21._Attachment_B_Drawings.pdf

PDF 6 MB Posted

Attached to
RE-ISSUE OF Medicine Bow Substation Service Building
Solicitation number
DE-SOL-000566
Issued by

About this file

DE-SOL-0008900 - Attachment B Project Drawings

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B Medicine Bow Substation Service Building - Drawings 04/30/2015

DE- SOL-0008900

MEDICINE BOW SUBSTATION - SERVICE BUILDING

WYOMING

SECTION C

DESCRIPTION/SPECIFICATIONS

Spec. No. 844

MEDICINE BOW SUBSTATION

SERVICE BUILDING 2014

PROJECT DRAWINGS

A. GENERAL:

CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.

Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAP:

1. MB 0015 – Location and Vicinity Map

ELECTRICAL:

2. MB 1000 Rev. G EI – Electrical Installation General Arrangement Plan View (Existing Installation)

3. MB 1000 Rev. H – Electrical Installation General Arrangement Plan View

4. MB 1500 Rev. D EI – Grounding System (Existing Installation)

5. MB 1500 Rev. E – Grounding System

CIVIL & SITE DRAWINGS:

6. MB 0016 – Topography

7. MB 2002 B EI – Foundation Plan (Existing Installation)

8. MB 2002 C – Foundation Plan

9. MB 2003 Rev. B – Concrete Structures Foundations Outline and Details

10. MB 2050 EI – Site Plan (Existing Installation)

11. MB 2050 A – Site Plan

12. MB 2051 EI – Grading Plan (Existing Installation)

13. MB 2051 A – Grading Plan

14. MB 2052 – Concrete Swales Grading Plan

15. MB 2053 Rev. A – Sections & Details 1 of 2

16. MB 2054 Rev. A – Sections & Details 2 of 2

SERVICE BUILDING:

17. MB 3200 Rev. A – General Structural Notes, Abbreviations, & Reference Drawings

18. MB 3201 Rev. A – Structural Foundation Plan

19. MB 3202 – Structural Roof Framing Plan

20. MB 3203 – Structural Typical Wood-Framed Wall

21. MB 3204 – Structural Equipment Mounting Details

22. MB 3205 Rev. A – Structural Foundation Details

23. MB 3206 – Structural Sections and Details

24. MB 3207 – Structural Sections and Details

25. MB 3208 – Structural Sections and Details

26. MB 3209 – Structural Sections and Details

27. MB 3000 – Architectural Floor Plan

28. MB 3001 – Architectural Reflected Ceiling Plan

29. MB 3002 – Architectural Exterior Elevations

30. MB 3003 – Architectural Building Sections

31. MB 3004 – Architectural Detailed Sections

32. MB 3005 – Architectural Detailed Sections

33. MB 3006 – Architectural Mechanical Equipment Mounting Details

34. MB 3007 – Architectural Doors, Door Details & Door Schedule

35. MB 3300 – Mechanical HVAC Floor Plan

36. MB 3301 – Mechanical Control Room Schedules

37. MB 3302 – Mechanical Battery Room Schedules

MEDICINE BOW SUBSTATION

SERVICE BUILDING 2014

PROJECT DRAWINGS

38. MB 3303 – Mechanical Battery Room Crane Schedule

39. MB 3400 – Electrical Power Plan

40. MB 3401 – Electrical Lighting & Egress Marking Plan

41. MB 3402 – Electrical Door Alarms

42. MB 3403 – Electrical Panelboards DHA, DHB

43. MB 3404 – Electrical Wiring Devices Schematic

44. MB 3405 – Electrical Luminaire & Equipment Schedules

CONTROLS:

45. MB T600 – Control Cable List

46. MB 4050 – Service Building Arrangement, Conduit & Grounding

47. MB 6050 Rev. A – DC Distribution Panel BHA

GEOLOGY:

48. MB 8000 – Site Vicinity and Exploration Location Map Figure 1

49. MB 8001 – Boring Log SB-1

50. MB 8002 – Boring Log SB-2

POINT NOT USED

POINT NOT USED

SB-1

SB-2

Site Vicinity and Exploration Location Map

Medicine Bow Substation Control Building Replacement

Medicine Bow, WY

20155211 4/14/2015 J. Weber

D. Robbins

BoringLocations.mxd

The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.

FIGUREPROJECT NO.

DRAWN:

DRAWN BY:

CHECKED BY:

FILE NAME:www.kleinfelder.com

Legend Soil Boring

0 80 16040 Feet

Project Location

Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

US 287

Proposed Control Building

SB-1

lampman Typewritten Text

MB 8000

Fill Sandy Lean CLAY: fine-grained sand, medium plasticity, brown, moist

Alluvium Clayey SAND (SC): fine-grained, medium plasticity, brown, moist, loose

Lean CLAY (CL): medium plasticity, brown to dark brown, wet, firm to hard

Steele Formation SHALE: low to medium plasticity, tan to brown, moist, very hard, fissured, with white mottling

The boring was terminated at approximately 20.5 ft.

below ground surface. The exploration was backfilled with auger cuttings on March 27, 2015.

Stratigraphic boundary observed within sample at

10.5 feet.

Drilling resistance increases at 15 feet.

12"

8"

12"

5"

5"

CL

CL

CL

11.0

11.9

11.6

110.5

133.0

99 54

94.9

GROUNDWATER LEVEL INFORMATION:

Groundwater was observed at approximately 9 ft. below ground surface during drilling.

Groundwater was observed at approximately 7.5 ft. below ground surface at the end of drilling.

BC=3

BC=4

BC=9

BC=28

50/5"

BC=50/5"

LABORATORY RESULTS

Lithologic Description

PAGE:

FIELD EXPLORATION

BORING LOG SB-1

BORING LOG SB-1

SB-1

Latitude: 41.89751° N Longitude: 106.22096° W

Surface Condition: Bare Earth and Grass

Logged By:

Date Begin - End:

Hor.-Vert. Datum:

Weather:

Drill Crew:

Hammer Type - Drop:Not Available CME-55

Alex

Vine Laboratories

140 lb. Auto - 30 in.

-90 degreesPlunge:

Drilling Company:

Drilling Method:

Drilling Equipment:

3/27/2015

4 in. O.D.Sunny, 45 °F Auger Diameter:

JTM

Solid Stem Auger

A dd iti on a l T es ts

R em ar ks

D ep th fe et

G ra p hi ca l L og

R ec ov er y (N

R

N o

R ec ov er y)

U S

C S

S ym bo l

W at er C on te nt

D ry

U ni t W t.

(p cf

P as si ng

P as si ng

Li qu id L im it

P la st ic ity In de x

(N P

N on P la st ic

Medicine Bow Substation Control Building Replacement

Medicine Bow, WY

KLEINFELDER - 1801 California Street, Suite 1100 | Denver, CO 80202 | PH: 303.297.5774 | FAX: 303.237.6602 | www.kleinfelder.com

B lo w C ou nt s( B

C

U nc or r.

B lo w s/ in

BORING

17.2

SB-1 & SB-2 0'-5' Composite Sample

CHECKED BY: DFR

DATE: 4/10/2015

DRAWN BY: JTM

REVISED: -

gI N

T F

IL

E

P

R O

JE

C

T W

IS

E

: 2

.0 a

M ed ic in e B ow .g pj gI N

T T

E M

P

LA

T E

P

R O

JE

C

T W

IS

E

: K

LF

S

T A

N D

A R

D _G

IN

T

_L

IB

R A

R Y

_2

5.

G

LB

[K

LF

_B O

R

IN

G /T

E S

T P

IT

S

O

IL

L O

G

P

LO

T T

E D

/1 6/

:0

A

M B

Y

D R ob bi ns

PROJECT NO.: 20155211

S am pl e

T yp e lampman

MB 8001

Fill Sandy Lean CLAY: fine-grained sand, medium plasticity, brown, moist

Alluvium Clayey SAND (SC): fine-grained, medium plasticity, brown, moist, loose

Lean CLAY (CL): medium plasticity, brown to dark brown, wet, firm to hard

Steele Formation SHALE: low to medium plasticity, tan to brown, moist, very hard, fissured, white mottling

The boring was terminated at approximately 20.5 ft.

below ground surface. The exploration was backfilled with auger cuttings on March 27, 2015.

Drilling resistance increases at 15 feet.

3"

7"

12"

10"

4"

CL

CL 11.2

13.0

16.6

11.4

115.3

99 54

60.5

GROUNDWATER LEVEL INFORMATION:

Groundwater observed at approximately 10 ft. below ground surface during drilling Groundwater was not observed approximately 30 minutes after completion of drilling.

BC=10

BC=3

BC=6

BC=30

50/4"

BC=50/5"

LABORATORY RESULTS

Lithologic Description

PAGE:

FIELD EXPLORATION

BORING LOG SB-2

BORING LOG SB-2

SB-2

Latitude: 41.89756° N Longitude: 106.22084° W

Surface Condition: Bare Earth and Grass

Logged By:

Date Begin - End:

Hor.-Vert. Datum:

Weather:

Drill Crew:

Hammer Type - Drop:Not Available CME-55

Alex

Vine Laboratories

140 lb. Auto - 30 in.

-90 degreesPlunge:

Drilling Company:

Drilling Method:

Drilling Equipment:

3/27/2015

4 in. O.D.Sunny, 45 °F Auger Diameter:

JTM

Solid Stem Auger

A dd iti on a l T es ts

R em ar ks

D ep th fe et

G ra p hi ca l L og

R ec ov er y (N

R

N o

R ec ov er y)

U S

C S

S ym bo l

W at er C on te nt

D ry

U ni t W t.

(p cf

P as si ng

P as si ng

Li qu id L im it

P la st ic ity In de x

(N P

N on P la st ic

Medicine Bow Substation Control Building Replacement

Medicine Bow, WY

KLEINFELDER - 1801 California Street, Suite 1100 | Denver, CO 80202 | PH: 303.297.5774 | FAX: 303.237.6602 | www.kleinfelder.com

B lo w C ou nt s( B

C

U nc or r.

B lo w s/ in

BORING

SB-1 & SB-2 0'-5' Composite Sample

CHECKED BY: DFR

DATE: 4/10/2015

DRAWN BY: JTM

REVISED: -

gI N

T F

IL

E

P

R O

JE

C

T W

IS

E

: 2

.0 a

M ed ic in e B ow .g pj gI N

T T

E M

P

LA

T E

P

R O

JE

C

T W

IS

E

: K

LF

S

T A

N D

A R

D _G

IN

T

_L

IB

R A

R Y

_2

5.

G

LB

[K

LF

_B O

R

IN

G /T

E S

T P

IT

S

O

IL

L O

G

P

LO

T T

E D

/1 6/

:0

A

M B

Y

D R ob bi ns

PROJECT NO.: 20155211

S am pl e

T yp e lampman

MB 8002

Cover Page
Drawing List
gs_0015e
gs_0001p_fio
gs_1001g_ei
gs_1001h
gs_1014e_ei
gs_1014f
gs_1101
gs_1114e_ei
gs_1114f
gs_1500g_ei
gs_1500h
gs_1718g_ei
gs_1718h
gs_3017a_fio
gs_4050b
bpt_0015b
bpt_0001e_fio
bpt_1001c_ei
bpt_1001d
bpt_1012b_ei
bpt_1012c
bpt_1114b_ei
bpt_1114c
bpt_1130
bpt_1510b_ei
bpt_1510c
bpt_3000_fio
bpt_3001a_fio
bpt_4000d
sd_0015d
sd_0001_1d_fio
sd_0010h_ei
sd_0010i
sd_0011b_ei
sd_0011c
sd_1700d_ei
sd_1700e
41_1029f
41_1031f
sd_3000a_fio
sd_3002a_fio
sd_4006d
mid_0015b
mid_0001m_fio
mid_0010g_ei
mid_0010h
mid_1010e_ei
mid_1010f
mid_1101
mid_1110d_ei
mid_1110e
mid_1510d_ei
mid_1510e
mid_1514f_fio
mid_t170_fio
mid_3003a_fio
mid_3004a_fio
mid_t700
mid_t701
ccw_0015a
ccw_0001b_fio
ccw_1000a_ei
ccw_1000b
ccw_1010a_ei
ccw_1010b
ccw_1011_ei
ccw_1011a
ccw_1102
ccw_1111_ei
ccw_1111a
ccw_1114_ei
ccw_1114a
ccw_1710a_ei
ccw_1710b
ccw_1711_ei
ccw_1711a
ccw_3000a
ccw_3200_fio
ccw_3201_fio
pon_0015d
pon_0001d_fio
43_16_n_2200
43_16_t_2200
43_21_2011
43_21_2012
43_21_2201
43_21_a_2200
43_21_a_2201
43_21_d_2200
43_21_s_2200
43_21_s_2205
43_21_t_2200
43_21_x_2200
43_21_x_2200
41_6000c
41_6001c
41_6010d
41_6018e
41_6074a
41_6075b
41_6087a
41_6088a
41_6153
41_6168
bpt_gs_1002
bpt_gs_1003
bpt_gs_1004
bpt_sd_1002
bpt_sd_1003
bpt_sd_1004
cci_mid_1001
cci_mid_1002
cci_mid_1003
cci_mid_1004
cci_mid_4114b
cci_mid_4115b
cci_mid_4116b
cci_mid_4117b
cci_mid_4118b
cci_mid_4119b
cci_mid_4120b
cci_mid_4121b
cci_mid_4122b
cci_mid_4123b
cci_mid_4124b
cci_mid_4125b
cci_mid_4126b
cci_mid_4127b
cci_mid_4128b
cci_mid_4129b
cci_mid_4130b
cci_mid_4131b
gs_sd.min_pon_opgw_project_03-20-14_part2.pdf
cci_mid_4132b
cci_mid_4133b
cci_mid_4134b
cci_mid_4135b
cci_mid_4136b
cci_mid_4137b
cci_mid_4138b
cci_mid_4139b
cci_mid_4140b
cci_mid_4141b
cci_mid_4142b
cci_mid_4143b
cci_mid_4144b
cci_mid_4145b
cci_mid_4146b
cci_mid_4147b
cci_mid_4148b
cci_mid_4149b
cci_mid_4150b
cci_mid_4151b
cci_mid_4152b
cci_mid_4153b
cci_mid_4154b
cci_mid_4155b
cci_mid_4156b
cci_mid_4157b
cci_mid_4158b
cci_mid_4159a
cci_mid_4160b
cci_mid_4161b
cci_mid_4162b
cci_mid_4163b
cci_mid_4164b
gs_sd.min_pon_opgw_project_03-20-14_part3.pdf
cci_mid_4165b
cci_mid_4166b
cci_mid_4167b
cci_mid_4168b
cci_mid_4169b
cci_mid_4170b
cci_mid_4171b
cci_mid_4172b
cci_mid_4173c
cci_mid_4174b
cci_mid_4175b
cci_mid_4176b
cci_mid_4177b
cci_mid_4178b
cci_mid_4179b
cci_mid_4180b
cci_mid_4181b
cci_mid_4182b
cci_mid_4183b
cci_mid_4184b
cci_mid_4185b
cci_mid_4186b
cci_mid_4187b
cci_mid_4188b
cci_mid_4189b
cci_mid_4190b
cci_mid_4191b
cci_mid_4192b
cci_mid_4193b
cci_mid_4194b
cci_mid_4195b
cci_mid_4196b
gs_sd.min_pon_opgw_project_03-20-14_part4.pdf
cci_mid_4197b
cci_mid_4198b
cci_mid_4199b
cci_mid_4200b
cci_mid_4201b
cci_mid_4202b
cci_mid_4203b
cci_mid_4204b
cci_mid_4205b
cci_mid_4206b
cci_mid_4207b
cci_mid_4208b
cci_mid_4209b
cci_mid_4210b
cci_mid_4211b
cci_mid_4212b
cci_mid_4213b
cci_mid_4214b
cci_mid_4215b
bpt_gs_4000b
bpt_gs_4001b
bpt_gs_4002b
bpt_gs_4003a
bpt_gs_4004b
bpt_gs_4005a
bpt_gs_4006b
gs_sd.min_pon_opgw_project_03-20-14_part5.pdf
bpt_gs_4007a
bpt_gs_4008a
bpt_gs_4009b
bpt_gs_4010b
bpt_gs_4011a
bpt_gs_4012b
bpt_gs_4013b
bpt_gs_4014b
bpt_gs_4015b
bpt_gs_4016b
bpt_gs_4017a
bpt_sd_4000a
bpt_sd_4001b
bpt_sd_4002b
bpt_sd_4003b
bpt_sd_4004b
bpt_sd_4005b
bpt_sd_4006b
bpt_sd_4007b
bpt_sd_4008b
bpt_sd_4009b
bpt_sd_4010a
bpt_sd_4011b
bpt_sd_4012b
bpt_sd_4013b
bpt_sd_4014b
gs_sd.min_pon_opgw_project_03-20-14_part6.pdf
bpt_sd_4015b
bpt_sd_4016a
bpt_sd_4017b
bpt_sd_4018b
srh_review_dwgs_12_1_14.pdf
Cover Page
Drawing List
srh_0016
srh_0015
srh_2300
shr_2600
srh_2601
srh_2602
srh_2603
srh_2925
srh_2900
41_6010d_ei
srh_1000
frc_wan_0001_ei
frc_wan_4013b_ei
frc_wan_4013c
frc_wan_1004
srh_final_01_07_15.pdf
srh_0016
srh_0015
srh_2300
srh_2600
srh_2601
srh_2602
srh_2603
srh_2925
srh_2900
41_6010d_ei
41_6010d
srh_1000
frc_wan_0001_ei
frc_wan_0001
frc_wan_4013b_ei
frc_wan_4013c
frc_wan_1004
Sheridan Hill Tap Drawing List.pdf
A. GENERAL:
B. LIST OF DRAWINGS:
Following is a partial list of standard drawings that will be needed for this specification. The standard drawings are available at http://www.wapa.gov/business/buys.htm
wtf_review_1_14_15.pdf
Drawing List
wtf_0018a
wtf_0010a
wtf_0001d_ei
wtf_0001e
wtf_1000b_ei
wtf_T900_fio
wtf_1000c
wtf_1010c_ei
wtf_1010d
wtf_1011
wtf_1100_ei
wtf_1100a
wtf_1110c_ei
wtf_T901_fio
wtf_1110d
wtf_1111a_ei
wtf_1111b
wtf_1112b_ei
wtf_1112c
wtf_1500b_ei
wtf_1500c
wtf_1510b_ei
wtf_1510c
wtf_1511
wtf_1600b_ei
wtf_1600c
wtf_1601d_ei
wtf_1601e
wtf_1602a_fio
wtf_1700
wtf_1710
wtf_1711
wtf_t600
wtf_2004e
wtf_2000d_ei
wtf_2028
wtf_2029
wtf_2030
wtf_2003b_ei
wtf_2003c
wtf_2005a
wtf_2006b_ei
wtf_2006c
wtf_2007a_ei
wtf_2007b
wtf_2008d
wtf_2010a
wtf_2300
wtf_2301
wtf_2018_fio
wtf_2550
wtf_2925
wtf_4501b_fio
wtf_8000 thru wtf_8004
wtf_project_dwgs_final_4_3_15.pdf
Drawing Cover
Drawing List
wtf_0018a
wtf_0010a
wtf_0001d_ei
wtf_0001e
wtf_1000b_ei
wtf_t900_fio
wtf_1000c
wtf_1010c_ei
wtf_1010d
wtf_1011
wtf_1100_ei
wtf_1100a
wtf_1110c_ei
wtf_t901_fio
wtf_1110d
wtf_1111a_ei
wtf_1111b
wtf_1112b_ei
wtf_1112c
wtf_1500b_ei
wtf_1500c
wtf_1510b_ei
wtf_1510c
wtf_1511
wtf_1600b_ei
wtf_1600c
wtf_1601d_ei
wtf_1601e
wtf_1602a_fio
wtf_1700
wtf_1710
wtf_1711
wtf_t600
wtf_2004e
wtf_2000d_ei
wtf_2028
wtf_2029
wtf_2030
wtf_2003b_ei
wtf_2003c
wtf_2005a
wtf_2006b_ei
wtf_2006c
wtf_2007a_ei
wtf_2007b
wtf_2008d
wtf_2010a
wtf_2300
wtf_2301
wtf_2018_fio
wtf_2550
wtf_2925
wtf_4501b_fio
wtf_8000
wtf_8001
wtf_8002
wtf_8003
wtf_8004
pd.05_project_dwgs_18_MAY_2015.pdf
Cover Page
Drawing List
pd_0015b
pd_0001f_ei
pd_0001g
pd_0010c_ei
pd_0010d
pd_1000a_ei
pd_1000b
pd_1001b_ei
pd_1001c
pd_1002b_ei
pd_1003c_ei
pd_1004c_ei
pd_1005b_ei
pd_1006b_ei
pd_1007c_ei
pd_1100
pd_1110
pd_1112
pd_1113
pd_1114
pd_1116
pd_1500
pd_1510
pd_1511
pd_1600
pd_1710
pd_1711
pd_6021b_ei
pd_6021c
pd_2000a
pd_2008b_ei
pd_2008c
pd_2001c_ei
pd_2001d
pd_2004b
pd_2007a
pd_2028_ei
pd_2028a
pd_2029_ei
pd_2029a
pd_2030a
pd_2300
pd_2301
pd_2302
pd_2303
pd_2550
pd_2014a_fio
pd_2016a_fio
pd_2018a_fio
pd_2600
pd_2601
pd_2602
pd_4004c
pd_t600
pd_8000
pd_8001
05._mb_project_dwgs_4_28_15.pdf
Cover Page
Drawing List
mb_0015
mb_1000g_ei
mb_1000h
mb_1500d_ei
mb_1500e
mb_0016
mb_2002b_ei
mb_2002c
mb_2003b
mb_2050_ei
mb_2050a
mb_2051_ei
mb_2051a
mb_2052
mb_2053
mb_2054
mb_3200
mb_3201
mb_3202
mb_3203
mb_3204
mb_3205
mb_3206
mb_3207
mb_3208
mb_3209
mb_3000
mb_3001
mb_3002
mb_3003
mb_3004
mb_3005
mb_3006
mb_3007
mb_3300
mb_3301
mb_3302
mb_3303
mb_3400
mb_3401
mb_3402
mb_3403
mb_3404
mb_3405
mb_t600
mb_4050
mb_6050

File details come from the government source that posted it. Updated .