Draft Section J-Appendix A (Statement of Work)

View the file

Other files

File Type Posted
SEC_M_Evaluation_Factors_v02.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J, APPENDIX A: STATEMENT OF WORK

TABLE OF CONTENTS

CHAPTER I. Objectives, Scope, and Requirements1
1.0Objective1
2.0Background1
2.1The NNSA Mission1
2.2The NNSA Organization1
2.3Location of Performance2
3.0Scope3
3.1Mission3
3.3Scope and Financial Management5
3.4Enterprise Success5
4.0Administrative and Technical Requirements6
4.1Integrated Safety Management (ISM), Integrated Safeguards and Security Management (ISSM), Environmental Management System (EMS), and Quality Assurance Systems (QAS)6
4.2Work Authorization (WA) System6
4.3Information Technology (IT)6
4.4Governance7
4.5Contractor Human Resources9
4.6Environmental Permits and Applications9
4.8Interfaces with Other Site Users10
4.9Privacy Act System of Records10
CHAPTER II. Work Scope Structure11
1.0Introduction11
2.0General Requirements11
2.1Defense Programs Strategic Planning Process11
2.2Technology and Business Integration11
2.3Plant Directed Research, Development and Demonstration (PDRD) Program12
3.0Directed Stockpile Work (DSW)12
3.1Weapons Programs12
3.2Production Support Programs13
4.0Campaigns13
4.1Enhanced Surveillance Campaign13
4.2Advanced Design and Production Technologies Campaign13
4.3Nonnuclear Readiness Campaign13
4.4Additional Campaigns13
5.0Readiness in Technical Base and Facilities14
5.1General Management, Administration and Oversight14
5.2Waste Management14
5.3Construction Programs and Capital Equipment14
5.4Asset Management15
5.5Site Services15
5.6Other Site Services16
6.0Functional Support16
6.1General Support16
6.2Mission Support16
6.3Site Specific Support16
7.0Other DOE Support17
7.1Secure Transportation Asset Support17
7.2Non-Proliferation, Treaty Related Issues and Verification17
7.3Environmental Restoration17
7.4Supply Chain Management Center (SCMC) and Roof Asset Management Program (RAMP)17
7.5Emergency Response17
8.0Other non-DOE Support17
8.1Work for Others (WFO) Program17
8.2Technology Partnerships Program17
CHAPTER III. Human Resources19
1.0Definitions19
2.0Workforce Transition19
2.1Staffing Plan19
2.2Pay & Benefits19
2.3Incumbent Employees Right of First Refusal20
2.4Advance Understanding on Human Resources20
3.0Compensation20
3.1Total Compensation System20
3.2Cash Compensation21
3.3Reports and Information: Compensation24
4.0Benefits24
4.1Assumption of Existing Pension and Benefit Plans and Establishment of New Pension and/or Benefit Plans24
4.2Reports and Information: Benefits26
4.3Workers’ Compensation26
4.4Pension Plans26
4.5Pension Management Plan31
5.0Labor Relations33
6.0Workforce Planning34
6.1Workforce Planning - General34
6.2Reductions in Contractor Employment – Workforce Restructuring34

Request for Proposal No. DE-SOL-XXXXXX

Section J, Appendix A, Page i CHAPTER I. Objectives, Scope, and Requirements

1.0 Objective

The objective of this Contract is to obtain non-nuclear production services to support National Nuclear Security Administration (NNSA) and broader national security requirements. The Contractor shall be fully responsible for functions to support NNSA Stockpile Stewardship and Management Program activities directed by the Office of Defense Programs (DP). Furthermore, the Contractor shall directly support the NNSA Offices of Safeguards Transportation and Nuclear Non-Proliferation in addition to other Department of Energy (DOE) offices. Beyond DOE/NNSA, the Contractor shall provide unique services to ongoing missions for other Government agencies or privately owned organizations in accordance with policies identified in the operating requirements.

In addition to achieving Presidential goals outlined in the April 2010 Nuclear Posture Review, this Contract will strengthen NNSA’s vision for a fully integrated and interdependent Nuclear Security Enterprise (NSE), consisting of all eight NNSA sites, by achieving the following three specific objectives:

(i) Improving performance in the completion of national security missions for non-nuclear production operations;

(ii) Reducing the cost of performing work; and

(iii) Requiring actions that support operation as an integrated DOE/NNSA enterprise.

2.0 Background

2.1 The NNSA Mission

The NNSA, established by Congress per the NNSA Act (Title XXXII of the National Defense Authorization Act for Fiscal Year 2000, Public Law 106-65) as a semiautonomous element within DOE. NNSA is responsible for the management and security of the nation’s nuclear weapons, non-proliferation, and naval propulsion programs. It also responds to nuclear and radiological emergencies in the United States and abroad. Additionally, NNSA federal agents provide safe and secure transportation of nuclear weapons, components and special nuclear materials, along with other missions supporting the national security.

2.2 The NNSA Organization

NNSA relies on Management and Operating (M&O) Contractors to manage day-to-day site operations and to adhere to its policies when operating its laboratories, production plants, and other facilities in the NSE in compliance with legal requirements and DOE/NNSA policies.

NNSA establishes the work to be accomplished by the Contractor and will provide program and performance direction regarding what NNSA wants in each of its programs. The Contractor will have the flexibility to use its expertise and ingenuity to determine how the work is to be accomplished and is accountable for assuring safe, secure, effective, and efficient operations, and providing directed deliverables in accordance with the terms and conditions of this Contract.

Together, NNSA’s M&O Contractors implement NNSA’s all-encompassing Stockpile Stewardship Program managed by Defense Programs that includes operations associated with surveillance, assessment, maintenance, refurbishment, manufacture and dismantlement of the nuclear weapons stockpile as well as research, development and certification efforts.

Overall, the NNSA needs to carry out its mission within research, development, and manufacturing organizations that are integrated, efficient, and cost effective. Work must be aligned with requirements received from key customers in a manner that strives to retain the intellectual excellence and key infrastructure capabilities demanded by national interests.

2.3 Location of Performance

The term "National Security Campus" (NSC) as used herein includes several Government-owned or leased facilities, along with a variety of satellite operations. The primary facility is located in Kansas City, Missouri, and consists of a Government-leased nuclear weapon component production plant that manufactures electrical, electronic, mechanical, electro-mechanical, plastic, and metal components. Satellite operations include Government-owned or leased facilities located in Albuquerque, New Mexico, that provide support to other DOE organizations associated with nuclear weapons activities; and support operations at several training and communications sites.

The NSC in Kansas City, Missouri is situated on approximately 177 acres located at Botts Road and US150 highway. The facility is owned by the Planned Industrial Expansion Authority of Kansas City and leased for the NNSA by the General Services Administration (GSA) from Centerpoint Zimmer LLC. The Occupancy Agreement between the NNSA and the GSA is for twenty years. The NSC is comprised of four buildings; building 1 is an office building, buildings 2 and 3 are NNSA manufacturing buildings, and building 4 is the National Secure Manufacturing Center supporting Work for Others. As of May 2014 the Kansas City, Missouri, employment is approximately 2,484 people.

The old Kansas City, Missouri, plant is situated on approximately 140 acres of the 300 acre Bannister Federal Complex. It is within the city limits in a highly developed area approximately 12 miles south of downtown Kansas City. The 3.1 million square foot plant shares the Bannister Federal Complex with numerous other federal agencies, and operates the site in conjunction with GSA. The plant is dominated by a large manufacturing building of 2.2 million gross square feet, and thirty-six other buildings with a total of approximately 0.9 million gross square feet. The Bannister facility will be dispositioned once it is determined to be excess to NNSA’s needs and disposition shall take place thereafter.

Kirtland Operations (KO), located in Albuquerque, New Mexico, are principally located in the vicinity of the Albuquerque International Sunport Airport, adjacent to the Kirtland Air Force Base (KAFB). This facility, NSC New Mexico (NSC NM), consists of five (5) leased commercial closely clustered buildings totaling approximately 121,000 gross square feet. These buildings are the Craddock facility (buildings A,B, and C) at approximately 81,000 gross square feet, the Alamo building at approximately 28,000 gross square feet, and the Air Park building at approximately 12,000 gross square feet. Additionally, KO provides support to the Office of Secure Transportation (OST) from an approximately 6,000 gross square feet facility located on KAFB and operated by OST, and to Office of Emergency Operations (NA-40) from an approximately 14,000 gross square feet facility located on KAFB and operated by NA-40. As of June 5, 2014, the KO employment was approximately 200 people.

3.0 Scope

This Contract is comprehensive with an objective to perform all necessary operational, coordination, and management functions at the NSC and Satellites required to support NNSA and broader national security missions assigned to these facilities. This includes but is not limited to all ongoing missions and functions, as well as those that may be assigned during the term of the Contract. It further includes all infrastructure management and maintenance; information technology; human resource management including critical skills recruitment and retention; environmental management; health, safety and security systems; and purchasing, asset management and other administrative systems.

The Contractor shall be fully responsible and accountable for the safe and secure accomplishment of all work, whether performed by its own personnel or team members, including subcontractors. The Contractor shall be responsible for planning and coordinating production schedules; integrating, managing and executing the programs; supporting and executing large and small projects; and completing operations and other activities as described in this Statement of Work.

3.1 Mission

The Contractor shall safely and securely complete all mission responsibilities and improve performance in the completion of national security missions for non-nuclear production operations and all other national security missions, as applicable. NNSA has a National Work Breakdown Structure (NWBS) that is discussed further in Section J, Appendix F, National Work Breakdown Structure. For this Contract, the general work structure and functional activities of the site is defined in Section J, Appendix A, Chapter II, Work Scope Structure.

The scope of operations at the NSC includes manufacturing and/or procuring a multitude of nonnuclear electrical, electronic, electro-mechanical, mechanical, plastic, and metal components for nuclear weapons. These manufacturing and/or procurement operations are reflected in approximately 5,700 major active part numbers and 1,000 ship items, requiring 120 major technologies/processes, supporting 42 product lines, approximately 300 suppliers. The NSC Contractor provides and operates a production management system to control and level-load the output of multiple manufacturing processes, considering an average of 8,000 weapon packages are shipped monthly.

At a minimum the contractor shall:

(i) Ensure the full set of manufacturing and evaluation operations are performed safely, efficiently and timely for active production technologies;

(ii) Implement diagnostic techniques that will provide high quality data on the safety, security and reliability of the nuclear weapons components manufactured and/or procured through the NSC;

(iii) Effectively use advanced design and manufacturing technologies and systems to design and produce products on short cycle times, with quality that approaches zero defects;

(iv) Effectively support requalification activities for the manufacture of electrical, electronic, electro-mechanical, mechanical, plastic, and metal components and hardware to support the NSE’s response to stockpile issues; and

(v) Disposition planning, preparation and execution are performed within scope and schedule. Cost of disposition is to be minimized to protect RTBF budgets. Work is to be accelerated to the extent possible to minimize out-year RTBF budgets.

In order to achieve the above results, the Contractor is expected to move to a higher level of performance throughout the term of the Contract by making the following process enhancements:

· Demonstrate a culture of continuous improvement for plant disciplines (such as cross-functional skill development, flexibility in job classifications, process-based manufacturing, outsourcing of appropriate products, quality, scheduling for continuous output, cost controls) and the associated metrics to demonstrate performance,

· Improve integration, partnering, and support among the NSE Contractors to promote early on-site problem solving and assist in NSE site issues, consolidation of business elements, and cost efficiencies,

· Develop and deploy effective strategic planning for the mission in the environment of changing budgets and technical and regulatory requirements,

· Assure effective human resource management and the availability of critical skills and capabilities to ensure operations are performed timely and efficiently, and

· Ensure that the infrastructure and facilities are operationally safe, secure, compliant, and that an acceptable defined level of readiness is sustained at all facilities to meet programmatic requirements while the floor space required for plant operations is reduced for movement to the new facility.

Operational excellence is a desired underlying philosophy and mindset expected for the NSC. This incorporates the principle that compliance with regulations and standards shall be accomplished while performing NSC missions on time, at a reasonable cost, while protecting human health and the environment, and conserving the Government’s assets. Operational excellence shall include a focus on the requisite rigor and discipline in all aspects of Contractor activities and, in particular, holding management and staff accountable. To achieve this operational excellence, it is essential that operations at the NSC be performed in a manner that meets DOE and other regulatory objectives. Therefore, a disciplined, effective and efficient management system to meet and exceed current industry performance in manufacturing operations is a significant objective of this contract.

3.3 Scope and Financial Management

The Contractor shall support the DOE/NNSA Planning, Programming, Budgeting and Evaluation (PPBE) process. In supporting PPBE, the Contractor shall provide financial data for Government systems, such as:

· Standard Accounting and Reporting System (STARS)

· STARS information is provided under the Institutional Cost Reporting Categories

· iMANAGE

· Enterprise Portfolio Analysis Tool (EPAT)

· Facilities Information Management System (FIMS)

The Contractor shall maintain financial cost reporting systems to provide detailed cost reports for cost, scope, and schedule for direct and indirect costs for all work performed under this Contract. The cost reports shall include labor costs, leave/hours not worked, staff augmentation, fringe, pension, legacy, materials, services-subcontractors, direct service centers, other expenses, capital, labor category, and full-time equivalent (FTE) resource usage for all direct and indirect costs and use cost benefit analyses to determine the appropriate level of support functions and risks. The Contractor shall provide NNSA transparency into those financial cost reporting systems and shall provide routine reports to allow NNSA visibility into program and cost management supporting reports to external sources (see Section J, Appendix O). The Contractor’s financial cost reporting systems shall support the DOE STARS, iMANAGE, EPAT and support systems, such as FIMS, as well as other Government systems as they are developed and implemented.

The NNSA will provide the initial cost information, FTE data and scope framework on the effective date of the Contract. The Contractor shall develop a baseline for all Contractor direct programs and indirect support costs in accordance with DOE institutional cost reporting categories. The baseline shall include cost, scope of work, and schedule with a change control process. Baselines will be used for implementing the cost reduction features under this Contract. The baseline will be reviewed and approved annually by the Contracting Officer.

The Contractor shall have in place tools to: 1) manage mission and indirect changes in scope, cost, and schedule; 2) compare actual costs of work performed (ACWP) to budgeted costs of work performed (BCWP); 3) accurately forecast estimated costs to complete (ETC) and estimated total costs at completion (EAC); and 4) document deviations from the baselines described above in this paragraph and, on a timely basis, notify the Contracting Officer of such changes. The Contractor shall not make retroactive changes to records pertaining to work performed that will change previously-reported costs, except for correction of errors and routine accounting adjustments and not make retroactive changes for funding fluctuations or revisions in EAC.

3.4 Enterprise Success

The Contractor shall actively identify and participate with NNSA, and other NNSA M&O Contractors, to evaluate, plan, develop and implement strategic initiative activities that optimize mission and business operations across the NSE. The goal of these initiatives is to increase the efficiency and cost effectiveness from a business and mission perspective.

The Contractor shall lead and/or participate in strategic business and management initiatives that result in:

· Reduced operational costs enterprise-wide;

· More consistent work practices and operational processes;

· Better pricing, better products, more timely delivery;

· Reduced administrative costs and lead times for both the Contractor and the DOE/NNSA;

· Greater standardization and interchangeability across the NSE; and

· Increased awards to small business entities.

4.0 Administrative and Technical Requirements

4.1 Integrated Safety Management (ISM), Integrated Safeguards and Security Management (ISSM), Environmental Management System (EMS), and Quality Assurance Systems (QAS) The Contractor shall ensure that the principles of ISM, ISSM, EMS, and QAS are integrated into its operations and that its Contractor Assurance System (CAS) reflects Contractor integrated performance related to these systems.

4.2 Work Authorization (WA) System

Specific work requirements under this Contract will be established annually and updated as needed by the Contracting Officer in accordance with DOE Order 412.2 entitled “Work Authorization System” and the Contract’s Section I Clause entitled “DEAR 970.5211-1, Work Authorization.”

4.3 Information Technology (IT)

The contractor shall support NNSA’s efforts to optimize the efficiency of the NSE by consolidating IT infrastructure/services and eliminate redundant systems, to increase efficiency through mobility and cloud computing, and to improve business processes to better integrate across sites. To accomplish these goals, the Contractor shall develop a single, integrated “to-be” vision that uses the best available technologies and management practices from both Government and commercial sources to improve and achieve performance excellence, including fiscal efficiency. Desktop and back-office computing capabilities shall be compatible with those used by NNSA. Back-office functions shall include, but not be limited to, payroll, finance, project management, and human resources.

All deliverables that involve information technology that use internet protocol (products, services, software, etc.) shall comply with Internet Protocol version 6 (IPv6) standards, the Homeland Security Presidential Directive-12 (HSPD-12), and interoperate with both IPv6 and IPV4 systems and products. If the Contractor plans to offer a deliverable that involve IT that is not initially compliant, the Contractor shall (1) obtain Contracting Officer’s approval before starting work on the deliverable; (2) provide a migration path and firm commitment to upgrade to IPv6 and HSPD-12 compatibility for all application and product features, and (3) have IPv6 technical support for fielded product management, development and implementation available.

The Contractor, prior to using any Contractor-owned software and systems where reimbursement is expected, shall obtain the Contracting Officer’s approval. Per the Section I clause DEAR 970.5227-2 Rights in Data - Technology Transfer (Dec 2000) Alternate I (Dec 2000) (NNSA Class Deviation Oct 2011), the Contractor agrees to and does hereby grant to the Government an irrevocable, nonexclusive, paid-up license by or for the Government, in any Contractor-owned software and systems brought in and used. Said license shall be limited to the continued non-nuclear production work by successor Contractors.

4.4 Governance

Governance is the system of management and controls exercised in the stewardship of the organization. The governance system shall be consistent with NNSA governance documents (NAP-21 included in Section J, Appendix N, List of Applicable Directives). Contractors must self-govern and deliver mission results in a safe and secure manner. The Contractor shall implement governance through a collaborative partnership with NNSA to form the self-governance framework by which the mission is accomplished in an effective and efficient manner. The governance framework invokes trust and confidence between parties, defines expectations and authorities and verifies performance by using objectives, requirements, assessments, metrics and rewards. The Contractor will focus on NNSA transformation activities that maximize the ability to complete the mission in a way that ensures effective and efficient stewardship of the taxpayers’ money. The Contractor shall streamline operations and reduce costs to maximize mission accomplishment through a common understanding of expectations and performance accountability, supported by a strong Contractor Assurance System (CAS). The Contractor shall have a CAS as a subordinate and supporting feature of Governance as described in 4.4.1 below.

4.4.1 Contractor Assurance System: The Contractor shall have a Contractor designed and used system to manage performance consistent with Contract requirements. The CAS shall be a primary tool used by Contractor management to measure and improve performance, ensure that mission objectives and Contract requirements are met; ensure that workers, the public and the environment are protected; and ensure that operations, facilities, and business systems are efficiently and effectively operated and maintained. An effective CAS integrates Contractor management, supports corporate parent governance and facilitates Government oversight systems as described in NAP-21. NNSA oversight shall not be relied upon by the Contractor as the primary feedback in assessing its performance. The Contractor is fully accountable for performing its own assessment of these areas.

4.4.2 Standards and Directives Reform: The Contractor shall submit a plan within 180 days after start of Base Term that identifies standards (e.g., ISO 9001, 14001, 18001, or other international or industry standards) to be used to replace other DOE requirements and provide the ability for the Contractor to operate with industry best practices. The plan shall describe how quickly the Contractor will achieve ISO certifications or other recommended standards but commit to completion no later than by the end of the second year of the Base Term. In addition, the Contractor, as part of its governance, shall continuously evaluate and examine DOE directives, orders, and requirements to propose needed exemptions or modifications to allow the Contractor to operate in the most effective and efficient manner and to assist in delivering cost savings to the Government.

4.4.3 Parent Organization(s)

(i) The contractor is encouraged to identify opportunities for the use of parent corporate systems and corporate home and branch office personnel for site operations for the purposes of monitoring plant performance, assisting the plant in meeting its mission and operational requirements, streamlining the Contractor’s administrative and business systems, improving performance, and adapting private sector expertise to plant issues.

(ii) The term “systems” means any discrete process, procedure, program, document or instrument where cost of use under this contract can be identified and quantified to the parent corporation.

(iii) The Contractor, prior to using any parent corporate systems or home and branch office personnel where reimbursement is expected, shall submit a plan to the Contracting Officer for review and approval. In reviewing the plan, the Contracting Officer will consider the extent to which each separate element of the Plan is more efficient in meeting mission and operational requirements; represents an overall cost savings to the Government; brings value-added expertise; assists the monitoring of performance; and whether data is readily transferable to a successor Contractor.

(iv)Per the Section I clause DEAR 970.5227-2 Rights in Data-Technology Transfer (Dec 2000) Alternate I (Dec 2000) (NNSA Class Deviation Oct 2011), the Contractor hereby grants the Government an irrevocable, nonexclusive, paid-up license, by or for the Government, in any Contractor-owned software and systems brought in and used in the performance of this Contract. Said license shall be limited to the continued operations of the National Security Campus by successor Contractors.
(v)The parent organization(s) shall establish an oversight entity, independent and autonomous from National Security Campus management, that shall ensure successful contract performance and that shall identify opportunities for the parent organization(s) to engage with National Security Campus management to address National Security Campus performance issues. The parent organization shall discuss oversight mechanism results and initiatives with senior NNSA leadership each quarter.
(vi)The parent organization(s) shall also establish an audit entity (e.g., audit committee), independent and autonomous from National Security Campus management, that shall perform financial reporting, risk management, internal control, ethics, compliance with laws and regulations and the National Security Campus code of conduct, and the internal audit and external audit and review processes. The audit entity shall be established consistent with best practices identified by the Institute of Internal Auditors (IIA) and The Sarbanes Oxley Act of 2002, Section 301.

(vii) The audit entity shall provide the Contracting Officer with annual reports of its activities. On an annual basis the audit entity shall brief the Contracting Officer, or other delegate, as to its perspective on the:

(1)Health of the Contractor’s control environment;
(2)Effectiveness of corrective action plans resulting from audit and review findings;
(3)Significant financial and operational risk facing the organization; and
(4)Adequacy of the Contractor's internal audit activity and staffing.

(ix) Parent organization(s) costs are "Home Office Expenses" as addressed in DEAR 970.3102-3-70, Home Office Expenses. Home Office Expenses, whether direct or indirect, are unallowable, unless otherwise specifically provided for in the Contract or specifically agreed to in writing by the Contracting Officer.

4.4.4 Performance Evaluation Plan: The Contractor shall participate in the formulation of Performance Evaluation Plans (PEP) that covers a defined period of time. The PEP shall include performance objectives, goals, and measures.

4.4.5 Performance Metrics: The Contractor shall propose a list of performance metrics that provide Contractor and NNSA management an overall assessment of the “health of the operation” quickly and accurately. Once established, the metrics shall be part of the CAS and be provided with transparency to aid in the identification and understanding of significant performance issues.

4.5 Contractor Human Resources

The Contractor shall have the flexibility to restructure the workforce and make changes to employee benefits throughout the term of the Contract, as may be permitted by this Contract and applicable law, to maximize efficiencies. The Contractor shall be responsible for identification and maintenance of critical skills and for the employment of all professional, technical, skilled, and other personnel engaged and to be engaged by the Contractor in the work hereunder, and for the training of personnel, including apprentice programs. Persons employed by the Contractor or its subcontractors or consultants shall not be deemed employees of the Government. The Contractor shall follow the Human Resources (HR) requirements pertaining to workforce transition and management in accordance with Section J, Appendix A, Chapter III, Human Resources.

4.6 Environmental Permits and Applications

In recognition of the Contractor's responsibility to operate in compliance with all applicable environmental requirements, the Contractor is responsible for signing environmental permits and applications as "operator or co-operator" at the sites.

(i) If bonds, insurance, or administrative fees are required as a condition for such permits, such costs shall be allowable. In the event that such costs are determined by NNSA to be excessive or unreasonable, NNSA shall provide the regulatory agency with an acceptable form of financial responsibility.

(ii) The Contractor shall accept, in its own name, service of notices of violations or alleged violations (NOVs/NOAVs) issued by Federal or State regulators to the Contractor resulting from the Contractor’s performance of work under this Contract, without regard to liability. The allowability of the costs associated with fines and penalties shall be subject to clauses of this Contract. The Contractor shall notify the Contracting Officer promptly when it receives service from the regulators of NOVs/NOAVs and fines and penalties. Nothing stated above shall affect the Contractor’s right to challenge or contest the applicability or validity of such NOVs/NOAVs and fines and penalties.

(iii) In the event of termination or expiration of this Contract, NNSA will require the new Contractor to accept transfer of all environmental permits executed by the Contractor.

(iv) When providing NNSA with permits and applications that are to be signed or co-signed by NNSA, the Contractor will accompany such document with a certification statement, signed by the appropriate Contractor corporate officer, attesting to NNSA that the document has been prepared in accordance with all applicable requirements and the information is, to the best of its knowledge and belief, true, accurate, and complete.

4.8 Interfaces with Other Site Users

Within the NSC locations, there are multiple Contractors responsible for a variety of broad-based programs. Within 90 calendar days after the start of transition for the Base Term, the Contractor shall submit, for NNSA approval, an Interface Management Plan (IMP) for the affected sites to identify and manage site interfaces/services between DOE, NNSA, DOE/NNSA Contractors, and tenant entities engaged in onsite activities. The IMP should identify any costs related to other site users. The Contractor IMP(s) will become part of the Contract as Section J, Appendix H, Interface Management Plan. For the sites, services that require interface agreements shall be provided in accordance with existing or newly developed memoranda of understanding or other appropriate agreements. The Contractor will provide input to the Kansas City Field Office regarding effective support toward common site security and operational objectives. The Government will not consider such input if one contractor has any potential Organizational Conflict of Interest with the other contractor.

4.9 Privacy Act System of Records

The Contractor shall design, develop, and maintain a system of records on individuals to accomplish an agency function in accordance with the Contract’s Section I Clause entitled “FAR 52.224-2, Privacy Act.” The applicable systems of records are available on the Federal Register. A list of applicable records will be finalized after contract award.

CHAPTER II. Work Scope Structure

1.0 Introduction

Specific work requirements under this contract will be established annually by the Contracting Officer in accordance with the Chapter I, Section 4.2 above entitled "Work Authorization System." The Contracting Officer will issue Work Authorizations for each major work area to be accomplished in a given year. These Work Authorizations will conform to the Scope of Work of this Contract and further affect the General Requirements specified in this section.

2.0 General Requirements

2.1 Defense Programs Strategic Planning Process

The Contractor shall contribute to the development of the DOE’s Office of Defense Programs (DP) strategic planning process and the Contractor shall execute those plans. The goal of the DP planning process is to integrate programmatic work to maximize scientific and technical work accomplishment, while minimizing duplication between programs and sites and while providing for major investments in facilities within essentially fixed budgets. Work is defined in three major categories:

· Directed Stockpile Work is activity that supports ongoing stockpile maintenance and refurbishment work as well as the scientific understanding and engineering development capabilities necessary for the refurbishment and certification of the stockpile to support Stockpile Life Extension Programs.

· Campaigns are focused efforts involving the weapons plants, the three weapons laboratories, and the Nevada Test Site (NTS), to address critical capabilities needed to achieve key future program objectives. Campaigns are technically challenging, multi-function efforts that have definitive milestones and specific work plans. The NSC is a major participant in the Enhanced Surveillance, the Advanced Design and Production Technologies, and the Nonnuclear Readiness campaigns.

· Readiness in Technical Base and Facilities are those scientific and technical activities required to ensure that the infrastructure and facilities are operationally safe, secure, compliant, and that an acceptable defined level of readiness is sustained at all facilities.

2.2 Technology and Business Integration

The Contractor shall use available technology and management practices from both government and commercial sources to improve and achieve excellence. The DOE is continuously looking for opportunities to optimize the efficiency of the site and the collective accomplishment of the weapons production mission through integration of multiple site activities.

The Contractor shall propose and participate with other DOE Contractors and other Federal Contractors and agencies to support these efficiencies. If a stockpile stewardship function were centralized at a single site, the Government would provide these centralized materials and services to the other sites. Therefore, the DOE reserves the right to reassign missions, both core and non-core responsibilities, when it is in the best interest of the Government, and requires the Contractor to propose and support such initiatives.

The Contractor shall provide nonnuclear materials and components for the six production sites of the NSE. The Contractor shall work with the six production sites to ensure cost-effective products are delivered on time to meet National Security needs. The Contractor shall integrate supplier management and quality to include: pre-qualification, manufacturing process evaluation, field inspection and source acceptance, performance tracking, and corrective action/problem resolution.

The NSC is designated as the lead site for the Supply Chain Management Center (SCMC). In this role, the Contractor shall work with NNSA to integrate strategic sourcing for contractor procurement spending across NNSA M&O sites. In addition, the Contractor shall support the effort to implement SCMC tools and systems at DOE M&O sites.

The Contractor shall provide subcontract administration for the NSE for the Roof Asset Management Program (RAMP). In this integration role the Contractor will coordinate with the other participating NSE sites to ensure efficient and effective management of the program. The Contractor will also work with NNSA to expand applicability of the RAMP to DOE sites beyond the NSE as directed by the Contracting Officer.

The Contractor shall provide the management expertise and such other services as may be necessary to accomplish the efficient operation of the facilities at the NSC. The Contractor shall maintain national security mission competency and capability.

2.3 Plant Directed Research, Development and Demonstration (PDRD) Program The Contractor shall conduct a DOE approved Plant Directed Research, Development and Demonstration (PDRD) Program that supports science-based manufacturing related to the NNSA weapons mission, and encourages advanced research, development, and demonstration work to enhance the science and technology capabilities and core competencies required to fulfill the mission of the plant.

3.0 Directed Stockpile Work (DSW)

Directed Stockpile Work includes weapons and production support programs. These programs are performed to achieve stockpile evaluation, stockpile maintenance, and nuclear weapons assembly and disassembly objectives in accordance with DOE/NNSA requirements. The Contractor shall provide the following:

3.1 Weapons Programs

Provide management of the manufacture, evaluation and refurbishment of nuclear weapon components as follows:

· Procure and manufacture nonnuclear electrical, electronic, electro-mechanical, mechanical, plastic, and metal components for nuclear weapons in support of the DOE Stockpile Life Extension Programs, Limited Life Component Exchanges, and the stockpile evaluation program;

· Manage the NSE Integrated Production Scheduling System;

· Store nonnuclear components and hardware for nuclear weapons;

· Refurbish, repair and modify nonnuclear components and hardware for nuclear weapons;

· Disassemble and dispose of nonnuclear nuclear weapons components and hardware no longer required in the military stockpile;

· Maintain production capabilities for components and hardware not in the active stockpile;

· Manage a weapons quality assurance program to ensure that products meet design agency specifications, and certify in writing that weapons material submitted to DOE meets the requirements of applicable drawings and specifications;

· Manage requalification activities associated with the move to the new facility and ensure production deliverables are met with quality parts, on time and within budget;

· Perform research, development, testing and engineering work for the current and future NSC production missions to include development work in support of the weapon laboratories; and

· Support DOE production information systems.

3.2 Production Support Programs

· Provide management of operations and support activities to support the nuclear weapons program functions, and maintain core mission competencies and capabilities. These activities include Quality Supervision and Control, Production Supervision and Control, Production Engineering, and other mission support.

· Provide support to other Management and Operating Contractors in the collective accomplishment of the NSE production mission.

· Operate product testing laboratories focused on metallurgical/mechanical analysis, analytical chemistry, stockpile environment testing, and nondestructive evaluation.

· Operate and maintain a metrology laboratory; and develop, build, and maintain test equipment and gages for nonnuclear components.

4.0 Campaigns

4.1 Enhanced Surveillance Campaign

Implement advanced diagnostic techniques to be used by the Core Surveillance Program. These techniques will provide high quality data on the safety, security and reliability of the nuclear weapons stockpile.

4.2 Advanced Design and Production Technologies Campaign

Effectively use advanced design and manufacturing technologies and systems to design and produce products on short cycle times, with quality that approaches zero defects.

4.3 Nonnuclear Readiness Campaign

Provide tools, techniques and capacities to enable ambitious goals in cost, delivery time and product performance for Directed Stockpile Work. This campaign bridges the gap between technologies developed and demonstrated in campaigns for Advanced Design and Production Technologies, Enhanced Surveillance, and Enhanced Surety and the production availability/capacity required by Directed Stockpile Work.

4.4 Additional Campaigns

Perform work in areas of other Campaigns as they are identified and established along with their associated implementation plans.

5.0 Readiness in Technical Base and Facilities

The Contractor shall provide management and administrative capabilities to maintain the NSC in the production readiness posture defined by DOE. Maintaining this state of readiness requires the Contractor to provide the following administrative and technical capabilities, and to provide an assessment of its Readiness to DOE each year.

5.1 General Management, Administration and Oversight

The Contractor shall be fully responsible and accountable for the safe, efficient and effective accomplishment of all work, whether performed by its own personnel or onsite subcontractors. The Contractor shall be responsible for planning, integrating, managing and executing the programs, projects, operations and other activities as described in this scope of work such that all functions are fully integrated and work is accomplished safely. The Contractor shall provide general management and program management functions that include: legal services, audit services, business systems management, human resources, property management, information resources, financial services, safeguards and security, public information and external communications activities, intergovernmental affairs, training, procurement, and industrial relations.

The Contractor shall establish clear ES&H priorities and manage activities in proactive ways that comply with human health, safety and environmental regulations; minimize wastes; and comply with applicable regulatory requirements and DOE directives.

The Contractor shall continuously analyze plant activities to identify commercial standards and practices that may be substituted for DOE Orders and Directives or for current plant business practices. The Contractor shall evaluate the benefits of incorporation of those standards and practices into facility operations, and develop proposals that define the transition timelines and metrics to be used in monitoring the success of those substitutions that are approved by DOE. The Contractor shall integrate the concepts of continuous improvement into all aspects of plant operations, for example, through the use of independent quality certification, safety and environmental management systems, total quality management, etc.

5.2 Waste Management

The Contractor shall manage and perform waste minimization activities and waste management activities to support plant operations.

5.3 Construction Programs and Capital Equipment

Construction programs include the design and construction of facilities necessary for the performance of NSC missions. The Contractor shall:

· Manage the design, construction, procurement/installation and startup of plant/equipment for capital facilities at the NSC. Modifications to the NSC will be handled consistent with the GSA Lease Agreement, Occupancy Agreement, and Delegations of Operations between NNSA and the GSA.

· Manage the building preparation for the disposition of the Bannister Federal Complex.

· Procure and install specific equipment items pursuant to capitalization criteria as defined by DOE.

It is expected that these projects and activities will be managed to the approved baseline, accomplished on or ahead of schedule, within budget, and will meet stated purpose or objective. During the term of the contract, significant recapitalization may be required to meet production readiness objectives.

5.4 Asset Management

The Contractor shall perform custodial management of government-owned/leased facilities and equipment at the NSC and in doing so provide the following:

· Planning/Engineering/Support The Contractor shall manage government-owned, leased, or controlled real property and attendant facilities under this contract. Support the management of the NSC consistent with the GSA Lease Agreement, Occupancy Agreement, and Delegations of Operations. Specific activities include land and facility use planning, real property management, construction project management, utility management, maintenance management, configuration management, and support of the DOE in its disposition activities of the Bannister Federal Complex .

· Utility Operations The Contractor shall manage utility operations that include support for all electric service, fuel oil, natural gas, potable water/sewer service, purified water, nitrogen, steam, chilled water, and non-potable hot water operations and utility services, whether contracted for by the Contractor or DOE. Included in Contractor's responsibilities is the operation of boiler/chiller plants, utility systems, procured utilities, utilities to other federal tenants, and managing the facility in an energy efficient manner per developed energy management plans. NSC operations will be managed by the Developer team and overseen by GSA with support from the Contractor. NSC New Mexico (NM) operations will be managed by lessor and overseen with support from the contractor.

· Maintenance The Contractor shall manage the Bannister maintenance activities, including facilities, custodial services, and energy repairs and/or projects, modifications, and special project services for facilities. The Contractor shall perform periodic condition assessments of the property to determine any deterioration or technical obsolescence that may threaten performance or safety. The NSC shall be managed consistent with the GSA Lease Agreement, Occupancy Agreement, and Delegations of Operations. The NSC/NM is to be managed consistent with the lease agreement.

5.5 Site Services

The Contractor shall provide the following Site Services, comparable to best-in-industry practices:

· Environmental, Safety & Health Programs Manage and integrate Environmental, Safety & Health (ES&H) programs for the purpose of ensuring that current and future plant operations do not negatively impact the environment, or the health and safety of the public, employees, and property. ES&H programs include air emissions; toxic materials; pesticides; storm-water, sanitary, and waste water discharges; safety and risk management; fire protection engineering; fire protection; industrial hygiene; and radiological protection.

· Security Manage the NSC security program to protect classified information, nuclear weapon components and other government property. In addition, provide general industrial security services for general plant operations.

· Emergency Services Manage onsite emergency management and emergency operations programs.

5.6 Other Site Services

The Contractor shall provide other site services that are incidental or related to this Statement of Work as directed and funded by DOE. These support services include onsite and offsite activities that are complementary to the NSC mission and enable DOE to accomplish its integrated nuclear weapons mission.

6.0 Functional Support

The Contractor shall provide:

6.1 General Support

General management and program management functions including: executive direction, human resources, financial support services, procurement, legal services, central administrative services, program and project controls, information outreach, information services, and other general support functions.

6.2 Mission Support

Mission support functions including environmental, safety and health, facilities management, maintenance, utilities, safeguards and security, logistics support, quality assurance, and laboratory/technical support.

In addition, provide services and support, as directed by NNSA, in the following areas:

(i) Office of Secure Transportation facilities;

(ii) DOE Central Scrap Management Office;

(iii) DOE Business Center for Precious Metals Sales and Recovery;

(iv) DOE Tri-Laboratory Office; and

(v) Sandia-operated Weapons Evaluation Test Laboratory (WETL) operations.

6.3 Site Specific Support

Site specific support includes management and incentive fee administration, state and local taxes, and direction of a DOE-approved PDRD Program.

7.0 Other DOE Support

7.1 Secure Transportation Asset Support

The Contractor shall provide production and technical support to the NNSA Office of Secure Transportation, including computer program design and development, numerical analysis, artificial intelligence applications, physics modeling, escort vehicle manufacturing, procurement and manufacture of tractors and trailers, vehicle maintenance and refurbishment, force on force simulation logistics, development of training programs, and maintenance of remote communications equipment.

7.2 Non-Proliferation, Treaty Related Issues and Verification The Contractor shall support planning activities and shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .