DF_013847.023_-_Riverbend_Equestrian_Park_Plan_Set_20240930.pdf
PDF 4 MB Posted
- Attached to
- Riverbend Park Drainage Improvements
- Solicitation number
- RFP #25050
- Issued by
- Greenville County, South Carolina
About this file
These construction documents are engineering plans prepared by Davis & Floyd, Inc. for Greenville County Parks, Recreation & Tourism for the Riverbend Equestrian Park Drainage Maintenance project located in Greenville, South Carolina. The project involves drainage improvements around an existing barn, which includes demolishing and removing existing storm drainage pipes, re-grading drainage ditches, installing new roof drain extensions, and providing new asphalt pavement and gravel surfaces. The plans consist of three sheets (C100, C200, and C500) detailing existing conditions, demolition, site grading, and stormwater pollution prevention plan (SWPPP) requirements.
The project involves specific technical specifications for site work, including installing 21 linear feet of 12-inch reinforced concrete pipe (RCP) at a 0.76% slope, re-grading ditch bottoms, tying downspouts to roof drains, and providing heavy-duty asphalt pavement with stone base. The construction documents specify detailed requirements for soil preparation, permanent seeding, erosion control measures, and site stabilization. The work includes compacting subgrades to 98% standard proctor density, installing sediment tubes, and implementing a comprehensive erosion control strategy. The project datum is based on horizontal datum SC83IF and vertical datum NAVD88, with precise elevation measurements and grading specifications provided throughout the plan set.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOC
LOC
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOC LOC
LOC
LOC
LOC
LOC
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LO
C
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LOC
LO
C
LOC
LOC
LO
C
LO
CLO
C
LO
C
LOC
LOC
D
DEMOLISH AND REMOVE
EXISTING STORM DRAINAGE PIPE
DEMOLISH AND REMOVE
EXISTING STORM DRAINAGE PIPE
DEMOLISH AND REMOVE
EXISTING GRAVEL
DEMOLISH AND REMOVE EXISTING 4"
HDPE ROOF DRAIN EXTENSIONS
(TYP. THIS SIDE OF BARN)
CONTRACTOR SHALL PROTECT
EXISTING 4" HDPE ROOF DRAIN
EXTENSIONS (TYP. THIS SIDE OF BARN)
PROJECT DATUM INFORMATION:
HORIZONTAL DATUM: SC83IF
VERTICAL DATUM: NAVD88
00 10' 20'
SCALE: 1" = 10'
ISSUED FOR
CONSTRUCTION
SOUT
H
CA
RO
L I
NA
CERT I F ICAT
E
OF
A
UT
HO
RIZATION
DA
VI
S
FL
OY
D, IN
C
No . C
SOUT
H
CA
RO
L I
NA
LICENSED PRO
FE
SS
IO
NA
L ENGINEER
JAMES D
AV
ID
C
OM
PTON
No . 4
9/3 0/2
N
STATE
PLANE
OW
NE
R
TH
ES
E
DR
AW
IN
GS
A
ND
T
HE
D
ES
IG
N
TH
ER
EO
N
AR
E
TH
E
PR
OP
ER
TY
O
F
DA
VI
S
FL
OY
D, IN
C.
A
ND
M
AY
N
OT
B E
US
ED
IN
W
HO
LE
O R
IN
P
AR
T
W
IT
HO
UT
W
RI
TT
EN
C
ON
SE
NT
O F
TH
E
EN
GI
NE
ER
/ A
RC
HI
TE
CT
A
ND
A
NY
IN
FR
IN
GE
ME
NT
W
ILL
B
E
SU
BJ
EC
T
TO
LE
GA
L A
CT
IO
N
\\g rn vl-fs\ da ta\
Jo bs od d\1
-0 2\P ro du cti on
\C ivi l\D ra wi ng s\0
7.0
2-
DE
MO
.dw g , 9
/30 /20
1:
:23
P M, ja me s d
. c om pto n, pe
PR
OJ
EC
T
TI
TL
E
DR
AW
IN
G
TI
TL
E
NO
RE
LE
AS
ED
CH
EC
KE
D
DA
TE
PAGE OF
CH
EC
KE
D
DE
SI
GN
ED
JO
B
NO
DR
AW
N
AP
PR
OV
ED
DA
TE
4 M
ILE
ST
ON
E
W
AY
, S
UI
TE
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
(8
) 5
-9
EX
IS
TI
NG
C
ON
DI
TI
ON
S
AN
D
DE
MO
LIT
IO
N
PL
AN
GR
EE
NV
ILL
E
CO
UN
TY
P
AR
KS
RE
CR
EA
TI
ON
T
OU
RI
SM
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
RI
VE
RB
EN
D
EQ
UE
ST
RI
AN
P
AR
K
DR
AI
NA
GE
M
AI
NT
EN
AN
CE
C100
JD
C
JD
C
JD
C
JD
C
SE
PT
EM
BE
R
.02
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
JD
C
/30 /20
R
Know what's below.
before you dig.Call
DEMOLITION PLAN NOTES
1. EXISTING CONDITIONS WERE OBTAINED FROM AVAILABLE RECORD DRAWINGS AND
FIELD SURVEYS AND ARE NOT WARRANTED TO BE COMPLETE OR ACCURATE.
CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL UTILITIES IN THE FIELD PRIOR
TO THE START OF ANY WORK.
2. PROTECT AND MAINTAIN EROSION CONTROLS THROUGHOUT DEMOLITION AND
CONSTRUCTION.
3. CONTRACTOR SHALL USE CARE WHEN WORKING NEAR EXISTING OCCUPIED
BUILDINGS AND OTHER INFRASTRUCTURE. ALL MATERIALS ON SITE SHALL BE
PROPERLY RESTRAINED AND COVERED.
4. ALL UTILITIES AND SITE FEATURES NOT SPECIFIED TO BE DEMOLISHED SHALL REMAIN
UNDISTURBED.
5. PRIOR TO BEGINNING DEMOLITION, THE CONTRACTOR SHALL ENSURE THAT PHASE 1
SEDIMENT AND EROSION CONTROL MEASURES ARE INSTALLED
6. ALL DEMOLITION INCLUDES PROPER REMOVAL AND DISPOSAL OF MATERIALS BY
CONTRACTOR.
7. STRIP TOPSOIL FROM LIMITS OF CONSTRUCTION AS NEEDED FOR CONSTRUCTION.
STOCKPILE TOPSOIL ONSITE TO ASSIST IN FINAL STABILIZATION.
DEMOLITION LEGEND
UNDERGROUND UTILITIES/MISC.
TO BE REMOVED / / / / / / / / / / / /
GRAVEL TO BE REMOVED
LIMITS OF CONSTRUCTION LOC
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
RE-GRADE BOTTOM OF DITCH TO
INVERT OF EXISTING PIPE AND
UP AT 1% SLOPE ALONG DITCH
R D
R D
R D
R D
R D
R D
R D
R D
R D
R D
R D
R D
R D
REGRADE DITCH AS SHOWN
TIE DOWNSPOUTS TO ROOF DRAINS
UNDER PROPOSED CONCRETE AND
PIPE TO DITCH (TYP.)
ROOF DRAINS SHALL BE 4" HDPE PIPE
AT 1% MINIMUM SLOPE TO DITCH
PROVIDE ASPHALT
PAVEMENT ALONG BARN
FILL LOW SPOT IN BARN FLOOR WITH APPROX.
0.4' OF COMPACTED EARTH TO 95% MAX
STANDARD PROCTOR TO FFE 1036.81.
PROVIDE 6" COMPACTED ABC STONE
1036.81
1036.81
1036.37
1036.71
1037.05
1038.00
1037.98
1036.84
1036.31
1036.40
1035.90
1036.10
1035.60
1035.75 1035.25
1035.75
1035.03
1036.06
1034.74
1036.061036.03 1036.25
1036.60
1036.90
1037.31
1037.31 1038.08
1038.65
1038.751039.10
1036.96
1037.11
1036.95
1036.62
1036.46
1036.86
1036.70
1035.85
1034.58
1035.85
1035.38
1034.38
1035.38
1035.17
1034.17
1035.17 1034.94
1033.94
1034.94
1034.78
1033.78
1034.78
1036.93
1035.98 1036.75
1035.91
1036.81
1036.74
1036.90
1035.67
1036.70
1036.87
1035.33
1036.81
1036.84
1034.98
1036.70
1036.58
1034.68
1036.44
1036.11
21 LF 12" RCP @0.76%
CLEANOUT SEDIMENT FROM STORM
DRAINS AT THE END OF CONSTRUCTION
CLEANOUT SEDIMENT FROM STORM
DRAINS AT THE END OF CONSTRUCTION
UTILITIES WERE NOT LOCATED AS PART OF
THE SURVEY - CARE SHALL BE TAKEN
AROUND EXISTING SPIGOTS TO PREVENT
DAMAGE TO WATER SERVICES (TYP.)
PROVIDE HEAVY DUTY ASPHALT PAVEMENT -
COORDINATE WITH DON SHUMAN AT
GREENVILLE COUNTY PARKS REGARDING
LIMITS OF ASPHALT STONE BASE
8.0 0'
8.0 0'
8.0 0'
75.00'
LOC
LOC
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOC LOC
LOC
LOC
LOC
LOC
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LO
C
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LOC
LO
C
LOC
LOC
LO
C
LO
CLO
C
LO
C
LOC
LOC
LIMITS OF CONSTRUCTION
1036103710381039
10351036
85.24'
2" (COMPACTED THICKNESS)
ASPHALT CONCRETE
SURFACE COURSE TYPE C
6" STABILIZED AGGREGATE
OR MACADAM BASE COURSE
NOTE:
1. 18" MIN. COMPACTED SUBGRADE TO BE 98% OF
STANDARD PROCTOR MAX. DRY DENSITY AS
DETERMINED IN ACCORDANCE WITH ASTM D698
ASPHALT PAVEMENT - SECTION
NO SCALE
COMPACTED SUBGRADE.
SEE NOTE 1
6" GABC
NOTE:
1. 18" MIN. COMPACTED SUBGRADE TO BE 98% OF
STANDARD PROCTOR MAX. DRY DENSITY AS
DETERMINED IN ACCORDANCE WITH ASTM D698
GRAVEL DRIVE SECTION
NO SCALE
COMPACTED SUBGRADE.
SEE NOTE 1
AGGREGATE BASE TO BE INSTALLED IN
HEAVY DUTY AREAS ONLY - ALL OTHER
AREAS SHALL BE ASPHALT PLACED ON
COMPACTED SUBGRADE
PROJECT DATUM INFORMATION:
HORIZONTAL DATUM: SC83IF
VERTICAL DATUM: NAVD88
00 10' 20'
SCALE: 1" = 10'
R
Know what's below.
before you dig.Call
ISSUED FOR
CONSTRUCTION
SOUT
H
CA
RO
L I
NA
CERT I F ICAT
E
OF
A
UT
HO
RIZATION
DA
VI
S
FL
OY
D, IN
C
No . C
SOUT
H
CA
RO
L I
NA
LICENSED PRO
FE
SS
IO
NA
L ENGINEER
JAMES D
AV
ID
C
OM
PTON
No . 4
9/3 0/2
N
STATE
PLANE
OW
NE
R
TH
ES
E
DR
AW
IN
GS
A
ND
T
HE
D
ES
IG
N
TH
ER
EO
N
AR
E
TH
E
PR
OP
ER
TY
O
F
DA
VI
S
FL
OY
D, IN
C.
A
ND
M
AY
N
OT
B E
US
ED
IN
W
HO
LE
O R
IN
P
AR
T
W
IT
HO
UT
W
RI
TT
EN
C
ON
SE
NT
O F
TH
E
EN
GI
NE
ER
/ A
RC
HI
TE
CT
A
ND
A
NY
IN
FR
IN
GE
ME
NT
W
ILL
B
E
SU
BJ
EC
T
TO
LE
GA
L A
CT
IO
N
\\g rn vl-fs\ da ta\
Jo bs od d\1
-0 2\P ro du cti on
\C ivi l\D ra wi ng s\0
7.0
2-
SM
AL
L P
RO
JE
CT
.dw g , 9
/30 /20
1:
:33
P M, ja me s d
. c om pto n, pe
PR
OJ
EC
T
TI
TL
E
DR
AW
IN
G
TI
TL
E
NO
RE
LE
AS
ED
CH
EC
KE
D
DA
TE
PAGE OF
CH
EC
KE
D
DE
SI
GN
ED
JO
B
NO
DR
AW
N
AP
PR
OV
ED
DA
TE
4 M
ILE
ST
ON
E
W
AY
, S
UI
TE
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
(8
) 5
-9
SI
TE
G
RA
DI
NG
P
LA
N
GR
EE
NV
ILL
E
CO
UN
TY
P
AR
KS
RE
CR
EA
TI
ON
T
OU
RI
SM
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
RI
VE
RB
EN
D
EQ
UE
ST
RI
AN
P
AR
K
DR
AI
NA
GE
M
AI
NT
EN
AN
CE
C200
JD
C
JD
C
JD
C
JD
C
SE
PT
EM
BE
R
.02
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
JD
C
/30
EXISTING CONTOUR - MAJOR 105
EXISTING CONTOUR - MINOR 104
PROPOSED CONTOUR - MAJOR 105
104PROPOSED CONTOUR - MINOR
SURFACE FLOW
DIRECTIONAL ARROW
GRADE ELEVATION:
PROPOSED ELEVATION 0.00
SWALE > > >
LIMITS OF CONSTRUCTION
SITE LEGEND
PROPOSED ASPHALT
WITH STONE BASEPROPOSED ASPHALT
LOC LOC
PROPOSED GRAVEL
PROPOSED STORM PIPE
ROOFDRAIN RD RD
NOTES:
1. A UTILITY LOCATE WAS NOT PROVIDED AS PART OF THE SURVEY OF THE PROJECT.
CONTRACTOR SHALL HAVE ALL UTILITIES LOCATED PRIOR TO BEGINNING
CONSTRUCTION AND VIELD VERIFY LOCATION OF ALL EXISTING UTILITIES WITHIN THE
LIMITS OF CONSTRUCTION. ALL SOUTH CAROLINA 811 BEFORE DIGGING. 888-721-7877.
ASPHALT PAVING NOTES AND SPECIFICATIONS:
1. QUALIFICATIONS OF WORKMEN:
ASSIGN AT LEAST ONE PERSON WHO IS THOROUGHLY TRAINED AND EXPERIENCED IN THE SKILLS REQUIRED, WHO IS COMPLETELY FAMILIAR WITH THE DESIGN AND APPLICATION OF THE WORK DESCRIBED INDICATED ON DRAWINGS, AND WHO
WILL BE PRESENT AT ALL TIMES DURING PROGRESS OF THE PAVING WORK.
2. FOR ACTUAL FINISHING OF ASPHALTIC CONCRETE SURFACES AND OPERATION OF THE REQUIRED EQUIPMENT, USE ONLY
PERSONNEL THOROUGHLY TRAINED AND EXPERIENCED IN THE SKILLS REQUIRED.
3. WEATHER LIMITATIONS: APPLY BITUMINOUS TACK COAT ONLY WHEN THE AMBIENT TEMPERATURE IN THE SHADE IS ABOVE 50 DEGREES F. AND WHEN THE TEMPERATURE HAS NOT BEEN BELOW 35 DEGREES F. FOR 12 HOURS IMMEDIATELY PRIOR TO
APPLICATION.
4. CONSTRUCT BITUMINOUS SURFACE COURSE ONLY WHEN ATMOSPHERIC TEMPERATURE IS ABOVE 45 DEGREES F., WHEN THE UNDERLYING BASE IS DRY, AND WHEN THE WEATHER IS NOT RAINY. BASE COURSE MAY BE PLACED WHEN AIR TEMPERATURE
IS NOT BELOW 35 DEGREES F. AND RISING.
5. PROTECTION: USE ALL MEANS NECESSARY TO PROTECT PAVEMENT MATERIALS BEFORE, DURING, AND AFTER INSTALLATION, AND TO PROTECT THE INSTALLED WORK AND MATERIALS OF ALL OTHER TRADES.
6. REPLACEMENTS: IN THE EVENT OF DAMAGE, IMMEDIATELY MAKE ALL REPAIRS AND REPLACEMENTS NECESSARY, TO THE
APPROVAL OF THE OWNER, AND AT NO ADDITIONAL COST TO THE OWNER.
LOOSE MATERIAL: REMOVE ALL LOOSE MATERIAL FROM THE COMPACTED SUBGRADE SURFACE IMMEDIATELY BEFORE
PLACING BITUMINOUS MATERIALS.
7. PROOF-ROLL: PROOF-ROLL PREPARED SUBGRADE SURFACE TO CHECK FOR UNSTABLE AREAS AND THE NEED FOR ADDITIONAL COMPACTION. DOCUMENT LOCATION AND SQUARE FOOT AREA OF UNSATISFACTORY CONDITIONS. DO NOT BEGIN PAVING WORK UNTIL SUCH CONDITIONS HAVE BEEN CORRECTED AND ARE READY TO RECEIVE PAVING.
8. THICKNESSES: INSTALL THICKNESSES OF BASE COURSES, BINDER COURSES, AND SURFACE COURSES AS INDICATED ON THE
DRAWINGS FOR VARYING TRAFFIC AND LOADING CONDITIONS.
IN-PLACE COMPACTED THICKNESSES WILL NOT BE ACCEPTABLE IF EXCEEDING THE FOLLOWING ALLOWABLE VARIATION FROM
THICKNESSES SHOWN ON THE DRAWINGS:
BASE COURSE: 1/2", PLUS OR MINUS.
BINDER COURSE: 1/4", PLUS OR MINUS
SURFACE COURSE: 1/4", PLUS OR MINUS.
9. SURFACE SMOOTHNESS: TEST THE FINISHED SURFACE OF EACH ASPHALT CONCRETE COURSE FOR SMOOTHNESS, USING 10' STRAIGHTEDGE APPLIED PARALLEL WITH, AND AT RIGHT ANGLES TO, CENTERLINE OF PAVED AREA. SURFACES WILL NOT BE
ACCEPTABLE IF EXCEEDING THE FOLLOWING TOLERANCES FOR SMOOTHNESS:
BASE COURSE SURFACE: 1/4".
BINDER COURSE SURFACE: 1/4".
WEARING COURSE SURFACE: 3/16".
10. CHECK SURFACED AREAS AT 25' INTERVALS. TEST CROWNED SURFACES WITH A CROWN TEMPLATE, CENTERED AND AT RIGHT ANGLES TO THE CROWN. SURFACES WILL NOT BE ACCEPTABLE IF THE FINISHED CROWN SURFACES VARY MORE THAN 1/4"
FROM THE CROWN TEMPLATE.
11. GRADE CONTROL: ESTABLISH AND MAINTAIN THE REQUIRED LINES AND GRADES, INCLUDING CROWN AND CROSS-SLOPE, FOR
EACH COURSE DURING CONSTRUCTION OPERATIONS.
FRAME ADJUSTMENTS: SET FRAMES FOR MANHOLES AND OTHER SUCH UNITS, WITHIN AREAS TO BE PAVED, TO FINAL GRADE.
SURROUND FRAMES SET TO GRADE WITH A RING OF COMPACTED ASPHALT CONCRETE BASE PRIOR TO PAVING.
12. TYING TO EXISTING BITUMINOUS PAVEMENT: WHERE NEW PAVEMENT TIES TO EXISTING PAVEMENT, CUT THE EXISTING PAVEMENT TO A STRAIGHT LINE AND COMPLETELY REMOVE ALL MATERIALS ON THE NEW PAVEMENT SIDE OF THE CUT AND REPLACE WITH NEW MATERIALS. COAT THE CUT LINE WITH A TACK COAT TO FURNISH A BOND BETWEEN THE EXISTING SURFACE COURSE AND THE NEW SURFACE COURSE. DO NOT ALLOW THE NEW WORK TO OVERLAP THE EXISTING WORK.
NOTIFY THE PROPER AUTHORITIES AT LEAST 10 DAYS BEFORE BEGINNING THE WORK OF TYING TO THE EXISTING WORK.
13. INSTALLATION: ESTABLISH A ROLLER PATTERN TO ENSURE PROPER, CONSISTENT COMPACTION OF THE ASPHALT COURSES AND FOLLOW THE ROLLER PATTERN THROUGHOUT THE ASPHALT PAVING PROCESS. BEGIN ROLLING AND COMPACTION AS SOON AS THE ASPHALT MATERIAL CAN BE COMPACTED WITHOUT DISPLACEMENT AND CONTINUE UNTIL IT IS THOROUGHLY COMPACTED AND ALL THE ROLLER MARKS ARE REMOVED. DO NOT ALLOW ROLLER EQUIPMENT TO SIT IDLE IN ONE LOCATION.
ALLOW TIME FOR THE ASPHALT TO CURE PRIOR TO ALLOWING VEHICLE TRAFFIC, CONSTRUCTION EQUIPMENT, LANDSCAPING
EQUIPMENT, AND ANY OTHER EQUIPMENT THAT WILL DAMAGE THE UNCURED SURFACE COURSE.
14. DRAINAGE: CROWN OR SLOPE ALL PAVED AREAS FOR COMPLETE WATER DRAINAGE UNDER ALL WEATHER CONDITIONS.
CROWN WITH CROSS-SLOPE SHALL BE A 2% MINIMUM SLOPE. PARKING AREAS AND OTHER LARGE PAVED AREAS SHALL HAVE A MINIMUM CROSS-SLOPE OF 1.5%. HOSE DOWN THE SURFACE TO DEMONSTRATE PROPER DRAINAGE WHEN THE PROJECT IS COMPLETED AND AGAIN AT THE END OF THE ONE-YEAR GUARANTEE PERIOD. REMOVE AND REPLACE ANY AREA THAT SHOWS
PUDDLING 30 MINUTES AFTER HOSING, AT NO ADDITIONAL COST TO THE OWNER.
15. REMEDIAL MEASURES: CUT OUT AND/OR REWORK ALL SURFACES AND SUBGRADE AREAS WHICH DO NOT MEET THE REQUIREMENTS, AND STANDARD OF QUALITY STATED IN THESE NOTES AND INDICATED ON THE DRAWINGS; PERFORM ALL
REMEDIAL MEASURES AT NO ADDITIONAL COST TO THE OWNER.
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
INSTALLATION:
A. INSTALL OVER BARE SOIL, MULCHED AREAS OR EROSION CONTROL BLANKETS.
B. BE COMPOSED OF GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL
COCONUT FIBER OR HARDWOOD MULCH ENCLOSED BY A FLEXIBLE NETTING
MATERIAL. STRAW, STRAW FIBER, STRAW BALES, PINE NEEDLES AND LEAF
MULCH ARE NOT ALLOWED.
C. THE MINIMUM DIAMETER SHOULD BE 18 INCHES.
D. SEDIMENT TUBES SHOULD BE STAKED USING WOODEN STAKES (2-INCH X
2-INCH) OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A
MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) A MINIMUM OF 48-INCHES
IN LENGTH PLACED ON 2-FOOT CENTERS.
E. STAKES SHOULD BE INTERTWINED WITH THE OUTER MESH ON THE
DOWNSTREAM SIDE AND DRIVEN IN THE GROUND TO A MINIMUM DEPTH OF 1.5
FEET LEAVING LESS THAN 1 FOOT OF STAKE EXPOSED ABOVE THE SEDIMENT
TUBE. ALWAYS REFER TO THE MANUFACTURER'S RECOMMENDATIONS FOR THE
STAKING DETAIL,INSTALL ALL SEDIMENT TUBES INSURING THAT NO GAPS EXIST
BETWEEN THE SOIL AND THE BOTTOM OF THE SEDIMENT TUBE. THE ENDS OF
ADJACENT SEDIMENT TUBES SHOULD BE LAPPED 6-INCH TO PREVENT FLOW
AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT.IN NO SITUATIONS
SHOULD SEDIMENT TUBES BE STACKED ON TOP OF ONE ANOTHER.
F. CONSTRUCT A TRENCH THAT IS 20% OF THE TUBE DIAMETER TO INSTALL THE
TUBE IN. AVOID DAMAGE TO SEDIMENT TUBES WHILE INSTALLING THEM. IF THE
SEDIMENT TUBE BECOMES DAMAGED DURING INSTALLATION, A STAKE SHOULD
BE PLACED ON BOTH SIDES OF THE DAMAGED AREA TERMINATING THE TUBE
SEGMENT AND A NEW TUBE SEGMENT SHOULD BE INSTALLED.SHOULD BE
INSTALLED IN SWALES OR DRAINAGE DITCHES PERPENDICULAR TO THE FLOW
OF WATER. SEDIMENT TUBES SHOULD CONTINUE UP THE SIDE SLOPES A
MINIMUM OF 1 FOOT ABOVE THE DESIGN FLOW DEPTH. SEDIMENT TUBES
SHOULD BE SPACED ACCORDING TO THE FOLLOWING TABLE.
INSPECTION AND MAINTENANCE:
A. SEE NOTE 3 UNDER SCHDEC STANDARD NOTES ON PLAN SHEET C500 FOR
INSPECTION FREQUENCIES.
B. LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED.
C. IF EROSION CAUSES THE EDGES TO FALL TO A HEIGHT EQUAL TO OR BELOW
THE HEIGHT OF THE CENTER, REPAIRS SHOULD BE MADE IMMEDIATELY.
D. REMOVE ACCUMULATED SEDIMENT FROM THE UPSTREAM SIDE OF THE
SEDIMENT TUBE WHEN THE SEDIMENT HAS REACHED A HEIGHT OF
APPROXIMATELY ONE-THIRD OF THE EXPOSED HEIGHT OF THE TUBE
(MEASURED AT THE CENTER).
E. ACCUMULATED SEDIMENT SHOULD BE REMOVED PRIOR TO REMOVING
SEDIMENT TUBES.
F. SEDIMENT TUBE REMOVAL SHOULD BE COMPLETED ONLY AFTER THE
CONTRIBUTING DRAINAGE AREA HAS BEEN COMPLETELY STABILIZED.
PERMANENT VEGETATION SHOULD REPLACE AREAS FROM WHICH GRAVEL,
STONE, SEDIMENT TUBES, OR OTHER MATERIALS HAVE BEEN REMOVED.
DESCRIPTION:
SEDIMENT TUBES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES, CURLED
EXCELSIOR WOOD, NATURAL COCONUT FIBER OR HARDWOOD MULCH. STRAW,
PINE NEEDLE AND LEAF MULCH-FILLED SEDIMENT TUBES ARE NOT PERMITTED
UNDER THIS SPECIFICATION.
GENERAL NOTES:
A. SEDIMENT TUBE LENGTH SELECTED SHOULD MINIMIZE THE NUMBER OF
SEDIMENT TUBES NEEDED TO SPAN THE WIDTH OF THE DRAINAGE
CONVEYANCE. IF THE DITCH CHECK LENGTH (PERPENDICULAR TO THE WATER
FLOW) IS 15 FEET, THEN ONE 15 FOOT SEDIMENT TUBE IS PREFERRED
COMPARED TO TWO OVERLAPPING 10 FOOT SEDIMENT TUBES.
B. SEDIMENT TUBES FOR DITCH CHECKS SHOULD REMAIN IN PLACE UNTIL FULLY
ESTABLISHED VEGETATION AND ROOT SYSTEMS HAVE COMPLETELY
DEVELOPED AND CAN SURVIVE ON THEIR OWN.
WHEN AND WHERE TO USE IT:
A. INSTALL SEDIMENT TUBES ALONG CONTOURS, IN DRAINAGE CONVEYANCE
SWALES, AND AROUND INLETS TO HELP REDUCE THE EFFECTS OF SOIL EROSION
BY ENERGY DISSIPATION AND RETAIN SEDIMENT.
MATERIALS:
A. SEDIMENT TUBES FOR DITCH CHECKS AND TYPE A INLET STRUCTURE FILTERS
EXHIBIT THE FOLLOWING PROPERTIES:
1. PRODUCED BY A MANUFACTURER EXPERIENCED IN SEDIMENT TUBE
MANUFACTURING.
2. COMPOSED OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD,
NATURAL COCONUT FIBERS, HARDWOOD MULCH OR A MIX OF THESE
MATERIALS ENCLOSED BY A FLEXIBLE NETTING MATERIAL.
3. STRAW, STRAW FIBER, STRAW BALES, PINE NEEDLES AND LEAF MULCH ARE
NOT ALLOWED UNDER THIS SPECIFICATION.
4. UTILIZES OUTER NETTING THAT CONSISTS OF SEAMLESS, HIGH-DENSITY
POLYETHYLENE PHOTODEGRADABLE MATERIALS TREATED WITH
ULTRAVIOLET STABILIZERS OR A SEAMLESS, HIGH-DENSITY POLYETHYLENE
NON-DEGRADABLE MATERIALS. DIAMETER RANGING FROM 18-INCHES TO
24-INCHES. CURLED EXCELSIOR WOOD, OR NATURAL COCONUT ROLLED
EROSION CONTROL PRODUCTS (RECPS) THAT ARE ROLLED UP TO CREATE A
SEDIMENT TUBE ARE NOT ALLOWED UNDER THIS SPECIFICATION.
MAXIMUM SEDIMENT TUB SPACINGSLOPE
4% 3% 2%
LESS THAN 2%
50-FEET
40-FEET
30-FEET
25-FEET
5% 6%
GREATER THAN 6%
150-FEET
100-FEET
75-FEET
END VIEW OF DITCH
TOP VIEW
OF DITCH
2.0'MINIMUM
48" MINIMUM
LENGTH
STAKES PLACED AT 2'
MINIMUM SPACING
2" X 2" CROSSING WOOD STAKES
OR 1.25 #/FT STEEL POST
2.0' SPACING (TYPICAL)
CONTINUOUS ALONG
TUBE
SEDIMENT TUBE DETAIL
NO SCALE
SEDIMENT TUBE SPACING
SECTION
R D
R D
R D
R D
R D
R D
R D
R D
R D
R D
R D
R D
R D
LOC
LOC
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOC LOC
LOC
LOC
LOC
LOC
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LO
C
LO
C
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LOC
LO
C
LOC
LOC
LO
C
LO
CLO
C
LO
C
LOC
LOC
1036103710381039
10351036
PROVIDE SEDIMENT TUBES (TYP.)
PROVIDE SEDIMENT TUBES (TYP.)
PERMANENTLY STABILIZE ALL
DISTURBED AREAS ONCE THEY ARE
BROUGHT TO FINAL GRADE (TYP.)
PERMANENTLY STABILIZE ALL
DISTURBED AREAS ONCE THEY ARE
BROUGHT TO FINAL GRADE (TYP.)
PERMANENTLY STABILIZE ALL
DISTURBED AREAS ONCE THEY ARE
BROUGHT TO FINAL GRADE (TYP.)
PS
PS
PS
PS
PS
PROJECT DATUM INFORMATION:
HORIZONTAL DATUM: SC83IF
VERTICAL DATUM: NAVD88
00 10' 20'
SCALE: 1" = 10'
R
Know what's below.
before you dig.Call
ISSUED FOR
CONSTRUCTION
SOUT
H
CA
RO
L I
NA
CERT I F ICAT
E
OF
A
UT
HO
RIZATION
DA
VI
S
FL
OY
D, IN
C
No . C
SOUT
H
CA
RO
L I
NA
LICENSED PRO
FE
SS
IO
NA
L ENGINEER
JAMES D
AV
ID
C
OM
PTON
No . 4
9/3 0/2
OW
NE
R
TH
ES
E
DR
AW
IN
GS
A
ND
T
HE
D
ES
IG
N
TH
ER
EO
N
AR
E
TH
E
PR
OP
ER
TY
O
F
DA
VI
S
FL
OY
D, IN
C.
A
ND
M
AY
N
OT
B E
US
ED
IN
W
HO
LE
O R
IN
P
AR
T
W
IT
HO
UT
W
RI
TT
EN
C
ON
SE
NT
O F
TH
E
EN
GI
NE
ER
/ A
RC
HI
TE
CT
A
ND
A
NY
IN
FR
IN
GE
ME
NT
W
ILL
B
E
SU
BJ
EC
T
TO
LE
GA
L A
CT
IO
N
\\g rn vl-fs\ da ta\
Jo bs od d\1
-0 2\P ro du cti on
\C ivi l\D ra wi ng s\0
7.0
2-
SM
AL
L P
RO
JE
CT
.dw g , 9
/30 /20
1:
:39
P M, ja me s d
. c om pto n, pe
PR
OJ
EC
T
TI
TL
E
DR
AW
IN
G
TI
TL
E
NO
RE
LE
AS
ED
CH
EC
KE
D
DA
TE
PAGE OF
CH
EC
KE
D
DE
SI
GN
ED
JO
B
NO
DR
AW
N
AP
PR
OV
ED
DA
TE
4 M
ILE
ST
ON
E
W
AY
, S
UI
TE
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
(8
) 5
-9
SW
PP
P
PL
AN
GR
EE
NV
ILL
E
CO
UN
TY
P
AR
KS
RE
CR
EA
TI
ON
T
OU
RI
SM
GR
EE
NV
ILL
E, S
OU
TH
C
AR
OL
IN
A
RI
VE
RB
EN
D
EQ
UE
ST
RI
AN
P
AR
K
DR
AI
NA
GE
M
AI
NT
EN
AN
CE
C500
JD
C
JD
C
JD
C
JD
C
SE
PT
EM
BE
R
.02
IS
SU
ED
F
OR
C
ON
ST
RU
CT
IO
N
JD
C
/30
N
STATE
PLANEPERMANENT SEEDING SCHEDULE
1. EXTENT OF WORK - PROVIDE SOIL ESTABLISHMENT OF FINISH GRADE, PREPARATION,
FERTILIZING AND SEEDING, OF ALL NEWLY GRADED FINISHED EARTH SURFACES, UNLESS
INDICATED OTHERWISE, AND AT ALL AREAS INSIDE OR OUTSIDE THE LIMITS OF
CONSTRUCTION THAT ARE DISTURBED BY THE CONTRACTOR'S OPERATIONS.
2. TURF ESTABLISHMENT PERIOD - THE ESTABLISHMENT PERIOD FOR TURF SHALL BEGIN
IMMEDIATELY AFTER INSTALLATION, WITH THE APPROVAL OF THE ENGINEER, AND CONTINUE
UNTIL THE DATE THAT THE OWNER ACCEPTS THE PROJECT OR PHASE FOR BENEFICIAL
USE AND OCCUPANCY AND A STAND OF GRASS IS ACHIEVED. DURING THE TURF
ESTABLISHMENT PERIOD THE CONTRACTOR SHALL:
A. WATER THE TURF TO MAINTAIN AN ADEQUATE SUPPLY OF MOISTURE WITHIN
ROOT ZONE. AN ADEQUATE SUPPLY OF MOISTURE IS THE EQUIVALENT OF 1 INCH
OF ABSORBED WATER PER WEEK EITHER THROUGH NATURAL RAINFALL OR
AUGMENTED BY PERIODIC WATERING. APPLY WATER AT A MODERATE RATE SO
AS NOT TO FLOOD THE TURF.
B. PROVIDE THE FOLLOWING TURF ESTABLISHMENT:
1. ERADICATE ALL WEEDS. WATER, FERTILIZE, OVERSEED, AND PERFORM ANY
OTHER OPERATION NECESSARY TO PROMOTE THE GROWTH OF GRASS.
2. RESEED OR RE-SOD AREAS VOID OF TURF ONE SQUARE FOOT AND LARGER IN AREA.
3. MOW THE NEW LAWN AT LEAST THREE TIMES PRIOR TO THE FINAL INSPECTION.
BEGIN MOWING WHEN GRASS IS 4 INCHES HIGH. MOW TO A 2 1/2 INCH HEIGHT.
PERMANENT GRASS SEEDING RATES- SEED MIXTURE
PLANTING SEASON VARIETY LB/ 1000 S.F.
SPRING/SUMMER (APRIL 1 - AUG. 31)
BROWN TOP MILLET 1/2 LB.
HULLED BERMUDA GRASS 2 LBS.
FALL/WINTER (SEPT 1. - MAR. 31)
ANNUAL RYE GRASS 6 LBS.
HULLED BERMUDA GRASS 1 LB.
UNHULLED BERMUDA GRASS 3 LBS.
NOTE: SOME ANNUAL GRASS SPECIES ARE INCLUDED IN THIS MIX. THESE ARE TO
BE PLANTED AT THE SAME TIME AS THE PERENNIAL GRASS SPECIES TO PROVIDE
QUICK COVER AND STABILIZE THE SOIL UNTIL THE PERENNIAL SEEDS GERMINATE
AND BECOME ESTABLISHED.
4. WOOD CELLULOSE FIBER MULCH - USE RECOVERED MATERIALS OF EITHER PAPER-
BASED(100 PERCENT) OR WOOD-BASED (100 PERCENT) HYDRAULIC MULCH. PROCESSED
TO CONTAIN NO GROWTH OR GERMINATION-INHIBITING FACTORS AND DYED AN APPROPRIATE
COLOR TO FACILITATE VISUAL METERING OF MATERIALS APPLICATION. COMPOSITION ON
AIR-DRY WEIGHT BASIS: 9 TO 15 PERCENT MOISTURE, pH RANGE FROM 3.5 TO 5.0. USE WITH
HYDRAULIC APPLICATION OF GRASS SEED AND FERTILIZER. FIRST, MIX WATER AND FIBER.
FIBER SHALL BE ADDED AT 1,000 POUNDS, DRY WEIGHT, PER ACRE. THEN ADD FERTILIZER TO
PRODUCE A HOMOGENEOUS SLURRY. WHEN HYDRAULICALLY SPRAYED ON THE GROUND,
MATERIAL SHALL FORM A BLOTTER LIKE COVER IMPREGNATED UNIFORMLY WITH GRASS SEED.
APPLY SEEDED SLURRY EVENLY IN TWO INTERSECTION DIRECTIONS TO ACHIEVE A MINIMUM
60% COVERAGE.
5. SOIL ANALYSIS - IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE A SOIL
ANALYSIS PERFORMED BY THE COUNTY EXTENSION SERVICE OR SOME OTHER APPROVED
LABORATORY FOR A SOIL ANALYSIS REPORT. THE CONTRACTOR SHALL THEN PROVIDE THE
RECOMMENDATIONS OF THE REPORT TO THE ENGINEER FOR WRITTEN APPROVAL.
RECOMMENDATIONS SHALL ENSURE THAT SOIL pH IS WITHIN 6-7 PRIOR TO SEEDING AND SHALL
INCLUDE RATES FOR LIME, AND FERTILIZER.
6. SOIL PREPARATION - PRIOR TO MASS GRADING, REMOVE EXISTING TOPSOIL AND STOCKPILE. IF
AREAS TO BE GRADED ARE COVERED WITH GRAVEL, COMPLETELY REMOVE GRAVEL AND
DISPOSE OF OFF-SITE IN A MANNER THAT COMPILES WITH ALL LOCAL, STATE, AND
FEDERAL LAWS. AFTER AREAS HAVE BEEN BROUGHT TO FINISH
SUBGRADE ELEVATION, THOROUGHLY TILL TO MINIMUM DEPTH OF 6 INCHES BY SCARIFYING,
DISKING OR HARROWING. REMOVE DEBRIS AND STONES LARGER THAN ONE INCH IN ANY
DIMENSION REMAINING ON SURFACE AFTER TILLAGE. SPREAD STOCKPILED OR HAULED IN
TOPSOIL EVENLY TO A MIN. DEPTH OF 6" TO PROVIDE POSITIVE DRAINAGE. DO NOT SPREAD
TOPSOIL WHEN FROZEN OR EXCESSIVELY WET OR DRY. CORRECT IRREGULARITIES IN FINISHED
SURFACES TO ELIMINATE DEPRESSIONS. PROTECT FINISHED PREPARED SOIL AREAS FROM
DAMAGE BY VEHICULAR OR PEDESTRIAN TRAFFIC.
6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SUPPLY WATER TO ALL TREES, SHRUBS, GROUNDCOVER AND TURF UNTIL FINAL ACCEPTANCE BY THE OWNER. THE OWNER IS
RESPONSIBLE
FOR IRRIGATING PLANT MATERIALS AND TURF AFTER FINAL ACCEPTANCE IF HE CHOOSES. THE
CONTRACTOR SHALL WARRANTY ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM THE
DATE
OF FINAL ACCEPTANCE AND SHALL GUARANTEE A STAND OF PERMANENT GRASS PER SCDHEC
NPDES
PERMIT REQUIREMENTS AND SHALL BE RELIEVED OF THIS REPONSIBILTY ONCE THE PROJECT
HAS
BEEN ACCEPTED AND AFTER THE OWNER HAS FILED A NOTICE OF TERMINATION OR ACCEPTED
BY THE
OWNER, WHICHEVER OCCURS FIRST.
EROSION CONTROL LEGEND
PERMANENT SEEDING PS SEDIMENT TUBE
LIMITS OF CONSTRUCTION LOC LOC
SWPPP SEQUENCE OF CONSTRUCTION:
1. OWNER TO RECEIVE LETTER OF EXEMPTION FROM SCDES FOR LAND DISTURBANCE
ACTIVITIES.
2. INSTALL PERIMETER CONTROL BMPS AND BEGIN MAINTENANCE OF SEDIMENT
CONTROLS AS NECESSARY. CONTINUE MAINTENANCE UNTIL ALL FINAL STABILIZATINO
MEASURES ARE IN PLACE AND REMOVAL OF CONTROLS IS APPROVED BY THE
AUTHORITY HAVING JURISDICTION.
3. CONDUCT DEMOLITION OF ITEMS AS IDENTIFIED ON SHEET C100.
4. GRADING OF SITE.
5. INSTALL PROPOSED STORM DRAINS.
6. COMPLETE SITE SURFACE IMPROVEMENTS.
7. SITE SHALL BE 100% STABILIZED TO A MINIMUM DENSITY OF 70%.
8. REMOVE SEDIMENT FROM STORM DRAINAGE NETWORK.
9. TEMPORARY BMPS SHALL BE REMOVED AFTER THE ENTIRE AREA DRAINING TO IT HAS
BEEN PERMANENTLY STABILIZED.
SWPPP NOTES:
1. UTILIZE EXISTING GRAVEL DRIVE AS CONSTRUCTION ENTRANCE. CLEAN SEDIMENT AND
REFRESH STONE AS NEEDED AFTER CONSTRUCTION ACTIVITIES HAVE CEASED TO
BRING GRAVEL DRIVE TO EXISTING CONDITIONS OR BETTER.
2. IS A PORTABLE TOILET IS PROVIDED ON SITE, IT SHALL BE LOCATED IN AN AREA THAT IS
NOT ADJACENT TO A WATERWAY OR STORM DRAINAGE.
3. EROSION CONTROL MEASURES SHALL BE MAINTAINED AT ALL TIMES. IF FILL
IMPLEMENTATION OF EROSION CONTROL MEASURES INDICATED DOES NOT PROVIDE
FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE IMPLEMENTED AS DIRECTED BY THE ON-SITE INSPECTOR.
4. THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION
CONTROL MEASURES INCLUDING REPLACING OR REPAIRING AND DAMAGED DEVICES.
5. AFTER FINAL STABILIZATION IS APPROVED, CONTRACTOR SHALL REMOVE ALL
SEDIMENT FROM STORM DRAINAGE PIPES.
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
File details come from the government source that posted it. Updated .