desoto parish sb (26-115)-NDHS WRESTLING FACILITY_PROJECT MANUAL.pdf
PDF 17 MB Posted
- Solicitation number
- CP2627D204-ND
- Issued by
- East Baton Rouge Parish, Louisiana
About this file
This is a project manual and invitation for bids issued by the Desoto Parish School Board for the construction of a new Wrestling Practice Gymnasium at North Desoto High School in Stonewall, Louisiana (Bid Number CP2627D204-ND). The project involves constructing an 8,720 square-foot facility containing four practice mats, one office, two locker rooms with associated restrooms, and related mechanical, electrical, and plumbing systems. The building is designed exclusively for wrestling practice and training, not for spectating matches. A mandatory pre-bid conference is scheduled for August 13, 2026 at 11:00 a.m. at the project jobsite. Sealed lump-sum bids must be submitted to the Desoto Parish School Board, 399 Jenkins Street, Mansfield, Louisiana 71052, no later than 2:00 p.m. on August 27, 2026. The contract duration is 180 calendar days from the Notice to Proceed, with work to be coordinated around regular school building operations. The project architect is Didier Architecture (Derryl Didier, Architect & Associates, LLC), and the engineer is Simpson Sports Engineering, LLC.
Bid security equal to five percent of the total bid amount, provided as a certified check, cashier's check, or bid bond, is required with bid submission. Louisiana contractors must hold a valid Building Construction license and demonstrate financial resources and relevant experience with similar projects. Preference is given to Louisiana-domiciled bidders and Louisiana-manufactured materials and supplies. The successful bidder must execute the contract within 15 days of award and furnish performance and payment bonds. Progress payments are made monthly based on work completed, with retainage of ten percent for contracts up to $500,000 and five percent for contracts exceeding $500,000. Liquidated damages are assessed at $250 per day for delays beyond substantial completion and $100 per failure to notify the owner's representative of schedule changes at least 12 hours in advance. No price adjustments are permitted for fuel, asphalt, or concrete price fluctuations. Apparent low bidders must submit a complete list of subcontractors and suppliers within three days of bid opening, accompanied by manufacturer data for engineer evaluation prior to Notice of Award. The Notice of Award shall be issued within 30 days of bid opening.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (26-115)-NDHS WRESTLING FACILITY_PROJECT MANUAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Wrestling Building For North Desoto High School
2571 US-171,
Stonewall, LA 71078 Project Bid Number: CP2627D204-ND
Superintendent: Clay Corley
CONSTRUCTION DOCUMENTS
-1
-1
-2
NDHS Wrestling Building TOC - 1 TABLE OF CONTENTS
TABLE OF CONTENTS
DIVISION 0 - BID REQUIREMENTS
INVITATION FOR BIDS
INSTRUCTIONS TO BIDDERS
LA PUBLIC WORK BID FORM
CORPORATE RESOLUTION
BIDDER’S NON-COLLUSION AFFIDAVIT
BID BOND FORM
00 50 00 CONTRACTING FORMS AND SUPPLEMENTS
SAMPLE CONTRACT
A201-2017 AIA GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION
SUPPLEMENTARY CONDITIONS
PERFORMANCE BOND
PAYMENT BOND
NOTICE OF AWARD
NOTICE TO PROCEED
DIVISION 1 – GENERAL REQUIREMENTS
SECTION 01 11 00 – SUMMARY OF WORK
01 12 13 – SUMMARY OF CONTRACTS
01 12 16 – WORK SEQUENCE
01 14 16 – COORDINATION WITH OCCUPANTS
01 14 19 – JOB SITE ADMINISTRATION
01 26 49 – MODIFICATION PROCEDURES
01 29 73 – SCHEDULE OF VALUES
01 29 76 – APPLICATION FOR PAYMENT AND MATERIAL INVOICES
01 31 13 – COORDINATION
01 31 19 – PROJECT MEETINGS
01 32 16 – CONSTRUCTION PROGRESS SCHEDULE
01 33 23 – SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
01 41 00 – REGULATORY REQUIREMENTS
01 45 16 – PROOF ROLLING
01 50 00 – TEMPORARY FACILITIES AND CONTROLS
01 54 00 – CONSTRUCTION AIDS
01 56 00 – BARRIERS
01 57 00 – TEMORARY CONTROLS
01 62 00 – PRODUCT OPTIONS AND SUBSTITUTIONS
01 66 00 – PRODUCT HANDLING
01 71 23 – FIELD ENGINEERING
01 73 29 – CUTTING AND PATCHING
01 74 13 – CLEANING UP
01 77 19 – CONTRACT CLOSEOUT
DIVISION 2 – EXISTING CONDITIONS
02 41 00 – DEMOLITION
DIVISION 3 – CONCRETE
03 20 00 – CONCRETE REINFORCING
03 30 00 – CAST IN PLACE CONCRETE
NDHS Wrestling Building TOC - 2 TABLE OF CONTENTS
DIVISION 5 – METALS
05 40 00 – COLD FORMED METAL FRAMING
05 50 00 – METAL FABRICATIONS
DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 – ROUGH CARPENTRY
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07 21 00 – THERMAL INSULATION
07 26 13 – VAPOR RETARDERS/AIR INFILTRATION BARRIERS
07 62 00 – FLASHING AND SHEET METAL
07 92 00 – SEALANTS AND CAULKING
DIVISION 8 – OPENINGS
08 11 13 – STEEL DOORS AND FRAMES
08 51 13 – ALUMINUM WINDOWS
08 71 00 – DOOR HARDWARE
DIVISION 9 – FINISHES
09 12 00 – METAL SUPPORT SYSTEMS, CEILING SUSPENSION
09 29 16 – GYPSUM BOARD ASSEMBLIES
09 30 00 – TILING
09 51 00 – SUSPENDED ACOUSTICAL CEILINGS
09 65 00 – RESILIENT FLOORING AND BASE
09 91 00 – PAINTING
DIVISION 10 – SPECIALITES
10 14 10 – INTERIOR SIGNAGE
10 21 13 – PLASTIC TOILET COMPARTMENTS
10 26 00 – WALL PROTECTION
10 28 00 – TOILET, BATH, AND LAUNDRY ACCESSORIES
10 44 00 – FIRE PROTECTION SPECIALITES
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 – METAL BULDING SYSTEM
DIVISION 22 – PLUMBING
22 10 00 – PLUMBING PIPING
22 10 10 – PLUMBING SPECIALITIES
22 40 00 – PLUMBING FIXTURES AND TRIM
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 – GENERAL MECHANICAL
23 01 00 – MECHANICAL COORDINATION DRAWINGS
23 05 00 – BASIC MATERIALS AND METHODS
23 05 13 – MOTORS
23 05 29 – SUPPORTS AND ANCHORS
23 05 53 – MECHANICAL IDENTIFICATION
23 05 93 – TESTING, ADJUSTING, AND BALANCING
23 07 00 – PIPING AND EQUIPMENT INSTALLATION
23 31 00 – DUCTWORK
23 34 23 – POWER VENTILATORS
23 37 00 – AIR OUTLETS AND INLETS
23 74 13 – AIR HANDLING UNIT (100% OUTSIDE AIR)
NDHS Wrestling Building TOC - 3 TABLE OF CONTENTS
DIVISION 26 – ELECTRICAL
26 01 00 – BASIC ELECTRICAL REQUIREMENTS
26 05 10 – UTILITY COORDINATION SERVICE ENTRY
26 05 19 – LOW VOLTAGE ELECTRICAL POWER
26 05 26 – GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 – HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 53 – IDENTIFICATION FOR ELECTRICAL EQUIPMENT
26 05 72 – SHORT CIRCUT
26 05 73 – COORDINATION
26 05 74 – OVERCURRENT PROTECTIVE DEVICE ARC FLASH
26 20 00 – SERVICE AND DISTRIBUTION
26 27 26 – WIRING DEVICES
26 50 00 – LIGHTING
DIVISION 31 – EARTHWORK
31 10 00 – SITE CLEARING
31 20 00 – EARTH MOVING
31 22 00 – FINE GRADING
31 31 16 – TERMITE CONTROL
31 92 23 – SODDING
NDHS Wrestling Building IFB - 1 INVITATION FOR BIDS
INVITATION FOR BIDS
From The Owner:
Desoto Parish School Board 399 Jenkins St., Mansfield, LA 71052 Superintendent, Clay Corley
And The Architect:
Didier Architecture: Derryl Didier, Architect & Associates, LLC 17531 Old Jefferson Hwy., Ste. C Prairieville, LA 70769
And The Engineer:
Simpson Sports Engineering, LLC 4241 Little Farms Dr.
Zachary, LA 70791
Your firm is invited to submit a bid for the following project:
North Desoto High School Wrestling Building
2571 US-171
Stonewall, LA 71078 Project Bid Number: CP2627D204-ND
DESCRIPTION OF PROJECT:
The project will consist of a new 8,720 sq ft Wrestling Practice Gymnasium for North Desoto High School including but not limited to; 4 practice mats, 1 office, 2 locker rooms and associated restrooms. The building will be used primarily for practices and are not intended to be for full viewing/spectating of wrestling matches.
DOCUMENTS:
Complete Bidding Documents for this project are available in electronic form without charge and without deposit from https://bidnetdirect.com/louisiana/desotoparishschoolboard. Questions about this procedure shall be directed to the Architect at:
Didier Architecture 17531 Old Jefferson Hwy., Suite C Prairieville, LA 70769 Telephone: (225)-744-0008 E-mail: derryl@didierarch.com
NDHS Wrestling Building IFB - 2 INVITATION FOR BIDS
MANDATORY PRE-BID CONFERENCE:
11:00AM Thursday August 13th, 2026 held at the jobsite. Refer to Instructions to Bidders.
TYPE OF BID:
Bids will be on a lump-sum basis. Segregated bids will not be accepted.
TIME LIMIT:
The time limit for the completion of this work will be 180 calendar days from the date of the Notice of Proceed. Work to be completed around regular building use.
BID OPENING:
Bids to be submitted no later than 2:00PM Thursday August 27th, 2026 at the following location:
DeSoto Parish School Board 399 Jenkins Street Mansfield, LA 71052
Division 0, Section 00100-Instructions to Bidders Page 1 of 7
00100-INSTRUCTIONS TO BIDDERS
1.1 CROSS REFERENCE TO PRIMARY STATEMENTS. Definitions, requirements, and limitations affecting the bidding are contained in the various contract documents and are not necessarily repeated in these instructions.
1.2 QUALIFICATION OF BIDDERS. Bidders may be required to submit evidence that they have a practical knowledge of the particular task bid upon, and that they have the financial resources to complete the proposed scope in entirety.
In determining the Bidder’s qualifications, the following factors will be considered:
contracts previously completed by the Bidder and whether the Bidder (a) maintains a permanent place of business, (b) has adequate plant and equipment to do the task properly and expeditiously, (c) has the financial resources to meet all obligations incidental to the task, and (d) has appropriate technical experience.
Preference will be given to bidders domiciled in Louisiana as stated in Louisiana Public
Contract Law (38:2281).
Each Bidder may be required to show that he has completed similar work and that there are no just claims pending against such work. No Bid will be accepted from a Bidder who is engaged on any contract which would impair his ability to perform or finance his work.
1.3 LOUISIANA LICENSE REQUIREMENTS. Only Bids of Contractors licensed under
LSA R.S. – 37:2150 et seq., will be considered. Licensing is supervised by the Louisiana
Licensing Board for Contractors, 7434 Perkins Road, Baton Rouge, Louisiana.
Contractors desiring to bid shall submit with their Bids evidence that they hold a valid
Building Construction license in Louisiana.
1.4 FAMILIARIZATION WITH THE WORK. Before submitting his Bid, each prospective
Bidder shall familiarize himself with the scope of the task, the sites where the proposed improvements are to be performed, local labor conditions and all laws, regulations and other factors affecting performance of the work. He shall carefully correlate his observations with requirements of the Contract Documents and otherwise satisfy himself of the expense and difficulties attending performance of the Work. The submission of a
Bid will constitute a representation of compliance by the Bidder. There will be no financial adjustment justification for lack of such familiarization. Additionally, evidence of having the lack of familiarization could result in contract termination or substantial financial impacts to the contractor due to liquidated damages or other variables.
1.4.1 Site Conditions. Each Bidder shall visit the sites of the Work and completely inform himself relative to construction hazards and procedure, the availability of lands, the character and quantity of surface and subsurface materials, and utilities to be encountered, the arrangement and condition of existing structures and facilities, the procedure necessary for maintenance of uninterrupted operation of existing facilities, the
Division 0, Section 00100-Instructions to Bidders Page 2 of 7 character of construction equipment and facilities needed for performance of the Work, and facilities for transportation, handling, and storage of materials and equipment. All such factors shall be properly investigated and considered in the preparation of the Bid.
1.4.2 Access to the Sites. The project is to be constructed within Stonewall, LA. Contractors and Suppliers wishing to inspect the various sites may do so at their convenience.
1.5 INTERPRETATIONS. The Drawings have been prepared by Didier Architecture: Derryl
Didier Architect and Associates, LLC, 17531 Old Jefferson Hwy., Ste. C, Prairieville, LA
70769, (225)-744-0008, who is hereinafter called ARCHITECT and who is to act as
OWNER’s representative, assume all duties and responsibilities and have the rights and authority assigned to ARCHITECT in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. All questions about the meaning or intent of the Specifications and Contract Documents shall be submitted to the Architect in writing. Replies will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the bidding documents. Addenda will be issued at least 72 hours, (3 working days, excluding weekends and holidays) prior to the time stated for opening bids. Questions received less than five (5) working days prior to the date for opening Bids will not be answered. Only answers furnished by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
1.6 TAXES AND PERMITS. In accordance with Louisiana laws, relative to the Public Bid
Law, certain purchases of material and supplies by certain Contractors and
Subcontractors awarded public works Contracts by a public entity are exempt from local and state taxes on public works contracts by public entities. Enclosed herein is form entitled Designation of Construction Contractor as Agent of Government Entity and
Exemption Certificate indicating the Designation of Agency as Desoto Parish School
Board for the period of construction outlined in Contract. This designation of agency form when properly executed by both the Contractor and the government entity, (Desoto
Parish School Board) for the construction period.
1.7 BID SECURITY. The amount of bid security is stated in the Invitation. The required security must be in the form of a certified or bank cashier’s check or a bid bond. The bid bond must be executed by a surety meeting the requirements set forth in the General
Conditions and Supplementary Conditions. Bid bond must have attached appropriate and satisfactory Power of Attorney. The bond shall also be countersigned by a person who is under contract with the Surety Company or Bond Issuer as a Licensed Agent in this State and who is residing in the State. Refer to R.S. 38:2218
The bid security shall be made payable without condition to the Owner. The bid security may be retained by and shall be forfeited to the Owner as liquidated damages if the Bid is accepted and a contract based thereon is awarded and the Bidder should fail to enter into a contract in the form prescribed, with legally responsible sureties, within fifteen (15) days after such award is made by Owner.
Division 0, Section 00100-Instructions to Bidders Page 3 of 7
1.8 RETURN OF BID SECURITY. The bid security of the successful Bidder will be retained until he has executed the Agreement and furnished the required Contract
Security, whereupon checks furnished as bid security will be returned; if he fails to execute and deliver the Agreement and furnish the required Contract Security within fifteen (15) days of the Notice of Award, Owner may annul the Notice of Award and the bid security of that Bidder will be forfeited. The bid security of any Bidder whom Owner believes ‘to have a reasonable chance of receiving the award’ may be retained by Owner until the seventh day after the executed Agreement is delivered by Owner to Contractor and the required Contract Security is furnished but not to exceed thirty (30) days after the
Bid opening. Checks furnished as bid security by other Bidders will be returned within five (5) days of the Bid opening.
1.9 CONTRACT TIME. The Contract Time is an essential part of the contract and it may be necessary for each Bidder to satisfy Owner of his ability to complete the Work within the time set forth in the Bid Form. Provisions for delays, liquidated damages, and extensions of time are set forth in the General and Supplementary Conditions.
The Contractor is responsible for equipment and material delivery. A time extension to the Contract duration will not be allowed for late material or equipment delivery.
1.10 SUBCONTRACTORS AND SUPPLIERS. Within three (3) days after Bids are opened, the apparent low Bidder, and any other Bidder so requested, shall submit a list of all
Subcontractors and Suppliers he expects to use in the Work and to submit manufacturer’s data on selected equipment, if requested by Owner.
1.10.1 Subcontractor Qualification. Particular consideration will be given to the qualifications of each Subcontractor proposed. An experience statement with pertinent information as to similar projects and other evidence of qualification shall be furnished for each named
Subcontractor, as requested by the Owner or Engineer. If Owner or Engineer, after due investigation has reasonable objection to any proposed Subcontractor, he may, before giving Notice of Award, request the apparent low Bidder to submit an acceptable substitute without an increase in his Bid. If the apparent low Bidder declines to make substitution, he will not thereby sacrifice his bid security. Any Subcontractor so listed and to whom Owner or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to the Owner and Engineer.
Contractor shall not be required to employ any Subcontractor against whom he has reasonable objection.
The use of Subcontractors listed by the Bidder and accepted by Owner prior to Notice of
Award will be required in the performance of the Work.
1.10.2 Suppliers. The list of Subcontractors shall also include the suppliers of the principal items of materials and equipment the Bidder expects to use in the Work unless such suppliers or manufacturers are named in the Bid.
Division 0, Section 00100-Instructions to Bidders Page 4 of 7
1.10.3 Manufacturer’s Data. The list of Subcontractors submitted as provided herein shall be accompanied by two prints or copies of data on equipment and materials to be furnished by each supplier or manufacturer. Data so submitted shall illustrate the physical characteristics of the equipment and materials to be furnished. Although the drawings and specifications submitted prior to the Notice of Award need not be complete, they must contain sufficient detail for Engineer to determine whether the materials and equipment will conform to the Contract Documents.
The Contract Documents will take precedence over any nonconforming data submitted.
Any Bid specifically conditioned upon furnishing equipment or materials which are not responsive to the Contract Documents will not be considered.
1.11 BIDS.
1.11.1 Bid Form. The Bid Form is bound within the Contract Documents. Bid forms must be completed in ink or typed.
Bids by corporations must be executed in the corporate name by a president or vice-president (or other corporate officer) accompanied by evidence of authority to sign. The state of incorporation shall be shown below the corporate name. Bids by partnerships must be executed in the partnership name and signed by a partner; title and the official address of the partnership must be shown below the signature. Bids by joint ventures shall be signed by each participant in the joint venture or by an authorized agent of each participant.
The names of all persons signing must also be legibly printed below the signature. A Bid by a person who affixes to his signature the word “president”, “secretary”, “agent”, or other designation without disclosing his principal may be held to be liable for the Bid.
All project pertinent blank spaces in the Bid Form shall be filled in. N/A shall be filled in spaces not applicable to this project. Bids received without all such items completed will be considered as a nonresponsive Bid.
The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers and dates of which shall be filled in on the Bid Form.
No alterations in the Bids, or in the printed forms therein, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the
Bidder. If initialed, Owner may require the Bidder to clarify any alteration so initialed.
In addition to paper bids, electronic bids and electronic bid bonds for the project will be downloaded by the Desoto Parish School Board. Electronic bids and electronic bid bonds must be submitted through https://www.bidnetdirect.com/louisiana/desotoparishschoolboard
Division 0, Section 00100-Instructions to Bidders Page 5 of 7 prior to the electronic bidding deadline. Beginning at 2:00 PM (CST) on August 27, 2026, all bids will be downloaded. No bids are accepted after 2:00 PM (CST) on August
27, 2026.
1.11.2 Affidavit. Low bidders shall provide Non-Collusion Affidavit within 10 days of bid award.
1.11.3 Submission of Bids. The bid shall consist of the Bid Form and the other documents that are required to be submitted along with the Bid Form.
Each Bid and accompanying data shall be enclosed in a sealed opaque envelope or wrapping, addressed to:
DeSoto Parish School Board
399 Jenkins St.
and identified on the outside with the Bidder’s name, Louisiana Contractor License Number and the words “NDHS Wrestling Building”.
If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation “BID ENCLOSED” on the face thereof.
Bids shall be deposited at the designated location prior to the time and date for receipt of
Bids indicated in the Invitation for Bids, or the modified time and date indicated by
Addendum. Bids received after the time and date for receipt of Bids will be returned unopened.
Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.
Oral, telephone, or telegraph Bids are invalid and will not receive consideration.
No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association.
1.11.4 Modification and Withdrawal of Bids. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of
Bids.
1.11.5 Bids to Remain Open. All Bids shall remain open for 45 days after the day of the Bid opening. Owner shall release Bids and return bid securities as specified in Section 1.8 under “Return of Bid Security”.
1.12 AWARD OF CONTRACT. Owner shall award a contract to the Bidder who, in Owner’s judgment, is the lowest responsive, responsible Bidder. Owner reserves the right to reject
Division 0, Section 00100-Instructions to Bidders Page 6 of 7 any or all Bids, to award the contract by sections, to waive informalities, and to reject nonconforming, nonresponsive, or conditional Bids.
In evaluating Bids, Owner shall consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and alternatives and unit prices if requested in the Bid Form. Owner may consider the qualifications and experience of
Subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment), and may reject the Bid of any Bidder who does not pass any such evaluation to Owner’s satisfaction.
The evaluation of manufacturer’s data, when required to be submitted with the Bid or submitted upon request prior to the Notice of Award, shall include the following information at a minimum for consideration:
• Full name and address of manufacturer.
• Manufacturer’s engineering or technical representative contact, including telephone number and email addresses.
• Manufacturers’ service facilities and availability of qualified field service personnel.
• Manufacture’s contact information for the local sales information.
• The name (model, series number, etc.) of the product(s) that are to be listed.
• Manufacture’s inventory on-hand and demand capacity.
• Manufacturer’s installation requirements and procedures, related engineering specifications, training, required certifications.
• Manufacture’s operating cost, maintenance upkeep schedule, life expectancy, and any warranty or other service included for the product listed.
• Experience and performance record of the manufacturer and specific products listed.
• Manufacture’s Cut sheet(s) / engineering details of products listed.
• A cost / benefit analysis compared to similar and common product from a different manufacturer.
If the contract is awarded, Owner shall give the apparent successful Bidder a Notice of
Award within thirty (30) days after the date of the Bid opening.
1.13 EXECUTION OF THE AGREEMENT. The Contractor shall be furnished four (4) copies of the Agreement, including insurance certificates, and other Contract Documents bound therewith. Within fifteen (15) days of Notice of Award, Contractor shall execute the Agreement, insert executed copies of the required bonds and power of attorney and submit all copies to Owner. The date of contract on the Agreement and Bond forms shall be left blank for filling in by Owner. The certification date on the power of attorney also shall be left blank for filling in by Owner.
Owner shall execute all copies, insert the date of contract on the Agreement, Bonds, and power of attorney, and return all copies to Engineer for review and distribution.
Division 0, Section 00100-Instructions to Bidders Page 7 of 7
Once all contract documents have been executed, the Contractor shall be furnished one
(1) set of original documents. The Owner shall have one (1) set of these documents recorded in the office of the Recorder of Mortgages in the jurisdiction where the work is to be performed.
1.14 COPIES OF CONTRACT DOCUMENTS. Copies of the drawings and specifications for use in preparing Bids may be obtained from:
https://bidnetdirect.com/louisiana/desotoparishschoolboard or
Didier Architecture: Derryl Didier, Architect & Associates, LLC 17531 Old Jefferson Hwy, Ste. C Prairieville, LA 70769
The Contractor to whom a contract is awarded will be responsible for obtaining two (2) working copies of the specifications and the drawings, together with all Addenda thereto.
LOCAL MATERIAL AND FIRMS. By statutory authority, preference is hereby given to materials, supplies, and provisions produced, manufactured, or grown in Louisiana, quality being equal to articles offered by competitors outside of the State (LSA R.S. – 38:2252), and preference is hereby given to firms doing business in the State of Louisiana (LSA R.S.
– 38:2253).
00300-LOUISIANA UNIFORM PUBLIC WORK BID FORM
TO: Desoto Parish School Board BID FOR: NDHS Wrestling Building
399 Jenkins St., Mansfield, LA 71052 CP2627D204-ND
The undersigned bidder hereby declares and represents that she/he: a) has carefully examined and understands the Bidding Documents,
b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by: Didier Architecture, Derryl Didier, Architect & Associates, LLC, dated 7/14/2026 .
Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the Designer has assigned to each of the addenda that the Bidder is acknowledging) __________________________________________ .
TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated “Base Bid” * but not alternates) the sum of:
Dollars ($ )
ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.
Alternate No. 1 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
N/A . Dollars ($ N/A )
Alternate No. 2 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
N/A . Dollars ($ N/A )
Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
N/A Dollars ($ N/A )
NAME OF BIDDER: _____________________________________________________________________________________
ADDRESS OF BIDDER: __________________________________________________________________________________
LOUISIANA CONTRACTOR’S LICENSE NUMBER: ____________________________________________________________
NAME OF AUTHORIZED SIGNATORY OF BIDDER: ___________________________________________________________
TITLE OF AUTHORIZED SIGNATORY OF BIDDER: ___________________________________________________________
SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:____________________________________________________
DATE: _________________________________________________________________________________________________
THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA UNIFORM PUBLIC WORK
BID FORM:
* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.
** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).
BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA RS 38:2218.A is attached to and made a part of this bid.
Division 0, Resolution Page 1 of 1
00320-RESOLUTION AUTHORIZING SUBMISSION OF QUOTE, SIGNATURE
OF QUOTE AND SIGNATURE OF CONTRACT
BE IT RESOLVED by the Board of Directors of _______________________________, a
Corporation organized and existing under the laws of the State of ________________________, and domiciled in the City of _________________________; that _________________________
President of the Corporation and/or __________________________ of the Corporation, be, and are hereby authorized and empowered to submit quotes and to execute any and all contracts of whatever kind on behalf of the Corporation and to do all things necessary in the premises.
CERTIFICATE
I, _____________________________, Secretary of ____________________________ do hereby certify that the foregoing resolution is a true and exact copy unanimously adopted by the Board of
Directors of said corporation at a meeting thereof legally held on the __________ day of
__________ 20_____; that said resolution is duly entered into the records of said corporation; that it has not been rescinded or modified; and that it is now in full force and effect.
IN TESTIMONY WHEREOF, I have hereunto set my hand and the seal of said corporation this
_______ day of ______________, 20________.
(Secretary)
Division 0, Section 00340-Affidavit Page 1 of 2
00340-BIDDER’S NON-COLLUSION AFFIDAVIT
(TO BE PROVIDED WITHIN 10 DAYS OF BID AWARD BY APPARENT LOW BIDDER)
STATE OF LOUISIANA
PARISH OF DESOTO
BEFORE ME, the undersigned authority, personally came and appeared
__________________________________ who after being by me duly sworn, deposed and said that he is the fully authorized _____________________________________ of
____________________________________(Herein after referred to as “BIDDER”) the party who submitted a quote for NDHS Wrestling Building which quote was received by Desoto
Parish School Board on _________________ and said affiant further said:
(1) That bidder employed no person, corporation, firm, asocial, or other organization, either directly or indirectly, to secure public contract under which he received payment, other than persons regularly employed by the affiant whose services in connection with the construction, alteration, or demolition of the public building or project or in securing the public contract were in the regular course of their duties for bidder, and
(2) That no part of the contract price received by bidder was paid or will be paid to any person, corporation, firm, association, or other organization for soliciting the contract, other than the payment of their normal compensation to persons regularly employed by the affiant whose services in connection with the construction, alteration, or demolition of the public building or project were in the regular course of their duties for bidder.
(3) Said bidder is genuine and the bidder has not colluded, conspired or agreed directly or indirectly with any other bidder to offer a sham or collusive quote.
(4) Said bidder has not in any manner directly or indirectly agreed with any other person to fix the quote price of affiant or any other bidder, or to fix any overhead profit or cost element of said quote price, of that of any other bidder, or to induce any other person to refrain from bidding.
(5) Said quote is not intended to secure an unfair advantage of benefit from Desoto Parish, Louisiana or in favor of any persons interested in the proposed contract.
(6) All statements contained in said quote are true and correct.
Division 0, Section 00340-Affidavit Page 2 of 2
(7) Neither affiant nor any member of his company has divulged information regarding said quote or any data relative thereto to any person, firm, or corporation.
By:_____________________________________
(Signature)
(Type or Print Name)
(Type or Print Title)
SUBSCRIBED AND SWORN TO BEFORE ME THIS _____________DAY OF
__________________, 20_______.
Notary Public
Division 0, Section 00360 Bond Page 1 of 1
00360-BID BOND FORM
Date: ________________
KNOW ALL MEN BY THESE PRESENTS:
That_______________________________ of _____________________________, as
Principal, and ________________________________________________, as Surety, are held and firmly bound unto the _______________________________________________ (Obligee), in the full and just sum of five (5%) percent of the total amount of this quote, including all alternates, lawful money of the United States, for payment of which sum, well and truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally firmly by these presents.
Surety represents that it is listed on the current U. S. Department of the Treasury Financial
Management Service list of approved bonding companies as approved for an amount equal to or greater that the amount for which it obligates itself in this instrument or that it is a Louisiana domiciled insurance company with at least an A - rating in the latest printing of the A. M. Bests Key Rating
Guide. If surety qualifies by virtue of its Best's listing, the Bond amount may not exceed ten percent of policyholders' surplus as shown in the latest A. M. Best's Key Rating Guide.
Surety further represents that it is licensed to do business in the State of Louisiana and that this Bond is signed by surety's agent or attorney-in-fact. This Bid Bond is accompanied by appropriate power of attorney.
THE CONDITION OF THIS OBLIGATION IS SUCH that, whereas said Principal is herewith submitting its proposal to the Obligee on a Contract for:
NOW, THEREFORE, if the said Contract be awarded to the Principal and the Principal shall, within such time as may be specified, enter into the Contract in writing and give a good and sufficient bond to secure the performance of the terms and conditions of the Contract with surety acceptable to the Obligee, then this obligation shall be void; otherwise this obligation shall become due and payable.
PRINCIPAL (BIDDER) SURETY
BY:_____________________________ BY:___________________________
AUTHORIZED OFFICER-OWNER-PARTNER AGENT OR ATTORNEY-IN-FACT(SEAL)
NDHS Wrestling Building 00 50 00 - 1 CONTRACTING FORMS AND SUPPLEMENTS
SECTION 00 50 00
CONTRACTING FORMS AND SUPPLEMENTS
PART 1 GENERAL
1.01 AGREEMENT AND CONDITIONS OF THE CONTRACT
A. See General Conditions for the General Conditions.
B. See Supplementary Conditions for the Supplementary Conditions.
C. The General Conditions are based on AIA A201, 2017 Edition.
D. See Sample Contract between Owner and Contractor
1.02 FORMS
A. Use the following forms for the specified purposes unless otherwise indicated elsewhere in the Contract Documents.
B. Bond Forms:
1. Performance Bond: as included in Division 0 of this project manual
2. Payment Bond: as included in Division 0 of this project manual
C. Post-Award Certificates and Other Forms:
1. Schedule of Values Form: AIA G703.
2. Application for Payment Forms: AIA G702 with AIA G703 (for Contractors).
D. Clarification and Modification Forms:
1. Change Order Form: AIA G701.
E. Closeout Forms:
1. Certificate of Substantial Completion Form: AIA G704.
1.03 REFERENCE STANDARDS
A. AIA A201 - General Conditions of the Contract for Construction; 2017.
B. AIA G701 - Change Order; 2017.
D. AIA G702 - Application and Certificate for Payment; 1992.
E. AIA G703 - Continuation Sheet; 1992.
F. AIA G704 - Certificate of Substantial Completion; 2017.
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
END OF SECTION
**Sample Contract Only – Final contract subject to final negotiations and special conditions that may arise for this project, until such agreement approved by Parish Legal**
Division 0, Section 00500. Sample Contract Page 1 of 5
00500-SAMPLE CONTRACT
THIS AGREEMENT, made and executed in FOUR (4) original copies on this ________day of ____________ in the year 20_____ by and between:
Desoto Parish School Board (Hereinafter called OWNER) and
(hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
Article 1 WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents in conjunction with:
NDHS Wrestling Building
Article 2 ARCHITECT.
The Drawings have been prepared by Didier Architecture: Derryl Didier Architect and Associates, LLC, 17531 Old Jefferson Hwy., Ste. C, Prairieville, LA 70769, (225)-744-0008, who is hereinafter called ARCHITECT and who is to act as OWNER’S REPRESENTATIVE, assume all duties and responsibilities and have the rights and authority assigned to ARCHITECT in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents.
Article 3 CONTRACT TIME.
3.1 The Work will be substantially completed within 180 calendar days from the date when the Contract Time commences to run as provided in paragraph 2.3 General Conditions.
3.2 Project Schedule. CONTRACTOR shall submit and strictly adhere to a project construction schedule throughout the allocated contract and associated time frame. See Sections 2.05, 2.06, and 2.07 on pages 00700-07. CONTRACTOR is aware that OWNER may have a representative at each site where Work is performed and that CONTRACTOR needs to coordinate with the OWNER’S REPRESENTATIVE where Work on the CONTRACT will be performed. CONTRACTOR will coordinate with the OWNER’S REPRESENTATIVE by strictly following the project construction schedule or Progress Schedule. OWNER recognizes and understands that changes in project construction schedule or Progress Schedule may become necessary during the course of the project. However, in the event of any such change, the CONTRACTOR shall notify the OWNER’S REPRESENTATIVE in writing (via mail or email) of a proposed change. Said written notice shall be provided at least 12 hours prior to the revised
**Sample Contract Only – Final contract subject to final negotiations and special conditions that may arise for
Division 0, Section 00500. Sample Contract Page 2 of 5 construction activity. Said notice shall be provided by emailing notice of change to derryl@didierarch.com, jsimpson@simpsonsportseng.com and dsimpson@simpsonsportseng.com. Should the CONTRACTOR fail to timely notify the OWNER’S REPRESENTATIVE of such change, the OWNER’S REPRESENTATIVE will document the CONTRACTOR’S failure to notify of the change in work and SHALL assess stipulated damages as follows. For EACH failure to notify the OWNER’S REPRESENTATIVE of any change in the project construction schedule or Progress Schedule, the CONTRACTOR AGREES TO PAY $100.00 per failure to notify the OWNER’S REPRESENTATIVE.
CONTRACTOR agrees that these stipulated damages reflect the lost time, manpower, and mileage incurred by OWNER attempting to locate the CONTRACTOR where a change in schedule occurs and the required notice was not provided. CONTRACTOR further agrees that said amount shall be paid by directly reducing the amount of monthly invoices/pay applications by the amount of penalties issued. The Penalty fees shall be itemized on monthly invoices.
3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and the OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of General Conditions. There are delays, expenses and difficulties involved in proving in a legal arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER the amount of Two Hundred Fifty ($250.00) Dollars for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete.
Article 4 CONTRACT PRICE.
4.1 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents in current funds the sum of (subject to adjustment as provided in the Contract Documents):
Based on unit prices specified within this Contract Document. Contract price is firm and subject only to modification by written change order agreed to by both parties.
Article 5 PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions.
5.1 Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR’S Applications for Payment as recommended by ENGINEER, once each month during construction. All progress payments will be on the basis of progress of the Work measured by the schedule of values established in paragraph 2.07.A of the General Conditions (and in each case of Unit Price Work based on the number of units
**Sample Contract Only – Final contract subject to final negotiations and special conditions that may arise for
Division 0, Section 00500. Sample Contract Page 3 of 5 completed) or, in the event there is no schedule of values, as provided in the General Requirements.
5.2 Pursuant to LA R.S. – 38.2248 (Public Contract Law), Owner shall withhold retainage from each progress payment until payment is due under terms and conditions governing substantial completion or final payment. Retainage shall be ten percent of the amount of work completed to date if the contract amount is up to $500,000 and five percent of the work complete to date if the contract amount is over $500,000.
5.3 Fuel or Asphalt/Concrete Adjustments. There shall be NO adjustments for prices or costs of any fuel or asphalt/concrete on this project, arising out of the work on this project/contract, or arising out of this contract. Further, the CONTRACTOR hereby waives any price adjustment for fuel or asphalt/concrete or the ability or right to request any price adjustment for fuel or asphalt/concrete. Particularly, the Louisiana DOTD provisions (or any such or similar provisions by any other third party) pertaining to or related to fuel or asphalt/concrete adjustments are not part of this contract, are not incorporated by reference or otherwise in this Contract, and shall not apply in any form or fashion to the contract. Any language in this Contract which implies that the CONTRACTOR may obtain an adjustment in price for fuel or asphalt/concrete is hereby to be interpreted that CONTRACTOR shall not receive any such adjustment. CONTRACTOR shall not assert that any language in the CONTRACT creates any vagueness or ambiguity in the CONTRACT entitling CONTRACTOR to price adjustments for fuel or asphalt/concrete. CONTRACTOR hereby waives any right or ability to request any price adjustment for fuel or asphalt/concrete and CONTRACTOR shall not submit any request for any change in price for fuel or asphalt/concrete adjustments to the OWNER in any form.
5.4 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General Conditions and Supplementary Conditions SC-9.03(B)(13).
OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER.
Article 6 CONTRACTOR’S REPRESENTATIONS.
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations:
6.1 CONTRACTOR is familiar with the nature and extent of the Contract Documents, Work site, locality and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work.
6.2 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies, or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.3 of the General Conditions.
**Sample Contract Only – Final contract subject to final negotiations and special conditions that may arise for
Division 0, Section 00500. Sample Contract Page 4 of 5
6.3 CONTRACTOR has correlated the results of all such observations, examinations, investigations, explorations, tests, reports, and studies with the terms and conditions of the Contract Documents.
6.4 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
Article 7 CONTRACT DOCUMENTS.
The Contract Documents which comprise the contract between OWNER and CONTRACTOR, attached hereto and made a part hereof, consist of the documents listed in Table of Contents, and the documents identified below.
a. Quote
b. Bid Bond
c. Agreement
d. Payment Bond
e. Performance Bond
f. Notice of Award
g. Notice to Proceed
h. Drawings prepared by Simpson Sports Engineering, LLC.
i. Specifications prepared by Simpson Sports Engineering, LLC.
Article 8 MISCELLANEOUS
8.1 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
8.2 OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representative to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents.
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Contract the day and year first above written.
**Sample Contract Only – Final contract subject to final negotiations and special conditions that may arise for
Division 0, Section 00500. Sample Contract Page 5 of 5
OWNER CONTRACTOR
Desoto Parish School Board ______________________________
Federal Identification No. Federal Identification No.
By: Clay Corley By
Title DPSB Superintendent Title
Attest____________________ Attest
Address for giving notices Address for giving notices:
399 Jenkins St., License No.
Document A201TM – 2017 General Conditions of the Contract for Construction
AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties.
Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:54:36 CT on 06/11/2019 under Order No.
1791696589 which expires on 07/23/2019, and is not for resale.
User Notes: (3B9ADA58)
This document has important legal consequences.
Consultation with an attorney is encouraged with respect to its completion or modification.
For guidance in modifying this document to include supplementary conditions, see AIA Document A503™, Guide for Supplementary Conditions.
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
for the following PROJECT:
(Name and location or address)
THE OWNER:
(Name, legal status and address)
THE ARCHITECT:
(Name, legal status and address)
Didier Architecture: Derryl Didier, Architect & Associates, LLC 17531 Old Jefferson Hwy, Ste. C Prairieville, LA 70769
TABLE OF ARTICLES
1 GENERAL PROVISIONS
2 OWNER
3 CONTRACTOR
4 ARCHITECT
5 SUBCONTRACTORS
6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
7 CHANGES IN THE WORK
8 TIME
9 PAYMENTS AND COMPLETION
10 PROTECTION OF PERSONS AND PROPERTY
11 INSURANCE AND BONDS
12 UNCOVERING AND CORRECTION OF WORK
13 MISCELLANEOUS PROVISIONS
14 TERMINATION OR SUSPENSION OF THE CONTRACT
NEW WRESTLING BUILDING FOR
NORTH DESOTO HIGH SCHOOL
2571 US-171, Stonewall, LA 71078
Desoto Parish School Board 399 Jenkins St., Mansfield, LA 71052 Superintendent, Clay Corley
AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties.
Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:54:36 CT on 06/11/2019 under Order No.
1791696589 which expires on 07/23/2019, and is not for resale.
User Notes: (3B9ADA58)
15 CLAIMS AND DISPUTES
AIA Document A201™ – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties.
Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 10:54:36 CT on 06/11/2019 under Order No.
1791696589 which expires on 07/23/2019, and is not for resale.
User Notes: (3B9ADA58)
INDEX
(Topics and numbers in bold are Section headings.)
Acceptance of Nonconforming Work 9.6.6, 9.9.3, 12.3 Acceptance of Work 9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 Access to Work 3.16, 6.2.1, 12.1 Accident Prevention Acts and Omissions 3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.3.2, 14.1, 15.1.2, 15.2 Addenda 1.1.1 Additional Costs, Claims for 3.7.4, 3.7.5, 10.3.2, 15.1.5 Additional Inspections and Testing 9.4.2, 9.8.3, 12.2.1, 13.4 Additional Time, Claims for 3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2, 15.1.6 Administration of the Contract 3.1.3, 4.2, 9.4, 9.5 Advertisement or Invitation to Bid 1.1.1 Aesthetic Effect 4.2.13 Allowances 3.8 Applications for Payment 4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.5.4, 9.6.3, 9.7, 9.10 Approvals 2.1.1, 2.3.1, 2.5, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10.1, 4.2.7, 9.3.2, 13.4.1 Arbitration 8.3.1, 15.3.2, 15.4
ARCHITECT
Architect, Definition of 4.1.1 Architect, Extent of Authority 2.5, 3.12.7, 4.1.2, 4.2, 5.2, 6.3, 7.1.2, 7.3.4, 7.4, 9.2, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.4.1, 13.4.2,…