATE
AND BECOME ESTABLISHED.
4. WOOD CELLULOSE FIBER MULCH - USE RECOVERED MATERIALS OF EITHER PAPER-
BASED(100 PERCENT) OR WOOD-BASED (100 PERCENT) HYDRAULIC MULCH. PROCESSED
TO CONTAIN NO GROWTH OR GERMINATION-INHIBITING FACTORS AND DYED AN APPROPRIATE
COLOR TO FACILITATE VISUAL METERING OF MATERIALS APPLICATION. COMPOSITION ON
AIR-DRY WEIGHT BASIS: 9 TO 15 PERCENT MOISTURE, pH RANGE FROM 3.5 TO 5.0. USE WITH
HYDRAULIC APPLICATION OF GRASS SEED AND FERTILIZER. FIRST, MIX WATER AND FIBER.
FIBER SHALL BE ADDED AT 1,000 POUNDS, DRY WEIGHT, PER ACRE. THEN ADD FERTILIZER TO
PRODUCE A HOMOGENEOUS SLURRY. WHEN HYDRAULICALLY SPRAYED ON THE GROUND,
MATERIAL SHALL FORM A BLOTTER LIKE COVER IMPREGNATED UNIFORMLY WITH GRASS SEED.
APPLY SEEDED SLURRY EVENLY IN TWO INTERSECTION DIRECTIONS TO ACHIEVE A MINIMUM
60% COVERAGE.
5. SOIL ANALYSIS - IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE A SOIL
ANALYSIS PERFORMED BY THE COUNTY EXTENSION SERVICE OR SOME OTHER APPROVED
LABORATORY FOR A SOIL ANALYSIS REPORT. THE CONTRACTOR SHALL THEN PROVIDE THE
RECOMMENDATIONS OF THE REPORT TO THE ENGINEER FOR WRITTEN APPROVAL.
RECOMMENDATIONS SHALL ENSURE THAT SOIL pH IS WITHIN 6-7 PRIOR TO SEEDING AND SHALL
INCLUDE RATES FOR LIME, AND FERTILIZER.
6. SOIL PREPARATION - PRIOR TO MASS GRADING, REMOVE EXISTING TOPSOIL AND STOCKPILE. IF AREAS TO BE GRADED ARE COVERED WITH GRAVEL, COMPLETELY REMOVE GRAVEL AND DISPOSE OF OFF-SITE IN A MANNER THAT COMPILES WITH ALL LOCAL, STATE, AND FEDERAL LAWS. AFTER AREAS HAVE BEEN BROUGHT TO FINISH
SUBGRADE ELEVATION, THOROUGHLY TILL TO MINIMUM DEPTH OF 6 INCHES BY SCARIFYING,
DISKING OR HARROWING. REMOVE DEBRIS AND STONES LARGER THAN ONE INCH IN ANY
DIMENSION REMAINING ON SURFACE AFTER TILLAGE. SPREAD STOCKPILED OR HAULED IN
TOPSOIL EVENLY TO A MIN. DEPTH OF 6" TO PROVIDE POSITIVE DRAINAGE. DO NOT SPREAD
TOPSOIL WHEN FROZEN OR EXCESSIVELY WET OR DRY. CORRECT IRREGULARITIES IN FINISHED
SURFACES TO ELIMINATE DEPRESSIONS. PROTECT FINISHED PREPARED SOIL AREAS FROM
DAMAGE BY VEHICULAR OR PEDESTRIAN TRAFFIC.
6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SUPPLY WATER TO ALL TREES, SHRUBS, GROUNDCOVER AND TURF UNTIL FINAL ACCEPTANCE BY THE OWNER. THE OWNER IS RESPONSIBLE FOR IRRIGATING PLANT MATERIALS AND TURF AFTER FINAL ACCEPTANCE IF HE CHOOSES. THE CONTRACTOR SHALL WARRANTY ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE AND SHALL GUARANTEE A STAND OF PERMANENT GRASS PER SCDHEC NPDES PERMIT REQUIREMENTS AND SHALL BE RELIEVED OF THIS REPONSIBILTY ONCE THE PROJECT HAS BEEN ACCEPTED AND AFTER THE OWNER HAS FILED A NOTICE OF TERMINATION OR ACCEPTED BY THE
OWNER, WHICHEVER OCCURS FIRST.
POST INSTALLATION DETAIL
FILTER FABRIC INSTALLATION DETAIL
FILTER FABRIC BURIAL DETAIL
POST REQUIREMENTS:
1. SILT FENCE POSTS MUST BE 48-INCH LONG STEEL POSTS THAT MEET, AT A MINIMUM, THE FOLLOWING
PHYSICAL CHARACTERISTICS.
- COMPOSED OF A HIGH STRENGTH STEEL WITH A MINIMUM YIELD STRENGTH OF 50,000 PSI.
- INCLUDE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND A NOMINAL "T"
LENGTH OF 1.48-INCHES.
- WEIGH 1.25 POUNDS PER FOOT (± 8%)
2. POSTS SHALL BE EQUIPPED WITH PROJECTIONS TO AID IN FASTENING OF FILTER FABRIC.
3. INSTALL POSTS TO A MINIMUM OF 24-INCHES. A MINIMUM HEIGHT OF 1- TO 2- INCHES ABOVE THE FABRIC SHALL BE MAINTAINED, AND A MAXIMUM HEIGHT OF 3 FEET SHALL BE MAINTAINED ABOVE THE
GROUND.
4. POST SPACING SHALL BE AT A MAXIMUM OF 3-FEET ON CENTER.
5. INSTALL RUBBER SAFETY CAPS ON TOP OF STEEL POSTS.
INSPECTION & MAINTENANCE:
1. THE KEY TO FUNCTIONAL INLET PROTECTION IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND
REGULAR SEDIMENT REMOVAL.
2. REGULAR INSPECTIONS OF INLET PROTECTION SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2-INCH
OR MORE OF PRECIPITATION.
3. ATTENTION TO SEDIMENT ACCUMULATIONS ALONG THE FILTER FABRIC IS EXTREMELY IMPORTANT.
ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN NECESSARY.
4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE FILTER FABRIC. WHEN A SUMP IS INSTALLED IN FRONT OF THE FABRIC, SEDIMENT SHOULD BE REMOVED WHEN IT FILLS
APPROXIMATELY 1/3 THE DEPTH OF THE SUMP.
5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS
DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED.
6. CHECK FOR AREAS WHERE STORM WATER RUNOFF HAS ERODED A CHANNEL BENEATH THE FILTER FABRIC, OR WHERE THE FABRIC HAS SAGGED OR COLLAPSED DUE TO RUNOFF OVERTOPPING THE
INLET PROTECTION.
7. CHECK FOR TEARS WITHIN THE FILTER FABRIC, AREAS WHERE FABRIC HAS BEGUN TO DECOMPOSE, AND FOR ANY OTHER CIRCUMSTANCE THAT MAY RENDER THE INLET PROTECTION INEFFECTIVE.
REMOVE DAMAGED FABRIC AND REINSTALL NEW FILTER FABRIC IMMEDIATELY.
8. INLET PROTECTION STRUCTURES SHOULD BE REMOVED AFTER ALL THE DISTURBED AREAS ARE PERMANENTLY STABILIZED. REMOVE ALL CONSTRUCTION MATERIAL AND SEDIMENT, AND DISPOSE OF THEM PROPERLY. GRADE THE DISTURBED AREA TO THE ELEVATION OF THE DROP INLET STRUCTURE
CREST. STABILIZE ALL BARE AREAS IMMEDIATELY.
-IN
. M
IN
. 8-
IN
(M
IN
-IN
TO
IN
FOLD FABRIC TO OVERLAP 1
FOOT AND SECURE TO POSTS
WITH HEAVY DUTY PLASTIC TIES
ATTACH FILTER FABRIC TO POSTS
WITH HEAVY DUTY PLASTIC TIES
ALONG TOP 8-INCHES OF FABRIC
BURY & TRENCH MINIMUM OF
12- INCHES OF FILTER FABRIC
3-FT. MAX.
SPACING
FILTER FABRIC REQUIREMENTS:
1. SILT FENCE MUST BE COMPOSED OF WOVEN GEOTEXTILE FILTER FABRIC THAT CONSISTS OF THE
FOLLOWING REQUIREMENTS:
- COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS OF AT LEAST 85% BY
WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES THAT ARE FORMED INTO A NETWORK
SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER;
- FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL PROPERTIES
AFTER INSTALLATION;
- FREE OF ANY DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING
PROPERTIES; AND,
- HAVE A MINIMUM WIDTH OF 36-INCHES.
2. USE ONLY FABRIC APPEARING ON SC DOT'S QUALIFIED PRODUCTS LISTING (QPL), APPROVAL SHEET
#34, MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE SCDOT STANDARD
SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.
3. 12-INCHES OF THE FABRIC SHOULD BE PLACED WITHIN EXCAVATED TRENCH AND TOED IN WHEN THE
TRENCH IS BACKFILLED.
4. FILTER FABRIC SHALL BE PURCHASED IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF THE
BARRIER TO AVOID JOINTS.
5. FILTER FABRIC SHALL BE INSTALLED AT A MINIMUM OF 24-INCHES ABOVE THE GROUND.
-IN
M
IN
BURY FABRIC
(SEE DETAIL)
1.25 LB/FT
STEEL POSTS
NOT TO SCALE
TYPE A INLET PROTECTION - FILTER FABRIC
INSTALL RUBBER
SAFETY CAPS ON THE
TOP OF STEEL POSTS
PLAN SYMBOL
INSTALL RUBBER
SAFETY CAPS ON THE
TOP OF STEEL POSTS
INSTALL RUBBER
SAFETY CAPS ON THE
TOP OF STEEL POSTS
A
BASIS OF DESIGN
NOTES:
1. THE SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY, AS
DETERMINED BY THE STANDARD PROCTOR TEST.
ASPHALT PATCH SECTION
NOT TO SCALE
COMPACTED SUBGRADE
2" SURFACE COURSE
File details come from the government source that posted it. Updated .