STATEMENT OF WORK

FOR

LIBERITY SUBSTATION

CONCERTINA WIRE

PURPOSE

The purpose of this Statement of Work (SOW) is to obtain equipment, labor, materials, and associated services to provide the following:

1. Approximately 5320-feet of concertina wire along the top rail of the perimeter fence around Liberity Substation.

2. Two rows of barbed wire (approximately 5,320-feet-each) along the top rail of the perimeter fence around Liberity Substation.

3. Replace the existing fence post top caps with 45-degree barbed arm caps to support the above-referenced wire.

4. Installing 45-degree barbed arm caps on sections of block walls at the miscellaneous areas around the perimeter (outside corners and gate corners) to support the new wire.

5. Grounding the new wire in accordance with Western’s Standard Drawings.

CONTRACTOR COMPLIANCE

The Contractor shall comply with the following:

1. Western’s Drawings LIB 0015 – Rev D, LIB 0010 – Rev K, LIB 3012 – Rev A, and LIB 3013 – Rev A. All drawings are for information only.

2. Western’s Standard Drawing 31-1060 – Rev G, 31-1500-Rev B, 31-1501-Rev B, 31-2000-Rev G, and 31-2038, for information only.

3. Western’s Standard Specifications’ Division 2.10 – Fencing.

4. ASTM Standards F567 and F1553.

5. Occupational Safety and Health Administration (Federal and State).

The Contractor shall be required to meet all applicable Federal, State, and local laws, regulations, and ordinances governing the installation of barbed wire and concertina wire.

If there is a conflict between these regulations and other applicable Federal, State, and local regulations and this SOW, the more stringent requirements shall prevail.

All Contractor personnel are required to be U.S. Citizens, and complete form WAPA F 3000.73 – Citizenship Form. Citizens or permanent residents shall complete a Foreign National Data Card 30-45-days prior to their potential appearance on-site. Western will advise the Contractor when clearance has been granted.

WORK LOCATION

The United States Department of Energy / Western Area Power Administration’s Liberty Substation facility is located in Maricopa County, Arizona. Western will provide the Contractor with an address at the time of contract award.

TECHNICAL POINT OF CONTACT

Western's Technical Point of Contact is:

Western Area Power Administration ATTN: David Pflanz, G5621 P.O. Box 6457 Phoenix, AZ 85005-6457 Telephone: (O) (602) 605-2472; (F) (602) 605-2410, (M) 602-663-3812

SERVICES TO BE PERFORMED BY THE CONTRACTOR

The Contractor is not allowed to work on-site without the presence of a Western representative. The Contractor shall commence work no later than 10-days after contract award. The Contractor shall complete the entire project within five-weeks, which includes two-weeks for submittal review, and subsequent to mobilization to the site.

The Contractor shall submit all new fence components to the COR for approval.

FENCE

The existing perimeter fence consists of eight-foot-tall chain-link fence with Concrete Masonry Unit (CMU) walls at the main entry gate and at all outside corners, see Drawings LIB-3012 – Rev A and LIB 0013 – Rev A. Each fence post has a standard top cap to support the existing top rail.

In 2007/2008, two rows (stacked) of concertina wire were installed at the inside perimeter of the fence. The top row of concertina wire attaches to the top of the block wall.

The Standard Drawings do not show the use of concertina wire; the Standards are included for reference only, and installation of the new concertina wire shall be done in a similar, manufacturer-approved, manner.

The Contractor shall remove the existing top rail and fence end caps; provide new 45-degree barbed arm caps for two new horizontal barbed wire strands; then reinstall the top rail. The removed top end caps become the property of the Contractor, and shall be disposed of/recycled at an appropriate location.

The Contractor shall provide two strands of galvanized, 12-½-inch gage wire with four-point barbs to the top perimeter of the fence on the new 45-degree barbed wire arms; see Standard Drawings for connections. The Contractor shall also provide 24-inch concertina wire, stainless steel, 12-½-inch-gage galvanized core wire, 31 loops, three clips per loop, 20-feet yield, and 16-inch spacing (24SG31) around the newly installed perimeter top barbed wire. The Contractor shall attach the new wire per the manufacturer’s recommendations.

The existing fence is grounded to the existing ground grid, in accordance with Standard Drawings 31-1500 and 31-1501. The Contractor shall ground the new barbed wire as shown on Standard Drawing 31-1501 – Rev B. Currently, every third post is connected to the existing ground grid. The Contractor shall extend this grounding wire to the new barbed wire at the top of the fence. The Contractor shall use as a minimum No. 2 bare copper clad (steel core) for the grounding wire, and Servit Connectors to attach the grounds to all connection points.

The Contractor shall submit, at the end of the contract, an as-built drawing showing the locations of the new wire installation and grounding connections. The as-built marks shall be done in a full-size (34-inches x 22-inches) hard copy of the existing site plan, with “Additions” in red, “Deletions” in green, and “Notes” to the drafter in blue.

CONTRACTOR-FURNISHED MATERIAL AND DELIVERABLES

The Contractor shall provide the following:

1. Submittals as outlined on the attached Submittal Log.

2. New concertina wire installed in accordance with the manufacturer’s installation instructions.

3. New barbed wire installed per the manufacturer’s installation instructions.

4. New top caps for fence posts with a minimum of two connection points for horizontal barbed wire installation.

5. Ground the new wire sections with No. 2 copper clad (steel core) conductor and ground to ground grid’s existing fence post connections.

6. All labor, equipment, and materials to install the concertina wire, barbed wire, 45-degree top caps, and No. 2 grounding of the new barbed wire.

7. Provide a commerical industry standard warranty on parts and labor.

8. As-built drawing(s) of new wire installation.

SITE REQUIREMENTS

Western will not provide any equipment or operator assistance to unload any Contractor-supplied equipment. Western will have a representative on-site to monitor compliance with OSHA and other regulatory agency requirements.

The Contractor’s work trucks shall be grounded while in the substation by utilizing drag chains.

SAFETY

In performing the work required by this contract, the Contractor shall comply with all applicable Federal, State, or local safety, health, or industrial safety codes, including the latest effective standards promulgated by the Secretary of Labor for the Department of Labor and Health Administration, Safety and Health Standards (29 CFR 1910).

Prior to commencing work, an on-site safety meeting shall be held with Western’s representative to address and discuss safety procedures related to the work required, and to discuss potential hazards and their mitigation. Additionally, Western has the right to remove any Contractor employee that does not adhere to said requirements. Details of the on-site representative shall be given at the time of contract award.