2016 UGP COMMUNICATION
TOWER RENOVATIONS
Solicitation No. DE-SOL-0009748 Spec. No. 16WC116627-697
SECTION C
DESCRIPTION/SPECIFICATIONS
SOUTH DAKOTA, NORTH DAKOTA,
MONTANA, AND NEBRASKA
SECTION C
DESCRIPTION/SPECIFICATIONS
2016 UGP COMMUNICATION TOWER RENOVATIONS
SOUTH DAKOTA, NORTH DAKOTA, MONTANA, AND NEBRASKA
DIVISION 1 - GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
1. Install Government Furnished Equipment (GFE)
2. Removing one antenna at Tyler site
3. Remove one antenna and one VHF reflector at Garrison site
4. Provide tower inspections and reporting at Tyler and Fox Creek sites
5. Dismantle 45’ communication tower at Garrison site and transport to Gwinner site for reassembly including the addition two new platforms and a safety cable system
6. Remove deficient tower members/girts and install replacement GFE tower members
7. Align antennas at Elliott and Rutland sites
8. Replace one GFE feedhorn, align antenna, and add waveguides at Orchard site
9. Install waveguides’ ice bridge between the tower and the Control Building at Gwinner site
10. Install dehydrator in communication building at the Grande Prairie site
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. The Bidding Schedule does not contain a separate item for mobilization and preparatory work. 4
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT, PROSECUTION, AND COMPLETION OF THE WORK:
2. INTERMEDIATE COMPLETION DATES:
3. SUBMITTAL APPROVAL TIME:
4. OUTAGE RESTRICTIONS:
5. CONSTRUCTION SCHEDULE RESTRICTIONS:
E. CONSTRUCTION PROGRAM:
1. SCHEDULE SUBMITTAL TIME:
F. GOVERNMENT FURNISHED EQUIPMENT (GFE) AND MATERIAL:
1. POINTS OF DELIVERY:
G. RIGHTS-OF-WAY:
1. GENERAL:
2. ACCESS EASEMENTS:
H. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
I. WATER FOR CONSTRUCTION PURPOSES:
J. EXPLOSIVES AND BLASTING:
K. SUBMITTALS:
1. GENERAL:
2. APPROVAL TIME:
3. TRANSMITTAL:
A. GENERAL:
1. The Bidding Schedule does not contain a separate item for complying with the following environmental Standard
DIVISION 14 - COMMUNICATION FACILITIES
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “GARRISON MICROWAVE SITE, ND”
2. Bidding Schedule item “ELLIOT SUBSTATION, ND”
3. Bidding Schedule item “RUTLAND MICROWAVE SITE, ND”
4. Bidding Schedule item “GWINNER MICROWAVE SITE, ND”
5. Bidding Schedule item “ORCHARD MICROWAVE SITE, NE”
6. Bidding Schedule item “GRANDE PRAIRIE SUBSTATION, NE”
7. Bidding Schedule item “TRIPP (East River) MICROWAVE SITE, SD”
8. Bidding Schedule item “FOX CREEK MICROWAVE SITE, MT”
9. Bidding Schedule item “TYLER MICROWAVE SITE, MT”
B. ICE BRIDGE AND SUPPORTS
1. ICE BRIDGE AND SUPPORTS:
C. GROUNDING SYSTEM
1. GROUNDING SYSTEM, GENERAL:
D. ANTENNA SYSTEM
1. GENERAL:
2. ANTENNAS AND MOUNTS:
3. COMMUNICATION TRANSMISSION LINES:
E. SAFETY CLIMB SYSTEM
1. SAFETY CLIMB SYSTEM, GENERAL:
F. TOWER INSPECTION AND MAINTENANCE:
1. GENERAL:
2. ANTENNA AND TOWER WORK REQUIREMENTS:
DIVISION 1 - GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
Construct and complete antenna systems and associated work for this telecommunications project in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western Construction Standards, including: Standard 1 - General Requirements (September 2013); Standard 2 - Sitework (September 2013); Standard 3 - Concrete (September 2013); Standard 4 - Substation Metalwork and Transmission Line Lattice Structures (September 2013); Standard 5 – Transmission Line Steel Pole Structures (September 2013); Standard 6 – Light Duty Steel Pole Structures (September 2013); Standard 7 – Wood Poles (September 2013); Standard 8 – Glued Laminated Structures (September 2009); Standard 9 – Substations: Electrical Service Building (September 2013); Standard 10 – Transmission Line: Electrical (September 2013); Standard 11 – Service Building (September 2013); Standard 12 – Painting (September 2013); Standard 13 - Environmental Quality Protection (September 2013); Standard 14 - Communication Facilities (September 2013);
Standard 15 - Drawings (September 2013); Standard Drawings; and these Project Specifications and Drawings. All Western Standards are incorporated by reference.
If a conflict occurs between the project specifications and the construction standards, the project specifications shall govern. The project’s specifications and drawings are used to take exceptions or to provide additions to the standard specifications. Some paragraphs in the standard specifications will not apply to this job.
Western’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
Western project specifications and standards are explained in Standard 1 - General Requirements, Section 1.1.1 “Standards and Project Specifications”.
B. DESCRIPTION OF WORK:
All of the work will be done at sites (total of 9) located in: South Dakota (Tripp), North Dakota (Garrison, Elliott, Rutland and Gwinner), Montana (Fox Creek and Tyler), and Nebraska (Orchard and Grand Prairie).
The principal components of work include:
1. Install Government Furnished Equipment (GFE) including antennas, feedhorns, radomes, and waveguides at four communication sites including Gwinner, Orchard, Grande Prairie, and Tripp.
2. Removing one antenna at Tyler site.
3. Remove one antenna and one VHF reflector at Garrison site.
4. Provide tower inspections and reporting at Tyler and Fox Creek sites.
5. Dismantle 45’ communication tower at Garrison site and transport to Gwinner site for reassembly including the addition two new platforms and a safety cable system.
6. Remove deficient tower members/girts and install replacement GFE tower members at Fox
Creek.
7. Align antennas at Elliott and Rutland sites.
8. Replace one GFE feedhorn, align antenna, and add waveguides at Orchard site.
9. Install waveguides’ ice bridge between the tower and the Control Building at Gwinner site.
10. Install dehydrator in communication building at the Grande Prairie site.
Paragraphs “Description of Bidding Schedule Items” in Divisions – 13 and 14 describe the work to be performed.
https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. The Bidding Schedule does not contain a separate item for mobilization and preparatory work.
This item should be included with each applicable Bidding Schedule item and includes:
a. Performing mobilization and preparatory work in accordance with Sections H and M of the contract clauses.
b. Providing one Construction Schedule and one Safety and Health Program that covers work at all sites.
c. Complying with DOE Order 442.2 “Differing Professional Opinions for Technical Issues Involving Environment Safety and Health.”
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT, PROSECUTION, AND COMPLETION OF THE WORK: See FAR 52.211-
10 in Section F of the solicitation/contract.
2. INTERMEDIATE COMPLETION DATES:
a. Begin work within 10 calendar days after date of receipt of Notice to Proceed, and complete all work in South Dakota and Nebraska by July 15, 2016, all work in Montana by October 1, 2016, and all work in North Dakota by November 1, 2016.
b. Tower work associated with Grande Prairie Substation, NE should be scheduled to start
June 1, 2016 and must be completed by June 30, 2016 and must be coordinated with Western.
c. Tower work associated with the Gwinner Microwave Site, ND should be scheduled to start September 01, 2016 and must be coordinated with Western.
3. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 20 calendar days for review of drawings or data submitted for approval.
4. OUTAGE RESTRICTIONS: In addition to the restrictions listed in the standard specifications, the following outage restrictions shall apply:
a. A minimum of 24 hours advance notice is required prior to turning off VHF systems to limit RF exposure to workers when working in close proximity to the antenna.
b. Tower work associated with Grande Prairie, Rutland, and Gwinner sites must be coordinated with Western.
5. CONSTRUCTION SCHEDULE RESTRICTIONS:
a. Work may be performed at more than one site at a time upon approval by the COR. At no time will the contractor be allowed on site without a site owner representative present unless otherwise approved by the COR.
b. The Contractor shall not work more than 12 hour per day nor more than 60 hours in one continuous period without approval from the COR.
E. CONSTRUCTION PROGRAM:
1. SCHEDULE SUBMITTAL TIME: Submit a construction program to the COR within 15 calendar days after date of Notice to Proceed.
F. GOVERNMENT FURNISHED EQUIPMENT (GFE) AND MATERIAL: Contractor shall furnish all material required for completing the work, except for material to be furnished by Western as listed below:
Item Estimated
Weight (pounds)
Estimated Delivery
Date
Estimated Cost
1. Replacement tower members, bolts, nuts, and pal nuts
1 – Fox Creek
250 lbs
At Fort Peck Warehouse
$750
2. One antenna face mount 1 - Tripp
75 lbs At Armour Warehouse
$100
3. One (10) ft standard solid Commscope antenna and radome
(PL10-71W-P7M)
1 - Gwinner
Antenna 550 lbs radome 410 lbs crated 1,245 lbs
At Bismarck
$8,000
4. One (4 )ft standard solid Commscope antenna and radome (PL4-71W-
PXA/E)
1 – Gwinner
Antenna 200 lbs radome 60 lbs crated 300 lbs
$3,000
5. One 4-1/2” pipe mount 96” with clamp Commscope (PM-SC4-96) 1 - Gwinner
195 lbs At Bismarck
$ 580
6. One 8 ft antenna face mount kit Commscope (TF-M4-8) including 96” and 63” pipe mounts and crossover plates
610 lbs At Bismarck
$1500
7. One side strut Andrew (520570-3)
15 lbs At Bismarck
$250
8. One bottom strut Andrew (520570-5) 1 - Gwinner
15 lbs At Bismarck Warehouse
$230
9. One 4” tower face strut support Andrew (TF-MSS-4) 1 - Gwinner
20 lbs At Bismark Warehouse
$145
10. One 2” tower face strut support Andrew (TF-MSS-2) 1- Gwinner
20 lbs At Bismark
$120
Weight (pounds)
Estimated Delivery
Date
Estimated Cost
11. Two channel supports 6’ round Andrew (MD-CS-6R) 2 - Gwinner
155 lbs/ea
310 lbs
At Bismark
$436 ea
$872
12. Six pressure windows Andrew (AND- 55001-112) 2 – Gwinner 4 – Tripp
1 lbs/ea
6 lbs
(2)
At Armour
(4)
$60 ea
$360
13. Eight waveguide boots for EW77, 4 inches Sitepro1 (BAEW77) 4 – Gwinner 4 – Tripp
2 lbs/ea
16 lbs
Warehouse (4)
At Armour
$38 ea
$304
14. Two bridge supports Sitepro1
(SP126)
2 – Gwinner
92 lbs/ea
184 lbs
$250 ea
$500
15. Sixteen 5/8” nuts Sitepro1 (G58NUT) 16 – Gwinner
0.1 lbs/ea
0.16 lbs
Warehouse
$10
16. Eight 5/8” galvanized flat washers Sitepro1 (G58-FW) 8 - Gwinner
0.1 lbs/ea
0.8 lbs
Warehouse
$5
17. Two pipe caps Sitepro1 (PC312) 2 - Gwinner
3 lbs At Bismarck
$6 ea
$12
18. One-and-one-half bridge trays
Sitepro1 (15’ of SP501)
1.5 - Gwinner
73 lbs/ea
110 lbs
$150 ea
$225
19. One straight bridge tray splice plate Sitepro1 (SP503) 1 - Gwinner
1 lb At Bismark Warehouse
$40.20
20. Two 12” cantilevers Sitepro1
(HHD12-K)
2 – Gwinner
12 lbs/ea
24 lbs
$32 ea
$64
21. Four waveguide trapezes Sitepro1 (Z12) 4 – Gwinner
10 lbs/ea At Bismarck
$80 ea
$320
Weight (pounds)
Estimated Delivery
Date
Estimated Cost
22. Eight fixed tuned connectors Andrew
(AND-177SE)
4 - Gwinner 4 - Tripp
3 lb/ea
24 lbs
$256 ea
$2048
23. Six flex waveguides Andrew (F112-
CCC3)
2 – Gwinner 4 - Tripp
6 lbs/ea
36 lbs
$357 ea
$2142
24. Two hundred & five EW77 donuts and hardware for EW77 Sitepro1 (SREW77-k) 25 – Gwinner 180 - Tripp
205 lbs
Warehouse
Facility (25)
(180)
$4 ea
$820
25. 500 feet elliptical waveguide Commscope (AND-EW77-F) 100 – Gwinner 400 - Tripp
0.45 lbs/ft
225 lbs
Separated Onto Two Reels
At Bismarck Warehouse
(100)
(400)
$16/ft
$8000
26. Four EW77 cable grips Andrew 2 – Gwinner 2 - Tripp
8 lbs
Warehouse
$35 ea
$140
27. Fourteen EW77 Andrew grounding kits (241088-2) 8 – Gwinner
6 - Tripp
28 lbs
Warehouse
(8)
(6)
$30 ea
$420
Weight (pounds)
Estimated Delivery
Date
Estimated Cost
28. Two 10’ parabolic antennas, dual feedhorn, and radome (UA10-
W71AC)
1 – Grande Prairie 1 - Tripp
Antenna 300 lbs/ea radome 50 lbs/ea
Crated 400 lbs
Grande Prairie -
Tripp – Antenna At Site
Western to
Deliver Feedhorns to
Sites
$4500 ea
$9000
29. One 6’ parabolic antenna with dual feedhorn, and radome (SB6-71CC) 1 – Grande Prairie
Antenna 200 lbs radome 60 lbs crated 300 lbs
Western to
Deliver Feedhorn to Site
$3000
30. Ten tuned RFS connectors (C112-
078FG E/EP78/CPR 112)
8 –Grande Prairie 2 - Orchard
10 lbs
$200 ea
$2000
31. Eight pressure windows (PW-C112) 8 – Grande Prairie
8 lbs
$60 ea
$480
32. Four 4” boots for E78 (BOOT4-078) 4 – Grande Prairie
4 lbs
$15 ea
$60
33. Six E78 cable grips
4 – Grande Prairie
$30 ea
$180
34. 1070 feet E78 waveguide 850 - Grande Prairie 220 - Orchard
4 lbs/ft
4,280 lbs
$8/ft
$8560
35. Twenty ground kits for E78 16 – Grande Prairie 4 - Orchard
20 lbs
$25 ea
$500
36. Two hundred & seventy five E78 donuts and hardware for E78 200 – Grande Prairie 75 - Orchard
275 lbs
$4 ea
$1100
37. Four 3-foot flexible waveguides
(FWG-083200-900)
4 – Grande Prairie
5 lbs/ea
20 lbs
$300 ea
$1200
38. One dual polarized feedhorn part #
20042822-SB6
1 - Orchard
10 lbs At Armour
$515
Weight (pounds)
Estimated Delivery
Date
Estimated Cost
39. Two hundred and twenty feet of 7/8” coax cable for VHF Antenna 220 - Orchard
0.45 lbs/ft
99 lbs
$10/ft
$2200
40. Two N-female connectors for LDF5- 50 (re: VHF Antenna)
0.8 lbs/ea
1.6 lbs
$35 ea
$70
41. Four 7/8” grounding kits Andrew 204989-2 (re: VHF Antenna) 4 - Orchard
1.5 lbs/ea
$18 ea
$72
42. Seventy-Five 7/8” Microflect donuts and hardware for 7/8” coax cable 75 - Orchard
1 lb/ea
75 lbs
$5 ea
$375
43. One dehydrator Andrew MT050- 81015 1 – Grande Prairie
36 lbs At Armour Warehouse
$2220
44. One 4-port manifold Andrew 6600D-4 1 – Grande Prairie
8 lb At Armour Warehouse
$215
45. One dehydrator wall shelf Andrew
AE01D-D1658-100
1 – Grande Prairie
5 lbs At Armour
$135
NST - No sooner than
NLT - No later than
1. POINTS OF DELIVERY:
a. The government-furnished equipment (GFE) for the South Dakota and Nebraska sites will be stored at the Armour Substation. The Armour Substation is located at 39302 285th Street, Armour, SD 57313. The contractor shall be responsible for loading the Government-furnished material for these sites, delivering to the work site, and unloading. Temporary storage sites shall be provided by the contractor.
b. The government-furnished equipment for the North Dakota sites will be stored at the
Bismarck O&M Service Center. The Bismarck O&M Service Center is located at 700 N Bismarck Expressway, Bismarck, ND 58501. The contractor shall be responsible for loading the Government-furnished material for these sites, delivering to the work site, and unloading. Temporary storage sites shall be provided by the contractor.
c. The government-furnished material for the Montana site will be stored at the Fort Peck
Service Center. The Fort Peck Service Center is located at 14 North Bighorn St., Fort Peck, MT 59223. The contractor shall be responsible for loading the Government-furnished material for these sites, delivering to the work site, and unloading. Temporary storage sites shall be provided by the contractor.
G. RIGHTS-OF-WAY:
1. GENERAL: Orient construction methods and equipment to utilize Government-furnished rights-of way or obtain additional temporary access without additional cost to Western. Any additional temporary access acquired by the contractor shall have prior COR approval. During the contract period, Western reserves the right to use contractor-obtained access. Any areas disturbed in the Public rights-of-way shall be left in conditions specified by the local government and Western representatives.
2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the communication sites.
H. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
At all sites except for Garrison and Gwinner, electric power up to a maximum of approximately 2.4 kVA for construction purposes will be available without cost. Sources of supply are located in the receptacles throughout the sites. Power made available by Western will be delivered as single phase, 60 Hz, ac, at approximately 120 V. Negotiate with the COR for establishing electric power service.
The contractor may furnish their own power through other means.
At the Garrison and Gwinner sites, the contractor will be required to make their own arrangements and provide all electric power for construction purposes. Provide necessary transmission lines, distribution circuits, transformers, and other electrical equipment including circuit breakers for distributing the power to the places of use. At contract completion, contractor shall remove temporary electrical equipment and distribution lines.
I. WATER FOR CONSTRUCTION PURPOSES:
Contractor shall furnish water for construction purposes. Make arrangements for obtaining the water, and to provide for conveying the water to the points of use.
J. EXPLOSIVES AND BLASTING:
Explosives shall not be used.
K. SUBMITTALS:
1. GENERAL: The Contractor shall furnish submittals via email as specified in the construction Standards and this Project Specification. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (AutoCAD 2014) formats. All submittals shall include the Western specification number, Western project title, and Bidding Schedule Contract Line Item Number (CLIN) and applicable division number. Multiple CLINs on a single submittal are not permitted.
A cover transmittal letter in Microsoft Word or PDF format shall be included with each email.
2. APPROVAL TIME: Approval time for submittals shall be in accordance with the "Commencement, Prosecution, and Completion of Work" paragraph.
3. TRANSMITTAL: The Contractor shall transmit submittals to the Construction Engineer.
a. Construction Engineer:
Western Area Power Administration Western Construction Engineer ATTN: B5613.HU, Amanda Wipf 200 4th Street SW Huron, South Dakota 57350-2474 Email: wipf@wapa.gov mailto:wipf@wapa.gov
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. GENERAL:
1. The Bidding Schedule does not contain a separate item for complying with the following environmental Standard. Include these costs in applicable Bidding Schedule items.
a. Environmental Requirements (See Section 13.2 of Standard).
b. Recycled Material Quantities (See Section 13.6 of Standard).
c. Disposal of Waste Material (See Section 13.8 of Standard).
d. Contractor's Liability for Regulated Material Incidents (See Section 13.9 of Standard).
e. Pollutant Spill Prevention, Notification, and Cleanup (See Section 13.10 of Standard).
f. Materials with Lead-based Paint (See Section 13.15 of Standard).
DIVISION 14 - COMMUNICATION FACILITIES
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
Include mobilization and preparatory work in the individual Bidding Schedule Items. The contractor shall be responsible for the following tower and site work:
1. Bidding Schedule item “GARRISON MICROWAVE SITE, ND” includes the following:
a. Dismantle the 45’ tall, 3-leg self-supporting tower at Garrison and prepare for transport and then reassembly at the Gwinner Microwave Site, ND for installation. The leg caps shall be reused (Please contact Western for a complete set of steel shop drawings).
b. Remove and dispose of the 2 GHz antenna and the VHF corner reflector at 40’ elevation including supporting framework; and the two steel platforms located at 11’ and 36’ elevations.
c. For access to the tower, the contractor may remove and dispose of the chain link fence on three sides.
d. Disposal of all tower, fencing and associated materials removed at Garrison and not required for the tower installation at Gwinner.
2. Bidding Schedule item “ELLIOT SUBSTATION, ND” includes the following:
a. Path align the 4’ parabolic antenna at 85’ elevation at azimuth 194.65 degrees horizontal polarity with Gwinner.
3. Bidding Schedule item “RUTLAND MICROWAVE SITE, ND” includes the following:
a. Path align the 10’ parabolic antenna at 15’ elevation at azimuth 337.76 degrees vertical polarity with Gwinner.
4. Bidding Schedule item “GWINNER MICROWAVE SITE, ND” includes the following:
a. Transport and then assemble the bottom 40’ of the 3-leg self-supporting tower delivered from Garrison Microwave Site, ND (Please contact Western for a complete set of tower shop drawings).
b. Fabricate, galvanize and install antenna framework that is not already included in the GFE;
and the two platforms at 11’ and 31’ elevations as per the drawings.
c. Provide 3/8” safety climb cable system as per Division 14, Paragraph E specifications.
d. Install Government Furnished Equipment including: a 10’ solid parabolic antenna with radome at 15’ elevation; a 4’ solid parabolic antenna with radome at 35’ elevation; EW77 waveguides; and a waveguide ice bridge.
e. Path align the 4’ parabolic antenna 35’ elevation at azimuth 14.62 degrees horizontal polarity with Elliot.
f. Path align the 10’ parabolic antenna 15’ elevation at azimuth 157.62 degrees vertical polarity with Rutland.
g. Connect the tower and the waveguide ice bridge to the existing grounding pigtails.
h. Provide all material and equipment not furnished by the government to complete these installations.
5. Bidding Schedule item “ORCHARD MICROWAVE SITE, NE” includes the following:
a. Install Government Furnished Equipment: replace existing single polarity feedhorn with a new GFE dual polarity 7 GHz feedhorn on the existing 6’ parabolic antenna at 160’ elevation and E78 waveguides. The single polarity feedhorn should be given to the Western representative at the site for their future use.
b. Path align 6’ parabolic antenna 160’ elevation at azimuth 358 degrees dual polarity with Grande Prairie.
c. Install GFE supplied E78 waveguide run from the newly installed dual polarity feedhorn.
d. Install GFE supplied 7/8” coax cable waveguide run from the VHF antenna previously installed at 170’ elevation.
e. Provide material and equipment not furnished by the government to complete these installations.
6. Bidding Schedule item “GRANDE PRAIRIE SUBSTATION, NE” includes the following:
a. Install Government Furnished Equipment: One 6’ solid parabolic antenna with a dual polarized feedhorn and radome at 150’ elevation and waveguide; and one 10’ solid parabolic antenna with a dual polarized feedhorn and radome at 180’ elevation and waveguide.
b. Path align 6’ parabolic antenna 150’ elevation at azimuth 178 degrees dual polarity with Orchard.
c. Path align 10’ parabolic antenna 180’ elevation at azimuth 20 degrees dual polarity with Tripp.
d. Install Government Furnished Equipment: dehydrator with 4-port manifold and shelf in the Control Building.
e. Provide material and equipment not furnished by the government to complete the installation.
7. Bidding Schedule item “TRIPP (East River) MICROWAVE SITE, SD” includes the following:
a. Install Government Furnished Equipment: one 10’ solid parabolic antenna with dual polarity
7GHz feedhorn, radome and waveguide at 150’ elevation.
b. Path align 10’ parabolic antenna 150’ elevation at azimuth 200 degrees dual polarity with Grande Prairie.
c. Provide material and equipment not furnished by the government to complete the
8. Bidding Schedule item “FOX CREEK MICROWAVE SITE, MT” includes the following:
a. Install Government Furnished Equipment: replace two girts in Section 2 (8’ to 20’) and replace three girts in Section 8 (120’ to 140’).
b. Remove deficient tower members and install replacement GFE tower members.
c. Provide material and equipment not furnished by the government to complete the
d. Disposal of all material removed.
e. Complete a tower inspection and report per Division 14, Paragraph F specifications.
9. Bidding Schedule item “TYLER MICROWAVE SITE, MT” includes the following:
a. Remove and dispose of: an 8’ grid parabolic 2 GHz antenna at 105’ elevation and azimuth 42 degrees, and associated hardware including 7/8 inch coax cable.
b. Complete a tower inspection and report per Division 14, Paragraph F specifications.
B. ICE BRIDGE AND SUPPORTS
1. ICE BRIDGE AND SUPPORTS:
a. GENERAL: Install new Government-furnished waveguide-bridge and supports from the communication tower which was relocated from Garrison to the Gwinner Repeater site.
b. ICE BRIDGE SUPPORTS: Install waveguide bridge supports per Western standard drawings.
C. GROUNDING SYSTEM
1. GROUNDING SYSTEM, GENERAL: Complete grounding of waveguide bridge supports and towers at the sites using Government supplied grounding kits detailed in Division 01. Connect supports and towers at Gwinner to the ground cable risers as per the standards.
D. ANTENNA SYSTEM
1. GENERAL: Western will furnish antennas, side struts, waveguides, ground kits, pressure windows, 3 foot flex connectors, connectors, waveguide port boots, and other associated hardware, as specified in the "Government-Furnished Equipment (GFE)" paragraph of Division 1 - "General Requirements". The contractor shall provide any associated hardware not listed but required for installation.
Pressurization systems shall be connected to existing pressurized waveguide with connections to existing pressurization equipment being disconnected. The installation shall meet the requirements of Rural Utilities Services Bulletin 1751F-810 "Electrical Protection of Digital and Lightwave Telecommunications Equipment." Of particular interest is Appendix B "Protection for Antenna Installations." Western Communication Facilities Grounding Standards will prevail where a conflict occurs.
a. WARRANTY: The installed antenna system shall be warranted as being free from manufacturer defects for a period of no less than three years. If a defect is discovered on any equipment within the warranty period, it may be returned to the manufacturer for free repair or replacement.
2. ANTENNAS AND MOUNTS:
a. GENERAL: The Contractor shall install antennas and mounts in accordance with the manufacturer's instructions. For 10’ dishes, an outer strut shall be added as well as a bottom strut.
b. MOUNTING ANTENNAS AND PIPE MOUNTS: Mount antennas and antenna pipe mounts at the height above ground, and orient in azimuth as specified in Table 14-1. Pipe mounts shall be installed so that the specified elevations of the antennas are in the center of the adjusting range of the pipe mount.
c. ANTENNA SYSTEM REMOVAL AT MONTANA SITES: For antenna systems that are being removed in Montana, including Tyler Microwave site, all waveguide ladders, antenna pipes, and pipe mounts shall be left in place. The components to be removed include antennas, side struts, waveguide/coaxial cable, clips, hangers, grounding systems, and other associated hardware. All materials removed become the property of Contractor and shall be disposed.
3. COMMUNICATION TRANSMISSION LINES:
a. WAVEGUIDE: The Contractor shall install waveguide and other required materials from the antennas to the interior of the building, including connectors on both ends of the waveguide.
Install Government-furnished waveguide hoisting grips at the top of all initial waveguide vertical runs. Project waveguide into the building as directed by the COR. For 7GHz waveguide and connectors, return loss shall match manufacturers’ assemblies specifications of a maximum of 1.15 VSWR (23.1 dB) on waveguide up to 300 feet in length.
b. HARDWARE AND INSTALLATION: All communication transmission line and associated hardware shall be installed per manufacturer’s instructions and applicable industry standards
(1) WAVEGUIDE FLANGES: The contractor shall install the Government-furnished waveguide flanges per manufacturer’s instructions and applicable industry standards.
Install the same style of flange (rectangular) on both the antenna and radio ends of waveguide.
(2) COMMUNICATION TRANSMISSION LINE HANGERS: The contractor shall install the Government-furnished waveguide hangers per manufacturer’s instructions and applicable industry standards. Waveguide hangers shall be installed every 3’ on all towers except where existing hangers may be installed at 4’ intervals.
(3) COMMUNICATION TRANSMISSION LINE GROUNDING KITS: The contractor shall install the Government-furnished transmission line grounding kits per manufacturer’s instructions and applicable industry standards. Install grounds at the antenna, base of waveguide ladder, and building entry as per the standard for 7 GHz elliptical waveguide.
E. SAFETY CLIMB SYSTEM
1. SAFETY CLIMB SYSTEM, GENERAL: Provide a safety climb system for the sites as indicated in Table 14-1. Each system shall consist of the following components:
a. Top Bracket: Provide galvanized top bracket, DBI SALA Model No. KC3PL280/6116280 or approved equal.
b. Cable: Provide 3/8” diameter, solid core, galvanized steel Lad-Saf cable, Model No.
KC36151 or approved equal. Length of cable for each tower shall be determined using the appropriate tower drawing.
c. Bottom Bracket: Provide galvanized bracket, DBI SALA Model No. KC3PL90/6100090 or approved equal.
d. Fall Arrest Devices: Provide three fall arrest devices per tower, DBI SALA Model No.
6116507 or approved equal. All devices shall be delivered to the communication site where they will be installed.
e. Intermediate Cable Guide: Provide galvanized intermediate cable guide, DBI SALA Model No. KC3PL330/6100400 or approved equal, at intervals as recommended by manufacturer.
F. TOWER INSPECTION AND MAINTENANCE:
1. GENERAL: There will be no Government-furnished material associated with this section of the specifications. The contractor shall perform complete tower inspection and maintenance as per the standards for all sites indicated:
a. SITE INSPECTION, PLUMB AND TENSION INCLUDES:
(1) Site name
(2) Date of inspection
(3) Tower Manufacturer, model, and height
(4) Inspected by
(5) Tower inspection
(a) Road, fence, building condition
(b) Tower, weep holes, bends, crack, welds, rusting
(c) Loose or missing bolts, nuts, washers (hardware)
(d) Galvanizing or paint condition
(e) Waveguide ice bridge condition
(f) Inspect no less than 1-% of bolted connections for proper torque
(g) Inspect climbing ladder and safety climb
(h) Lighting type, operation, replaced bulbs
(i) Antennas on tower
(6) Plumb and tension report
(7) Photos of site/site problems-before/after
2. ANTENNA AND TOWER WORK REQUIREMENTS:
a. TOWER: Perform tower and antenna work items identified in Table 14-1:
TABLE 14-1 ANTENNA AND TOWER DATA:
STRUCTURE NAME/LOCATION
Gwinner Microwave Site, Sargent County, ND
Antenna Destination or Equipment Function
Antenna or Equipment Type
Frequency Band
Antenna/ Equipment Status (Add-new, Install, Remove)
Size (diameter or length
Elevation 1 (feet)
Azimuth2
(main lobe) Rutland Solid parabolic antenna with radome 7 GHz Add-new 10 15 157.62
4.5” pipe/face mount 96” Add-new 96”
Waveguide 7 GHz Add-new EW77 15 N/A Elliot Solid parabolic antenna with radome 7 GHz Add-new 4 35 14.62
4.5” pipe/face mount Add-new 63” Waveguide 7 GHz Add-new EW77 35 N/A
Tower access 3/8” safety cable climb system
Contractor to provide
Grande Prairie Substation, Holt County, NE
Antenna Destination or Equipment Function
Antenna or Equipment Type
Frequency Band
Antenna/ Equipment Status (Add-new, Install, Remove)
Size (diameter or length in feet)
Elevation1
(feet) Azimuth2
(main lobe)
Orchard
Solid parabolic antenna with dual polarized feedhorn and radome
7 GHz Add-new 6 150 178 deg
Waveguide 7 GHz Add-new EW78 150 N/A
Tripp
Solid parabolic antenna with dual feedhorn and radome
7 GHz Add-new 10 180 20 deg
Waveguide 7 GHz Add-new EW78 180 N/A
Orchard Microwave Site, Holt County, NE
Antenna or Equipment Type
Frequency Band
Antenna/ Equipment Status (Add-new, Install, Remove)
Size (diameter or length in feet)
Elevation1
(feet) Azimuth2
(main lobe)
Grande Prairie Dual polarized feedhorn 7 GHz Add-new N/A 160 358 deg
Orchard Waveguide for dual feedhorn 7 GHz Add-new E78 160 N/A
Grande Prairie Coax Cable for VHF antenna VHF Add-new 7/8” 170 N/A
Tripp (East River) Microwave Site, Bon Homme County, SD
Antenna or Equipment Type
Frequency Band
Antenna/ Equipment Status (Add-new, Install, Remove)
Size (diameter or length in feet)
Elevation1
(feet) Azimuth2
(main lobe)
Grande Prairie
Solid parabolic antenna with dual polarized feedhorn and radome
7 GHz Add-new 10’ 150 200 deg
Waveguide 7 GHz Add-new EW 77 150 N/A
Face mount N/A Add-new N/A N/A
Fox Creek Microwave Site, Richland County, MT
Antenna or Equipment Type
Frequency Band
Antenna/ Equipment Status (Add-new, Install, Remove)
Size (diameter or length in feet)
Elevation1
(feet) Azimuth2
(main lobe)
Tower Section 2 (A60-
28) - replace two horizontal girts
Remove and replace
N/A N/A
Tower Section 8 (A60-
33) - replace three horizontal girts
Remove and Replace
N/A N/A
Tyler Microwave Site, Choteau County, MT
Antenna or Equipment Type
Frequency Band
Antenna/ Equipment Status (Add-new, Install, Remove)
Size (diameter or length in feet)
Elevation1
(feet) Azimuth2
(main lobe)
Havre Grid parabolic antenna, coax and hardware
2 GHz Remove 8 105 42 deg
STRUCTURE NAME/LOCATION
Garrison Microwave Site, Mercer County, ND
Antenna Destination or Equipment Function
Antenna or Equipment Type
Frequency Band
Antenna/ Equipment Status (Add-new, Install, Remove)
Size (diameter or length in feet)
Elevation1
(feet) Azimuth2
(main lobe)
Antenna – Solid Gabriel Mark P2096 31 db Remove 8 40 178 deg
Corner Reflector VHF Remove 40
STRUCTURE NAME/LOCATION
Elliott Substation, Ransom County, ND
Antenna Destination or Equipment Function
Antenna or Equipment Type
Frequency Band
Antenna/ Equipment Status (Add-new, Install, Remove)
Size (diameter or length in feet)
Elevation1
(feet) Azimuth2
(main lobe)
Gwinner Path align parabolic antenna Align 4 85 194.65
Rutland Microwave Site, Sargent County, ND
Antenna Destination or Equipment Function
Antenna or Equipment Type
Frequency Band
Antenna/ Equipment Status (Add-new, Install, Remove)
Size (diameter or length in feet)
Elevation1
(feet) Azimuth2
(main lobe)
Gwinner Path align parabolic antenna Align 10’ 15’ 337.76
Note 1: Elevation for parabolic antennas is measured from the top of the foundation to center of the antenna.
Note 2: Antenna azimuth is measured in degrees east of true north.
Message from the Administrator
At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.
Our safety program is based on four points:
Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.
Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.
Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.
Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.
By integrating these principles into every task we take, together we can ensure Western is a safe place to work.
Mark A. Gabriel Administrator
File details come from the government source that posted it. Updated .