Project_Specificaitons.pdf

PDF 279 KB Posted

Attached to
Rapid City -Dry Creek 115kV Transmission LIne Steel Pole Structure Foundations
Solicitation number
DE-SOL-0008443
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
Contract_Clauses_and_Bid_Schedule.pdf PDF
Project_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RAPID CITY-DRY CREEK

115-KV TRANSMISSION LINE

STEEL POLE STRUCTURE

FOUNDATIONS

TYPICAL FOUNDATION REINFORCEMENT CAGE INSTALLATION

Solicitation No. DE-SOL-0008443 Specification No.15WC112489- 829

SECTION C

DESCRIPTION/SPECIFICATIONS

SOUTH DAKOTA

SECTION C

DESCRIPTION/SPECIFICATIONS

RAPID CITY-DRY CREEK 115-KV TRANSMISSION LINE

STEEL POLE STRUCTURE FOUNDATIONS

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

B. DESCRIPTION OF WORK:

1. Constructing seventy-three (73) reinforced concrete foundations

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item "Mobilization and preparatory work"

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT AND COMPLETION:

2. SUBMITTAL APPROVAL TIME:

3. SEQUENCE OF WORK/OUTAGE RESTRICTIONS:

4. CONSTRUCTION SCHEDULE RESTRICTIONS:

5. MAXIMUM AVAILABLE FAULT CURRENT:

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME:

2. FORMAT AND DETAIL:

F. MATERIAL:

1. POINTS OF DELIVERY:

G. RIGHTS-OF-WAY:

1. GENERAL:

2. WORK ON THE RIGHT-OF-WAY:

H. GEOLOGIC INVESTIGATIONS:

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

J. WATER FOR CONSTRUCTION PURPOSES:

K. EXPLOSIVES AND BLASTING:

L. SUBMITTALS:

1. GENERAL:

2. APPROVAL TIME:

3. TRANSMITTAL:

DIVISION 2 – SITEWORK

A. GENERAL:

1. All excavation along the transmission line will require the contractor to dispose of excess excavated material off Government Right-of-Way

2. Bidding Schedule does not contain separate items for the following:

DIVISION 3 – CONCRETE

A. GENERAL:

1. Material:

2. Test for Potential Reactivity of Sand and Coarse Aggregate:

3. SPECIAL NOTE:

B. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item "Concrete foundations"

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. GENERAL:

1. Bidding Schedule does not contain separate items for Environmental Quality Protection

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

Construct and complete Rapid City-Dry Creek 115-kV Transmission Line - Steel Pole Structure Foundations, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western’s Construction Standards, including Standard 1 – General Requirements (September 2013), Standard 2 – Sitework (September 2013), Standard 3 – Concrete (September 2013), Standard 13 – Environmental Quality Protection (September 2013), Standard 15 – Drawings (September 2013); Standard Drawings; and these Project Specifications and Drawings.

If a conflict occurs between the project specifications and the construction standards, the project specifications shall govern. The project specifications and the Drawings are used to take exceptions or provide additions to the construction standards. Some paragraphs in the construction standards will not apply to this job.

Western’s construction standards, standard Drawings, and electrical equipment standards are available at http://www.wapa.gov/business/buys.htm.

Western project specifications and construction standards are explained in Standard 1 – General Requirements, Section 1.1.1 “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

The principal components of work include:

1. Constructing seventy-three (73) reinforced concrete foundations for Types 157D, 158A, 158D, 158L, and 158N steel pole structures.

Paragraphs "Description of Bidding Schedule Item" in Divisions 1 and 3 describe the work to be performed.

The work is located in Pennington County, South Dakota, beginning at Western’s Rapid City Substation and ending at Basin Electric’s Dry Creek Substation as shown on drawings RC 0015 and RC-DRY 4000.

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item "Mobilization and preparatory work" includes the following:

a. Performing mobilization and preparatory work in accordance with Section H of the contract clauses.

b. Prepare and submit a Construction Schedule and a Safety and Health Program.

c. Complying with DOE Order 442.2 “Differing Professional Opinions for Technical Issues

Involving Environment, Safety, and Health.

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT AND COMPLETION: See FAR 52.211-10 in Section F of the solicitation/contract.

2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 10 calendar days for review of drawings or data submitted for approval.

3. SEQUENCE OF WORK/OUTAGE RESTRICTIONS: In addition to the outage restrictions listed in the standard specifications, the following sequence of work shall be followed to complete the work required by these specifications.

a. The electrical operation of the transmission lines are under the jurisdiction of Western’s

Watertown Operations Office. All outage requests by the Contractor shall be subject to the approval of the COR. Approval or denial of an individual outage request will be based on transmission system electrical loads, system operating configurations and weather conditions at the time the outage is scheduled to begin. At any time because of transmission system electrical loads, system operating configurations, weather conditions or any condition which may cause an adverse effect on the transmission system operation or reliability, Western may deny an outage request or direct the Contractor to return facilities to operating conditions and release the applicable Special Work Permit.

b. Make all outage requests in writing to the COR a minimum of 3 weeks (21 days) in advance.

c. Meeting the minimum advance notice requirement of 3 weeks does not guarantee an outage will be approved. To improve the chances of an outage being approved, all outages should be submitted with as much advance notice as practicable. Weather conditions and other system conditions such as other scheduled and non-scheduled

4. CONSTRUCTION SCHEDULE RESTRICTIONS: The following construction schedule restrictions shall apply:

a. Materials and equipment shall not be stored on the Right-Of-Way longer than 3 consecutive days. For the portion of the Right-Of-Way between structures 0/9 to 1/4, material and equipment shall not be staged over night or without contractor personnel in visible range of the equipment or material.

b. Structure 2/5 is located within the boundary of archaeological site 39PN3614. The site has been preserved using a geofabric underlayment and 8 inches of topsoil and seed has been applied over the felt. The contractor is responsible to preserve this felt and topsoil during construction, as well as, re-grade any areas disturbed and reseed those disturbed areas once work is complete. Western will require a two week notice before starting work at this structure in order for scheduling the archaeological monitor that must be onsite for all work in this area.

c. Structures 2/3-3/7 shall not be started until all other structures are complete.

d. The Contractor shall not work more than 12 hours per day nor more than 60 hours in one continuous period without approval from the COR.

5. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized to carry the maximum available fault current in accordance with the Standard 1 - General Requirements, Section 1.4 “Safety and Health” and the following:

a. The maximum available fault current in the Rapid City Substation is 115-kV area is 3,831 amps and the X/R ratio is 6.62 prior to completing construction of Stage 11 and 7,318 amps and the X/R ratio is 6.76 after completing construction. The maximum available fault current in the 69-kV area is 4,264 amps and the X/R ratio is 7.1. The maximum available fault current in the 13.8-kV area is 5,830 amps and the X/R ratio is 14.3.

b. A minimum of (1) – 1/0, (1) – 2/0, or (1) – 4/0 grounds not to exceed 36-feet in length shall be used in the Rapid City Substation area.

c. No protective ground lead shall be longer than 36-feet in length, unless approved by Contracting Office Representative (COR). Resistance values given in Personal Protective Grounds Test Report shall be less than or equal to those allowed in ASTM F 2249.

E. CONSTRUCTION SCHEDULE:

1. SUBMITTAL TIME: Submit a construction program to the CO within 10 calendar days after date of Notice to Proceed. Notify the COR a minimum of 14 days prior to commencement of drilling.

2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be furnished. Do not program dates earlier than the estimated delivery dates shown in the "Material" paragraph.

F. MATERIAL: Furnish all material for completing the work, except material furnished by Western as listed below:

Item Estimated

Weight

(LB)

Estimated Cost

1. (1) Anchor bolt cage for Type 157D-60 steel pole structure 2,400 $4,488

2. (1) Anchor bolt cage for Type 158A-50 steel pole structure 1,400 $2,618

3. (2) Anchor bolt cages for Type 158A-60 steel pole structures 1,500 EA $2,805 EA

4. (1) Anchor bolt cage for Type 158A-70 steel pole structure 1,600 $2,992

5. (1) Anchor bolt cage for Type 158D-35 steel pole structure 2,900 $5,423

6. (3) Anchor bolt cages for Type 158D-40 steel pole structures 2,900 EA $5,423 EA

7. (4) Anchor bolt cages for Type 158D-45 steel pole structures 3,300 EA $6,171 EA

8. (1) Anchor bolt cage for Type 158D-50 steel pole structure 3,300 $6,171

9. (2) Anchor bolt cages for Type 158D-55 steel pole structures 3,300 EA $6,171 EA

10. (1) Anchor bolt cage for Type 158D-60 steel pole structure 3,300 $6,171

11. (3) Anchor bolt cages for Type 158L-50 steel pole structures 1,200 EA $2,244 EA

12. (10) Anchor bolt cages for Type 158L-55 steel pole structures 1,200 EA $2,244 EA

13. (11) Anchor bolt cages for Type 158L-60 steel pole structures 1,200 EA $2,444 EA

14. (10) Anchor bolt cages for Type 158L-65 steel pole structures 1,400 EA $2,618 EA

15. (7) Anchor bolt cages for Type 158L-70 steel pole structures 1,400 EA $2,618 EA

16. (4) Anchor bolt cages for Type 158L-75 steel pole structures 1,400 EA $2,618 EA

Item Estimated

Weight

(LB)

Estimated Cost

17. (1) Anchor bolt cage for Type 158L-80 steel pole structure 1,400 $2,618

18. (1) Anchor bolt cage for Type 158L-85 steel pole structure 1,700 $3,179

19. (1) Anchor bolt cage for Type 158L-90 steel pole structure 1,700 $3,179

20. (1) Anchor bolt cage for Type 158L-95 steel pole structure 1,700 $3,179

21. (1) Anchor bolt cage for Type 158L-110 steel pole structure 1,700 $3,179

22. (2) Anchor bolt cages for Type 158N-40 steel pole structures 4,000 EA $7,480 EA

23. (2) Anchor bolt cages for Type 158N-50 steel pole structures 4,600 EA $8,602 EA

24. (1) Anchor bolt cage for Type 158N-55 steel pole structure 4,600 $8,602

25. (1) Anchor bolt cage for Type 158N-70 steel pole structure 4,600 $8,602

1. POINTS OF DELIVERY: Material furnished by Western will be delivered to Western’s Rapid

City Substation as shown on drawing RC 0015. The contractor is responsible for loading, transporting, and off-loading this material at the required structure locations.

G. RIGHTS-OF-WAY:

1. GENERAL: Transmission line right-of-way is 80 feet wide. Western does not represent that the Contractor can gain access to every foundation site or travel continuously along the transmission line. Orient construction methods and equipment to utilize Government-furnished rights-of-way or obtain additional temporary access without additional cost to Western. Any additional temporary access acquired by the Contractor shall have prior COR approval since several areas of the transmission line may have travel restricted areas. During the contract period, Western reserves the right to use Contractor-obtained access.

NOTE: The transmission line right-of-way between Structure Nos. 1/2 (Station 57+74) and 1/14 (Station 105+12) lies within the 100-year flood plain of Rapid Creek, and access can be difficult during flood conditions or periods of high runoff. See drawing RC-DRY T200.

2. WORK ON THE RIGHT-OF-WAY:

a. General: Perform work on the rights-of-way necessary for access to or along the transmission line. Only that excavation, dozing, or blading that is absolutely necessary will be allowed. Excavation, dozing, and blading for ease of travel may only be performed after field review and approval by the COR. Unauthorized excavation, dozing, or blading shall immediately be repaired or Western will have the damage repaired and backcharge the Contractor for all costs involved.

b. Ease of Travel and Crane Landings: Excavation, dozing, or blading done for ease of travel on any easement or for crane landings shall be restored to the original contour of the land and shall be compacted to a dry density not less than the natural in-place dry density of the surrounding earth. The use of water may be required to obtain the required density. Topsoil shall be stockpiled and spread on cuts prior to completion of work.

H. GEOLOGIC INVESTIGATIONS:

Geologic logs of subsurface explorations included in the "Drawings" Division constitute the information and records of geologic investigations for the work. Locations of subsurface investigations are shown on drawing RC-DRY 8000.

Samples and cores of recovered material were not retained. Additional geologic borings will not be allowed. Western does not guarantee that the geologic information and records show the conditions that will be encountered in performing the work, but only that the geologic information and records show conditions encountered at the particular point and time the information and records were obtained.

The geologic information may not indicate variations, such as those caused by seasonal fluctuations in rainfall and other factors, which may affect the water level. The Contractor shall determine the nature of material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the work site.

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

Make arrangements and provide all electric power for construction purposes. At contract completion, remove temporary electrical equipment.

J. WATER FOR CONSTRUCTION PURPOSES:

Furnish water for construction purposes. Make arrangements for obtaining the water, and provide for conveying the water to the points of use.

K. EXPLOSIVES AND BLASTING:

Explosives shall not be used.

L. SUBMITTALS:

1. GENERAL: The Contractor shall furnish submittals, via email as specified in the Construction Standards and this Project Specification. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals shall include the Western specification number, Western project title, and Bidding Schedule Contract Line Item Number (CLIN) and applicable division number. A cover transmittal letter in Microsoft Word or PDF format shall be included with each email.

2. APPROVAL TIME: Approval time for submittals shall be in accordance with the

“Commencement, Prosecution, and Completion of Work” paragraph.

3. TRANSMITTAL: The Contractor shall transmit submittals to the Construction Field Engineer.

Construction Field Engineer:

Western Construction Field Engineer ATTN: B5610.HU, Trevor Howard 200 4th Street SW Huron, South Dakota 57350-2474 Email: THoward@wapa.gov mailto:THoward@wapa.gov

DIVISION 2 – SITEWORK

A. GENERAL:

1. All excavation along the transmission line will require the contractor to dispose of excess excavated material off Government Right-of-Way and in an approved manner.

2. Bidding Schedule does not contain separate items for the following: Include these items in applicable Bidding Schedule items:

a. Clearing as directed by the COR.

b. Grading for foundation sites as directed by the COR.

c. Excavations for foundations. Any additional excavations required by the contractor in addition to the approved foundation plan shall be submitted to the COR for review and approval prior to excavation.

d. Disposing of excavated material.

e. Complying with Standard 13 – Environmental Quality Protection.

f. Unwatering auger excavations and casing auger excavations, if required, is included in Bidding Schedule Item “Concrete foundations”.

DIVISION 3 – CONCRETE

1. Material:

a. Cement: Type IIA cement in accordance with ASTM C 150.

b. Compressive Strength: 4000 psi at 28 days.

c. Water-Cement Ratio: Net water-cement ratio, exclusive of water absorbed by the aggregates, shall not exceed 0.45 by weight.

d. Type A and D water-reducing and retarding admixtures may be used if approved by the

COR.

e. Use of fly ash is required in concrete.

2. Test for Potential Reactivity of Sand and Coarse Aggregate: Western may perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be unsuitable as a concrete aggregate, a suitable source shall be obtained by the Contractor.

3. SPECIAL NOTE: Foundations for Structure Nos. 1/2 through 1/14 lie within the 100-year flood plain of Rapid Creek as shown on drawing RC-DRY T200, and concrete projections for these 13 foundations will extend 4 feet above ground line.

B. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule item "Concrete foundations" includes providing the following with Government-furnished anchor bolt cages:

a. Constructing one (1) Type 157D-1 foundation for Type 157D-60 steel pole structure as shown on drawing RC-DRY 2100.

b. Constructing four (4) Types 158A-1, 158A-2, and 158A-3 foundations for Type 158A steel pole structure as shown on drawing RC-DRY 2101.

c. Constructing twelve (12) Types 158D-1, 158D-2, 158D-3, 158D-4 and 158D-5 foundations for Type 158D steel pole structures as shown on drawing RC-DRY 2102.

d. Constructing fifty (50) Types 158L-1, 158L-2, 158L-3, 158L-4 and 158L-5 foundations for

Type 158L steel pole structures as shown on drawing RC-DRY 2103.

e. Constructing six (6) Types 158N-1 and 158N-2 foundations for Type 158N steel pole structures as shown on drawing RC-DRY 2104.

f. Concrete construction includes earthwork, formwork, reinforcement, material used in concrete, curing, finishing, joints, and other related work and material needed to complete the required concrete construction.

g. Unwatering auger excavations, if required.

h. Casing auger excavations, if required.

i. Measurement for quantities will be made on the basis of concrete quantities shown on drawings RC-DRY 2100, RC-DRY 2101, RC-DRY 2102, RC-DRY 2103, and RC-DRY 2104. Regardless of concrete quantities actually placed, payment will be based on the quantities shown on the drawings.

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

1. Bidding Schedule does not contain separate items for Environmental Quality Protection.

Include these items in applicable Bidding Schedule items.

a. Environmental Quality Protection: Standard 13 – Environmental Quality Protection

(September 2013).

Message from the Administrator

At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.

By integrating these principles into every task we take, together we can ensure Western is a safe place to work.

Mark A. Gabriel Administrator

DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
1. Constructing seventy-three (73) reinforced concrete foundations for Types 157D, 158A, 158D, 158L, and 158N steel pole structures.
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item "Mobilization and preparatory work" includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT AND COMPLETION: See FAR 52.211-10 in Section F of the solicitation/contract.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 10 calendar days for review of drawings or data submitted for approval.
3. SEQUENCE OF WORK/OUTAGE RESTRICTIONS: In addition to the outage restrictions listed in the standard specifications, the following sequence of work shall be followed to complete the work required by these specifications.
4. CONSTRUCTION SCHEDULE RESTRICTIONS: The following construction schedule restrictions shall apply:
5. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized to carry the maximum available fault current in accordance with the Standard 1 - General Requirements, Section 1.4 “Safety and H...
E. CONSTRUCTION SCHEDULE:
1. SUBMITTAL TIME: Submit a construction program to the CO within 10 calendar days after date of Notice to Proceed. Notify the COR a minimum of 14 days prior to commencement of drilling.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be furnished. Do not program dates earlier than the estimated delivery dates shown in the "Material" paragraph.
F. MATERIAL: Furnish all material for completing the work, except material furnished by Western as listed below:
1. POINTS OF DELIVERY: Material furnished by Western will be delivered to Western’s Rapid City Substation as shown on drawing RC 0015. The contractor is responsible for loading, transporting, and off-loading this material at the required structure lo...
G. RIGHTS-OF-WAY:
1. GENERAL: Transmission line right-of-way is 80 feet wide. Western does not represent that the Contractor can gain access to every foundation site or travel continuously along the transmission line. Orient construction methods and equipment to uti...
NOTE: The transmission line right-of-way between Structure Nos. 1/2 (Station 57+74) and 1/14 (Station 105+12) lies within the 100-year flood plain of Rapid Creek, and access can be difficult during flood conditions or periods of high runoff. See dra...
2. WORK ON THE RIGHT-OF-WAY:
H. GEOLOGIC INVESTIGATIONS:
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
J. WATER FOR CONSTRUCTION PURPOSES:
K. EXPLOSIVES AND BLASTING:
L. SUBMITTALS:
1. GENERAL: The Contractor shall furnish submittals, via email as specified in the Construction Standards and this Project Specification. Submittals via email shall be in standard PDF or Electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals ...
2. APPROVAL TIME: Approval time for submittals shall be in accordance with the “Commencement, Prosecution, and Completion of Work” paragraph.
3. TRANSMITTAL: The Contractor shall transmit submittals to the Construction Field Engineer.
DIVISION 2 – SITEWORK
A. GENERAL:
1. All excavation along the transmission line will require the contractor to dispose of excess excavated material off Government Right-of-Way and in an approved manner.
2. Bidding Schedule does not contain separate items for the following: Include these items in applicable Bidding Schedule items:
DIVISION 3 – CONCRETE
A. GENERAL:
1. Material:
2. Test for Potential Reactivity of Sand and Coarse Aggregate: Western may perform tests for potential reactivity for the sand and coarse aggregate to be used by the Contractor. If the tests determine the aggregate(s) to be unsuitable as a concrete ...
3. SPECIAL NOTE: Foundations for Structure Nos. 1/2 through 1/14 lie within the 100-year flood plain of Rapid Creek as shown on drawing RC-DRY T200, and concrete projections for these 13 foundations will extend 4 feet above ground line.

B. DESCRIPTION OF BIDDING SCHEDULE ITEM:

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. GENERAL:
1. Bidding Schedule does not contain separate items for Environmental Quality Protection. Include these items in applicable Bidding Schedule items.