21._Attachment_B_Drawings.pdf
PDF 6 MB Posted
- Solicitation number
- DE-SOL-000566
About this file
DE-SOL-0008900 - Attachment B Project Drawings
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B Medicine Bow Substation Service Building - Drawings 04/30/2015
DE- SOL-0008900
MEDICINE BOW SUBSTATION - SERVICE BUILDING
WYOMING
SECTION C
DESCRIPTION/SPECIFICATIONS
Spec. No. 844
MEDICINE BOW SUBSTATION
SERVICE BUILDING 2014
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.
Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. MB 0015 – Location and Vicinity Map
ELECTRICAL:
2. MB 1000 Rev. G EI – Electrical Installation General Arrangement Plan View (Existing Installation)
3. MB 1000 Rev. H – Electrical Installation General Arrangement Plan View
4. MB 1500 Rev. D EI – Grounding System (Existing Installation)
5. MB 1500 Rev. E – Grounding System
CIVIL & SITE DRAWINGS:
6. MB 0016 – Topography
7. MB 2002 B EI – Foundation Plan (Existing Installation)
8. MB 2002 C – Foundation Plan
9. MB 2003 Rev. B – Concrete Structures Foundations Outline and Details
10. MB 2050 EI – Site Plan (Existing Installation)
11. MB 2050 A – Site Plan
12. MB 2051 EI – Grading Plan (Existing Installation)
13. MB 2051 A – Grading Plan
14. MB 2052 – Concrete Swales Grading Plan
15. MB 2053 Rev. A – Sections & Details 1 of 2
16. MB 2054 Rev. A – Sections & Details 2 of 2
SERVICE BUILDING:
17. MB 3200 Rev. A – General Structural Notes, Abbreviations, & Reference Drawings
18. MB 3201 Rev. A – Structural Foundation Plan
19. MB 3202 – Structural Roof Framing Plan
20. MB 3203 – Structural Typical Wood-Framed Wall
21. MB 3204 – Structural Equipment Mounting Details
22. MB 3205 Rev. A – Structural Foundation Details
23. MB 3206 – Structural Sections and Details
24. MB 3207 – Structural Sections and Details
25. MB 3208 – Structural Sections and Details
26. MB 3209 – Structural Sections and Details
27. MB 3000 – Architectural Floor Plan
28. MB 3001 – Architectural Reflected Ceiling Plan
29. MB 3002 – Architectural Exterior Elevations
30. MB 3003 – Architectural Building Sections
31. MB 3004 – Architectural Detailed Sections
32. MB 3005 – Architectural Detailed Sections
33. MB 3006 – Architectural Mechanical Equipment Mounting Details
34. MB 3007 – Architectural Doors, Door Details & Door Schedule
35. MB 3300 – Mechanical HVAC Floor Plan
36. MB 3301 – Mechanical Control Room Schedules
37. MB 3302 – Mechanical Battery Room Schedules
MEDICINE BOW SUBSTATION
SERVICE BUILDING 2014
PROJECT DRAWINGS
38. MB 3303 – Mechanical Battery Room Crane Schedule
39. MB 3400 – Electrical Power Plan
40. MB 3401 – Electrical Lighting & Egress Marking Plan
41. MB 3402 – Electrical Door Alarms
42. MB 3403 – Electrical Panelboards DHA, DHB
43. MB 3404 – Electrical Wiring Devices Schematic
44. MB 3405 – Electrical Luminaire & Equipment Schedules
CONTROLS:
45. MB T600 – Control Cable List
46. MB 4050 – Service Building Arrangement, Conduit & Grounding
47. MB 6050 Rev. A – DC Distribution Panel BHA
GEOLOGY:
48. MB 8000 – Site Vicinity and Exploration Location Map Figure 1
49. MB 8001 – Boring Log SB-1
50. MB 8002 – Boring Log SB-2
POINT NOT USED
POINT NOT USED
SB-1
SB-2
Site Vicinity and Exploration Location Map
Medicine Bow Substation Control Building Replacement
Medicine Bow, WY
20155211 4/14/2015 J. Weber
D. Robbins
BoringLocations.mxd
The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the sole risk of the party using or misusing the information.
FIGUREPROJECT NO.
DRAWN:
DRAWN BY:
CHECKED BY:
FILE NAME:www.kleinfelder.com
Legend Soil Boring
0 80 16040 Feet
Project Location
Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
US 287
Proposed Control Building
SB-1
lampman Typewritten Text
MB 8000
Fill Sandy Lean CLAY: fine-grained sand, medium plasticity, brown, moist
Alluvium Clayey SAND (SC): fine-grained, medium plasticity, brown, moist, loose
Lean CLAY (CL): medium plasticity, brown to dark brown, wet, firm to hard
Steele Formation SHALE: low to medium plasticity, tan to brown, moist, very hard, fissured, with white mottling
The boring was terminated at approximately 20.5 ft.
below ground surface. The exploration was backfilled with auger cuttings on March 27, 2015.
Stratigraphic boundary observed within sample at
10.5 feet.
Drilling resistance increases at 15 feet.
12"
8"
12"
5"
5"
CL
CL
CL
11.0
11.9
11.6
110.5
133.0
99 54
94.9
GROUNDWATER LEVEL INFORMATION:
Groundwater was observed at approximately 9 ft. below ground surface during drilling.
Groundwater was observed at approximately 7.5 ft. below ground surface at the end of drilling.
BC=3
BC=4
BC=9
BC=28
50/5"
BC=50/5"
LABORATORY RESULTS
Lithologic Description
PAGE:
FIELD EXPLORATION
BORING LOG SB-1
BORING LOG SB-1
SB-1
Latitude: 41.89751° N Longitude: 106.22096° W
Surface Condition: Bare Earth and Grass
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
Hammer Type - Drop:Not Available CME-55
Alex
Vine Laboratories
140 lb. Auto - 30 in.
-90 degreesPlunge:
Drilling Company:
Drilling Method:
Drilling Equipment:
3/27/2015
4 in. O.D.Sunny, 45 °F Auger Diameter:
JTM
Solid Stem Auger
A dd iti on a l T es ts
R em ar ks
D ep th fe et
G ra p hi ca l L og
R ec ov er y (N
R
N o
R ec ov er y)
U S
C S
S ym bo l
W at er C on te nt
D ry
U ni t W t.
(p cf
P as si ng
P as si ng
Li qu id L im it
P la st ic ity In de x
(N P
N on P la st ic
Medicine Bow Substation Control Building Replacement
Medicine Bow, WY
KLEINFELDER - 1801 California Street, Suite 1100 | Denver, CO 80202 | PH: 303.297.5774 | FAX: 303.237.6602 | www.kleinfelder.com
B lo w C ou nt s( B
C
U nc or r.
B lo w s/ in
BORING
17.2
SB-1 & SB-2 0'-5' Composite Sample
CHECKED BY: DFR
DATE: 4/10/2015
DRAWN BY: JTM
REVISED: -
gI N
T F
IL
E
P
R O
JE
C
T W
IS
E
: 2
.0 a
M ed ic in e B ow .g pj gI N
T T
E M
P
LA
T E
P
R O
JE
C
T W
IS
E
: K
LF
S
T A
N D
A R
D _G
IN
T
_L
IB
R A
R Y
_2
5.
G
LB
[K
LF
_B O
R
IN
G /T
E S
T P
IT
S
O
IL
L O
G
P
LO
T T
E D
/1 6/
:0
A
M B
Y
D R ob bi ns
PROJECT NO.: 20155211
S am pl e
T yp e lampman
MB 8001
Fill Sandy Lean CLAY: fine-grained sand, medium plasticity, brown, moist
Alluvium Clayey SAND (SC): fine-grained, medium plasticity, brown, moist, loose
Lean CLAY (CL): medium plasticity, brown to dark brown, wet, firm to hard
Steele Formation SHALE: low to medium plasticity, tan to brown, moist, very hard, fissured, white mottling
The boring was terminated at approximately 20.5 ft.
below ground surface. The exploration was backfilled with auger cuttings on March 27, 2015.
Drilling resistance increases at 15 feet.
3"
7"
12"
10"
4"
CL
CL 11.2
13.0
16.6
11.4
115.3
99 54
60.5
GROUNDWATER LEVEL INFORMATION:
Groundwater observed at approximately 10 ft. below ground surface during drilling Groundwater was not observed approximately 30 minutes after completion of drilling.
BC=10
BC=3
BC=6
BC=30
50/4"
BC=50/5"
LABORATORY RESULTS
Lithologic Description
PAGE:
FIELD EXPLORATION
BORING LOG SB-2
BORING LOG SB-2
SB-2
Latitude: 41.89756° N Longitude: 106.22084° W
Surface Condition: Bare Earth and Grass
Logged By:
Date Begin - End:
Hor.-Vert. Datum:
Weather:
Drill Crew:
Hammer Type - Drop:Not Available CME-55
Alex
Vine Laboratories
140 lb. Auto - 30 in.
-90 degreesPlunge:
Drilling Company:
Drilling Method:
Drilling Equipment:
3/27/2015
4 in. O.D.Sunny, 45 °F Auger Diameter:
JTM
Solid Stem Auger
A dd iti on a l T es ts
R em ar ks
D ep th fe et
G ra p hi ca l L og
R ec ov er y (N
R
N o
R ec ov er y)
U S
C S
S ym bo l
W at er C on te nt
D ry
U ni t W t.
(p cf
P as si ng
P as si ng
Li qu id L im it
P la st ic ity In de x
(N P
N on P la st ic
Medicine Bow Substation Control Building Replacement
Medicine Bow, WY
KLEINFELDER - 1801 California Street, Suite 1100 | Denver, CO 80202 | PH: 303.297.5774 | FAX: 303.237.6602 | www.kleinfelder.com
B lo w C ou nt s( B
C
U nc or r.
B lo w s/ in
BORING
SB-1 & SB-2 0'-5' Composite Sample
CHECKED BY: DFR
DATE: 4/10/2015
DRAWN BY: JTM
REVISED: -
gI N
T F
IL
E
P
R O
JE
C
T W
IS
E
: 2
.0 a
M ed ic in e B ow .g pj gI N
T T
E M
P
LA
T E
P
R O
JE
C
T W
IS
E
: K
LF
S
T A
N D
A R
D _G
IN
T
_L
IB
R A
R Y
_2
5.
G
LB
[K
LF
_B O
R
IN
G /T
E S
T P
IT
S
O
IL
L O
G
P
LO
T T
E D
/1 6/
:0
A
M B
Y
D R ob bi ns
PROJECT NO.: 20155211
S am pl e
T yp e lampman
MB 8002
| Cover Page |
| Drawing List |
| gs_0015e |
| gs_0001p_fio |
| gs_1001g_ei |
| gs_1001h |
| gs_1014e_ei |
| gs_1014f |
| gs_1101 |
| gs_1114e_ei |
| gs_1114f |
| gs_1500g_ei |
| gs_1500h |
| gs_1718g_ei |
| gs_1718h |
| gs_3017a_fio |
| gs_4050b |
| bpt_0015b |
| bpt_0001e_fio |
| bpt_1001c_ei |
| bpt_1001d |
| bpt_1012b_ei |
| bpt_1012c |
| bpt_1114b_ei |
| bpt_1114c |
| bpt_1130 |
| bpt_1510b_ei |
| bpt_1510c |
| bpt_3000_fio |
| bpt_3001a_fio |
| bpt_4000d |
| sd_0015d |
| sd_0001_1d_fio |
| sd_0010h_ei |
| sd_0010i |
| sd_0011b_ei |
| sd_0011c |
| sd_1700d_ei |
| sd_1700e |
| 41_1029f |
| 41_1031f |
| sd_3000a_fio |
| sd_3002a_fio |
| sd_4006d |
| mid_0015b |
| mid_0001m_fio |
| mid_0010g_ei |
| mid_0010h |
| mid_1010e_ei |
| mid_1010f |
| mid_1101 |
| mid_1110d_ei |
| mid_1110e |
| mid_1510d_ei |
| mid_1510e |
| mid_1514f_fio |
| mid_t170_fio |
| mid_3003a_fio |
| mid_3004a_fio |
| mid_t700 |
| mid_t701 |
| ccw_0015a |
| ccw_0001b_fio |
| ccw_1000a_ei |
| ccw_1000b |
| ccw_1010a_ei |
| ccw_1010b |
| ccw_1011_ei |
| ccw_1011a |
| ccw_1102 |
| ccw_1111_ei |
| ccw_1111a |
| ccw_1114_ei |
| ccw_1114a |
| ccw_1710a_ei |
| ccw_1710b |
| ccw_1711_ei |
| ccw_1711a |
| ccw_3000a |
| ccw_3200_fio |
| ccw_3201_fio |
| pon_0015d |
| pon_0001d_fio |
| 43_16_n_2200 |
| 43_16_t_2200 |
| 43_21_2011 |
| 43_21_2012 |
| 43_21_2201 |
| 43_21_a_2200 |
| 43_21_a_2201 |
| 43_21_d_2200 |
| 43_21_s_2200 |
| 43_21_s_2205 |
| 43_21_t_2200 |
| 43_21_x_2200 |
| 43_21_x_2200 |
| 41_6000c |
| 41_6001c |
| 41_6010d |
| 41_6018e |
| 41_6074a |
| 41_6075b |
| 41_6087a |
| 41_6088a |
| 41_6153 |
| 41_6168 |
| bpt_gs_1002 |
| bpt_gs_1003 |
| bpt_gs_1004 |
| bpt_sd_1002 |
| bpt_sd_1003 |
| bpt_sd_1004 |
| cci_mid_1001 |
| cci_mid_1002 |
| cci_mid_1003 |
| cci_mid_1004 |
| cci_mid_4114b |
| cci_mid_4115b |
| cci_mid_4116b |
| cci_mid_4117b |
| cci_mid_4118b |
| cci_mid_4119b |
| cci_mid_4120b |
| cci_mid_4121b |
| cci_mid_4122b |
| cci_mid_4123b |
| cci_mid_4124b |
| cci_mid_4125b |
| cci_mid_4126b |
| cci_mid_4127b |
| cci_mid_4128b |
| cci_mid_4129b |
| cci_mid_4130b |
| cci_mid_4131b |
| gs_sd.min_pon_opgw_project_03-20-14_part2.pdf |
| cci_mid_4132b |
| cci_mid_4133b |
| cci_mid_4134b |
| cci_mid_4135b |
| cci_mid_4136b |
| cci_mid_4137b |
| cci_mid_4138b |
| cci_mid_4139b |
| cci_mid_4140b |
| cci_mid_4141b |
| cci_mid_4142b |
| cci_mid_4143b |
| cci_mid_4144b |
| cci_mid_4145b |
| cci_mid_4146b |
| cci_mid_4147b |
| cci_mid_4148b |
| cci_mid_4149b |
| cci_mid_4150b |
| cci_mid_4151b |
| cci_mid_4152b |
| cci_mid_4153b |
| cci_mid_4154b |
| cci_mid_4155b |
| cci_mid_4156b |
| cci_mid_4157b |
| cci_mid_4158b |
| cci_mid_4159a |
| cci_mid_4160b |
| cci_mid_4161b |
| cci_mid_4162b |
| cci_mid_4163b |
| cci_mid_4164b |
| gs_sd.min_pon_opgw_project_03-20-14_part3.pdf |
| cci_mid_4165b |
| cci_mid_4166b |
| cci_mid_4167b |
| cci_mid_4168b |
| cci_mid_4169b |
| cci_mid_4170b |
| cci_mid_4171b |
| cci_mid_4172b |
| cci_mid_4173c |
| cci_mid_4174b |
| cci_mid_4175b |
| cci_mid_4176b |
| cci_mid_4177b |
| cci_mid_4178b |
| cci_mid_4179b |
| cci_mid_4180b |
| cci_mid_4181b |
| cci_mid_4182b |
| cci_mid_4183b |
| cci_mid_4184b |
| cci_mid_4185b |
| cci_mid_4186b |
| cci_mid_4187b |
| cci_mid_4188b |
| cci_mid_4189b |
| cci_mid_4190b |
| cci_mid_4191b |
| cci_mid_4192b |
| cci_mid_4193b |
| cci_mid_4194b |
| cci_mid_4195b |
| cci_mid_4196b |
| gs_sd.min_pon_opgw_project_03-20-14_part4.pdf |
| cci_mid_4197b |
| cci_mid_4198b |
| cci_mid_4199b |
| cci_mid_4200b |
| cci_mid_4201b |
| cci_mid_4202b |
| cci_mid_4203b |
| cci_mid_4204b |
| cci_mid_4205b |
| cci_mid_4206b |
| cci_mid_4207b |
| cci_mid_4208b |
| cci_mid_4209b |
| cci_mid_4210b |
| cci_mid_4211b |
| cci_mid_4212b |
| cci_mid_4213b |
| cci_mid_4214b |
| cci_mid_4215b |
| bpt_gs_4000b |
| bpt_gs_4001b |
| bpt_gs_4002b |
| bpt_gs_4003a |
| bpt_gs_4004b |
| bpt_gs_4005a |
| bpt_gs_4006b |
| gs_sd.min_pon_opgw_project_03-20-14_part5.pdf |
| bpt_gs_4007a |
| bpt_gs_4008a |
| bpt_gs_4009b |
| bpt_gs_4010b |
| bpt_gs_4011a |
| bpt_gs_4012b |
| bpt_gs_4013b |
| bpt_gs_4014b |
| bpt_gs_4015b |
| bpt_gs_4016b |
| bpt_gs_4017a |
| bpt_sd_4000a |
| bpt_sd_4001b |
| bpt_sd_4002b |
| bpt_sd_4003b |
| bpt_sd_4004b |
| bpt_sd_4005b |
| bpt_sd_4006b |
| bpt_sd_4007b |
| bpt_sd_4008b |
| bpt_sd_4009b |
| bpt_sd_4010a |
| bpt_sd_4011b |
| bpt_sd_4012b |
| bpt_sd_4013b |
| bpt_sd_4014b |
| gs_sd.min_pon_opgw_project_03-20-14_part6.pdf |
| bpt_sd_4015b |
| bpt_sd_4016a |
| bpt_sd_4017b |
| bpt_sd_4018b |
| srh_review_dwgs_12_1_14.pdf |
| Cover Page |
| Drawing List |
| srh_0016 |
| srh_0015 |
| srh_2300 |
| shr_2600 |
| srh_2601 |
| srh_2602 |
| srh_2603 |
| srh_2925 |
| srh_2900 |
| 41_6010d_ei |
| srh_1000 |
| frc_wan_0001_ei |
| frc_wan_4013b_ei |
| frc_wan_4013c |
| frc_wan_1004 |
| srh_final_01_07_15.pdf |
| srh_0016 |
| srh_0015 |
| srh_2300 |
| srh_2600 |
| srh_2601 |
| srh_2602 |
| srh_2603 |
| srh_2925 |
| srh_2900 |
| 41_6010d_ei |
| 41_6010d |
| srh_1000 |
| frc_wan_0001_ei |
| frc_wan_0001 |
| frc_wan_4013b_ei |
| frc_wan_4013c |
| frc_wan_1004 |
| Sheridan Hill Tap Drawing List.pdf |
| A. GENERAL: |
| B. LIST OF DRAWINGS: |
| Following is a partial list of standard drawings that will be needed for this specification. The standard drawings are available at http://www.wapa.gov/business/buys.htm |
| wtf_review_1_14_15.pdf |
| Drawing List |
| wtf_0018a |
| wtf_0010a |
| wtf_0001d_ei |
| wtf_0001e |
| wtf_1000b_ei |
| wtf_T900_fio |
| wtf_1000c |
| wtf_1010c_ei |
| wtf_1010d |
| wtf_1011 |
| wtf_1100_ei |
| wtf_1100a |
| wtf_1110c_ei |
| wtf_T901_fio |
| wtf_1110d |
| wtf_1111a_ei |
| wtf_1111b |
| wtf_1112b_ei |
| wtf_1112c |
| wtf_1500b_ei |
| wtf_1500c |
| wtf_1510b_ei |
| wtf_1510c |
| wtf_1511 |
| wtf_1600b_ei |
| wtf_1600c |
| wtf_1601d_ei |
| wtf_1601e |
| wtf_1602a_fio |
| wtf_1700 |
| wtf_1710 |
| wtf_1711 |
| wtf_t600 |
| wtf_2004e |
| wtf_2000d_ei |
| wtf_2028 |
| wtf_2029 |
| wtf_2030 |
| wtf_2003b_ei |
| wtf_2003c |
| wtf_2005a |
| wtf_2006b_ei |
| wtf_2006c |
| wtf_2007a_ei |
| wtf_2007b |
| wtf_2008d |
| wtf_2010a |
| wtf_2300 |
| wtf_2301 |
| wtf_2018_fio |
| wtf_2550 |
| wtf_2925 |
| wtf_4501b_fio |
| wtf_8000 thru wtf_8004 |
| wtf_project_dwgs_final_4_3_15.pdf |
| Drawing Cover |
| Drawing List |
| wtf_0018a |
| wtf_0010a |
| wtf_0001d_ei |
| wtf_0001e |
| wtf_1000b_ei |
| wtf_t900_fio |
| wtf_1000c |
| wtf_1010c_ei |
| wtf_1010d |
| wtf_1011 |
| wtf_1100_ei |
| wtf_1100a |
| wtf_1110c_ei |
| wtf_t901_fio |
| wtf_1110d |
| wtf_1111a_ei |
| wtf_1111b |
| wtf_1112b_ei |
| wtf_1112c |
| wtf_1500b_ei |
| wtf_1500c |
| wtf_1510b_ei |
| wtf_1510c |
| wtf_1511 |
| wtf_1600b_ei |
| wtf_1600c |
| wtf_1601d_ei |
| wtf_1601e |
| wtf_1602a_fio |
| wtf_1700 |
| wtf_1710 |
| wtf_1711 |
| wtf_t600 |
| wtf_2004e |
| wtf_2000d_ei |
| wtf_2028 |
| wtf_2029 |
| wtf_2030 |
| wtf_2003b_ei |
| wtf_2003c |
| wtf_2005a |
| wtf_2006b_ei |
| wtf_2006c |
| wtf_2007a_ei |
| wtf_2007b |
| wtf_2008d |
| wtf_2010a |
| wtf_2300 |
| wtf_2301 |
| wtf_2018_fio |
| wtf_2550 |
| wtf_2925 |
| wtf_4501b_fio |
| wtf_8000 |
| wtf_8001 |
| wtf_8002 |
| wtf_8003 |
| wtf_8004 |
| pd.05_project_dwgs_18_MAY_2015.pdf |
| Cover Page |
| Drawing List |
| pd_0015b |
| pd_0001f_ei |
| pd_0001g |
| pd_0010c_ei |
| pd_0010d |
| pd_1000a_ei |
| pd_1000b |
| pd_1001b_ei |
| pd_1001c |
| pd_1002b_ei |
| pd_1003c_ei |
| pd_1004c_ei |
| pd_1005b_ei |
| pd_1006b_ei |
| pd_1007c_ei |
| pd_1100 |
| pd_1110 |
| pd_1112 |
| pd_1113 |
| pd_1114 |
| pd_1116 |
| pd_1500 |
| pd_1510 |
| pd_1511 |
| pd_1600 |
| pd_1710 |
| pd_1711 |
| pd_6021b_ei |
| pd_6021c |
| pd_2000a |
| pd_2008b_ei |
| pd_2008c |
| pd_2001c_ei |
| pd_2001d |
| pd_2004b |
| pd_2007a |
| pd_2028_ei |
| pd_2028a |
| pd_2029_ei |
| pd_2029a |
| pd_2030a |
| pd_2300 |
| pd_2301 |
| pd_2302 |
| pd_2303 |
| pd_2550 |
| pd_2014a_fio |
| pd_2016a_fio |
| pd_2018a_fio |
| pd_2600 |
| pd_2601 |
| pd_2602 |
| pd_4004c |
| pd_t600 |
| pd_8000 |
| pd_8001 |
| 05._mb_project_dwgs_4_28_15.pdf |
| Cover Page |
| Drawing List |
| mb_0015 |
| mb_1000g_ei |
| mb_1000h |
| mb_1500d_ei |
| mb_1500e |
| mb_0016 |
| mb_2002b_ei |
| mb_2002c |
| mb_2003b |
| mb_2050_ei |
| mb_2050a |
| mb_2051_ei |
| mb_2051a |
| mb_2052 |
| mb_2053 |
| mb_2054 |
| mb_3200 |
| mb_3201 |
| mb_3202 |
| mb_3203 |
| mb_3204 |
| mb_3205 |
| mb_3206 |
| mb_3207 |
| mb_3208 |
| mb_3209 |
| mb_3000 |
| mb_3001 |
| mb_3002 |
| mb_3003 |
| mb_3004 |
| mb_3005 |
| mb_3006 |
| mb_3007 |
| mb_3300 |
| mb_3301 |
| mb_3302 |
| mb_3303 |
| mb_3400 |
| mb_3401 |
| mb_3402 |
| mb_3403 |
| mb_3404 |
| mb_3405 |
| mb_t600 |
| mb_4050 |
| mb_6050 |
File details come from the government source that posted it. Updated .