Amendment 001.pdf

PDF 132 KB Posted

Attached to
Communication Towers, Buildings, and Site Work, Various Locations, MT, NE, ND and SD
Solicitation number
DE-SOL-0004349
Issued by

About this file

Amendment No. 001

View the file

Other files

File Type Posted
Project Drawings.pdf PDF
Contract Clauses Bid Schedule.pdf PDF
Project Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

DE-SOL-0004349 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO 5. PROJECT NO. (If applicable)

001 August 28, 2012 N/A 65-12WC98883-628

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

U.S. DEPARTMENT OF ENERGY

Western Area Power Administration 200 4

TH

ST SW

Huron, SD 57350-2474

Jonathan D. Dittmer

(605) 353-2640

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (√√√√) 9A. AMENDMENT OF SOLICITATION NO.

ALL PROSPECTIVE BIDDERS X

DE-SOL-0004349

9B. DATED (SEE ITEM 11)

August 2, 2012

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OFO YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO : (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Communication Towers, Buildings, & Sitework, Various Locations, MT, NE, ND, SD

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

Communication Tower, Buildings & Sitework, Solicitation No. DE-SOL-0004349

Various Locations, MT, NE, ND, SD Amendment No. 001, page 2 of 2

The purpose of this amendment is to incorporate necessary changes in the solicitation prior to receipt of bids as follows:

1. The date and time set for receipt of bids remains unchanged at September 5, 2012, 2:00 PM local time at place of bid opening.

2. In Section C, Description/Specifications, Project Specifications, ensure the following changes are made:

- Replace Division 14 Paragraph D.2.c ANTENNA SYSTEM REMOVALS AT MONTANA SITES:

With: ANTENNA SYSTEM REMOVAL AT MONTANA SITES: For antenna systems that are being removed in Montana, all waveguide ladders, antenna pipes, and pipe mounts shall be left in place. The components to be removed include antennas, side struts, waveguide/coaxial cable, clips, hangers, grounding systems, and other associated hardware. All materials removed become the property of the contractor.

- Replace Division 14 Paragraph D.2.d ANTENNA SYSTEM REMOVALS AT NORTH DAKOTA

SITES:

With: ANTENNA SYSTEM REMOVAL AT NORTH DAKOTA SITES: For all antenna systems that are being removed or replaced in North Dakota, the following antenna system components shall be removed: antennas, side struts, waveguide/coaxial cable, clips, hangers, grounding systems, and all other associated hardware, except the waveguide ladder. Antenna pipe mounts will be re-used where indicated. All antenna mounting materials (face brackets and pipe mounts) removed that are not to be reused become the property of Western and shall be delivered to the

Bismarck O&M facility. All other components removed become the property of the contractor.

3. The Heavy wage rates for the Montana Wage Decisions have been revised. In Section J, List of

Attachments, Item C, change the Wage Determination Decision numbers to read as follows:

Decision Number: MT120070, Modification No. 3 (08/17/2012) Heavy

Decision Number: MT120075, Modification No. 4 (08/10/2012) Heavy

Decision Number: MT120077, Modification No. 4 (08/17/2012) Heavy

Decision Number: MT120078, Modification No. 9 (08/17/2012) Heavy

The following pages behind Attachment C are deleted and the attached revised pages are substituted therefor:

Remove Decision Nos: Insert revised Decision Nos

No. MT120070, Mod No. 2 No. MT120070, Mod No. 3

No. MT120075, Mod No. 3 No. MT120075, Mod No. 4

No. MT120077, Mod No. 2 No. MT120077, Mod No. 4

No. MT120078, Mod No. 7 No. MT120078, Mod No. 9

4. If you have given your copy of the specifications to someone else, please forward this amendment also.

General Decision Number: MT120070 08/17/2012 MT70

Superseded General Decision Number: MT20100080

State: Montana

Construction Type: Heavy

County: Custer County in Montana.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 01/06/2012

1 02/03/2012

2 03/02/2012

3 08/17/2012

* ELEC0532-012 06/01/2012

Rates Fringes

ELECTRICIAN......................$ 30.33 11.92

ENGI0400-013 07/29/2011

POWER EQUIPMENT OPERATOR:

(Zone 1)

(1) A-frame truck Crane, oiler (except crane).$ 23.47 10.40

(2) Crane

Oiler,Bulldozer, Roller

(Dirt and Grade

Compaction), Backhoe........$ 23.94 10.40

(3) Mechanic................$ 24.34 10.40

(4) Cranes, 25 tons - 44 tons........................$ 25.00 10.40

(5) Cranes, 45 tons to and incl. 74 tons...............$ 25.50 10.40

(6) Cranes, 75 tons to and incl. 149 tons; Cranes, Whirley (All)...............$ 26.60 10.40

(7) Cranes, 150 tons to including 250 tons (add

$1.00 for every 100 tons over

250 tons); Crane, Stiff-

Leg or

Derrick; Helicopter

Hoist; Crane, Tower (all)...$ 27.10 10.40

ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:

The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT70.dvb?v=3

Amendment 001 Solic. DE-SOL-0004349

House of the following listed towns to the center of the job:

BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL,

MISSOULA

Zone 1: 0 to 30 miles - Base Pay

Zone 2: 30 to 60 miles - Base Pay + $3.50

Zone 3: Over 60 miles - Base Pay + $5.50

IRON0732-018 06/01/2011

IRONWORKER: Reinforcing and

Structural.......................$ 25.75 18.38

* SUMT2011-045 02/08/2011

CARPENTER (Form Work Only).......$ 24.30 7.80

CARPENTER, Excludes Form Work....$ 21.13 7.00

LABORER: Common or General......$ 17.99 5.90

LABORER: Pipelayer..............$ 21.10 5.28

LABORER: Landscape and

Irrigation.......................$ 15.14 1.30

OPERATOR: Bobcat/Skid

Steer/Skid Loader................$ 20.97 8.05

OPERATOR: Excavator.............$ 23.05 8.05

OPERATOR: Grader/Blade..........$ 25.44 8.45

OPERATOR: Loader (Front End)....$ 23.02 8.05

OPERATOR: Scraper...............$ 23.00 6.76

TRUCK DRIVER: Dump Truck........$ 19.99 5.09

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT70.dvb?v=3

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be

July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT70.dvb?v=3

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT70.dvb?v=3

General Decision Number: MT120077 08/17/2012 MT77

Superseded General Decision Number: MT20100087

Counties: Big Horn, Carter, Daniels, Dawson, Fallon, Garfield, McCone, Phillips, Powder River, Prairie, Richland, Roosevelt, Rosebud, Sheridan, Treasure and Wibaux Counties in

Montana.

1 02/03/2012

2 03/02/2012

3 08/10/2012

4 08/17/2012

ELEC0233-021 06/01/2012

PHILLIPS COUNTY

ELECTRICIAN......................$ 28.61 4.25%+9.70

* ELEC0532-013 06/01/2012

BIG HORN, CARTER, DANIELS, DAWSON, FALLON, GARFIELD, MCCONE,

POWDER RIVER, PRAIRIE, RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN,

TREASURE, AND WILBAUX COUNTIES

ENGI0400-010 07/29/2011

oiler (except crane)..$ 23.47 10.40

Oiler,Bulldozer, Roller

(Dirt and Grade

Compaction), Backhoe........$ 23.94 10.40

(3) Mechanic................$ 24.34 10.40

(4) Cranes, 25 tons - 44 tons........................$ 25.00 10.40

(5) Cranes, 45 tons to and incl. 74 tons...............$ 25.50 10.40

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT77.dvb?v=4

(6) Cranes, 75 tons to and incl. 149 tons; Cranes, Whirley (All)...............$ 26.60 10.40

(7) Cranes, 150 tons to determined by measuring the road miles over the shortest practical maintained route from the nearest County Court

Zone 3: Over 60 miles - Base Pay + $5.50

SUMT2011-052 02/08/2011

LABORER: Pipelayer..............$ 21.10 5.46

Steer/Skid Loader................$ 23.53 8.05

OPERATOR: Excavator.............$ 23.62 8.05

OPERATOR: Loader (Front End)....$ 24.58 8.05

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT77.dvb?v=4 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT77.dvb?v=4

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT77.dvb?v=4

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT77.dvb?v=4

General Decision Number: MT120075 08/10/2012 MT75

Superseded General Decision Number: MT20100085

County: Valley County in Montana.

1 01/27/2012

2 02/03/2012

3 03/02/2012

4 08/10/2012

* ELEC0233-019 06/01/2012

ENGI0400-013 07/29/2011

oiler (except crane).$ 23.47 10.40

Oiler,Bulldozer, Roller

(Dirt and Grade

Compaction), Backhoe........$ 23.94 10.40

(3) Mechanic................$ 24.34 10.40

(4) Cranes, 25 tons - 44 tons........................$ 25.00 10.40

(5) Cranes, 45 tons to and incl. 74 tons...............$ 25.50 10.40

(6) Cranes, 75 tons to and incl. 149 tons; Cranes, Whirley (All)...............$ 26.60 10.40

(7) Cranes, 150 tons to determined by measuring the road miles over the shortest

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT75.dvb?v=4 practical maintained route from the nearest County Court

Zone 3: Over 60 miles - Base Pay + $5.50

* SUMT2011-050 02/08/2011

LABORER: Pipelayer..............$ 21.10 5.46

OPERATOR: Excavator.............$ 23.62 8.05

OPERATOR: Loader (Front End)....$ 24.58 8.05

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT75.dvb?v=4 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates

* a Wage and Hour Division letter setting forth a position on

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT75.dvb?v=4

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT75.dvb?v=4

General Decision Number: MT120078 08/17/2012 MT78

Superseded General Decision Number: MT20100088

Counties: Blaine, Chouteau, Fergus, Glacier, Golden Valley, Hill, Judith Basin, Liberty, Musselshell, Petroleum, Pondera, Sweet Grass, Teton and Wheatland Counties in Montana.

1 02/03/2012

2 02/10/2012

3 03/02/2012

4 04/06/2012

5 05/18/2012

6 06/01/2012

7 07/06/2012

8 08/10/2012

9 08/17/2012

ELEC0044-002 06/01/2012

LINE CONSTRUCTION

(1) Lineman.................$ 39.45 4.75%+11.51

(3) Groundman...............$ 23.59 4.75%+10.47

ELEC0233-022 06/01/2012

BLAINE, CHOUTEAU, FERGUS, GLACIER, JUDITH BASIN, LIBERTY,

PETROLEUM, PONDERA,WHEATLAND, HILL, AND TETON COUNTIES

* ELEC0532-014 06/01/2012

GOLDEN VALLEY AND MUSSLESHELL COUNTIES

* ELEC0532-017 06/01/2012

SWEET GRASS COUNTY

ELECTRICIAN......................$ 27.53 10.96

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT78.dvb?v=9

ENGI0400-011 07/29/2011

oiler (except crane)......$ 23.47 10.40

Oiler,Bulldozer, Roller

(Dirt and Grade

Compaction), Excavator......$ 23.94 10.40

(3) Mechanic, Scraper.......$ 24.34 10.40

(4) Cranes, 25 tons - 44 tons........................$ 25.00 10.40

(5) Cranes, 45 tons to and incl. 74 tons...............$ 25.50 10.40

(6) Cranes, 75 tons to and incl. 149 tons; Cranes, Whirley (All)...............$ 26.60 10.40

(7) Cranes, 150 tons to determined by measuring the road miles over the shortest practical maintained route from the nearest County Court

Zone 3: Over 60 miles - Base Pay + $5.50

IRON0014-017 01/01/2012

GLACIER COUNTY

Structural.......................$ 25.65 19.28

IRON0732-019 06/01/2011

BLAINE, CHOUTEAU, FERGUS, GOLDEN VALLEY, HILL, JUDITH BASIN,

LIBERTY, MUSSELSHELL, PETROLEUM, PONDERA, SWEET GRASS, TETON,

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT78.dvb?v=9

AND WHEATLAND COUNTIES

SUMT2011-053 02/08/2011

LABORER: Pipelayer..............$ 18.13 5.90

OPERATOR: Backhoe...............$ 25.71 8.05

OPERATOR: Loader (Front End)....$ 25.01 7.78

* TEAM0190-002 05/01/2012

TRUCK DRIVER

(2) Dump Truck

ZONE A.....................$ 25.69 7.26

ZONE B (30-60 miles from County Courthouse of listed cities*): Add $3.05 per hour to ZONE A rates

ZONE C (over 60 miles from County COurthouse of listed cities*): Add $4.85 per hour to ZONE A rates.

*Zone pay will be calculated from the city center of the following listed cities:

BILLINGS

BOZEMAN

BUTTE

GREAT FALLS

HELENA

KALISPELL

8/27/2012http://www.wdol.gov/wdol/scafiles/davisbacon/MT78.dvb?v=9 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates

* a Wage and Hour Division letter setting forth a position on

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial

U.S. Department of Labor

File details come from the government source that posted it. Updated .